{
  "schema_version": 1,
  "source_compilation_context": {
    "az": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/az.json",
      "updated": "2026-10-24"
    },
    "ia": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ia.json",
      "updated": "2026-10-24"
    },
    "nc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nc.json",
      "updated": "2026-10-25"
    },
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    },
    "or": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/or.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "apple",
    "label": "Apple"
  },
  "records": [
    {
      "id": "apple-maiden-nc",
      "state": "nc",
      "kind": "facility",
      "name": "Apple Maiden Data Center (iCloud)",
      "group": "operating",
      "status": "Company reported operation",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Catawba"
      ],
      "city": "Maiden",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 20 MWsolar and 5 MWfuel-cell descriptions are GENERATION, not campuscriticalIT or added computing capacity.84 millionkWh is forecastANNUALENERGYfor two arrays, not MW. May 14 staffconference/May 17 certificate issuance are 2012 events; November/December 2012 construction/operation dates are forecasts, not 2026 availability. PrimaryNCUCcertificate linked but not separately examined in this pass. No current grid mix, fullrenewablesmatching or operating capacity certified. Automated unrelated-story selection corrected from retained main body. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://9to5mac.com/2012/05/17/apples-20-megawatt-solar-farm-near-nc-data-center-gets-ncuc-approval/",
          "host": "9to5mac.com",
          "date": "2012-05-17",
          "published": "2012-05-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "host": "www.apple.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://inspector.catawbacountync.gov/Tidemark/crreports/reportdump/CRReports_74.7.229.228_74.7.229.228_rtaxoccupancy.rpt20260413053515.pdf",
          "host": "inspector.catawbacountync.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Original explicit computing facility street"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5977+Startown+Rd%2C+Maiden%2C+NC+28650&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal street response and exact county context"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-81.26276351799318%2C35.58366628853755%2C-81.25061248200682%2C35.593547711462456&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed source setting with unknown imagery acquisition date"
        }
      ],
      "loc": {
        "lng": -81.256688,
        "lat": 35.588607,
        "precision": "address",
        "basis": "The original Catawba County computing facility source explicitly identifies 5977 Startown Rd, Maiden, NC 28650. One unique complete literal Census street range supplies a calculated reference inside the retained county. It selects no surveyed roof, tenant floor, parcel or complete campus. Existing status group operating remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "9 to 5 Mac’s historical account quotes NCUC approval/certificate for Apple’s proposed 20 MWsolar generating facility near Maiden.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "20 MWsolar and 5 MWfuel-cell descriptions are GENERATION, not campuscriticalIT or added computing capacity.84 millionkWh is forecastANNUALENERGYfor two arrays, not MW. May 14 staffconference/May 17 certificate issuance are 2012 events; November/December 2012 construction/operation dates are forecasts, not 2026 availability. PrimaryNCUCcertificate linked but not separately examined in this pass. No current grid mix, fullrenewablesmatching or operating capacity certified. Automated unrelated-story selection corrected from retained main body.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://9to5mac.com/2012/05/17/apples-20-megawatt-solar-farm-near-nc-data-center-gets-ncuc-approval/",
              "host": "9to5mac.com",
              "date": "2012-05-17",
              "published": "2012-05-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 39",
          "scope": "Apple 2026 Environmental Progress Report explicitly identifies Maiden among the data centers it owns and operates, and its named Maiden appendix reports 2025 electricity use and current building cooling context. Company reported operation is limited to that named campus account. It does not certify all future expansion phases, measured environmental benefits, an exact physical opening day or independent technical verification. The report gives only June 2010 for historic opening, so no day is invented. No energy, cooling, ownership or capacity field is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_company_report_named_maiden_computing_campus",
              "scope": "Apple 2026 Environmental Progress Report explicitly identifies Maiden among the data centers it owns and operates, and its named Maiden appendix reports 2025 electricity use and current building cooling context. Company reported operation is limited to that named campus account. It does not certify all future expansion phases, measured environmental benefits, an exact physical opening day or independent technical verification. The report gives only June 2010 for historic opening, so no day is invented. No energy, cooling, ownership or capacity field is promoted."
            }
          },
          "notes": [
            "Apple 2026 Environmental Progress Report explicitly identifies Maiden among the data centers it owns and operates, and its named Maiden appendix reports 2025 electricity use and current building cooling context. Company reported operation is limited to that named campus account. It does not certify all future expansion phases, measured environmental benefits, an exact physical opening day or independent technical verification. The report gives only June 2010 for historic opening, so no day is invented. No energy, cooling, ownership or capacity field is promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
              "host": "www.apple.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 58, October 23, 2026",
          "scope": "Explicit source bound calculated street reference only. Existing status group operating remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -81.256688,
                "lat": 35.588607,
                "precision": "address",
                "basis": "The original Catawba County computing facility source explicitly identifies 5977 Startown Rd, Maiden, NC 28650. One unique complete literal Census street range supplies a calculated reference inside the retained county. It selects no surveyed roof, tenant floor, parcel or complete campus. Existing status group operating remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "5977 Startown Rd, Maiden, NC 28650",
              "county_fips": [
                "37035"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original county tax occupancy report for BLDC-05-2022-171970 explicitly labels5977STARTOWNRD as the street for the computing building and property3627-11-76-0090. Apple owner mail6028StartownRoad, the architect, lien agent and contractor streets are excluded. Printed applied and issuedMay20,2022,C/OorfinalOctober5,2022andgeneratedApril13,2026are separate record clocks, without a new current service, opening, title or entire campus determination. A historical independent water auditor repeats5977but its July12,2026validity endpoint does not establish current certification. Source rounded coordinates and solar asset street reporting are not adopted.",
            "Explicit source bound calculated street reference only. Existing status group operating remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
            "Actually viewed unknown age official setting shows several large roofs west of the street and a broad solar array east of it, with multiple smaller utility structures. No solar field, roof, neighboring driveway or complete campus is selected. The Census street range is not a surveyed building point.",
            "The inherited area coordinate and county display were not reviewed physical facility destinations. The original explicitly named computing facility street and complete unique literal Census response now support only a calculated street range reference inside the retained county. Earlier coordinates and complete source history remain intact. This corrects the reference without physical relocation, a surveyed roof, new computing, title or complete campus certification."
          ],
          "sources": [
            {
              "url": "https://inspector.catawbacountync.gov/Tidemark/crreports/reportdump/CRReports_74.7.229.228_74.7.229.228_rtaxoccupancy.rpt20260413053515.pdf",
              "host": "inspector.catawbacountync.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original explicit computing facility street"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5977+Startown+Rd%2C+Maiden%2C+NC+28650&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal street response and exact county context"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-81.26276351799318%2C35.58366628853755%2C-81.25061248200682%2C35.593547711462456&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed source setting with unknown imagery acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Maiden · Catawba · Source context reviewed",
      "status_scope": "Apple 2026 Environmental Progress Report explicitly identifies Maiden among the data centers it owns and operates, and its named Maiden appendix reports 2025 electricity use and current building cooling context. Company reported operation is limited to that named campus account. It does not certify all future expansion phases, measured environmental benefits, an exact physical opening day or independent technical verification. The report gives only June 2010 for historic opening, so no day is invented. No energy, cooling, ownership or capacity field is promoted."
    },
    {
      "id": "apple-mesa-az",
      "state": "az",
      "kind": "facility",
      "name": "Apple Mesa Data Center (Global Command Center)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Maricopa"
      ],
      "city": "Mesa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical industrial trade-zone application only. Foreign-trade subzone application for an Apple facility does not identify 2014data-center use, current operating status, ITMW or incentive amount received. No data-center opening inferred from industrial application. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.federalregister.gov/documents/full_text/text/2014/01/23/2014-01296.txt",
          "host": "federalregister.gov",
          "date": "2014-01-23",
          "published": "2014-01-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "host": "www.apple.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.24039,
        "lng": -112.48188,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "historical industrial trade-zone application only",
          "fields": {
            "historical_apple_site_address": "3740 SSignal Butte Road, Mesa, Arizona",
            "historical_ftz_application_area_acres": 83.17,
            "foreign_trade_zone_application_docket_date": "2014-01-14"
          },
          "notes": [
            "Foreign-trade subzone application for an Apple facility does not identify 2014data-center use, current operating status, ITMW or incentive amount received. No data-center opening inferred from industrial application.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.federalregister.gov/documents/full_text/text/2014/01/23/2014-01296.txt",
              "host": "federalregister.gov",
              "date": "2014-01-23",
              "published": "2014-01-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 11",
          "scope": "Apple identifies Mesa among its owned and operated data centers in its 2026 environmental report and provides a Mesa operating electricity account for 2025. Operating phase describes the reported existing data center, not every possible building, all capacity, continuous uptime or a certified exact opening day. The water stewardship certification is supporting context and is not the basis of operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_reported_existing_operation",
              "scope": "Apple identifies Mesa among its owned and operated data centers in its 2026 environmental report and provides a Mesa operating electricity account for 2025. Operating phase describes the reported existing data center, not every possible building, all capacity, continuous uptime or a certified exact opening day. The water stewardship certification is supporting context and is not the basis of operation."
            },
            "historical_date_scope": {
              "source_pages_visually_read": [
                53,
                96
              ],
              "report_year": 2026,
              "operating_account_year": 2025,
              "exact_opening_day_established": false,
              "source_date_descriptions": "Page 96 describes coming online in 2016 and separately gives March 2017 for customer service in its footnote. These are retained as distinct source descriptions without manufacturing a day or changing the native opening field.",
              "renewable_generation_dates_not_data_center_opening_dates": true
            }
          },
          "notes": [
            "Apple identifies Mesa among its owned and operated data centers in its 2026 environmental report and provides a Mesa operating electricity account for 2025. Operating phase describes the reported existing data center, not every possible building, all capacity, continuous uptime or a certified exact opening day. The water stewardship certification is supporting context and is not the basis of operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
              "host": "www.apple.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Mesa · Maricopa · Source context reviewed",
      "status_scope": "Apple identifies Mesa among its owned and operated data centers in its 2026 environmental report and provides a Mesa operating electricity account for 2025. Operating phase describes the reported existing data center, not every possible building, all capacity, continuous uptime or a certified exact opening day. The water stewardship certification is supporting context and is not the basis of operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04013"
      }
    },
    {
      "id": "apple-prineville-or",
      "state": "or",
      "kind": "facility",
      "name": "Apple Prineville Data Center Campus",
      "group": "operating",
      "status": "Company reported operation",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Crook"
      ],
      "city": "Prineville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite. June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf",
          "host": "oregon.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "host": "www.apple.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.14222,
        "lng": -120.35641,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite",
          "fields": {
            "historical_umatilla_amazon_sip_approval_year": 2017,
            "historical_prineville_apple_lrz_exempt_projects": 2,
            "historical_prineville_apple_lrz_term_years": 15,
            "historical_reporting_period": "2022-2023"
          },
          "notes": [
            "June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf",
              "host": "oregon.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 42",
          "scope": "Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_apple_prineville_operating_account",
              "scope": "Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted."
            },
            "source_read_scope": {
              "text_read": "Page 53 owned and operated site paragraph, page 95 data center context and page 96 Prineville subsection.",
              "visual_pages": [
                95,
                96
              ],
              "whole_report_audited": false,
              "may_2012_month_not_completed_to_exact_day": true,
              "other_named_campuses_not_merged": true
            }
          },
          "notes": [
            "Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted.",
            "Identity, organization roles, locations, jurisdictions, quantities and physical opening fields stay unchanged. Source checks and prospective dates never establish an opening."
          ],
          "sources": [
            {
              "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
              "host": "www.apple.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Prineville · Crook · Source context reviewed",
      "status_scope": "Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "41013"
      }
    },
    {
      "id": "apple-reno-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Apple Reno Data Center (Reno Technology Park)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washoe"
      ],
      "city": "Sparks",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Apple Washoe expansion incentive application facts,notpaidaward. Application/boardpacket not observed actual spend, taxsaving or final executed approval. Fiveyearcapex is within tenyearprojection, not additive.1281economicimpactjobs include1257construction andindirecteffects, not permanent onsitepositions. Solarprojects offsite generation notITload. Claimed130600millionmetrictonsCO2avoided implausible; fieldquarantined without silent correction. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-07-11",
          "The Apple letter in the original GOED packet bears July 11, 2024 and describes existing Reno operations and proposed expansion. This dates the issuer letter rather than an incentive award, first opening or completion of the expansion."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
          "host": "goed.nv.gov",
          "date": "2024-07-25",
          "published": "2024-07-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.66573,
        "lng": -119.66433,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Apple Washoe expansion incentive application facts,notpaidaward",
          "fields": {
            "board_packet_date": "2024-07-25",
            "published_company_site_address": "21505 RenoTechnologyParkwayWest,Sparks,NV89434",
            "published_county": "Washoe,Nevada",
            "historical_opening_month": "2012-12",
            "five_year_proposed_equipment_capex_usd": 742071428,
            "ten_year_proposed_equipment_capex_usd": 992071428,
            "estimated_ten_year_sales_tax_abatement_usd": 62153275,
            "proposed_new_fulltime_jobs_first5years": 10
          },
          "notes": [
            "Application/boardpacket not observed actual spend, taxsaving or final executed approval. Fiveyearcapex is within tenyearprojection, not additive.1281economicimpactjobs include1257construction andindirecteffects, not permanent onsitepositions. Solarprojects offsite generation notITload. Claimed130600millionmetrictonsCO2avoided implausible; fieldquarantined without silent correction.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
              "host": "goed.nv.gov",
              "date": "2024-07-25",
              "published": "2024-07-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "Selected original July 2024 GOED packet pages publish an Apple letter describing existing Reno data center operations and a separate expansion request. The account identifies Washoe County, while broader Nevada summaries use regional county groupings. The letter establishes an attributed historical service account without certifying the current completion of the expansion or independently crosswalking every regional building. The forecast expansion month and an incentive application are not commissioned capacity. The original 2026 environmental report exceeded the bounded capture limit and was not read. No exact first opening day or present physical stage is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_issuer_operation_and_expansion_letter_current_stage_held",
              "scope": "Selected original July 2024 GOED packet pages publish an Apple letter describing existing Reno data center operations and a separate expansion request. The account identifies Washoe County, while broader Nevada summaries use regional county groupings. The letter establishes an attributed historical service account without certifying the current completion of the expansion or independently crosswalking every regional building. The forecast expansion month and an incentive application are not commissioned capacity. The original 2026 environmental report exceeded the bounded capture limit and was not read. No exact first opening day or present physical stage is adopted."
            },
            "source_read_scope": {
              "original_packet_physical_pages": [
                1,
                2,
                3,
                4,
                6
              ],
              "complete_packet_review_not_claimed": true,
              "existing_operation_separate_from_expansion": true,
              "month_only_opening_not_exact_day": true,
              "regional_county_assignment_unchanged": true,
              "oversize2026_report_unread": true
            }
          },
          "notes": [
            "Selected original July 2024 GOED packet pages publish an Apple letter describing existing Reno data center operations and a separate expansion request. The account identifies Washoe County, while broader Nevada summaries use regional county groupings. The letter establishes an attributed historical service account without certifying the current completion of the expansion or independently crosswalking every regional building. The forecast expansion month and an incentive application are not commissioned capacity. The original 2026 environmental report exceeded the bounded capture limit and was not read. No exact first opening day or present physical stage is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
              "host": "goed.nv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sparks · Washoe · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-07-11",
          "text": "The Apple letter in the original GOED packet bears July 11, 2024 and describes existing Reno operations and proposed expansion. This dates the issuer letter rather than an incentive award, first opening or completion of the expansion.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
              "host": "goed.nv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32031"
      }
    },
    {
      "id": "apple-waukee-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Apple Waukee Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Waukee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "host": "www.apple.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.6848,
        "lng": -94.03964,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_reported_opened_facility_month_only_not_entire_future_campus",
              "scope": "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted."
            },
            "source_read_scope": {
              "pdf_page_visually_read": 97,
              "corroborating_pdf_footnote_page_read": 95,
              "reported_opening_month": "October 2024",
              "exact_opening_day_unknown": true,
              "future_expansion_not_certified_operating": true,
              "energy_allocation_not_independent_environmental_finding": true
            }
          },
          "notes": [
            "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
              "host": "www.apple.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Waukee · Dallas · Source context reviewed",
      "status_scope": "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
