  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "va/louisa",
    "label": "Louisa, Virginia"
  },
  "records": [
    {
      "id": "aws-lake-anna-technology-campus-louisa-va",
      "state": "va",
      "kind": "facility",
      "name": "Lake Anna Technology Campus (LATC)",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Louisa"
      ],
      "city": "Louisa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-18",
          "The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.louisacounty.gov/3258/Data-Centers",
          "host": "louisacounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.louisacounty.gov/m/faq?cat=40",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.louisacounty.gov/Blog.aspx?IID=59",
          "host": "www.louisacounty.gov",
          "published": "2026-06-18",
          "date": "2026-06-18",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 37.979,
        "lng": -77.96292,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.louisacounty.gov/3258/Data-Centers",
              "host": "louisacounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Louisa County identifies Lake Anna separately from North Creek. Its June 18, 2026 water update says initial construction WILL temporarily rely on groundwater; that future arrangement does not establish an observed construction start. The June 2025 guide’s general campus wording is not a current individual phase report. Reservoir delivery forecast for early 2027 is prospective, and reservoir safe yield is not AWS consumption. Current stage remains unresolved."
            }
          },
          "notes": [
            "Louisa County identifies Lake Anna separately from North Creek. Its June 18, 2026 water update says initial construction WILL temporarily rely on groundwater; that future arrangement does not establish an observed construction start. The June 2025 guide’s general campus wording is not a current individual phase report. Reservoir delivery forecast for early 2027 is prospective, and reservoir safe yield is not AWS consumption. Current stage remains unresolved."
          ],
          "sources": [
            {
              "url": "https://www.louisacounty.gov/3258/Data-Centers",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.louisacounty.gov/m/faq?cat=40",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.louisacounty.gov/Blog.aspx?IID=59",
              "host": "www.louisacounty.gov",
              "published": "2026-06-18",
              "date": "2026-06-18",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 49",
          "scope": "The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_reported_vertical_construction",
              "scope": "The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified."
            },
            "source_read_scope": {
              "budget_selected_pdf_pages": [
                1,
                88
              ],
              "annual_selected_text_pages": [
                10,
                28
              ],
              "entire_financial_reports_not_reviewed": true
            }
          },
          "notes": [
            "The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.louisacounty.gov/Blog.aspx?IID=59",
              "host": "www.louisacounty.gov",
              "published": "2026-06-18",
              "date": "2026-06-18",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Louisa · Louisa · Source context reviewed",
      "typed_water_facts": [
        {
          "measure": "supply_source",
          "value": "Future initial-phase groundwater, followed by planned reservoir supply",
          "unit": null,
          "basis": "operator_reported_statement",
          "as_of": "2026-06-18",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-17",
          "scope": "County-reported FUTURE initial-construction water arrangement and early-2027 reservoir forecast. It does not establish an observed construction start, delivered reservoir water, a withdrawal quantity or actual consumption.",
          "sources": [
            "https://www.louisacounty.gov/Blog.aspx?IID=59"
          ]
        }
      ],
      "status_scope": "The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.",
      "event_evidence": [
        {
          "date": "2026-06-18",
          "text": "The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.louisacounty.gov/Blog.aspx?IID=59",
              "host": "www.louisacounty.gov",
              "published": "2026-06-18",
              "date": "2026-06-18",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51109"
      }
    },
    {
      "id": "aws-north-creek-technology-campus-louisa-va",
      "state": "va",
      "kind": "facility",
      "name": "North Creek Technology Campus (NCTC)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Louisa"
      ],
      "city": "Louisa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.louisacounty.gov/3258/Data-Centers",
          "host": "louisacounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.louisacounty.gov/m/faq?cat=40",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101",
          "host": "www.louisacounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 37.9933,
        "lng": -77.97852,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.louisacounty.gov/3258/Data-Centers",
              "host": "louisacounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Louisa County identifies North Creek, formerly JCM, separately from Lake Anna, formerly REB. The guide’s June 2025 campus context, plural references to contractor work and older FAQ forecasts do not establish North Creek’s current building phase. Shared future water service is not evidence of construction or commissioning. No exact day is invented for the guide’s month-only date. Current stage remains unresolved."
            }
          },
          "notes": [
            "Louisa County identifies North Creek, formerly JCM, separately from Lake Anna, formerly REB. The guide’s June 2025 campus context, plural references to contractor work and older FAQ forecasts do not establish North Creek’s current building phase. Shared future water service is not evidence of construction or commissioning. No exact day is invented for the guide’s month-only date. Current stage remains unresolved."
          ],
          "sources": [
            {
              "url": "https://www.louisacounty.gov/m/faq?cat=40",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 49",
          "scope": "The County FY2027 budget and earlier December 12, 2025 transmittal report describe North Creek site preparation starting in spring 2025. Neither selected passage establishes exact current vertical construction, all phase readiness or computing operation. Lake Anna vertical construction is a separate named campus and is not transferred to North Creek. A season is not converted to an invented exact start date.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "reported_site_preparation_not_current_vertical_building_stage",
              "scope": "The County FY2027 budget and earlier December 12, 2025 transmittal report describe North Creek site preparation starting in spring 2025. Neither selected passage establishes exact current vertical construction, all phase readiness or computing operation. Lake Anna vertical construction is a separate named campus and is not transferred to North Creek. A season is not converted to an invented exact start date."
            },
            "source_read_scope": {
              "budget_selected_pdf_pages": [
                1,
                88
              ],
              "annual_selected_text_pages": [
                10,
                28
              ],
              "entire_financial_reports_not_reviewed": true
            }
          },
          "notes": [
            "The County FY2027 budget and earlier December 12, 2025 transmittal report describe North Creek site preparation starting in spring 2025. Neither selected passage establishes exact current vertical construction, all phase readiness or computing operation. Lake Anna vertical construction is a separate named campus and is not transferred to North Creek. A season is not converted to an invented exact start date.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101",
              "host": "www.louisacounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Louisa · Louisa · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51109"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}