{
  "schema_version": 1,
  "source_compilation_context": {
    "wa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "wa/richland",
    "label": "Richland, Washington"
  },
  "records": [
    {
      "id": "atlas-agro-richland-data-center-campus-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Atlas Agro Richland Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Benton"
      ],
      "city": "Richland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Richland option stage and separate fertilizer scope. Option is not land purchase or construction approval. Separate PortofBenton fertilizer plant is not same DCsite or500Mdata-centerbudget. No actual DC criticalITMW, opening, spend or paid land-sale proceeds established. Source acquisition/permit stages need original legal record; engineering agenda supplement separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Richland original agenda corrects automated approval inference. Agenda records planned consideration, not actual adopted resolution, issuedinterconnection or allcosts paid. AutomatedCivicIQsearchresult incorrectly promoted agenda to approved contract and misidentifiedCityCouncilasPublicFacilitiesDistrict; not adopted. No criticalITMW or energization proven.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center",
          "host": "tricitiesbusinessnews.com",
          "date": "2025-12-12",
          "published": "2025-12-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://swagit-attachments.granicus.com/uploads/video/agenda_file/391466/2026.06.16_City_Council_Agenda__1_.pdf",
          "host": "swagit-attachments.granicus.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 46.23963,
        "lng": -119.51125,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Richland option stage and separate fertilizer scope",
          "fields": {
            "company": "Atlas Agro",
            "reported_option_approval_date": "2025-12-02",
            "location": "2100 HornRapidsRoad, Richland, Washington",
            "optioned_acres": 275,
            "reported_nonrefundable_option_fee_usd": 250000,
            "proposed_data_center_buildings": 5,
            "proposed_each_building_sqft_approx": 500000,
            "proposed_dc_project_cost_usd": 500000000,
            "conditional_land_purchase_price_usd_max_exclusive": 24000000,
            "construction_start_target_year": 2027,
            "expected_jobs": 100
          },
          "notes": [
            "Option is not land purchase or construction approval. Separate PortofBenton fertilizer plant is not same DCsite or500Mdata-centerbudget. No actual DC criticalITMW, opening, spend or paid land-sale proceeds established. Source acquisition/permit stages need original legal record; engineering agenda supplement separate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center",
              "host": "tricitiesbusinessnews.com",
              "date": "2025-12-12",
              "published": "2025-12-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Richland original agenda corrects automated approval inference",
          "fields": {
            "agency": "RichlandCityCouncil, Washington",
            "agenda_date": "2026-06-16",
            "resolution_listed": "2026-84",
            "agenda_item": 17,
            "subject": "BPAengineering/procurement reimbursableagreement for L0534 and secondcostallocation agreement with AtlasAgroDataCenterLLC"
          },
          "notes": [
            "Agenda records planned consideration, not actual adopted resolution, issuedinterconnection or allcosts paid. AutomatedCivicIQsearchresult incorrectly promoted agenda to approved contract and misidentifiedCityCouncilasPublicFacilitiesDistrict; not adopted. No criticalITMW or energization proven.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://swagit-attachments.granicus.com/uploads/video/agenda_file/391466/2026.06.16_City_Council_Agenda__1_.pdf",
              "host": "swagit-attachments.granicus.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Richland · Benton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53005"
      }
    },
    {
      "id": "pnnl-ai-data-center-richland-wa",
      "state": "wa",
      "kind": "facility",
      "name": "PNNL AI Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Benton"
      ],
      "city": "Richland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An RFI is not site selection, a lease, a permit or an operating campus. PNNL's existing AI research center is separate from the proposed infrastructure. SMR prospects are not commissioned generation; regional market capacity and an unidentified Wallula buyer are not PNNL figures. The unrelated automatic excerpt was corrected using the retained main article. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tricitiesbusinessnews.com/articles/pnnl-data-centers",
          "host": "tricitiesbusinessnews.com",
          "date": "2025-05-15",
          "published": "2025-05-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 46.26975,
        "lng": -119.54413,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Tri-Cities Area Journal of Business describes DOE seeking information on possible AI infrastructure at PNNL among sixteen candidate sites.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "An RFI is not site selection, a lease, a permit or an operating campus. PNNL's existing AI research center is separate from the proposed infrastructure. SMR prospects are not commissioned generation; regional market capacity and an unidentified Wallula buyer are not PNNL figures. The unrelated automatic excerpt was corrected using the retained main article.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tricitiesbusinessnews.com/articles/pnnl-data-centers",
              "host": "tricitiesbusinessnews.com",
              "date": "2025-05-15",
              "published": "2025-05-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Richland · Benton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53005"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
