{
  "schema_version": 1,
  "source_compilation_context": {
    "wa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "wa/east-wenatchee",
    "label": "East Wenatchee, Washington"
  },
  "records": [
    {
      "id": "actapio-east-wenatchee-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Actapio East Wenatchee Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "East Wenatchee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Permit index alone cannot establishcurrentoperation orMW. Backup-generator emissions permits are not IT-capacity authorization. Ecology index specifically linksActapioapproval18AQ-C226forEastWenatchee; this isairpermit identity, notcommissioningproof. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. state permit index with three named source contexts. State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
          "host": "ecology.wa.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 47.73645,
        "lng": -119.69135,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "East Wenatchee",
            "air_approval_order": "18AQ-C226"
          },
          "notes": [
            "Permit index alone cannot establishcurrentoperation orMW.",
            "Backup-generator emissions permits are not IT-capacity authorization.",
            "Ecology index specifically linksActapioapproval18AQ-C226forEastWenatchee; this isairpermit identity, notcommissioningproof.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
              "host": "ecology.wa.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "state permit index with three named source contexts",
          "fields": {
            "actapio_east_wenatchee_listed_approval_order": "18AQ-C226",
            "microsoft_mwh_listed_approval_order": "22AQ-E035",
            "microsoft_mwh_order_date": "2022-09-27",
            "olympia_listed_health_impact_document_date": "2010-09-16"
          },
          "notes": [
            "State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
              "host": "ecology.wa.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 35",
          "scope": "Ecology current index expressly associates approval order 18AQ C226 with Actapio in East Wenatchee, distinct from its Wenatchee listing and other operators. This is air permit identity context for backup generators. A construction notice or health assessment is not current customer compute service, commissioned IT capacity or proof of every building phase. The index says its statewide list is incomplete. Exact present component phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_east_wenatchee_air_permit_identity_not_compute_operation",
              "scope": "Ecology current index expressly associates approval order 18AQ C226 with Actapio in East Wenatchee, distinct from its Wenatchee listing and other operators. This is air permit identity context for backup generators. A construction notice or health assessment is not current customer compute service, commissioned IT capacity or proof of every building phase. The index says its statewide list is incomplete. Exact present component phase remains unclear."
            }
          },
          "notes": [
            "Ecology current index expressly associates approval order 18AQ C226 with Actapio in East Wenatchee, distinct from its Wenatchee listing and other operators. This is air permit identity context for backup generators. A construction notice or health assessment is not current customer compute service, commissioned IT capacity or proof of every building phase. The index says its statewide list is incomplete. Exact present component phase remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Wenatchee · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53017"
      }
    },
    {
      "id": "gigawatt-east-wenatchee-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Giga Watt Mining Facility (former)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "East Wenatchee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Corporate bankruptcy does not prove every building closed or identify today's operator. Liabilities and token proceeds are not facility capex. Securities allegations are not court judgments. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.coindesk.com/markets/2018/11/21/bitcoin-mining-firm-giga-watt-declares-bankruptcy-owing-millions",
          "host": "coindesk.com",
          "date": "2018-11-21",
          "published": "2018-11-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 47.76788,
        "lng": -119.72565,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "CoinDesk reports Giga Watt's 2018 Chapter 11 filing and historical creditor claims.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Corporate bankruptcy does not prove every building closed or identify today's operator. Liabilities and token proceeds are not facility capex. Securities allegations are not court judgments.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.coindesk.com/markets/2018/11/21/bitcoin-mining-firm-giga-watt-declares-bankruptcy-owing-millions",
              "host": "coindesk.com",
              "date": "2018-11-21",
              "published": "2018-11-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Wenatchee · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53017"
      }
    },
    {
      "id": "microsoft-east-wenatchee-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Microsoft East Wenatchee Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "East Wenatchee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. JasonTaylor KPQ December13,2022 original utility-spokesperson interviews distinguish Douglas County PUD TRANSMISSION/DISTRIBUTION from electricity bought from THIRD PARTY. Reported180MW concerns three Microsoft county buildings, not180MWITeach or allhydro fromWellsDam. Agreement January6,2023-December31,2029 asreported, actual executedcontract/commissioning/current amendments unread. One building had grandopening but was about to operate; another underconstruction. Ceremony is not energization.875UrbanIndustrialWay is substation address, not a new exact data-center parcel. Historical delivery tariff charges/kWh/kW demand are delivery components not all-in2026energy price; no unsupported rate sum. Microsoft reportedly paid substation, receipt unread. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/",
          "host": "kpq.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/quincy/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-central-washington/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 47.67091,
        "lng": -119.68559,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "JasonTaylor KPQ December13,2022 original utility-spokesperson interviews distinguish Douglas County PUD TRANSMISSION/DISTRIBUTION from electricity bought from THIRD PARTY. Reported180MW concerns three Microsoft county buildings, not180MWITeach or allhydro fromWellsDam. Agreement January6,2023-December31,2029 asreported, actual executedcontract/commissioning/current amendments unread.",
            "One building had grandopening but was about to operate; another underconstruction. Ceremony is not energization.875UrbanIndustrialWay is substation address, not a new exact data-center parcel. Historical delivery tariff charges/kWh/kW demand are delivery components not all-in2026energy price; no unsupported rate sum. Microsoft reportedly paid substation, receipt unread.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/",
              "host": "kpq.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 15",
          "scope": "Microsoft regional sources distinguish existing East Wenatchee operation from additional East Wenatchee development. One community landing page mentions only the development while its linked explanatory page also mentions existing operation. The inherited record derives from a utility agreement, with no exact facility or phase crosswalk established here. Existing city service and future development are retained as separate contexts, leaving this individual physical stage unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "mixed_existing_and_future_city_context_individual_phase_held",
              "scope": "Microsoft regional sources distinguish existing East Wenatchee operation from additional East Wenatchee development. One community landing page mentions only the development while its linked explanatory page also mentions existing operation. The inherited record derives from a utility agreement, with no exact facility or phase crosswalk established here. Existing city service and future development are retained as separate contexts, leaving this individual physical stage unclear."
            },
            "identity_scope": {
              "regional_existing_operation_claim_retained": true,
              "regional_new_development_claim_retained": true,
              "individual_inherited_record_phase_match_verified": false
            }
          },
          "notes": [
            "Microsoft regional sources distinguish existing East Wenatchee operation from additional East Wenatchee development. One community landing page mentions only the development while its linked explanatory page also mentions existing operation. The inherited record derives from a utility agreement, with no exact facility or phase crosswalk established here. Existing city service and future development are retained as separate contexts, leaving this individual physical stage unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/quincy/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-central-washington/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Wenatchee · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53017"
      }
    },
    {
      "id": "sabey-intergate-columbia-building-b-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Sabey Intergate.Columbia Building B",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "East Wenatchee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Columbia campus; not each individual building. 70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://sabeydatacenters.com/locations/east-wenatchee-data-center",
          "host": "sabeydatacenters.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://info.sabeydatacenters.com/hubfs/SDC%20Downloadables/SDC%20Cutsheets/SDC%20Columbia%2009242024.pdf",
          "host": "info.sabeydatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 47.8004,
        "lng": -119.64232,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Columbia campus; not each individual building",
          "fields": {
            "campus_utility_power_mw": 70,
            "buildings_on_campus_at_page": 3,
            "additional_building_stage": "under construction",
            "published_address": "4405 Grant Rd, East Wenatchee, WA98802"
          },
          "notes": [
            "70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://sabeydatacenters.com/locations/east-wenatchee-data-center",
              "host": "sabeydatacenters.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete current original Columbia campus body describes existing provider service and a further building under construction. The complete original specification sheet separately describes Building E and future Building F. Those campus accounts do not independently identify current commissioned computing at this inherited individual building letter. Their different aggregate campus quantities are not reconciled or transferred to a component. A planned tranche in 2026 does not establish accomplished opening, and campus service is not certification of every building.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_columbia_campus_service_exact_building_letter_held",
              "scope": "The complete current original Columbia campus body describes existing provider service and a further building under construction. The complete original specification sheet separately describes Building E and future Building F. Those campus accounts do not independently identify current commissioned computing at this inherited individual building letter. Their different aggregate campus quantities are not reconciled or transferred to a component. A planned tranche in 2026 does not establish accomplished opening, and campus service is not certification of every building."
            },
            "source_read_scope": {
              "complete_current_original_campus_body_read": true,
              "complete_original_four_page_cutsheet_text_read": true,
              "campus_aggregate_quantities_not_reconciled_or_exported": true,
              "building_e_and_f_not_assigned_to_b_or_d": true,
              "forecast_not_completion": true
            }
          },
          "notes": [
            "The complete current original Columbia campus body describes existing provider service and a further building under construction. The complete original specification sheet separately describes Building E and future Building F. Those campus accounts do not independently identify current commissioned computing at this inherited individual building letter. Their different aggregate campus quantities are not reconciled or transferred to a component. A planned tranche in 2026 does not establish accomplished opening, and campus service is not certification of every building.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://sabeydatacenters.com/locations/east-wenatchee-data-center",
              "host": "sabeydatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://info.sabeydatacenters.com/hubfs/SDC%20Downloadables/SDC%20Cutsheets/SDC%20Columbia%2009242024.pdf",
              "host": "info.sabeydatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Wenatchee · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53017"
      }
    },
    {
      "id": "sabey-intergate-columbia-building-d-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Sabey Intergate.Columbia Building D",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "East Wenatchee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Columbia campus; not each individual building. 70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://sabeydatacenters.com/locations/east-wenatchee-data-center",
          "host": "sabeydatacenters.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://info.sabeydatacenters.com/hubfs/SDC%20Downloadables/SDC%20Cutsheets/SDC%20Columbia%2009242024.pdf",
          "host": "info.sabeydatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 47.72025,
        "lng": -119.78297,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Columbia campus; not each individual building",
          "fields": {
            "campus_utility_power_mw": 70,
            "buildings_on_campus_at_page": 3,
            "additional_building_stage": "under construction",
            "published_address": "4405 Grant Rd, East Wenatchee, WA98802"
          },
          "notes": [
            "70MWis explicitly utility campus power, not criticalITor eachB/Dbuilding. Operator5centrate claim lacks reviewed utility tariff, not adopted current customer rate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://sabeydatacenters.com/locations/east-wenatchee-data-center",
              "host": "sabeydatacenters.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete current original Columbia campus body describes existing provider service and a further building under construction. The complete original specification sheet separately describes Building E and future Building F. Those campus accounts do not independently identify current commissioned computing at this inherited individual building letter. Their different aggregate campus quantities are not reconciled or transferred to a component. A planned tranche in 2026 does not establish accomplished opening, and campus service is not certification of every building.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_columbia_campus_service_exact_building_letter_held",
              "scope": "The complete current original Columbia campus body describes existing provider service and a further building under construction. The complete original specification sheet separately describes Building E and future Building F. Those campus accounts do not independently identify current commissioned computing at this inherited individual building letter. Their different aggregate campus quantities are not reconciled or transferred to a component. A planned tranche in 2026 does not establish accomplished opening, and campus service is not certification of every building."
            },
            "source_read_scope": {
              "complete_current_original_campus_body_read": true,
              "complete_original_four_page_cutsheet_text_read": true,
              "campus_aggregate_quantities_not_reconciled_or_exported": true,
              "building_e_and_f_not_assigned_to_b_or_d": true,
              "forecast_not_completion": true
            }
          },
          "notes": [
            "The complete current original Columbia campus body describes existing provider service and a further building under construction. The complete original specification sheet separately describes Building E and future Building F. Those campus accounts do not independently identify current commissioned computing at this inherited individual building letter. Their different aggregate campus quantities are not reconciled or transferred to a component. A planned tranche in 2026 does not establish accomplished opening, and campus service is not certification of every building.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://sabeydatacenters.com/locations/east-wenatchee-data-center",
              "host": "sabeydatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://info.sabeydatacenters.com/hubfs/SDC%20Downloadables/SDC%20Cutsheets/SDC%20Columbia%2009242024.pdf",
              "host": "info.sabeydatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Wenatchee · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53017"
      }
    },
    {
      "id": "salcido-pangborn-east-wenatchee-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Salcido Pangborn Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "East Wenatchee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.salcidoenterprises.tech/data-centers",
          "host": "salcidoenterprises.tech",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 47.84651,
        "lng": -119.72093,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Salcido nine named Washington site chronologies",
          "fields": {
            "operator": "Salcido Enterprises",
            "named_sites": [
              {
                "name": "Wheeler",
                "county": "Grant, Washington",
                "power_mw": 4.8,
                "completion_month": "2024-12"
              },
              {
                "name": "Broadway",
                "county": "Grant, Washington",
                "expanded_power_mw": 2,
                "expansion_month": "2023-09"
              },
              {
                "name": "Cashmere",
                "locality": "Cashmere, Washington",
                "completion_year": 2014
              },
              {
                "name": "Columbia",
                "locality": "Wenatchee, Washington",
                "conversion": "cold-storage warehouse"
              },
              {
                "name": "Eller",
                "county": "Douglas, Washington",
                "power_mw": 4,
                "renovation_completion_month": "2018-09"
              },
              {
                "name": "Entiat",
                "county": "Chelan, Washington",
                "power_mw": 2,
                "deployment_month": "2023-07"
              },
              {
                "name": "Fortress",
                "county": "Grant, Washington",
                "power_mw": 4.6,
                "deployment_month": "2023-03"
              },
              {
                "name": "Horizon",
                "power_mw": 4,
                "online_quarter": "2019-Q1"
              },
              {
                "name": "Pangborn",
                "county": "Douglas, Washington",
                "power_mw": 10,
                "buildings": 4,
                "completion_month": "2018-05"
              }
            ],
            "power_basis": "operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"
          },
          "notes": [
            "NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.salcidoenterprises.tech/data-centers",
              "host": "salcidoenterprises.tech",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Wenatchee · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53017"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
