{
  "schema_version": 1,
  "source_compilation_context": {
    "ar": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ar.json",
      "updated": "2026-10-26"
    },
    "ca": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ca.json",
      "updated": "2026-10-25"
    },
    "ms": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ms.json",
      "updated": "2026-10-24"
    },
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "avaio-digital",
    "label": "AVAIO Digital"
  },
  "records": [
    {
      "id": "avaio-appomattox-va",
      "state": "va",
      "kind": "facility",
      "name": "AVAIO Appomattox Data Center Campus",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Appomattox"
      ],
      "city": "Appomattox",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/",
          "host": "wdbj7.com",
          "date": "2026-03-23",
          "published": "2026-03-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.avaiodigital.com/developments/appomattox-virginia",
          "host": "www.avaiodigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 37.37259,
        "lng": -78.81292,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "WDBJ reports AVAIO proposed Appomattox campus with initial construction and partial substation work planned for 2027 to 2028.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Developer tax benefit claim is a projection, not annual revenue received. No project opening, construction start or all permits established.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wdbj7.com/2026/03/24/board-answers-questions-future-data-center/",
              "host": "wdbj7.com",
              "date": "2026-03-23",
              "published": "2026-03-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "next-status-2026-10-19",
          "scope": "AVAIO lists Project Hercules in Appomattox as construction-ready, with initial power delivery planned for 2027.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "AVAIO lists Project Hercules in Appomattox as construction-ready, with initial power delivery planned for 2027."
            }
          },
          "notes": [
            "Construction-ready does not establish actual construction or operation. The page does not certify current land ownership, every required permit or measured capacity. The older announcement and current page describe different acreage; neither figure is adopted."
          ],
          "sources": [
            {
              "url": "https://www.avaiodigital.com/developments/appomattox-virginia",
              "host": "www.avaiodigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Appomattox · Appomattox · Source context reviewed",
      "status_scope": "AVAIO lists Project Hercules in Appomattox as construction-ready, with initial power delivery planned for 2027.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51011"
      }
    },
    {
      "id": "avaio-digital-leo-little-rock-ar",
      "state": "ar",
      "kind": "facility",
      "name": "AVAIO Digital Leo Campus",
      "group": "building",
      "status": "Site work underway",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pulaski"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AVAIO Leo development and planned energy components. 1070=570grid+500BTM, not all IT or power delivered. ExecutedESA/sourceplannedenergizationnotobservedservice. State/localofficialquotesnotspendingrecordsorindependentpermitinspection. Noactualincentiveawardordisbursementverified. Referencepointnotindependentlyparcelcentroid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.avaiodigital.com/developments/little-rock-arkansas",
          "host": "avaiodigital.com",
          "date": "2026-01-12",
          "published": "2026-01-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.73305,
        "lng": -92.30867,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "AVAIO Leo development and planned energy components",
          "fields": {
            "project": "Leo",
            "location": "145th Street, Little Rock, Pulaski County, Arkansas",
            "operator_reference_point": {
              "lat": 34.623375,
              "lon": -92.246825
            },
            "campus_acres": 296,
            "planned_total_baseload_power_mw": 1070,
            "planned_grid_power_mw": 570,
            "planned_behind_meter_baseload_mw": 500,
            "initial_grid_service_target": "2027-Q4",
            "developer_reported_status": "ground broken; site plan approved; ESA executed with Entergy Arkansas",
            "investment_quoted_usd": 6000000000,
            "jobs_quoted_min_exclusive": 500
          },
          "notes": [
            "1070=570grid+500BTM, not all IT or power delivered. ExecutedESA/sourceplannedenergizationnotobservedservice. State/localofficialquotesnotspendingrecordsorindependentpermitinspection. Noactualincentiveawardordisbursementverified. Referencepointnotindependentlyparcelcentroid.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.avaiodigital.com/developments/little-rock-arkansas",
              "host": "avaiodigital.com",
              "date": "2026-01-12",
              "published": "2026-01-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Site work underway",
              "basis": "AVAIO’s current named Leo project page says it has broken ground on the Little Rock development.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "Groundbreaking supports reported site activity, not completed data halls or operation. The electricity-service and energization schedule remains future. The January 12 linked update is not used as the publication date of the entire undated project page."
          },
          "notes": [
            "Groundbreaking supports reported site activity, not completed data halls or operation. The electricity-service and energization schedule remains future. The January 12 linked update is not used as the publication date of the entire undated project page.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://www.avaiodigital.com/developments/little-rock-arkansas",
              "host": "www.avaiodigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pulaski · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. AVAIO’s current named Leo project page says it has broken ground on the Little Rock development. Groundbreaking supports reported site activity, not completed data halls or operation. The electricity-service and energization schedule remains future. The January 12 linked update is not used as the publication date of the entire undated project page.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "05119"
      }
    },
    {
      "id": "avaio-perseus-pittsburg-ca",
      "state": "ca",
      "kind": "facility",
      "name": "AVAIO Digital Perseus",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Contra Costa"
      ],
      "city": "Pittsburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pittsburg approved design modification and CEQA notice. Notice of determination records specified design/CEQA approval, not all construction permits or operations. No numeric MW in reviewed notice. AVAIO applicant email supports link, not tenant lease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ceqanet.lci.ca.gov/2025100607/4",
          "host": "ceqanet.lci.ca.gov",
          "date": "2026-02-17",
          "published": "2026-02-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.avaiodigital.com/developments/pittsburg-california",
          "host": "www.avaiodigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        },
        {
          "url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0/query?where=APN+%3D+%27095160008%27+OR+parcel_dashes+%3D+%27095-160-008%27&outFields=OBJECTID%2CAPN%2CS_STR_NM%2CS_STR_SUF%2CS_STR_NBR%2Cfull_address_display%2Cfull_address_search%2Cparcel_dashes%2Cs_city&returnGeometry=true&outSR=4326&resultRecordCount=10&f=json",
          "host": "gis.cccounty.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact official source parcel or situs query"
        },
        {
          "url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0?f=pjson",
          "host": "gis.cccounty.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Official public parcel layer definitions"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.91633072996447%2C38.006618444125046%2C-121.90492927003552%2C38.01560155587496&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -121.91063,
        "lat": 38.01111,
        "precision": "approximate",
        "basis": "Approximate calculated center of official Contra Costa County GIS reference parcel 095160008 for the explicitly named project street 2242 Golf Club Road, Pittsburg, CA. No surveyed boundary, roof, title, tenant, owner, independent building, current operation or complete campus is established. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Pittsburg approved design modification and CEQA notice",
          "fields": {
            "project_title": "Pittsburg Data Hub",
            "application": "AP-25-0113 CDR modification",
            "agency_approval_date": "2026-02-12",
            "notice_posted_date": "2026-02-17",
            "earlier_design_approval_date": "2025-12-11",
            "address": "2242 Golf Club Road, Pittsburg, California",
            "parcel": "095-160-008",
            "site_acres_approx": 22,
            "data_center_stories": 3,
            "modification": "PG&E interconnection relocation and wetland mitigation grading/site layout"
          },
          "notes": [
            "Notice of determination records specified design/CEQA approval, not all construction permits or operations. No numeric MW in reviewed notice. AVAIO applicant email supports link, not tenant lease.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ceqanet.lci.ca.gov/2025100607/4",
              "host": "ceqanet.lci.ca.gov",
              "date": "2026-02-17",
              "published": "2026-02-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "next-status-2026-10-19",
          "scope": "AVAIO lists Project Perseus in Pittsburg as a development with future first occupancy and power delivery.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "AVAIO lists Project Perseus in Pittsburg as a development with future first occupancy and power delivery."
            }
          },
          "notes": [
            "The developer page does not establish current operation or completed phases. Its statements about public approvals are company reports; the original agency decisions have not been read for this review. No forecast power, water or property figures are adopted."
          ],
          "sources": [
            {
              "url": "https://www.avaiodigital.com/developments/pittsburg-california",
              "host": "www.avaiodigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 52, October 23, 2026",
          "scope": "Explicit source bound location reference only. Existing Native status remains proposed. No new physical stage, opening, current operation, title, owner, tenant, role, quantity, roof or complete campus boundary is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -121.91063,
                "lat": 38.01111,
                "precision": "approximate",
                "basis": "Approximate calculated center of official Contra Costa County GIS reference parcel 095160008 for the explicitly named project street 2242 Golf Club Road, Pittsburg, CA. No surveyed boundary, roof, title, tenant, owner, independent building, current operation or complete campus is established. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "095160008",
                "identifier_field": "APN",
                "objectid": 219044,
                "agency": "Contra Costa County GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "geometry_acquisition_date": null
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "The exact agency project description names2242GolfClubRoad and APN095160008. The current county parcel repeats that exact APN and street. The current operator page instead prints2232GolfClubRoad and different broader site context. The literal address conflict remains explicit. This selects one approximate agency defined parcel reference only, without silently validating or replacing the operator street or certifying its complete campus.",
            "Explicit source bound location reference only. Existing Native status remains proposed. No new physical stage, opening, current operation, title, owner, tenant, role, quantity, roof or complete campus boundary is certified.",
            "The source parcel center falls in open ground with former developed traces, a road north and residential areas outside the eastern setting. The county exact APN and2242GolfClubRoad match the agency filing. The operator2232street remains an unresolved literal difference. No residential roof, current physical stage, complete campus, acreage allocation or operator coordinate is selected. Acquisition date is unknown.",
            "The original inherited general area coordinate was not a reviewed physical destination. The exact independent official street and source reference join now support only the stated bounded reference. Its earlier value and complete source history remain retained, without a physical relocation or new physical milestone.",
            "Source registration, planning, tax, title, administrative dates and imagery setting retain their independent scopes. Acquisition dates are unknown. Canonical address, protected attributes and every existing field remain exact except the reviewed reference and provenance."
          ],
          "sources": [
            {
              "url": "https://www.avaiodigital.com/developments/pittsburg-california",
              "host": "www.avaiodigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Literal2232operatorstreet retained as a conflict, not selected"
            },
            {
              "url": "https://ceqanet.lci.ca.gov/2025100607/4",
              "host": "ceqanet.lci.ca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact official named project street and scope"
            },
            {
              "url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0/query?where=APN+%3D+%27095160008%27+OR+parcel_dashes+%3D+%27095-160-008%27&outFields=OBJECTID%2CAPN%2CS_STR_NM%2CS_STR_SUF%2CS_STR_NBR%2Cfull_address_display%2Cfull_address_search%2Cparcel_dashes%2Cs_city&returnGeometry=true&outSR=4326&resultRecordCount=10&f=json",
              "host": "gis.cccounty.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact official source parcel or situs query"
            },
            {
              "url": "https://gis.cccounty.us/arcgis/rest/services/CCMAP/Assessment_Parcels_ArcPro/MapServer/0?f=pjson",
              "host": "gis.cccounty.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official public parcel layer definitions"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.91633072996447%2C38.006618444125046%2C-121.90492927003552%2C38.01560155587496&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate official source parcel reference, not a roof or complete campus",
      "summary": "Pittsburg · Contra Costa · Source context reviewed",
      "status_scope": "AVAIO lists Project Perseus in Pittsburg as a development with future first occupancy and power delivery."
    },
    {
      "id": "avaio-taurus-brandon-ms",
      "state": "ms",
      "kind": "facility",
      "name": "AVAIO Digital Taurus",
      "group": "building",
      "status": "Developer-reported groundbreaking",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rankin"
      ],
      "city": "Brandon",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/",
          "host": "governorreeves.ms.gov",
          "date": "2025-08-19",
          "published": "2025-08-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.avaiodigital.com/developments/brandon-mississippi",
          "host": "www.avaiodigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 32.26403,
        "lng": -89.94563,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "announcement_date": "2025-08-19",
            "planned_investment_usd": 6000000000,
            "expected_direct_jobs_min": 60,
            "construction_completion_target": "2027-H1",
            "government_reported_tax_program_approval": "Mississippi Data Center Enterprises exemption",
            "published_location": "East Metropolitan Center Business and Industrial Park, Brandon, Rankin County"
          },
          "notes": [
            "Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/",
              "host": "governorreeves.ms.gov",
              "date": "2025-08-19",
              "published": "2025-08-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "next-status-2026-10-19",
          "scope": "AVAIO reports that it has broken ground on Project Taurus in Brandon, Mississippi.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_reported_groundbreaking",
              "scope": "AVAIO reports that it has broken ground on Project Taurus in Brandon, Mississippi."
            }
          },
          "notes": [
            "Its first-occupancy and power-delivery dates are future forecasts, not completed facilities or commissioned capacity. The linked update date does not establish an exact physical start day."
          ],
          "sources": [
            {
              "url": "https://www.avaiodigital.com/developments/brandon-mississippi",
              "host": "www.avaiodigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Brandon · Rankin · Source context reviewed",
      "status_scope": "AVAIO reports that it has broken ground on Project Taurus in Brandon, Mississippi.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28121"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
