  "schema_version": 1,
  "source_compilation_context": {
    "co": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/co.json",
      "updated": "2026-10-26"
    },
    "mo": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mo.json",
      "updated": "2026-10-26"
    },
    "ne": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ne.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "crusoe",
    "label": "Crusoe"
  },
  "records": [
    {
      "id": "crusoe-blue-energy-victoria-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Crusoe Victoria AI Factory",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Calhoun"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blue Energy and Crusoe proposed gas-to-nuclear campus. 1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-30",
          "Crusoe announced the Blue Energy partnership for a future campus near the Port of Victoria. October 30, 2025 is the release date confirmed by its newsroom. Future gas service and nuclear generation targets are not a completed opening or nuclear construction authorization."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
          "host": "crusoe.ai",
          "date": "2025-10-30",
          "published": "2025-10-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12/query?where=1%3D1&outFields=GEOID%2CSTATE%2CCOUNTY%2CBASENAME%2CNAME%2CLSADC%2CCOUNTYCC%2COBJECTID&returnGeometry=true&outSR=4326&geometryPrecision=4&f=geojson&orderByFields=GEOID",
          "host": "tigerweb.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Retained generalized Census county reference"
        },
        {
          "url": "https://www.crusoe.ai/resources/newsroom?18bea8f7_page=3&1fdf54dd_page=2",
          "host": "www.crusoe.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 28.50431,
        "lng": -96.60401,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Blue Energy and Crusoe proposed gas-to-nuclear campus",
          "fields": {
            "project_region": "Port of Victoria, Texas",
            "operator_named_campus_county": "Calhoun County, Texas",
            "planned_crusoe_campus_acres": 1600,
            "planned_nuclear_plant_generation_gw_max": 1.5,
            "early_gas_powered_service_target_year": 2028,
            "nuclear_generation_target_year": 2031,
            "partners": [
              "Blue Energy",
              "Crusoe"
            ],
            "original_heading_date": "2025-10-30",
            "secondary_template_date": "2026-08-18"
          },
          "notes": [
            "1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "crusoe.ai",
              "date": "2025-10-30",
              "published": "2025-10-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "site-location-correction-20261021-crusoe",
          "scope": "Crusoe explicitly corrects the campus county to Calhoun County, Texas. The Port of Victoria brand does not establish Victoria County or a legal municipality. Correct geographic text and jurisdiction context and suppress the inherited point. No replacement coordinate, physical stage, parcel, power plant or technical quantity promotion.",
          "fields": {
            "campus_county_correction": {
              "operator_named_campus_county": "Calhoun County, Texas",
              "superseded_county": "Victoria County, Texas",
              "municipality_established": false,
              "site_point_adopted": false,
              "power_plant_location_used_as_campus": false
            },
            "county_reference": {
              "name": "Calhoun County",
              "state": "TX",
              "county_fips": "48057",
              "vintage": "2025-01-01",
              "scale": "1:5,000,000",
              "scope": "Generalized display reference, not a project parcel or legal municipality."
            }
          },
          "notes": [
            "The retained older context already warned of the county discrepancy. This makes that correction explicit in current geographic fields.",
            "Planned generation, IT capacity and 2028/2031 forecasts remain separate. None is newly adopted here. County context is not a verified project parcel."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "www.crusoe.ai",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-20",
              "label": "Crusoe"
            },
            {
              "url": "https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12/query?where=1%3D1&outFields=GEOID%2CSTATE%2CCOUNTY%2CBASENAME%2CNAME%2CLSADC%2CCOUNTYCC%2COBJECTID&returnGeometry=true&outSR=4326&geometryPrecision=4&f=geojson&orderByFields=GEOID",
              "host": "tigerweb.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Retained generalized Census county reference"
            }
          ],
          "checked": "2026-10-20",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 9",
          "scope": "The Crusoe release heading and newsroom index identify the Blue Energy partnership announcement as October 30, 2025. A secondary August 18, 2026 template date is not used to reset publication. The source explicitly locates the campus in Calhoun County, as already retained. Future gas and nuclear generation targets are not a license, completed energization or current data center operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historic_partnership_forecasts_current_stage_held",
              "scope": "The Crusoe release heading and newsroom index identify the Blue Energy partnership announcement as October 30, 2025. A secondary August 18, 2026 template date is not used to reset publication. The source explicitly locates the campus in Calhoun County, as already retained. Future gas and nuclear generation targets are not a license, completed energization or current data center operation."
            },
            "source_date_and_jurisdiction_context": {
              "heading_and_newsroom_publication_on": "2025-10-30",
              "secondary_template_date": "2026-08-18",
              "county_explicitly_corrected_by_source": "Calhoun",
              "native_county_already_retained": true,
              "future_generation_targets_not_operating_capacity": true
            }
          },
          "notes": [
            "The Crusoe release heading and newsroom index identify the Blue Energy partnership announcement as October 30, 2025. A secondary August 18, 2026 template date is not used to reset publication. The source explicitly locates the campus in Calhoun County, as already retained. Future gas and nuclear generation targets are not a license, completed energization or current data center operation.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "www.crusoe.ai",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.crusoe.ai/resources/newsroom?18bea8f7_page=3&1fdf54dd_page=2",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Calhoun County · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-10-30",
          "text": "Crusoe announced the Blue Energy partnership for a future campus near the Port of Victoria. October 30, 2025 is the release date confirmed by its newsroom. Future gas service and nuclear generation targets are not a completed opening or nuclear construction authorization.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "www.crusoe.ai",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.crusoe.ai/resources/newsroom?18bea8f7_page=3&1fdf54dd_page=2",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48057"
      }
    },
    {
      "id": "crusoe-callaway-county-kingdom-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Crusoe Callaway County Data Center (proposed)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Callaway"
      ],
      "city": "Kingdom City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html",
          "host": "komu.com",
          "date": "2026-07-14",
          "published": "2026-07-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.83527,
        "lng": -91.92612,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "KOMU describes Callaway County Crusoe open house, with no construction or county contract at report date.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html",
              "host": "komu.com",
              "date": "2026-07-14",
              "published": "2026-07-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kingdom City · Callaway · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29027"
      }
    },
    {
      "id": "crusoe-monolith-hallam-lancaster-ne",
      "state": "ne",
      "kind": "facility",
      "name": "Crusoe Hallam Data Center (Monolith Olive Creek campus)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lancaster"
      ],
      "city": "Hallam",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No construction date released. Original approval conditions and power basis not reviewed; public reaction is not unanimous support. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-08-19",
          "The original Hallam August 19, 2026 Planning Commission minutes record a unanimous pause to obtain further information and the discussed sound study. This is a procedural action rather than a general enacted Village moratorium or a final computing permit decision."
        ],
        [
          "2026-09-16",
          "The original Hallam September 16, 2026 Planning Commission minutes record four members supporting a recommendation on the revised computing application to the Board. A recommendation is separate from a completed final Board permit vote or computing construction."
        ],
        [
          "2026-09-14",
          "The original Hallam September 14, 2026 Board minutes record all five trustees voting to table a resident proposal for a single facility limit until further planning information and the October Board meeting. This is postponement rather than enactment of a Village computing ban or numerical limit."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wowt.com/2026/10/06/hallam-village-board-approves-zoning-rights-data-center/",
          "host": "wowt.com",
          "date": "2026-10-05",
          "published": "2026-10-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf",
          "host": "villageofhallamnebraska.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf",
          "host": "villageofhallamnebraska.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf",
          "host": "villageofhallamnebraska.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/October-Agenda-2026-R.pdf",
          "host": "villageofhallamnebraska.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 40.7993,
        "lng": -96.70435,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "KOLN report carried by WOWT says Hallam board approved zoning rights Monday following July special-permit step with Monolith.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No construction date released. Original approval conditions and power basis not reviewed; public reaction is not unanimous support.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wowt.com/2026/10/06/hallam-village-board-approves-zoning-rights-data-center/",
              "host": "wowt.com",
              "date": "2026-10-05",
              "published": "2026-10-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 73",
          "scope": "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "village_named_olive_creek_proposal_recommendation_not_final_vote",
              "scope": "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims."
            },
            "source_read_scope": {
              "original_august_minutes_selected_physical_pages1_3_4_5_6_14_16_21_read": true,
              "original_september_planning_minutes_selected_physical_pages1_4_5_read": true,
              "original_september_board_selected_resolution_and_vote_passages_read": true,
              "complete_original_october_agenda_text_read": true,
              "no_unread_october_vote_or_current_operation_adopted": true,
              "private_resident_names_and_addresses_omitted": true
            }
          },
          "notes": [
            "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf",
              "host": "villageofhallamnebraska.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf",
              "host": "villageofhallamnebraska.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf",
              "host": "villageofhallamnebraska.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/October-Agenda-2026-R.pdf",
              "host": "villageofhallamnebraska.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hallam · Lancaster · Source context reviewed",
      "status_scope": "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims.",
      "event_evidence": [
        {
          "date": "2026-08-19",
          "text": "The original Hallam August 19, 2026 Planning Commission minutes record a unanimous pause to obtain further information and the discussed sound study. This is a procedural action rather than a general enacted Village moratorium or a final computing permit decision.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf",
              "host": "villageofhallamnebraska.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-09-16",
          "text": "The original Hallam September 16, 2026 Planning Commission minutes record four members supporting a recommendation on the revised computing application to the Board. A recommendation is separate from a completed final Board permit vote or computing construction.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf",
              "host": "villageofhallamnebraska.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-09-14",
          "text": "The original Hallam September 14, 2026 Board minutes record all five trustees voting to table a resident proposal for a single facility limit until further planning information and the October Board meeting. This is postponement rather than enactment of a Village computing ban or numerical limit.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf",
              "host": "villageofhallamnebraska.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "31109"
      }
    },
    {
      "id": "crusoe-nolan-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Crusoe Nolan County Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Nolan"
      ],
      "city": "Sweetwater",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Seven-billion investment and200MW are proposed. Commissioner safeguards/own-generation statements not measured performance or executed contract review. Construction jobs temporary; PILOT and charity distinct from tax receipts. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved",
          "host": "ktxs.com",
          "date": "2026-04-13",
          "published": "2026-04-13",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.30352,
        "lng": -100.40614,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "KTXS reports Nolan County approved ten-year abatement for Crusoe proposal and quoted future PILOT/charitable payments.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Seven-billion investment and200MW are proposed. Commissioner safeguards/own-generation statements not measured performance or executed contract review. Construction jobs temporary; PILOT and charity distinct from tax receipts.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved",
              "host": "ktxs.com",
              "date": "2026-04-13",
              "published": "2026-04-13",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sweetwater · Nolan · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48353"
      }
    },
    {
      "id": "crusoe-walden-co",
      "state": "co",
      "kind": "facility",
      "name": "Crusoe Energy Digital Flare Mitigation  -  Oxbow Well Pad",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Walden",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Crusoe NYDIG portfolio transaction context only. Portfolio spans seven states and Argentina, not Walden-only. Does not mention exact Walden facility/parcel or prove transaction later closed.425modularunits not425independently located physical buildings. Environmental estimates attributed company claims not independently certified. August18,2026secondary template date does not replace March25,2025release. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.crusoe.ai/resources/newsroom/nydig-to-acquire-crusoes-bitcoin-mining-operation-crusoe-to-scale-vertically",
          "host": "crusoe.ai",
          "date": "2025-03-25",
          "published": "2025-03-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.66658,
        "lng": -106.34312,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Crusoe NYDIG portfolio transaction context only",
          "fields": {
            "transaction_announcement_date": "2025-03-25",
            "transaction_stage_at_announcement": "NYDIG plans to acquire Crusoe bitcoin operation, subject to regulatory approvals, consents and closing",
            "portfolio_modular_data_centers_min_exclusive": 425,
            "portfolio_power_mw_min_exclusive": 250,
            "portfolio_employee_transfer_expected_approx": 135,
            "walden_specific_acquisition_closed_date": null
          },
          "notes": [
            "Portfolio spans seven states and Argentina, not Walden-only. Does not mention exact Walden facility/parcel or prove transaction later closed.425modularunits not425independently located physical buildings. Environmental estimates attributed company claims not independently certified. August18,2026secondary template date does not replace March25,2025release.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/nydig-to-acquire-crusoes-bitcoin-mining-operation-crusoe-to-scale-vertically",
              "host": "crusoe.ai",
              "date": "2025-03-25",
              "published": "2025-03-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 47",
          "scope": "The original company release describes a planned portfolio transaction subject to approvals, consents and closing, and mentions operations across multiple states. It does not identify the exact Oxbow well pad. Portfolio operation and a pending sale do not establish this site current physical stage or transfer its provider role. The page contains multiple displayed dates, so no exact site transaction date or closing event is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "portfolio_transaction_without_exact_site_crosswalk_stage_held",
              "scope": "The original company release describes a planned portfolio transaction subject to approvals, consents and closing, and mentions operations across multiple states. It does not identify the exact Oxbow well pad. Portfolio operation and a pending sale do not establish this site current physical stage or transfer its provider role. The page contains multiple displayed dates, so no exact site transaction date or closing event is promoted."
            }
          },
          "notes": [
            "The original company release describes a planned portfolio transaction subject to approvals, consents and closing, and mentions operations across multiple states. It does not identify the exact Oxbow well pad. Portfolio operation and a pending sale do not establish this site current physical stage or transfer its provider role. The page contains multiple displayed dates, so no exact site transaction date or closing event is promoted.",
            "Existing identities, provider roles, locations, jurisdiction, quantities and physical opening fields remain unchanged. Publication, administrative filing and withdrawal dates are not physical opening dates."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/nydig-to-acquire-crusoes-bitcoin-mining-operation-crusoe-to-scale-vertically",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Walden · Jackson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "08057"
      }
    },
    {
      "id": "crusoe-warrenton-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Crusoe Warrenton Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Warren"
      ],
      "city": "Warrenton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses. Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583",
          "host": "warrencountyrecord.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.76459,
        "lng": -91.16076,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "original-operator-transaction-and-local-outcomes-round61-2026-10-15.json",
          "scope": "Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.",
          "fields": {},
          "notes": [
            "WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses.",
            "Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read.",
            "Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."
          ],
          "sources": [
            {
              "url": "https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583",
              "host": "warrencountyrecord.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Warrenton · Warren · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29219"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}