{
  "schema_version": 1,
  "source_compilation_context": {
    "co": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/co.json",
      "updated": "2026-10-26"
    },
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    },
    "ut": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ut.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "blusky-ai",
    "label": "BluSky AI"
  },
  "records": [
    {
      "id": "blusky-ai-delta-millard-county-ut",
      "state": "ut",
      "kind": "facility",
      "name": "BluSky AI Delta Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Millard"
      ],
      "city": "Delta",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. BluSky originalGlobeNewswire July29,2025 syndicatedbyManilaTimes: NONBINDINGLOI for25acres/up50MW atCreekstoneDelta. Definitive documents/closing stillfuture, expectedQ4then/late2026groundbreaking. Not completedlandpurchase/PPA/ITenergization. CreekstonebroaderDeltaGigasite notallBluSkyownedIT. Milford51.6acre/9.3MW isSEPARATEproject. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223",
          "host": "manilatimes.net",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://bluskyaidatacenters.com/investor-relations",
          "host": "bluskyaidatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.07334,
        "lng": -113.10051,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "BluSky originalGlobeNewswire July29,2025 syndicatedbyManilaTimes: NONBINDINGLOI for25acres/up50MW atCreekstoneDelta. Definitive documents/closing stillfuture, expectedQ4then/late2026groundbreaking. Not completedlandpurchase/PPA/ITenergization. CreekstonebroaderDeltaGigasite notallBluSkyownedIT. Milford51.6acre/9.3MW isSEPARATEproject.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223",
              "host": "manilatimes.net",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "generic_issuer_strategy_without_exact_named_site_phase",
              "scope": "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted."
            }
          },
          "notes": [
            "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://bluskyaidatacenters.com/investor-relations",
              "host": "bluskyaidatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Delta · Millard · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49027"
      }
    },
    {
      "id": "blusky-ai-milford-ut",
      "state": "ut",
      "kind": "facility",
      "name": "BluSky AI Milford Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Beaver"
      ],
      "city": "Milford",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. BluSky originalJuly8,2025 issuer release: June30definitiveDAM power-assignment agreement9.3MWgridinterconnectedrights, paid20Mrestrictedshares; no USDvaluecomputedfromsharecount. GroundLEASE51.6acres with purchaseOPTION, two-yearinitialterm/90kannualaccruingrent, notlandpurchase. Title operational site doesnot prove AIcomputecommissioned.9.3MWcontractedpower notexplicitIT. CentralUtahheadline versusMilfordbody: noexactparcelverified. Underlyingagreements/ESA/currentloadunread; no guaranteedall-inrate fromhighlycompetitivedescription. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.manilatimes.net/2025/07/08/tmt-newswire/globenewswire/blusky-ai-inc-secures-first-site-with-93mw-to-launch-flagship-data-center-in-central-utah/2145520",
          "host": "manilatimes.net",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://bluskyaidatacenters.com/investor-relations",
          "host": "bluskyaidatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 38.35694,
        "lng": -113.2351,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "BluSky originalJuly8,2025 issuer release: June30definitiveDAM power-assignment agreement9.3MWgridinterconnectedrights, paid20Mrestrictedshares; no USDvaluecomputedfromsharecount. GroundLEASE51.6acres with purchaseOPTION, two-yearinitialterm/90kannualaccruingrent, notlandpurchase.",
            "Title operational site doesnot prove AIcomputecommissioned.9.3MWcontractedpower notexplicitIT. CentralUtahheadline versusMilfordbody: noexactparcelverified. Underlyingagreements/ESA/currentloadunread; no guaranteedall-inrate fromhighlycompetitivedescription.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.manilatimes.net/2025/07/08/tmt-newswire/globenewswire/blusky-ai-inc-secures-first-site-with-93mw-to-launch-flagship-data-center-in-central-utah/2145520",
              "host": "manilatimes.net",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "generic_issuer_strategy_without_exact_named_site_phase",
              "scope": "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted."
            }
          },
          "notes": [
            "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://bluskyaidatacenters.com/investor-relations",
              "host": "bluskyaidatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Milford · Beaver · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49001"
      }
    },
    {
      "id": "blusky-ai-nephi-ut",
      "state": "ut",
      "kind": "facility",
      "name": "BluSky AI Nephi SkyMod Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Juab"
      ],
      "city": "Nephi",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unrelated redevelopment fund hold. CRA fund page describes hotel development incentives, not BluSky AI. No project-specific site, incentive award, construction or capacity finding adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.. LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nephi.utah.gov/690/CRA-Fund",
          "host": "nephi.utah.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
          "host": "gazette.com",
          "date": "2026-03-28",
          "published": "2026-03-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://bluskyaidatacenters.com/investor-relations",
          "host": "bluskyaidatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.70274,
        "lng": -112.7848,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "unrelated redevelopment fund hold",
          "fields": {},
          "notes": [
            "CRA fund page describes hotel development incentives, not BluSky AI. No project-specific site, incentive award, construction or capacity finding adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nephi.utah.gov/690/CRA-Fund",
              "host": "nephi.utah.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.",
          "fields": {
            "reported_context": "Gazette quotes Nephi administrator saying four-MW project functionally approved with building permits awaiting pickup; no commissioned operation established",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
              "host": "gazette.com",
              "date": "2026-03-28",
              "published": "2026-03-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The current original issuer overview describes modular infrastructure strategy without an exact Nephi deployment account. The inherited original City CRA Fund page instead describes hotel incentives and does not establish a BluSky data center award, construction or operation. A general reinvestment fund, powered pad, lease intention and promised modular delivery are not exact computing service. No incentive or company role is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_generic_strategy_and_unrelated_city_hotel_fund_context",
              "scope": "The current original issuer overview describes modular infrastructure strategy without an exact Nephi deployment account. The inherited original City CRA Fund page instead describes hotel incentives and does not establish a BluSky data center award, construction or operation. A general reinvestment fund, powered pad, lease intention and promised modular delivery are not exact computing service. No incentive or company role is promoted."
            }
          },
          "notes": [
            "The current original issuer overview describes modular infrastructure strategy without an exact Nephi deployment account. The inherited original City CRA Fund page instead describes hotel incentives and does not establish a BluSky data center award, construction or operation. A general reinvestment fund, powered pad, lease intention and promised modular delivery are not exact computing service. No incentive or company role is promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://bluskyaidatacenters.com/investor-relations",
              "host": "bluskyaidatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.nephi.utah.gov/690/CRA-Fund",
              "host": "www.nephi.utah.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Nephi · Juab · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49023"
      }
    },
    {
      "id": "blusky-ai-walsenburg-co",
      "state": "co",
      "kind": "facility",
      "name": "BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Huerfano"
      ],
      "city": "Walsenburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Developercommunitypartnership/powerreadyclaims are not executedmunicipalservice or approvedproject.15 MWisproposedbasisundefined, not currentcriticalIT. Mayorunwillingnesstosupplyutilities is not a formaldenial. SeparateWellsNevada 2 acrenonbindingleaseLOI andNephiUtah 4 MWpermit-readyprojectcannotbesummedintoWalsenburg. Nephi 29 to 85 MWcitysupplyupgrade is municipalcapacity, not DCload. Generic 15 MWwater/hospitalcomparison is not sitecoolingdemand. ColoradoSB 26-102/HB 26-1030 werependingbillsandnoresultassumed. No operatingstatus/RFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
          "host": "gazette.com",
          "date": "2026-03-28",
          "published": "2026-03-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.6847,
        "lng": -104.96034,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "ColoradoSpringsGazette reports BluSky’s 36-acre Walsenburg purchaseagreement remained unclosed, with localmayor/administrator initially unaware of proposedup-to 15 MWmodularsite.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Developercommunitypartnership/powerreadyclaims are not executedmunicipalservice or approvedproject.15 MWisproposedbasisundefined, not currentcriticalIT. Mayorunwillingnesstosupplyutilities is not a formaldenial. SeparateWellsNevada 2 acrenonbindingleaseLOI andNephiUtah 4 MWpermit-readyprojectcannotbesummedintoWalsenburg. Nephi 29 to 85 MWcitysupplyupgrade is municipalcapacity, not DCload. Generic 15 MWwater/hospitalcomparison is not sitecoolingdemand. ColoradoSB 26-102/HB 26-1030 werependingbillsandnoresultassumed. No operatingstatus/RFSverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
              "host": "gazette.com",
              "date": "2026-03-28",
              "published": "2026-03-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Walsenburg · Huerfano · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "08055"
      }
    },
    {
      "id": "blusky-ai-wells-elko-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "BluSky AI Wells Modular Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Elko"
      ],
      "city": "Wells",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nevada legislative briefing is compiled context, not facility census. LCBexplicitlycannotverifymapcompleteness. Footnotecompares71Baxtellocationsand68DataCenterMaplocations, not70certifiedoperatingphysicalbuildings. Tablelistscompaniesbycountynotnumberofbuildings. BluSkyLOIcompiledfrompressrelease,notexecutedpurchase/permitorWellsparcelconfirmation. Othercountyoperatorstagesnotindependentnewcertification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. No exact-site credit or independent operating census from regional company table.68 versus 71 directory counts and omitted WhitePine/Carson applications illustrate gaps. Page 5 total 716 gallons/year is an apparent missing-unit/magnitude error, not corrected by assumption or used as state total. Withdrawal versus consumption and forecasts remain distinct; no site actuals adopted from secondary tables. General energy/cooling/household/AI-query comparisons and legal summaries are not independently examined primary measurements/laws. Revised CTT/TRIGID footnotes correct older memo errors. All 7 pages extracted/read;countytablepage 2 visuallyviewed. Later originals and observed outcomes take precedence; future dates have no assumed result. Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.. LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075",
          "host": "leg.state.nv.us",
          "date": "2026-05-12",
          "published": "2026-05-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
          "host": "gazette.com",
          "date": "2026-03-28",
          "published": "2026-03-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.14602,
        "lng": -115.3578,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Nevada legislative briefing is compiled context, not facility census",
          "fields": {
            "publisher": "Nevada Legislative Counsel Bureau Research Division",
            "document_date": "2026-05-12",
            "document_stage": "revised background briefing",
            "blusky_elko_county_status_as_compiled": "signed letter of intent",
            "reported_statewide_location_count_approx": 70,
            "statewide_count_scope": "planned, under construction and operational combined; compiled commercial maps"
          },
          "notes": [
            "LCBexplicitlycannotverifymapcompleteness. Footnotecompares71Baxtellocationsand68DataCenterMaplocations, not70certifiedoperatingphysicalbuildings. Tablelistscompaniesbycountynotnumberofbuildings. BluSkyLOIcompiledfrompressrelease,notexecutedpurchase/permitorWellsparcelconfirmation. Othercountyoperatorstagesnotindependentnewcertification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075",
              "host": "leg.state.nv.us",
              "date": "2026-05-12",
              "published": "2026-05-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {},
          "notes": [
            "No exact-site credit or independent operating census from regional company table.68 versus 71 directory counts and omitted WhitePine/Carson applications illustrate gaps. Page 5 total 716 gallons/year is an apparent missing-unit/magnitude error, not corrected by assumption or used as state total. Withdrawal versus consumption and forecasts remain distinct; no site actuals adopted from secondary tables. General energy/cooling/household/AI-query comparisons and legal summaries are not independently examined primary measurements/laws. Revised CTT/TRIGID footnotes correct older memo errors. All 7 pages extracted/read;countytablepage 2 visuallyviewed.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075",
              "host": "leg.state.nv.us",
              "date": "2026-05-12",
              "published": "2026-05-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.",
          "fields": {
            "reported_context": "Gazette March28report describes August2025nonbinding two-acre cannabis-site lease LOI and Wells city-manager opposition, not final denial",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
              "host": "gazette.com",
              "date": "2026-03-28",
              "published": "2026-03-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete seven page May 12, 2026 revised Legislative Counsel Bureau background memorandum lists BluSky AI in Elko County with a letter of intent. Its roster is explicitly compiled from private mapping and selected external accounts, is current as of March 2026 and is not certified complete. The original issuer letter and exact Wells site application were not independently read. A government hosted derivative roster and letter of intent do not establish current exact computing construction, final permission or service. General statewide research and utility projections are not site findings.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "legislative_background_derivative_roster_exact_wells_stage_held",
              "scope": "The complete seven page May 12, 2026 revised Legislative Counsel Bureau background memorandum lists BluSky AI in Elko County with a letter of intent. Its roster is explicitly compiled from private mapping and selected external accounts, is current as of March 2026 and is not certified complete. The original issuer letter and exact Wells site application were not independently read. A government hosted derivative roster and letter of intent do not establish current exact computing construction, final permission or service. General statewide research and utility projections are not site findings."
            },
            "source_read_scope": {
              "complete_seven_page_original_staff_memorandum_read": true,
              "derivative_roster_not_independent_operating_verification": true,
              "original_linked_issuer_release_unread": true,
              "printed_revision_day_not_project_event": true
            }
          },
          "notes": [
            "The complete seven page May 12, 2026 revised Legislative Counsel Bureau background memorandum lists BluSky AI in Elko County with a letter of intent. Its roster is explicitly compiled from private mapping and selected external accounts, is current as of March 2026 and is not certified complete. The original issuer letter and exact Wells site application were not independently read. A government hosted derivative roster and letter of intent do not establish current exact computing construction, final permission or service. General statewide research and utility projections are not site findings.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075",
              "host": "www.leg.state.nv.us",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wells · Elko · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32007"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
