{
  "schema_version": 1,
  "source_compilation_context": {
    "al": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/al.json",
      "updated": "2026-10-24"
    },
    "az": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/az.json",
      "updated": "2026-10-24"
    },
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    },
    "ia": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ia.json",
      "updated": "2026-10-24"
    },
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    },
    "mo": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mo.json",
      "updated": "2026-10-26"
    },
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    },
    "ut": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ut.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "edged",
    "label": "Edged"
  },
  "records": [
    {
      "id": "edged-atlanta-tilford-yard-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Edged Atlanta (ATL01)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html",
          "host": "prnewswire.com",
          "date": "2024-08-22",
          "published": "2024-08-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/news/edged-us-tops-out-ultra---efficient-42-mw-data-center-optimized-for-ai-inference-at-scale-at-its-atlanta-campus",
          "host": "edged.us",
          "published": "2026-04-24",
          "date": "2026-04-24",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://edged.us/atlanta",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        }
      ],
      "loc": {
        "lat": 33.80394,
        "lng": -84.48247,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-release-review-round6-2026-10-14.json",
          "scope": "named issuer release",
          "fields": {
            "first_building_opening_event_date": "2024-08-21",
            "published_address": "1800 Thomas Street NW, Atlanta, GA",
            "first_building_capacity_mw": 27,
            "planned_campus_critical_capacity_mw": 168,
            "campus_buildings": 3,
            "operator_described_economic_investment_region_usd": 1690000000,
            "tax_revenue_forecast_usd_approx": 70000000,
            "tax_revenue_forecast_period_years": 10
          },
          "notes": [
            "ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html",
              "host": "prnewswire.com",
              "date": "2024-08-22",
              "published": "2024-08-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-tops-out-ultra---efficient-42-mw-data-center-optimized-for-ai-inference-at-scale-at-its-atlanta-campus",
              "host": "edged.us",
              "published": "2026-04-24",
              "date": "2026-04-24",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The retained campus identity is not split into the three advertised ATL01 components. Campus capacity and individual facility status remain outside this role review.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The retained campus identity is not split into the three advertised ATL01 components. Campus capacity and individual facility status remain outside this role review."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The retained campus identity is not split into the three advertised ATL01 components. Campus capacity and individual facility status remain outside this role review."
          ],
          "sources": [
            {
              "url": "https://edged.us/atlanta",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Atlanta · Fulton · Source context reviewed",
      "status_scope": "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "edged-aurora-il",
      "state": "il",
      "kind": "facility",
      "name": "Edged Chicago Campus  -  Aurora (ORD01)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "DuPage"
      ],
      "city": "Aurora",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. ReleaseNovember14saysceremonyyesterday. Campusfirstbuildingopennotsecondphaseonline. Water-savingcomparisonandportfolioPUEdesignnotmeasuredsiteconsumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://edged.us/news/edged-us-expands-chicagoland-campus",
          "host": "edged.us",
          "date": "2025-11-14",
          "published": "2025-11-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/news/edged-us-tops-out-second-sustainable-data-center-on-edged-chicago-campus",
          "host": "edged.us",
          "published": "2026-06-04",
          "date": "2026-06-04",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://edged.us/chicago",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2835+Bilter+Road%2C+Aurora%2C+IL+60502&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal published street query, calculated range only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-88.24994331826387%2C41.80207128853755%2C-88.23668668173612%2C41.81195271146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -88.243315,
        "lat": 41.807012,
        "precision": "approximate",
        "basis": "The original operator computing source identifies 2835 Bilter Road, Aurora, IL 60502. One complete unique literal Census street range supports this approximate shared campus street context inside the unchanged county. The shared ORD01 street selects no separate phase or building. No roof, tenant floor, surveyed parcel, whole campus or current computing operation is certified. Original source publication date and imagery acquisition date are unknown; imagery may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "second_building_groundbreaking_event": "2025-11-13",
            "second_building_planned_critical_power_mw": 72,
            "second_building_published_address": "2835 Bilter Road, Aurora, IL",
            "first_building_opening_month": "2025-02",
            "second_building_operation_target": "2027-Q2"
          },
          "notes": [
            "ReleaseNovember14saysceremonyyesterday. Campusfirstbuildingopennotsecondphaseonline. Water-savingcomparisonandportfolioPUEdesignnotmeasuredsiteconsumption.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-expands-chicagoland-campus",
              "host": "edged.us",
              "date": "2025-11-14",
              "published": "2025-11-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Edged reported on June 4, 2026 that its first Chicago campus facility opened in February 2025, while construction continued on a second facility targeted for the second quarter of 2027. Only an operating phase of the existing Aurora campus is supported. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "Edged reported on June 4, 2026 that its first Chicago campus facility opened in February 2025, while construction continued on a second facility targeted for the second quarter of 2027. Only an operating phase of the existing Aurora campus is supported. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Edged reported on June 4, 2026 that its first Chicago campus facility opened in February 2025, while construction continued on a second facility targeted for the second quarter of 2027. Only an operating phase of the existing Aurora campus is supported."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-tops-out-second-sustainable-data-center-on-edged-chicago-campus",
              "host": "edged.us",
              "published": "2026-06-04",
              "date": "2026-06-04",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Chicago and names Aurora and ORD01 components. Its optional future split is not a physical building count or separate identity.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Chicago and names Aurora and ORD01 components. Its optional future split is not a physical building count or separate identity."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Chicago and names Aurora and ORD01 components. Its optional future split is not a physical building count or separate identity."
          ],
          "sources": [
            {
              "url": "https://edged.us/chicago",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 68, 2026-10-24",
          "scope": "The exact original computing source street and a calculated literal Census range only. Every existing physical stage, role, quantity, title, address, county and source history stays exact. No roof, tenant floor, current operator certification or whole campus is established.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -88.243315,
                "lat": 41.807012,
                "precision": "approximate",
                "basis": "The original operator computing source identifies 2835 Bilter Road, Aurora, IL 60502. One complete unique literal Census street range supports this approximate shared campus street context inside the unchanged county. The shared ORD01 street selects no separate phase or building. No roof, tenant floor, surveyed parcel, whole campus or current computing operation is certified. Original source publication date and imagery acquisition date are unknown; imagery may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2835 Bilter Road, Aurora, IL 60502",
              "county_fips": [
                "17043"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The exact original computing source street and a calculated literal Census range only. Every existing physical stage, role, quantity, title, address, county and source history stays exact. No roof, tenant floor, current operator certification or whole campus is established.",
            "The inherited general area coordinate was not an independently reviewed computing street reference. The exact original computing source and one complete literal Census query uniquely support this bounded street reference inside the unchanged county. The measured correction is 3866.9 metres. The original operator street is shared across the named campus phases and remains approximate. This documents a source reference correction, not physical relocation, title, current operation, a selected building or a complete campus boundary.",
            "Original operator campus street supports only shared context across ORD01 phases; no phase specific roof or complete campus boundary.",
            "The complete source setting image shows the literal street through a mix of undeveloped land, ponds and larger buildings. Acquisition date is unknown and may predate construction. It supports context only; no phase specific roof, campus extent or current building count is selected."
          ],
          "sources": [
            {
              "url": "https://edged.us/chicago",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Exact original named computing site street, distinct from mail and technical figures"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2835+Bilter+Road%2C+Aurora%2C+IL+60502&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal published street query, calculated range only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-88.24994331826387%2C41.80207128853755%2C-88.23668668173612%2C41.81195271146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate shared source street context, not a roof or whole campus",
      "summary": "Aurora · DuPage · Source context reviewed",
      "status_scope": "Edged reported on June 4, 2026 that its first Chicago campus facility opened in February 2025, while construction continued on a second facility targeted for the second quarter of 2027. Only an operating phase of the existing Aurora campus is supported. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "edged-bluffdale-ut",
      "state": "ut",
      "kind": "facility",
      "name": "Edged Salt Lake City Data Center (Project Inabi)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Salt Lake"
      ],
      "city": "Bluffdale",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical planning agenda with exact item distinction. Agenda scheduled consideration and vote, not outcome. The public-hearing label applies to a different hot-springs item, not data center item5. City Hall is meeting venue, not project site. Attachment posting2024notproject opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.utah.gov/pmn/sitemap/notice/876505.html",
          "host": "utah.gov",
          "date": "2023-12-04",
          "published": "2023-12-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.65791,
        "lng": -111.97391,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "historical planning agenda with exact item distinction",
          "fields": {
            "proposed_project_name": "Project Inabi Edged Data Center",
            "site_acres": 22.91,
            "published_site_location": "600 West Bluffdale Boulevard,14600South,Bluffdale,Utah",
            "planning_site_plan_consideration_scheduled_date": "2023-12-06"
          },
          "notes": [
            "Agenda scheduled consideration and vote, not outcome. The public-hearing label applies to a different hot-springs item, not data center item5. City Hall is meeting venue, not project site. Attachment posting2024notproject opening.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.utah.gov/pmn/sitemap/notice/876505.html",
              "host": "utah.gov",
              "date": "2023-12-04",
              "published": "2023-12-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The original Utah public notice identifies Project Inabi Edged Data Center as a proposed site plan for December 6, 2023 consideration. Its posted and later edited metadata are distinct from the meeting date. The reviewed agenda body is not the minutes or an accomplished vote. Other Edged cities, historic proposal drawings and an elapsed target are not an accepted current exact Bluffdale construction or computing account.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historic_exact_inabi_site_plan_agenda_without_current_physical_phase",
              "scope": "The original Utah public notice identifies Project Inabi Edged Data Center as a proposed site plan for December 6, 2023 consideration. Its posted and later edited metadata are distinct from the meeting date. The reviewed agenda body is not the minutes or an accomplished vote. Other Edged cities, historic proposal drawings and an elapsed target are not an accepted current exact Bluffdale construction or computing account."
            }
          },
          "notes": [
            "The original Utah public notice identifies Project Inabi Edged Data Center as a proposed site plan for December 6, 2023 consideration. Its posted and later edited metadata are distinct from the meeting date. The reviewed agenda body is not the minutes or an accomplished vote. Other Edged cities, historic proposal drawings and an elapsed target are not an accepted current exact Bluffdale construction or computing account.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.utah.gov/pmn/sitemap/notice/876505.html",
              "host": "www.utah.gov",
              "published": "2023-12-04",
              "date": "2023-12-04",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bluffdale · Salt Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49035"
      }
    },
    {
      "id": "edged-columbus-new-albany-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Edged Columbus",
      "group": "operating",
      "status": "Operator-announced opening",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "New Albany",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. ReleaseSeptember11saysopeningyesterday. Criticalcapacityspecificationnotmeasuredload.92Mgallonswatersavingscomparedtoconventionaldesignnotactualwaterwithdrawal;1.15PUEportfolioaverage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://edged.us/news/columbus-grand-opening",
          "host": "edged.us",
          "date": "2025-09-11",
          "published": "2025-09-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/columbus",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        }
      ],
      "loc": {
        "lat": 39.99348,
        "lng": -82.99121,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "opening_event_date": "2025-09-10",
            "critical_capacity_mw": 24,
            "published_city": "New Albany, Ohio"
          },
          "notes": [
            "ReleaseSeptember11saysopeningyesterday. Criticalcapacityspecificationnotmeasuredload.92Mgallonswatersavingscomparedtoconventionaldesignnotactualwaterwithdrawal;1.15PUEportfolioaverage.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/columbus-grand-opening",
              "host": "edged.us",
              "date": "2025-09-11",
              "published": "2025-09-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_announced_opening",
              "scope": "Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
              "reported_stage_date": {
                "date": "2025-09-10",
                "basis": "operator_reported_opening",
                "status_label": "Operator-announced opening",
                "source_scope": "September 11 release explicitly describes the opening celebration as yesterday; independent commissioning and all halls are not certified."
              }
            }
          },
          "notes": [
            "Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/columbus-grand-opening",
              "host": "edged.us",
              "published": "2025-09-11",
              "date": "2025-09-11",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Columbus and explicitly names New Albany. The marketing city does not replace current city or county fields.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Columbus and explicitly names New Albany. The marketing city does not replace current city or county fields."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Columbus and explicitly names New Albany. The marketing city does not replace current city or county fields."
          ],
          "sources": [
            {
              "url": "https://edged.us/columbus",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Franklin · Source context reviewed",
      "status_scope": "Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39049"
      }
    },
    {
      "id": "edged-council-bluffs-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Edged Council Bluffs Data Center Campus (Project Lola)",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pottawattamie"
      ],
      "city": "Council Bluffs",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Plan approval does not establish a delivered building, working substation or current opening. Keep the revised size distinct from the superseded concept. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-09-11",
          "Edged published its Council Bluffs OMA01 1 and OMA01 2 structural framework milestone account September 11, 2026. The company reports topping out of the two buildings that day. This records the company account and does not establish campus operation or delivery of all marketed capacity."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.3newsnow.com/council-bluffs/council-bluffs-project-lola-data-center-reduced-in-size-still-planned-near-iowa-western",
          "host": "3newsnow.com",
          "date": "2025-06-10",
          "published": "2025-06-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs",
          "host": "edged.us",
          "published": "2026-09-11",
          "date": "2026-09-11",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.33659,
        "lng": -95.54273,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "KMTV reports Council Bluffs amended Project Lola from 450,000 to 285,000 square feet and reduced building height.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Plan approval does not establish a delivered building, working substation or current opening. Keep the revised size distinct from the superseded concept.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.3newsnow.com/council-bluffs/council-bluffs-project-lola-data-center-reduced-in-size-still-planned-near-iowa-western",
              "host": "3newsnow.com",
              "date": "2025-06-10",
              "published": "2025-06-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_reported_two_council_bluffs_structural_frameworks_not_campus_operation",
              "scope": "Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged."
            }
          },
          "notes": [
            "Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs",
              "host": "edged.us",
              "published": "2026-09-11",
              "date": "2026-09-11",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The September 11, 2026 company release describes development of its Council Bluffs campus. Developer per source does not establish current operation, a land title or completion of the whole campus. The two named structures do not become two new records.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The September 11, 2026 company release describes development of its Council Bluffs campus. Developer per source does not establish current operation, a land title or completion of the whole campus. The two named structures do not become two new records."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The September 11, 2026 company release describes development of its Council Bluffs campus. Developer per source does not establish current operation, a land title or completion of the whole campus. The two named structures do not become two new records."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs",
              "host": "edged.us",
              "published": "2026-09-11",
              "date": "2026-09-11",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped developer relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Council Bluffs · Pottawattamie · Source context reviewed",
      "status_scope": "Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged.",
      "event_evidence": [
        {
          "date": "2026-09-11",
          "text": "Edged published its Council Bluffs OMA01 1 and OMA01 2 structural framework milestone account September 11, 2026. The company reports topping out of the two buildings that day. This records the company account and does not establish campus operation or delivery of all marketed capacity.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs",
              "host": "edged.us",
              "published": "2026-09-11",
              "date": "2026-09-11",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19155"
      }
    },
    {
      "id": "edged-dallas-irving-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Edged Dallas (Irving)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Irving",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Pasttargetnotcurrentopeningproof. Operatorreportofcouncilsupportnotindependentreviewedsignedpermit. Nozero-waterwhole-siteclaimfromwaterlesscooling. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://edged.us/news/edged-dallas-irving",
          "host": "edged.us",
          "date": "2024-04-12",
          "published": "2024-04-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://data.texas.gov/resource/t34q-qzi3.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
          "host": "data.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Texas Commission on Environmental Quality source context"
        },
        {
          "url": "https://edged.us/news/edged-us-adds-second-ultra-efficient-high-performance-ai-data-center-to-its-irving-texas-campus",
          "host": "edged.us",
          "published": "2026-01-15",
          "date": "2026-01-15",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=505+North+Wildwood+Drive%2C+Irving%2C+TX&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-96.92067021820111%2C32.81436604345353%2C-96.9131878637929%2C32.82065422167847&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting only, acquisition date unknown"
        },
        {
          "url": "https://edged.us/dallas",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        }
      ],
      "loc": {
        "lng": -96.916929040997,
        "lat": 32.817510132566,
        "precision": "address",
        "basis": "Published Edged facility address 505 North Wildwood Drive matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "development_announcement": "2024-04-12",
            "operator_reported_city_council_support_date": "2024-04-11",
            "published_address": "505 N Wildwood Drive, Irving, Texas",
            "planned_critical_capacity_mw": 24,
            "opening_target": "fall2024"
          },
          "notes": [
            "Pasttargetnotcurrentopeningproof. Operatorreportofcouncilsupportnotindependentreviewedsignedpermit. Nozero-waterwhole-siteclaimfromwaterlesscooling.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-dallas-irving",
              "host": "edged.us",
              "date": "2024-04-12",
              "published": "2024-04-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "texas-registry-2026-10-17",
          "scope": "Official Texas registry source context, with initial eligibility and component triage. Not a physical-site census or current-stage review.",
          "fields": {
            "texas_registry_air_context": {
              "regulated_entity": "RN111969002",
              "registry_name": [
                "EDGED ENERGY NFL"
              ],
              "program_contexts": [
                {
                  "program": "AIRNSR",
                  "identifiers": [
                    "185610"
                  ]
                }
              ],
              "association_scope": "Edged Dallas customer plus Irving Wildwood address and Edged Energy name support the inherited Edged Dallas/Irving research context; no operating-stage promotion.",
              "limits": "Registry authorizations, emissions reporting and historical customer affiliations can overlap. ACTIVE is a registry value, not proof of signed permit issuance, current operation, title or complete campus buildout. No generator MW, coordinates, street address or physical stage is promoted."
            }
          },
          "notes": [
            "AIRNSR and AIROP entries are registry contexts, not substitutes for signed permits. AIREI is emissions reporting, not a permit. Customer and status dates are not opening, completion or current ownership dates.",
            "The extract is a selected portion of Central Registry and the name/industry query is incomplete for all generator permits. Nonmatches are not evidence of absence."
          ],
          "sources": [
            {
              "url": "https://data.texas.gov/resource/t34q-qzi3.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
              "host": "data.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Texas Commission on Environmental Quality source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Edged reported on January 15, 2026 that the first Irving facility opened in January 2025 while announcing a second facility with future groundbreaking. This supports an operating phase, not completion of the second facility or the separate Fort Worth development. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "Edged reported on January 15, 2026 that the first Irving facility opened in January 2025 while announcing a second facility with future groundbreaking. This supports an operating phase, not completion of the second facility or the separate Fort Worth development. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Edged reported on January 15, 2026 that the first Irving facility opened in January 2025 while announcing a second facility with future groundbreaking. This supports an operating phase, not completion of the second facility or the separate Fort Worth development."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-adds-second-ultra-efficient-high-performance-ai-data-center-to-its-irving-texas-campus",
              "host": "edged.us",
              "published": "2026-01-15",
              "date": "2026-01-15",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 19, October 23, 2026",
          "scope": "Current official facility street reference only. Native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -96.916929040997,
                "lat": 32.817510132566,
                "precision": "address",
                "basis": "Published Edged facility address 505 North Wildwood Drive matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "505 North Wildwood Drive",
              "county_fips": [
                "48113"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds the service address to this existing research record. Corporate offices, related facility cards and embedded map coordinates are excluded.",
            "The unique Census calculated street range agrees with the retained state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The reference does not locate a surveyed roof, parcel, full campus, legal owner, floor or suite.",
            "All canonical address, status, physical dates, quantity, role, identity and jurisdiction wrappers remain exact. The retained Census method source keeps its actual October 22 date; new captures are dated October 23.",
            "The operator publishes 505 North Wildwood Drive and names Irving in the retained official source. The query adds the named city and retained Texas context. No operator postal code or second building identity is claimed."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-dallas-irving",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named Edged Dallas numeric facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=505+North+Wildwood+Drive%2C+Irving%2C+TX&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-96.92067021820111%2C32.81436604345353%2C-96.9131878637929%2C32.82065422167847&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. Only the explicitly named Irving DFW01 campus relationship is retained. Fort Worth DFW02 is a separate advertised project and is not merged or admitted. Current street wording differs from the earlier record source and is a separate location research lead, with no point or address promotion.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. Only the explicitly named Irving DFW01 campus relationship is retained. Fort Worth DFW02 is a separate advertised project and is not merged or admitted. Current street wording differs from the earlier record source and is a separate location research lead, with no point or address promotion."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. Only the explicitly named Irving DFW01 campus relationship is retained. Fort Worth DFW02 is a separate advertised project and is not merged or admitted. Current street wording differs from the earlier record source and is a separate location research lead, with no point or address promotion."
          ],
          "sources": [
            {
              "url": "https://edged.us/dallas",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Irving · Dallas · Source context reviewed",
      "status_scope": "Edged reported on January 15, 2026 that the first Irving facility opened in January 2025 while announcing a second facility with future groundbreaking. This supports an operating phase, not completion of the second facility or the separate Fort Worth development. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "edged-dekalb-project-vector-il",
      "state": "il",
      "kind": "facility",
      "name": "Edged DeKalb Campus (Project Vector)",
      "group": "approved",
      "status": "City reported land use approval",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "DeKalb"
      ],
      "city": "DeKalb",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeKalb Project Vector table approval and distinct nearby projects. Actual table columns visually checked; recommendation and councilapproval distinct. Constructionintervalnotproofallphasesunderwayoroperating. SeparateGoldin/Karis1.75MsqftsevenbuildingrownotVectorandnotadded. No criticalITMWorcurrentenergization. Annexation/rezoning/concept approval not all final building permits. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The single page was visually inspected. Vector has four planned buildings and two substations with a 2026 to 2032 construction schedule. Karis has seven planned buildings and a blank status. Approval and schedules do not prove construction or operation. The solar row is unrelated. Current original approvals, disclosures and later outcomes take precedence.",
      "date": "",
      "events": [
        [
          "2025-12-08",
          "DeKalb March 18, 2026 project table records City Council approval of Project Vector annexation, annexation agreement, rezoning and concept plan on December 8, 2025. Planning Commission recommendation on December 1 is separate. This is land use approval, not a physical construction start, building permit or opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-",
          "host": "cityofdekalb.com",
          "date": "2026-03-18",
          "published": "2026-03-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.89352,
        "lng": -88.77031,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "DeKalb Project Vector table approval and distinct nearby projects",
          "fields": {
            "agency": "City of DeKalb, Illinois",
            "status_list_asof_date": "2026-03-18",
            "project": "JJK343LLC Edged ProjectVector",
            "location": "Route23 and KeslingerRoad",
            "site_acres": 560,
            "planned_data_center_buildings": 4,
            "planned_electrical_substations": 2,
            "planning_recommendation_date": "2025-12-01",
            "city_council_approval_date": "2025-12-08",
            "listed_construction_schedule": "2026to2032"
          },
          "notes": [
            "Actual table columns visually checked; recommendation and councilapproval distinct. Constructionintervalnotproofallphasesunderwayoroperating. SeparateGoldin/Karis1.75MsqftsevenbuildingrownotVectorandnotadded. No criticalITMWorcurrentenergization. Annexation/rezoning/concept approval not all final building permits.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-",
              "host": "cityofdekalb.com",
              "date": "2026-03-18",
              "published": "2026-03-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "DeKalb's city table separates Edged Vector's December 8, 2025 council approval from Karis's July 22, 2024 amendment approval.",
            "independently_verified_current_operating_status": null,
            "city_council_approval_date": "2025-12-08",
            "city_status_as_of": "2026-03-18",
            "city_reported_status": "Construction 2026 to 2032",
            "data_center_buildings_planned": 4
          },
          "notes": [
            "The single page was visually inspected. Vector has four planned buildings and two substations with a 2026 to 2032 construction schedule. Karis has seven planned buildings and a blank status. Approval and schedules do not prove construction or operation. The solar row is unrelated.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-",
              "host": "cityofdekalb.com",
              "date": "2026-03-18",
              "published": "2026-03-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 22",
          "scope": "DeKalb March 18, 2026 project table names JJK 343 LLC and Edged Project Vector and records City Council approval on December 8, 2025 for annexation, annexation agreement, rezoning and concept plan. City reported land use approval describes that scope. The separate construction years column is a forecast and does not prove an actual construction start, issued building permits or operating data centers. Other JJK projects at different intersections remain separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_vector_city_land_use_approval_not_construction_forecast",
              "scope": "DeKalb March 18, 2026 project table names JJK 343 LLC and Edged Project Vector and records City Council approval on December 8, 2025 for annexation, annexation agreement, rezoning and concept plan. City reported land use approval describes that scope. The separate construction years column is a forecast and does not prove an actual construction start, issued building permits or operating data centers. Other JJK projects at different intersections remain separate."
            },
            "source_scope": {
              "city_table_as_of": "2026-03-18",
              "city_council_action_on": "2025-12-08",
              "planning_recommendation_on": "2025-12-01",
              "pdf_page_visually_read": 1,
              "forecast_construction_years_not_actual_milestone": true
            }
          },
          "notes": [
            "DeKalb March 18, 2026 project table names JJK 343 LLC and Edged Project Vector and records City Council approval on December 8, 2025 for annexation, annexation agreement, rezoning and concept plan. City reported land use approval describes that scope. The separate construction years column is a forecast and does not prove an actual construction start, issued building permits or operating data centers. Other JJK projects at different intersections remain separate.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-",
              "host": "www.cityofdekalb.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "DeKalb · DeKalb · Source context reviewed",
      "status_scope": "DeKalb March 18, 2026 project table names JJK 343 LLC and Edged Project Vector and records City Council approval on December 8, 2025 for annexation, annexation agreement, rezoning and concept plan. City reported land use approval describes that scope. The separate construction years column is a forecast and does not prove an actual construction start, issued building permits or operating data centers. Other JJK projects at different intersections remain separate.",
      "event_evidence": [
        {
          "date": "2025-12-08",
          "text": "DeKalb March 18, 2026 project table records City Council approval of Project Vector annexation, annexation agreement, rezoning and concept plan on December 8, 2025. Planning Commission recommendation on December 1 is separate. This is land use approval, not a physical construction start, building permit or opening.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-",
              "host": "www.cityofdekalb.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17037"
      }
    },
    {
      "id": "edged-energy-ankeny-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Edged Ankeny (Des Moines) Data Center",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Ankeny",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-08-06",
          "Edged published the Ankeny structural framework milestone account August 6, 2025. The release reports a topping out event the previous day, while full operation remains an end of 2026 target. This publication date is not a facility opening or exact commissioning day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://edged.us/news/des-moines-iowa",
          "host": "edged.us",
          "date": "2025-05-06",
          "published": "2025-05-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale",
          "host": "edged.us",
          "published": "2025-08-06",
          "date": "2025-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://edged.us/des-moines",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.65867,
        "lng": -93.57113,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "groundbreaking_announcement": "2025-05-06",
            "planned_critical_capacity_mw": 13.2,
            "published_city": "Ankeny, Iowa",
            "expected_construction_duration_months": 24
          },
          "notes": [
            "24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/des-moines-iowa",
              "host": "edged.us",
              "date": "2025-05-06",
              "published": "2025-05-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_reported_named_ankeny_structural_completion_not_operation",
              "scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes."
            }
          },
          "notes": [
            "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale",
              "host": "edged.us",
              "published": "2025-08-06",
              "date": "2025-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://edged.us/des-moines",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction."
          ],
          "sources": [
            {
              "url": "https://edged.us/des-moines",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ankeny · Polk · Source context reviewed",
      "status_scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.",
      "event_evidence": [
        {
          "date": "2025-08-06",
          "text": "Edged published the Ankeny structural framework milestone account August 6, 2025. The release reports a topping out event the previous day, while full operation remains an end of 2026 target. This publication date is not a facility opening or exact commissioning day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale",
              "host": "edged.us",
              "published": "2025-08-06",
              "date": "2025-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "edged-gateway-prichard-al",
      "state": "al",
      "kind": "facility",
      "name": "Edged Prichard Data Center (Project Gateway)",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mobile"
      ],
      "city": "Prichard",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Edged Gateway Prichard proposed building and forecast. 93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Project website identifies an Edged US proposal and explicit approval conditions. The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://projectgatewayal.com/",
          "host": "projectgatewayal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.80728,
        "lng": -88.22571,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Edged Gateway Prichard proposed building and forecast",
          "fields": {
            "developer": "Edged US",
            "project": "Project Gateway",
            "locality": "Prichard, Alabama",
            "developer_described_stage": "proposed/evaluated campus",
            "proposed_building_power_mw": 8,
            "power_basis": "building capacity, not explicit critical IT",
            "proposed_building_sqft": 57000,
            "planned_investment_usd": 93000000,
            "expected_permanent_jobs_min_inclusive": 20
          },
          "notes": [
            "93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://projectgatewayal.com/",
              "host": "projectgatewayal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Project website identifies an Edged US proposal and explicit approval conditions",
          "fields": {
            "current_status": "proposed",
            "status_basis": "The project website calls Gateway a proposed Prichard development being evaluated by Edged US."
          },
          "notes": [
            "The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://projectgatewayal.com/",
              "host": "projectgatewayal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "329e73d0bd598b89c4bff6047e3e5919a39b768498596db88a484026a7a90271",
          "events": [],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Prichard · Mobile · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01097"
      }
    },
    {
      "id": "edged-kansas-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Edged Kansas City",
      "group": "operating",
      "status": "Agency reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clay"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historic opening verified; later additions and current measured load remain unchecked. State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-12-12",
          "The original Missouri DED December 12, 2024 publication reports the Kansas City Edged opening and says a ribbon ceremony occurred the prior day. The publication and ceremony are distinct from an independently verified exact first computing commissioning day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
          "host": "ded.mo.gov",
          "date": "2024-12-12",
          "published": "2024-12-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/kansas-city",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3420+N+Arlington+Avenue%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street range and county response"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.46823866938118%2C39.15205228853755%2C-94.45549533061882%2C39.16193371146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        }
      ],
      "loc": {
        "lng": -94.461867,
        "lat": 39.156993,
        "precision": "address",
        "basis": "The exact named Edged Kansas City facility page identifies 3420 N Arlington Avenue, Kansas City, MO 64161. One complete literal Census street range supplies only a calculated reference in Clay County. The unknown imagery date may predate later construction; no roof or present physical stage is certified. Existing Native group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "event_status": "opened",
            "event_date": "2024-12-11",
            "power_mw": 26,
            "power_basis": "critical capacity",
            "investment_usd_min": 143000000,
            "investment_basis": "initial facility economic investment",
            "incentive": "Data Center Sales Tax Exemption Program; no award value supplied"
          },
          "notes": [
            "Historic opening verified; later additions and current measured load remain unchecked.",
            "State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
              "host": "ded.mo.gov",
              "date": "2024-12-12",
              "published": "2024-12-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The named Missouri facility is retained. No nearby Kansas project or regional market identity is merged.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The named Missouri facility is retained. No nearby Kansas project or regional market identity is merged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The named Missouri facility is retained. No nearby Kansas project or regional market identity is merged."
          ],
          "sources": [
            {
              "url": "https://edged.us/kansas-city",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 54, October 23, 2026",
          "scope": "Explicit source bound calculated street reference only. Existing Native group unknown remains unchanged. No new current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -94.461867,
                "lat": 39.156993,
                "precision": "address",
                "basis": "The exact named Edged Kansas City facility page identifies 3420 N Arlington Avenue, Kansas City, MO 64161. One complete literal Census street range supplies only a calculated reference in Clay County. The unknown imagery date may predate later construction; no roof or present physical stage is certified. Existing Native group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "3420 N Arlington Avenue, Kansas City, MO 64161",
              "county_fips": [
                "29047"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The exact Edged Kansas City facility body identifies 3420 N Arlington Avenue, Kansas City, MO 64161. Corporate contacts, service specifications, numerical capacity, certification claims and operational wording do not change any protected Native field.",
            "Explicit source bound calculated street reference only. Existing Native group unknown remains unchanged. No new current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
            "Open fields, a local road junction, scattered residences and a diagonal rail corridor are visible. The image has unknown acquisition date and may predate later construction. No visible building is selected as the computing facility.",
            "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official source and complete literal street response now support only the bounded calculated street reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, not physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://edged.us/kansas-city",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Explicit named computing facility service street in source body"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3420+N+Arlington+Avenue%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street range and county response"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.46823866938118%2C39.15205228853755%2C-94.45549533061882%2C39.16193371146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "state_opening_and_current_provider_named_service",
              "scope": "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation."
            },
            "source_read_scope": {
              "complete_original_state_release_and_current_provider_body_read": true,
              "opening_account_not_incentive_alone": true,
              "ceremony_not_exact_computing_commissioning": true,
              "no_capacity_savings_or_compliance_certification": true
            }
          },
          "notes": [
            "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
              "host": "ded.mo.gov",
              "published": "2024-12-12",
              "date": "2024-12-12",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://edged.us/kansas-city",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Kansas City · Clay · Source context reviewed",
      "status_scope": "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation.",
      "event_evidence": [
        {
          "date": "2024-12-12",
          "text": "The original Missouri DED December 12, 2024 publication reports the Kansas City Edged opening and says a ribbon ceremony occurred the prior day. The publication and ceremony are distinct from an independently verified exact first computing commissioning day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
              "host": "ded.mo.gov",
              "published": "2024-12-12",
              "date": "2024-12-12",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    },
    {
      "id": "edged-mesa-az",
      "state": "az",
      "kind": "facility",
      "name": "Edged Mesa Data Center",
      "group": "operating",
      "status": "Operator-announced opening",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Maricopa"
      ],
      "city": "Mesa",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. ReleaseApril2saysunveiledyesterday.138Mgallonsforecastwatersavingsnotmeasuredconsumption. Phoenixmarketlabelnotcity; mayorzero-waterquotenotproofnopotable/domesticuse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor",
          "host": "edged.us",
          "date": "2026-04-02",
          "published": "2026-04-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/phoenix",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        }
      ],
      "loc": {
        "lat": 33.42393,
        "lng": -112.28645,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "opening_event_date": "2026-04-01",
            "published_city": "Mesa, Arizona",
            "critical_capacity_mw": 36
          },
          "notes": [
            "ReleaseApril2saysunveiledyesterday.138Mgallonsforecastwatersavingsnotmeasuredconsumption. Phoenixmarketlabelnotcity; mayorzero-waterquotenotproofnopotable/domesticuse.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor",
              "host": "edged.us",
              "date": "2026-04-02",
              "published": "2026-04-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Edged announced the opening of its named Mesa facility in an April 2, 2026 release describing the previous day as the unveiling. The opening is operator-reported; advertised load, water savings, measured use and every hall being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_announced_opening",
              "scope": "Edged announced the opening of its named Mesa facility in an April 2, 2026 release describing the previous day as the unveiling. The opening is operator-reported; advertised load, water savings, measured use and every hall being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
              "reported_stage_date": {
                "date": "2026-04-01",
                "basis": "operator_reported_opening",
                "status_label": "Operator-announced opening",
                "source_scope": "April 2 release explicitly describes the unveiling as yesterday; independent commissioning and all halls are not certified."
              }
            }
          },
          "notes": [
            "Edged announced the opening of its named Mesa facility in an April 2, 2026 release describing the previous day as the unveiling. The opening is operator-reported; advertised load, water savings, measured use and every hall being energized are not independently certified."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor",
              "host": "edged.us",
              "published": "2026-04-02",
              "date": "2026-04-02",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Phoenix and explicitly names Mesa. Its current address wording differs from the earlier record source and remains a separate location research lead. The availability quarter is not an opening or closure finding.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Phoenix and explicitly names Mesa. Its current address wording differs from the earlier record source and remains a separate location research lead. The availability quarter is not an opening or closure finding."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Phoenix and explicitly names Mesa. Its current address wording differs from the earlier record source and remains a separate location research lead. The availability quarter is not an opening or closure finding."
          ],
          "sources": [
            {
              "url": "https://edged.us/phoenix",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Mesa · Maricopa · Source context reviewed",
      "status_scope": "Edged announced the opening of its named Mesa facility in an April 2, 2026 release describing the previous day as the unveiling. The opening is operator-reported; advertised load, water savings, measured use and every hall being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04013"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
