{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "va/remington",
    "label": "Remington, Virginia"
  },
  "records": [
    {
      "id": "convergent-technology-park-remington-fauquier-va",
      "state": "va",
      "kind": "facility",
      "name": "Convergent Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fauquier"
      ],
      "city": "Remington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Case numbers COMA-24-022504,REZN-24-022505,SPEX-24-022506 are review identifiers, not approvals. Acreage categories in letter do not reconcile arithmetically; preserve printed figures without inferred allocation. Two pages visually inspected. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.pecva.org/wp-content/uploads/convergent-tech-park-acceptance-letter-fauquier-aug-20-2024.pdf",
          "host": "pecva.org",
          "date": "2024-08-20",
          "published": "2024-08-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.75908,
        "lng": -77.83144,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Signed Fauquier staff letter accepts Convergent comprehensive-plan/rezoning/special-exception application as complete for processing.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Case numbers COMA-24-022504,REZN-24-022505,SPEX-24-022506 are review identifiers, not approvals. Acreage categories in letter do not reconcile arithmetically; preserve printed figures without inferred allocation. Two pages visually inspected.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.pecva.org/wp-content/uploads/convergent-tech-park-acceptance-letter-fauquier-aug-20-2024.pdf",
              "host": "pecva.org",
              "date": "2024-08-20",
              "published": "2024-08-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Remington · Fauquier · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51061"
      }
    },
    {
      "id": "pointone-remington-technology-park-fauquier-va",
      "state": "va",
      "kind": "facility",
      "name": "Remington Technology Park",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fauquier"
      ],
      "city": "Remington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-09",
          "PointOne published a Remington Technology Park release on July 9, 2026 reporting a fuel cell equipment yard rezoning amendment and campus construction. This dates the developer publication, not the exact first physical work day, a verified operating power plant or computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html",
          "host": "fauquier.com",
          "date": "2026-02-25",
          "published": "2026-02-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard",
          "host": "www.pointonecorp.com",
          "published": "2026-07-09",
          "date": "2026-07-09",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.pointonecorp.com/locations",
          "host": "www.pointonecorp.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 38.78003,
        "lng": -77.77777,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Fauquier Times' public caption says Remington Technology Park was the one approved campus among five nearby proposals at that historical date.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html",
              "host": "fauquier.com",
              "date": "2026-02-25",
              "published": "2026-02-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 50",
          "scope": "The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_reported_campus_construction",
              "scope": "The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified."
            }
          },
          "notes": [
            "The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard",
              "host": "www.pointonecorp.com",
              "published": "2026-07-09",
              "date": "2026-07-09",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.pointonecorp.com/locations",
              "host": "www.pointonecorp.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Remington · Fauquier · Source context reviewed",
      "status_scope": "The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified.",
      "event_evidence": [
        {
          "date": "2026-07-09",
          "text": "PointOne published a Remington Technology Park release on July 9, 2026 reporting a fuel cell equipment yard rezoning amendment and campus construction. This dates the developer publication, not the exact first physical work day, a verified operating power plant or computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard",
              "host": "www.pointonecorp.com",
              "published": "2026-07-09",
              "date": "2026-07-09",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51061"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
