{
  "schema_version": 1,
  "source_compilation_context": {
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "cipher-digital",
    "label": "Cipher Digital"
  },
  "records": [
    {
      "id": "cipher-barber-lake-colorado-city-tx",
      "state": "tx",
      "kind": "project",
      "name": "Cipher Digital Barber Lake",
      "group": "building",
      "status": "Under construction",
      "crypto": false,
      "type": "HPC data-center development",
      "counties": [
        "Mitchell"
      ],
      "city": "Colorado City",
      "address": "951 County Road 204, Colorado City, TX 79512",
      "who": "Cipher Digital",
      "mw": null,
      "power": "",
      "power_note": "Barber Lake:300 MW gross contracted HPC scope from the June 8 issuer exhibit. It is not IT load, current delivered service, a power-meter reading or a completed-campus total. Later delivery milestones remain phased.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Company reports on-site water supply and no draw from the city system; total consumption is not established.",
      "incentives": "",
      "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.",
      "date": "",
      "events": [
        [
          "2026-09-25",
          "Cipher announced an amended Barber Lake lease and phased future hall delivery/rent milestones from Q4 2026 through Q1 2027; no actual opening date is established by this announcement."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-expands-barber-lake-lease-term-20-years",
          "host": "investors.cipherdigital.com",
          "published": "2026-09-25",
          "date": "2026-09-25",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-fluidstack-and-anthropic-commit-10-million-repair",
          "host": "investors.cipherdigital.com",
          "published": "2026-09-14",
          "date": "2026-09-14",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534",
          "host": "www.tdlr.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government project record"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
          "host": "www.sec.gov",
          "published": "2026-06-08",
          "date": "2026-06-08",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://data.texas.gov/resource/5eqq-7nad.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
          "host": "data.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Texas Commission on Environmental Quality source context"
        }
      ],
      "loc": {
        "lat": 32.30622,
        "lng": -100.92121,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Colorado City · Mitchell County · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "texas_program_scope": "Exact program rows and participant roles retained. Effective/exemption dates are not opening, closure, actual tenancy, legal title or realized savings.",
            "current_stage": "Construction/commissioning and tenant compute deployment continue; September 25 amendment shifts phased hall delivery across Q4 2026 to Q1 2027. October 13 update still describes approaching initial rent. Energization or beneficial access is not proof of completed HPC service.",
            "project_address": "951 County Road 204, Colorado City, TX 79512 is the TDLR project-location address in Mitchell County. No contact/mailing address or map point is adopted.",
            "accessibility_registration": "TABS2026023534 is an Architectural Barriers registration, Review Complete, with source start 2025-10-13/completion 2026-12-08 and 800000 sqft scope. These are registered project fields, not verified physical milestones or an issued building permit. Estimated$50 million is not actual spend or public tax cost.",
            "water_supply_statement": "Cipher's September 14 statement says Barber Lake uses an on-site supply and does not draw from Colorado City's system. This is a company statement about supply scope, not measured zero total consumption, a water-rights finding or independent proof of no local impact.",
            "lease_and_program_roles": "Fluidstack lease and the program-listed Anthropic occupant are separate source roles. Backstop/lease duration and announced future contracted revenue do not establish current tenancy, completion, capex or tax savings."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-expands-barber-lake-lease-term-20-years",
              "host": "investors.cipherdigital.com",
              "published": "2026-09-25",
              "date": "2026-09-25",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-fluidstack-and-anthropic-commit-10-million-repair",
              "host": "investors.cipherdigital.com",
              "published": "2026-09-14",
              "date": "2026-09-14",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government project record"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
              "host": "www.sec.gov",
              "published": "2026-06-08",
              "date": "2026-06-08",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "texas_current_program_contexts": {
              "checked": "2026-10-17",
              "reference_rows": [
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "Cipher Barber Lake LLC Data Center",
                  "program": "Qualifying large data center project",
                  "registration_number": "LD910271-OW2"
                }
              ],
              "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Current qualifying data-center and large-project registered lists"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "texas-registry-2026-10-17",
          "scope": "Official Texas registry source context, with initial eligibility and component triage. Not a physical-site census or current-stage review.",
          "fields": {
            "texas_registry_air_context": {
              "regulated_entity": "RN112273891",
              "registry_name": [
                "BARBER LAKE DATA CENTER PROJECT"
              ],
              "program_contexts": [
                {
                  "program": "AIRNSR",
                  "identifiers": [
                    "182754"
                  ]
                }
              ],
              "association_scope": "Barber Lake project, Cipher Barber Lake customer and 951 CR204 agree with the existing cited Barber Lake street context. Contractor affiliates and alternate CR/Co Rd spelling are not extra sites.",
              "limits": "Registry authorizations, emissions reporting and historical customer affiliations can overlap. ACTIVE is a registry value, not proof of signed permit issuance, current operation, title or complete campus buildout. No generator MW, coordinates, street address or physical stage is promoted."
            }
          },
          "notes": [
            "AIRNSR and AIROP entries are registry contexts, not substitutes for signed permits. AIREI is emissions reporting, not a permit. Customer and status dates are not opening, completion or current ownership dates.",
            "The extract is a selected portion of Central Registry and the name/industry query is incomplete for all generator permits. Nonmatches are not evidence of absence."
          ],
          "sources": [
            {
              "url": "https://data.texas.gov/resource/5eqq-7nad.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
              "host": "data.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Texas Commission on Environmental Quality source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "raw_status": "under construction",
      "status_field": "current_status",
      "status_scope": "HPC construction and phased tenant deployment; September 30 source state disclosed October 13. Future hall/rent milestones are not accomplished opening dates.",
      "event_evidence": [
        {
          "date": "2026-09-25",
          "text": "Cipher announced an amended Barber Lake lease and phased future hall delivery/rent milestones from Q4 2026 through Q1 2027; no actual opening date is established by this announcement.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-expands-barber-lake-lease-term-20-years",
              "host": "investors.cipherdigital.com",
              "published": "2026-09-25",
              "date": "2026-09-25",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            }
          ]
        }
      ],
      "building_contexts": [
        {
          "id": "building:cipher-barber-lake-registration-context",
          "name": "Barber Lake accessibility-project building context",
          "phase": null,
          "identity_scope": "Named TDLR project context only; distinct physical building/campus identity remains unresolved.",
          "address": "951 County Road 204, Colorado City, TX 79512",
          "status": "unknown",
          "status_scope": "Accessibility workflow does not establish physical building operating status.",
          "field_sources": {
            "name": [
              "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"
            ],
            "phase": [
              "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"
            ],
            "identity_scope": [
              "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"
            ],
            "address": [
              "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"
            ],
            "status": [
              "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"
            ],
            "status_scope": [
              "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"
            ]
          },
          "conflicts": {}
        }
      ],
      "typed_power_facts": [
        {
          "measure": "contracted_gross_capacity",
          "value": 300,
          "unit": "MW",
          "as_of": "2026-06-08",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "contracted",
          "scope": "Barber Lake:300 MW gross contracted HPC scope from the June 8 issuer exhibit. It is not IT load, current delivered service, a power-meter reading or a completed-campus total. Later delivery milestones remain phased.",
          "sources": [
            "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm"
          ]
        }
      ],
      "typed_water_facts": [
        {
          "measure": "supply_source",
          "value": "Operator reports on-site supply and no draw from the Colorado City municipal system.",
          "unit": null,
          "as_of": "2026-09-14",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "operator_reported_statement",
          "scope": "Qualitative issuer statement about supply source only. Total withdrawal/consumption, water rights, permitted volume and independent local-impact review remain unestablished. No zero-usage volume is inferred.",
          "sources": [
            "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-fluidstack-and-anthropic-commit-10-million-repair"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48335"
      }
    },
    {
      "id": "cipher-black-pearl-wink-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Cipher Digital Black Pearl",
      "group": "operating",
      "status": "Operating phase",
      "crypto": false,
      "type": "HPC data center; former bitcoin mining use",
      "counties": [
        "Winkler"
      ],
      "city": "Wink",
      "address": "",
      "who": "Cipher Digital",
      "mw": null,
      "power": "",
      "power_note": "Black Pearl:300 MW gross capacity contracted for phased HPC delivery. This is not IT load, metered consumption, current delivered capacity or a physical-completion total. Source period June 30,2026; later partial delivery does not prove all 300 MW operational.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.",
      "date": "",
      "events": [
        [
          "2026-08-04",
          "Cipher announced initial Black Pearl HPC capacity delivery during August and rent commencement; remaining halls and phases continued construction. This is the disclosure date, not an exact physical handover day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://investors.cipherdigital.com/node/11731/html",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
          "host": "www.sec.gov",
          "published": "2026-06-08",
          "date": "2026-06-08",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_sic=7374&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
          "host": "echodata.epa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "EPA registry context; not proof of operation"
        }
      ],
      "loc": {
        "lat": 31.84999,
        "lng": -103.04844,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wink · Winkler County · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "texas_program_scope": "Exact program rows and participant roles retained. Effective/exemption dates are not opening, closure, actual tenancy, legal title or realized savings.",
            "epa_registry_scope": {
              "registry_id": "110071658844",
              "identity": "Named Cipher facility/city context matches the issuer disclosure; agency program status is not the facility operating stage.",
              "precision": "EPA coordinates are not adopted. Black Pearl reports 17,483 m accuracy with no collection method; Odessa reports address matching and 30 m accuracy. Neither independently verifies a building center."
            },
            "current_stage": "Initial HPC capacity delivered and rent commenced in August 2026; remaining Phase I fit-out and Phase II construction continue. The initial operating phase does not establish full 300 MW completion.",
            "historical_mining_scope": "Former bitcoin-mining use is a separate period. June 2026 filing describes retrofit; earlier mining production is not evidence of current mining after the HPC conversion.",
            "capacity_scope": "300 MW gross contracted HPC capacity is the lease/site scope, not current delivered IT load, consumption or proof all halls are operating.",
            "program_role_change": "Earlier Cipher-only qualifying entry ends 2026-01-22; later large-project entry effective 2026-01-23 lists Amazon in occupant/operator roles. Those administrative dates do not establish physical closure or reopening."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://investors.cipherdigital.com/node/11731/html",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
              "host": "www.sec.gov",
              "published": "2026-06-08",
              "date": "2026-06-08",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_sic=7374&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
              "host": "echodata.epa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "EPA registry context; not proof of operation"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "texas_current_program_contexts": {
              "checked": "2026-10-17",
              "reference_rows": [
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "Cipher Black Pearl LLC Data Center",
                  "program": "Qualifying data center",
                  "registration_number": "DC470713-OW1"
                },
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "Cipher Black Pearl LLC Data Center",
                  "program": "Qualifying large data center project",
                  "registration_number": "LD089477-OW1"
                }
              ],
              "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Current qualifying data-center and large-project registered lists"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Initial delivered HPC component only, disclosed August 4 and reaffirmed in the October 13 furnished update as of September 30. Remaining halls/phases are construction, not fully operating capacity.",
      "event_evidence": [
        {
          "date": "2026-08-04",
          "text": "Cipher announced initial Black Pearl HPC capacity delivery during August and rent commencement; remaining halls and phases continued construction. This is the disclosure date, not an exact physical handover day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "contracted_gross_capacity",
          "value": 300,
          "unit": "MW",
          "as_of": "2026-06-30",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "contracted",
          "scope": "Black Pearl:300 MW gross capacity contracted for phased HPC delivery. This is not IT load, metered consumption, current delivered capacity or a physical-completion total. Source period June 30,2026; later partial delivery does not prove all 300 MW operational.",
          "sources": [
            "https://investors.cipherdigital.com/node/11731/html"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48495"
      }
    },
    {
      "id": "cipher-colchis-tom-green-tx",
      "state": "tx",
      "kind": "project",
      "name": "Cipher Colchis Campus",
      "group": "proposed",
      "status": "In development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tom Green"
      ],
      "city": "San Angelo",
      "address": "",
      "who": "Cipher Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization. Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [
        [
          "2026-10-13",
          "Cipher furnished a Colchis update describing conditional Batch Zero status in an ERCOT audit process and future energization targets. This disclosure is not a final regulator approval or operating milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate",
          "host": "sanangelolive.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://cipherdigital.com/infrastructure/",
          "host": "cipherdigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
          "host": "www.sec.gov",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        }
      ],
      "loc": {
        "lat": 31.42547,
        "lng": -100.48531,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization.",
            "Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate",
              "host": "sanangelolive.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "current_stage": "Colchis is a named development-pipeline site. Future energization/capacity is conditional and does not establish construction completion, final regulatory approval or operating service.",
            "regulatory_scope": "October 13 furnished update describes 1 GW conditional Batch Zero base-load status within an ERCOT audit process, land secured/deposits funded and a 2028 target. This is issuer disclosure, not a final ERCOT decision or energized IT load."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://cipherdigital.com/infrastructure/",
              "host": "cipherdigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
              "host": "www.sec.gov",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Angelo · Tom Green · Source context reviewed",
      "status_scope": "Development pipeline only. Gross targets and energization forecasts remain conditional, with no operating or actual construction-completion claim.",
      "event_evidence": [
        {
          "date": "2026-10-13",
          "text": "Cipher furnished a Colchis update describing conditional Batch Zero status in an ERCOT audit process and future energization targets. This disclosure is not a final regulator approval or operating milestone.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48451"
      }
    },
    {
      "id": "cipher-digital-odessa-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Cipher Digital Odessa",
      "group": "operating",
      "status": "Operating",
      "crypto": true,
      "type": "Bitcoin mining data center",
      "counties": [
        "Ector"
      ],
      "city": "Odessa",
      "address": "2200 E Interstate 20, Odessa, TX 79766",
      "who": "Cipher Digital",
      "mw": null,
      "power": "",
      "power_note": "Odessa:207 MW gross energized site capacity as reported in the August 4 presentation. This is not critical IT load, metered electricity use, generation or the capacity of a separate planned HPC conversion.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cipherdigital.com/infrastructure/",
          "host": "cipherdigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://investors.cipherdigital.com/node/11731/html",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
          "host": "www.sec.gov",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_ncs=518210&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
          "host": "echodata.epa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "EPA registry context; not proof of operation"
        }
      ],
      "loc": {
        "lat": 31.86911,
        "lng": -102.54297,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Odessa · Ector County · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "operator",
            "texas_program_scope": "Exact program rows and participant roles retained. Effective/exemption dates are not opening, closure, actual tenancy, legal title or realized savings.",
            "epa_registry_scope": {
              "registry_id": "110071181368",
              "identity": "Named Cipher facility/city context matches the issuer disclosure; agency program status is not the facility operating stage.",
              "precision": "EPA coordinates are not adopted. Black Pearl reports 17,483 m accuracy with no collection method; Odessa reports address matching and 30 m accuracy. Neither independently verifies a building center."
            },
            "current_stage": "Current operator portfolio lists Odessa as operating bitcoin-mining capacity; Q2 filing identifies revenue-producing mining at this named facility. HPC lease discussions are a potential later use, not current HPC service.",
            "agency_published_address": "EPA registry names Cipher Mining Odessa Data Center at 2200 E Interstate 20, Odessa 79766, Ector County 48135. The address/registry context is retained; agency ActiveFlag Y and a stormwater program do not supply the operating label."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://cipherdigital.com/infrastructure/",
              "host": "cipherdigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://investors.cipherdigital.com/node/11731/html",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
              "host": "www.sec.gov",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_ncs=518210&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
              "host": "echodata.epa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "EPA registry context; not proof of operation"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "texas_current_program_contexts": {
              "checked": "2026-10-17",
              "reference_rows": [
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "Cipher Mining Technologies Inc. - Odessa Site",
                  "program": "Qualifying data center",
                  "registration_number": "DC453534-OW1"
                }
              ],
              "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Current qualifying data-center and large-project registered lists"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "raw_status": "operating",
      "status_field": "current_status",
      "typed_power_facts": [
        {
          "measure": "site_gross_capacity",
          "value": 207,
          "unit": "MW",
          "as_of": "2026-08-04",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "operator_reported_capacity",
          "scope": "Odessa:207 MW gross energized site capacity as reported in the August 4 presentation. This is not critical IT load, metered electricity use, generation or the capacity of a separate planned HPC conversion.",
          "sources": [
            "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48135"
      }
    },
    {
      "id": "cipher-digital-ulysses-center-township-morgan-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Cipher Digital Ulysses",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Morgan"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Two-hundred MW is secured power-site capacity, not verified critical IT or operating supply. Purchase price and intended initial workload undisclosed. Original utility agreements not reviewed. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://theenergymag.com/news/2025-12-23/cipher-ohio-hpc-pjm",
          "host": "theenergymag.com",
          "date": "2025-12-23",
          "published": "2025-12-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.62053,
        "lng": -81.85381,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "EnergyMag reports Cipher Ulysses Ohio land/power-site acquisition and Q42027 energization target.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Two-hundred MW is secured power-site capacity, not verified critical IT or operating supply. Purchase price and intended initial workload undisclosed. Original utility agreements not reviewed.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://theenergymag.com/news/2025-12-23/cipher-ohio-hpc-pjm",
              "host": "theenergymag.com",
              "date": "2025-12-23",
              "published": "2025-12-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Morgan · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39115"
      }
    },
    {
      "id": "cipher-mclennan-county-tx",
      "state": "tx",
      "kind": "project",
      "name": "Cipher McLennan HPC Data Center",
      "group": "proposed",
      "status": "In development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "McLennan"
      ],
      "city": "Waco",
      "address": "",
      "who": "Cipher Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd. Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/",
          "host": "wacobridge.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://cipherdigital.com/infrastructure/",
          "host": "cipherdigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
          "host": "www.sec.gov",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        }
      ],
      "loc": {
        "lat": 31.55244,
        "lng": -97.20197,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "SamShaw WacoBridge May27updatedJune18,2026 original companyemail/landrecordreport: McLennanCipher300acres nearRattlesnakeRoad/Riesel, up500MWprojectrequestedgridaccess. No explicitITbasis or Juneexpectedapprovalobserved; existing900MWcoalplantnotcampusITtoadd.",
            "Water/coolingnotchosen; noRieselcitywater promise doesnotmeanzerowater. NearbyLakeCreek10000acrefeet/year/9MGDpotential not ownedrightsoractualdata-centeruse.13Maveragetax/yearoverdecade lacks jurisdictionbreakdown, notpaidreceipt.300acreland dealsOctober/Februaryreferencesnotoneinventedclosingday.13Mnotcapex. Originalreportedsectionsread; embeddedrepublishcopyignored.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/",
              "host": "wacobridge.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "current_stage": "McLennan is a named development-pipeline site. Future energization/capacity is conditional and does not establish construction completion, final regulatory approval or operating service.",
            "pipeline_scope": "Issuer identifies 500 MW gross target capacity and future energization, subject to the ERCOT process. Company pipeline totals are not assigned to this site as current IT load or approved utility service."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://cipherdigital.com/infrastructure/",
              "host": "cipherdigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
              "host": "www.sec.gov",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Waco · McLennan · Source context reviewed",
      "status_scope": "Development pipeline only. Gross targets and energization forecasts remain conditional, with no operating or actual construction-completion claim.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48309"
      }
    },
    {
      "id": "cipher-stingray-andrews-county-tx",
      "state": "tx",
      "kind": "project",
      "name": "Cipher Digital Stingray",
      "group": "building",
      "status": "Under construction",
      "crypto": false,
      "type": "HPC data-center development",
      "counties": [
        "Andrews"
      ],
      "city": "Andrews",
      "address": "",
      "who": "Cipher Digital",
      "mw": null,
      "power": "",
      "power_note": "Stingray:70 MW critical IT capacity under contract for future phased HPC delivery, separately stated from 100 gross MW. This is not delivered or metered IT load. April/May 2027 rent milestones are targets; construction remains the supported stage.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
          "host": "www.sec.gov",
          "published": "2026-06-08",
          "date": "2026-06-08",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/exh992revduploadtoworkiv.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        }
      ],
      "loc": {
        "lat": 32.27409,
        "lng": -102.63496,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Andrews · Andrews County · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "current_stage": "HPC construction: earthwork, underground electrical work, foundations and steel erection disclosed as of September 30. Past energization forecasts and a signed lease do not establish current HPC operation.",
            "county_context": "Older issuer exhibit explicitly places the acquired Stingray site in Andrews County, Texas; June 2026 exhibit locates the HPC development in Andrews. No point/parcel or contact address is adopted.",
            "contracted_capacity_and_dates": "June 8 exhibit separates 100 gross MW from 70 IT MW under contract. April 1/May 1,2027 network/data-hall rent dates are targets, not accomplished operation."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
              "host": "www.sec.gov",
              "published": "2026-06-08",
              "date": "2026-06-08",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/exh992revduploadtoworkiv.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        }
      ],
      "raw_status": "under construction",
      "status_field": "current_status",
      "status_scope": "HPC construction, based on September 30 source state furnished October 13. Contracted future capacity and rent targets do not establish operating service.",
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 70,
          "unit": "MW",
          "as_of": "2026-06-08",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "contracted",
          "scope": "Stingray:70 MW critical IT capacity under contract for future phased HPC delivery, separately stated from 100 gross MW. This is not delivered or metered IT load. April/May 2027 rent milestones are targets; construction remains the supported stage.",
          "sources": [
            "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48003"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
