{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "va/leesburg",
    "label": "Leesburg, Virginia"
  },
  "records": [
    {
      "id": "jk-land-cross-mill-center-leesburg-va",
      "state": "va",
      "kind": "facility",
      "name": "Cross Mill Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Loudoun"
      ],
      "city": "Leesburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/",
          "host": "pecva.org",
          "date": "2026-07-02",
          "published": "2026-07-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.08237,
        "lng": -77.68283,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Piedmont Environmental Council discusses Cross Mill's rezoning and Quantum Park's future Loudoun decision while advocating a pause.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/",
              "host": "pecva.org",
              "date": "2026-07-02",
              "published": "2026-07-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Leesburg · Loudoun · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51107"
      }
    },
    {
      "id": "jk-land-greenlin-park-leesburg-va",
      "state": "va",
      "kind": "facility",
      "name": "Greenlin Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Loudoun"
      ],
      "city": "Leesburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus. 300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html",
          "host": "loudounnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.06203,
        "lng": -77.59075,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json",
          "scope": "Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.",
          "fields": {},
          "notes": [
            "LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus.",
            "300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred.",
            "Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."
          ],
          "sources": [
            {
              "url": "https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html",
              "host": "loudounnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Leesburg · Loudoun · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51107"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
