{
  "schema_version": 1,
  "source_compilation_context": {
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    },
    "la": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/la.json",
      "updated": "2026-10-25"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "hut-8",
    "label": "Hut 8"
  },
  "records": [
    {
      "id": "hut8-batavia-il",
      "state": "il",
      "kind": "facility",
      "name": "Hut 8 Batavia Data Center",
      "group": "proposed",
      "status": "City listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kane"
      ],
      "city": "Batavia",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. City of Batavia August31,2026 update explicitly names Hut8proposal at1780HubbardAvenue. It says updatedprojectmaterial addresses closed-loopcooling, municipalwaterlimits, noise, projectedutility/fundrevenue and infrastructurecost/reimbursement. No exact limits, MW, money or signedagreement printed in thisannouncement; those remain unverified here. City describes proposal andfutureperformance rules, not an observedenergization/occupancycertificate. Currentmainpage returnedonlynavigation. No questionformsubmitted, videoswatched or imaginedcontents of absentagreement adopted. Publicworks/city-officeaddress100NIslandAvenue is NOTthedata-centeraddress. Not full-field, exact parcel, currentoperations or independently audited numerical certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bataviail.gov/o/ed/article/3102661",
          "host": "bataviail.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1780+Hubbard+Ave%2C+Batavia%2C+IL&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal published street query; calculated range only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-88.27670176102897%2C41.85460828853755%2C-88.26343423897102%2C41.864489711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source street setting; acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -88.270068,
        "lat": 41.859549,
        "precision": "address",
        "basis": "The original City of Batavia computing source identifies 1780 Hubbard Ave, Batavia, IL. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The proposed computing street is distinct from City offices at 100 N. Island Avenue. The August 31, 2026 page publication is not a physical event. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json",
          "scope": "Named municipal/limited original-witness or operator context; dates and source origins explicit.",
          "fields": {},
          "notes": [
            "City of Batavia August31,2026 update explicitly names Hut8proposal at1780HubbardAvenue. It says updatedprojectmaterial addresses closed-loopcooling, municipalwaterlimits, noise, projectedutility/fundrevenue and infrastructurecost/reimbursement. No exact limits, MW, money or signedagreement printed in thisannouncement; those remain unverified here.",
            "City describes proposal andfutureperformance rules, not an observedenergization/occupancycertificate. Currentmainpage returnedonlynavigation. No questionformsubmitted, videoswatched or imaginedcontents of absentagreement adopted. Publicworks/city-officeaddress100NIslandAvenue is NOTthedata-centeraddress.",
            "Not full-field, exact parcel, currentoperations or independently audited numerical certification."
          ],
          "sources": [
            {
              "url": "https://www.bataviail.gov/o/ed/article/3102661",
              "host": "bataviail.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 22",
          "scope": "Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_named_proposal_not_forecast_revenue_or_current_service",
              "scope": "Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted."
            }
          },
          "notes": [
            "Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.bataviail.gov/o/ed/article/3102661",
              "host": "www.bataviail.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 72, 2026-10-24",
          "scope": "Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -88.270068,
                "lat": 41.859549,
                "precision": "address",
                "basis": "The original City of Batavia computing source identifies 1780 Hubbard Ave, Batavia, IL. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The proposed computing street is distinct from City offices at 100 N. Island Avenue. The August 31, 2026 page publication is not a physical event. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1780 Hubbard Ave, Batavia, IL",
              "county_fips": [
                "17089"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.",
            "The inherited general area coordinate was not independently admitted as a reviewed computing street reference. The original City of Batavia source explicitly identifies 1780 Hubbard Ave, Batavia, IL as the named computing location. One complete literal Census query returns a unique calculated street range inside unchanged county 17089. The measured correction is 413.0 metres. Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus. This is a source reference correction, not physical relocation.",
            "Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus.",
            "The street setting shows substantial buildings, parking, a curved road and rail corridor beside open fields. No computing roof, current construction stage or source parcel boundary is selected. Imagery acquisition date is unknown and may predate the proposal."
          ],
          "sources": [
            {
              "url": "https://www.bataviail.gov/o/ed/article/3102661",
              "host": "www.bataviail.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Exact original named computing street, distinct from contacts and technical fields"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1780+Hubbard+Ave%2C+Batavia%2C+IL&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal published street query; calculated range only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-88.27670176102897%2C41.85460828853755%2C-88.26343423897102%2C41.864489711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source street setting; acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Batavia · Kane · Source context reviewed",
      "status_scope": "Batavia current economic development update describes the Hut 8 facility at Hubbard Avenue as proposed. City listed proposal describes that project account. The update discusses future noise standards, cooling, water limits and projected utility or general fund revenue; those statements do not establish measured effects, completed electrical service, construction or operation. The separate current project route returned a page shell without substantive project body in this capture, so no uncaptured FAQ detail is adopted."
    },
    {
      "id": "hut8-beacon-point-robstown-tx",
      "state": "tx",
      "kind": "project",
      "name": "Hut 8 Beacon Point AI Campus",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "AI data center campus",
      "counties": [
        "Nueces"
      ],
      "city": "Robstown",
      "address": "",
      "who": "Hut 8",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Beacon Point: 704 MW contracted IT across both leases sits within 1,000 MW of secured utility capacity. The two boundaries are not additive. Construction and delivery forecasts are separate from operation and measured consumption.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-20",
          "Hut 8 announced Beacon Point Phase 2, reporting a second 352 MW IT lease and 704 MW contracted IT across the campus. This is not a commissioning event."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county",
          "host": "kristv.com",
          "date": "2026-06-08",
          "published": "2026-06-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
          "host": "www.hut8.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-16",
          "label": "Hut 8 Q2 construction update"
        },
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease",
          "host": "www.hut8.com",
          "published": "2026-07-20",
          "date": "2026-07-20",
          "checked": "2026-10-16",
          "label": "Beacon Point Phase 2 announcement"
        }
      ],
      "loc": {
        "lat": 27.72366,
        "lng": -97.64729,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "KRIS reports Hut 8 Beacon Point's planned 352 MW critical IT inside a 1,000 MW AEP interconnection plan, with an initial 1.8-million-gallon cooling fill trucked from outside the county.",
            "independently_verified_current_operating_status": null,
            "planned_critical_it_mw": 352,
            "planned_interconnection_mw": 1000,
            "initial_cooling_fill_gallons": 1800000,
            "incentives": null
          },
          "notes": [
            "Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county",
              "host": "kristv.com",
              "date": "2026-06-08",
              "published": "2026-06-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-AI-Campus-Depth-20261016",
          "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.",
          "fields": {
            "documented_construction": "Phase 1 and the campus substation were under construction; the July Phase 2 announcement describes site preparation.",
            "secured_utility_capacity": "1,000 MW of utility capacity under an AEP Texas interconnection agreement; not currently energized IT or measured load.",
            "contracted_it_capacity": "704 MW of contracted IT capacity across two 352 MW leases. The leases overlap the campus utility envelope and are not another 704 MW of utility service.",
            "initial_energization_target": "Q1 2027 in the reviewed disclosures, a forecast rather than an accomplished milestone.",
            "initial_hall_delivery_target": "Q3 2027 in the August 4 update; this is separate from energization and has no exact accomplished day.",
            "tenant_identity_scope": "The issuer describes the same investment-grade tenant for both leases but does not name it. No hyperscaler identity is inferred."
          },
          "notes": [
            "The older 352 MW description is the first leased phase; the July 20 announcement adds a second lease and explicitly reports 704 MW contracted IT. It does not mean the full campus is operating.",
            "The unnamed tenant remains unnamed. Contract values and financing are not capital spending, and local water/incentive claims are not promoted from earlier news context."
          ],
          "sources": [
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
              "host": "www.hut8.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-16",
              "label": "Hut 8 Q2 construction update"
            },
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease",
              "host": "www.hut8.com",
              "published": "2026-07-20",
              "date": "2026-07-20",
              "checked": "2026-10-16",
              "label": "Beacon Point Phase 2 announcement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Robstown · Nueces · Source context reviewed",
      "status_scope": "Hut 8 reported Beacon Point Phase 1 and substation construction in its August 4, 2026 update. Phase 2/site preparation and leased capacity do not establish completion of the full campus.",
      "event_evidence": [
        {
          "date": "2026-07-20",
          "text": "Hut 8 announced Beacon Point Phase 2, reporting a second 352 MW IT lease and 704 MW contracted IT across the campus. This is not a commissioning event.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease",
              "host": "www.hut8.com",
              "published": "2026-07-20",
              "date": "2026-07-20",
              "checked": "2026-10-16",
              "label": "Beacon Point Phase 2 announcement"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 704,
          "unit": "MW",
          "basis": "contracted",
          "as_of": "2026-07-20",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Two announced 352 MW IT leases, Phase 1 plus Phase 2; delivery remains future.",
          "sources": [
            "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease"
          ]
        },
        {
          "measure": "utility_capacity",
          "value": 1000,
          "unit": "MW",
          "basis": "forecast",
          "as_of": "2026-07-20",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Campus utility capacity secured under an AEP Texas interconnection agreement; not an accomplished energization or metered demand.",
          "sources": [
            "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48355"
      }
    },
    {
      "id": "hut8-river-bend-west-feliciana-la",
      "state": "la",
      "kind": "project",
      "name": "Hut 8 River Bend AI Data Center Campus",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "AI data center campus",
      "counties": [
        "West Feliciana"
      ],
      "city": "St. Francisville",
      "address": "",
      "who": "Hut 8",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "River Bend: 245 MW contracted IT and 330 MW utility capacity under construction describe the same initial development at different electrical boundaries. They are not additive or metered load; conditional expansion is excluded.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-12-17",
          "Hut 8 announced a 245 MW IT lease for River Bend. This is a commercial announcement, not an opening or physical construction-start day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center",
          "host": "opportunitylouisiana.gov",
          "date": "2025-12-17",
          "published": "2025-12-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
          "host": "www.hut8.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-16",
          "label": "Hut 8 Q2 construction update"
        },
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
          "host": "www.hut8.com",
          "published": "2025-12-17",
          "date": "2025-12-17",
          "checked": "2026-10-16",
          "label": "River Bend lease announcement"
        }
      ],
      "loc": {
        "lat": 30.8759,
        "lng": -91.41253,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "development_announcement_date": "2025-12-17",
            "phase1_investment_usd_max": 10000000000,
            "phase1_initial_utility_capacity_mw": 330,
            "phase1_critical_it_capacity_mw": 245,
            "potential_full_site_utility_capacity_mw_max": 1000,
            "expected_phase1_direct_jobs_min": 75,
            "expected_phase1_indirect_jobs": 193,
            "peak_phase1_construction_workers_approx": 1000,
            "operations_target": "2027-Q2",
            "tenant": "Fluidstack",
            "tenant_lease_backstop": "Google"
          },
          "notes": [
            "330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center",
              "host": "opportunitylouisiana.gov",
              "date": "2025-12-17",
              "published": "2025-12-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-AI-Campus-Depth-20261016",
          "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.",
          "fields": {
            "documented_construction": "Vertical works and the campus substation were in construction in the August 4 update.",
            "initial_utility_capacity": "330 MW of utility capacity under construction; not 330 MW of IT or measured consumption.",
            "contracted_it_capacity": "245 MW of IT capacity in the announced Fluidstack lease, not currently commissioned load.",
            "initial_hall_delivery_target": "Q2 2027, forecast at the August 4 report date; no exact commissioning day.",
            "future_expansion_scope": "Hut 8 describes up to 1,000 MW of additional utility capacity and a distinct Fluidstack right of first offer for up to 1,000 MW of additional IT capacity. Both depend on future expansion; neither is current capacity.",
            "tenant_and_backstop_scope": "Fluidstack is the contracted tenant; Google backs specified payment obligations. This does not make Google the physical operator or certify tenant occupancy.",
            "expansion_source_difference": "The Louisiana announcement describes potential scaling to up to 1,000 MW of utility capacity, while Hut 8 describes up to 1,000 MW of additional utility capacity. These same-day source envelopes differ. The future full-campus limit remains unresolved."
          },
          "notes": [
            "Initial utility service, contracted IT and conditional expansion are different scopes and cannot be added. Earlier retained government context and the operator expansion language remain side by side.",
            "A lease/backstop, projected investment or future delivery quarter does not establish present operation, paid incentives or a verified parcel."
          ],
          "sources": [
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
              "host": "www.hut8.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-16",
              "label": "Hut 8 Q2 construction update"
            },
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
              "host": "www.hut8.com",
              "published": "2025-12-17",
              "date": "2025-12-17",
              "checked": "2026-10-16",
              "label": "River Bend lease announcement"
            },
            {
              "url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center",
              "host": "www.opportunitylouisiana.gov",
              "published": "2025-12-17",
              "date": "2025-12-17",
              "checked": "2026-10-16",
              "label": "Louisiana River Bend announcement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "St. Francisville · West Feliciana · Source context reviewed",
      "status_scope": "Hut 8 reported River Bend vertical and substation construction on August 4, 2026. Initial hall delivery remained a Q2 2027 target; operation and the full expansion are not established.",
      "event_evidence": [
        {
          "date": "2025-12-17",
          "text": "Hut 8 announced a 245 MW IT lease for River Bend. This is a commercial announcement, not an opening or physical construction-start day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
              "host": "www.hut8.com",
              "published": "2025-12-17",
              "date": "2025-12-17",
              "checked": "2026-10-16",
              "label": "River Bend lease announcement"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 245,
          "unit": "MW",
          "basis": "contracted",
          "as_of": "2025-12-17",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Initial Fluidstack lease IT capacity; commissioning is future.",
          "sources": [
            "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value"
          ]
        },
        {
          "measure": "utility_capacity",
          "value": 330,
          "unit": "MW",
          "basis": "forecast",
          "as_of": "2026-08-04",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Initial River Bend utility capacity under construction, not energized load or an issued utility permit.",
          "sources": [
            "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "22125"
      }
    },
    {
      "id": "hut8-salt-creek-culberson-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Hut 8 Salt Creek Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Culberson"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Hut8 original Form10-K transition report filed March28,2024, covering July1-December31,2023 with later developments. Server sent gzip-encoded PDF: raw transport retained, ordinary gzip decoding saved as a separate hashed PDF. Only cover and PDF pages8/65/124 fully read; cover/8/124 viewed. December29,2023 purchase of substation and1.9acres for$7.1M CASH CONSIDERATION; no cash paid as ofDecember31. Not whole-campus acreage, verified paid capex or total build cost. February2024 SaltCreek construction began;63MW/3.6EH/s are then-future design/conditional miner assumptions, not measured current IT or verified commissioning. Other203-page filing sections unreviewed. Ontario310MW generation and managed Ionic sites are separate. Not all fields, current operation, permits, exact parcel or critical IT independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cdn.kscope.io/4a3545ac7cd83ed5809d42e808998efa.pdf",
          "host": "cdn.kscope.io",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hut8.com/our-platform",
          "host": "www.hut8.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 31.44659,
        "lng": -104.51793,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Hut8 original Form10-K transition report filed March28,2024, covering July1-December31,2023 with later developments. Server sent gzip-encoded PDF: raw transport retained, ordinary gzip decoding saved as a separate hashed PDF. Only cover and PDF pages8/65/124 fully read; cover/8/124 viewed. December29,2023 purchase of substation and1.9acres for$7.1M CASH CONSIDERATION; no cash paid as ofDecember31. Not whole-campus acreage, verified paid capex or total build cost. February2024 SaltCreek construction began;63MW/3.6EH/s are then-future design/conditional miner assumptions, not measured current IT or verified commissioning. Other203-page filing sections unreviewed. Ontario310MW generation and managed Ionic sites are separate.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://cdn.kscope.io/4a3545ac7cd83ed5809d42e808998efa.pdf",
              "host": "cdn.kscope.io",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 21",
          "scope": "Hut 8 current platform page lists Salt Creek at Orla under ASIC Compute. The listing and advertised output are not an explicit current operating account or an exact physical milestone. The separate SEC filing target was not fetched after its robots response returned HTTP 403. Regional mining results, a sample investment animation and other Hut 8 facilities are not substituted. Salt Creek current physical phase remains unclear in this bounded captured review.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_platform_listing_without_captured_explicit_operating_statement",
              "scope": "Hut 8 current platform page lists Salt Creek at Orla under ASIC Compute. The listing and advertised output are not an explicit current operating account or an exact physical milestone. The separate SEC filing target was not fetched after its robots response returned HTTP 403. Regional mining results, a sample investment animation and other Hut 8 facilities are not substituted. Salt Creek current physical phase remains unclear in this bounded captured review."
            }
          },
          "notes": [
            "Hut 8 current platform page lists Salt Creek at Orla under ASIC Compute. The listing and advertised output are not an explicit current operating account or an exact physical milestone. The separate SEC filing target was not fetched after its robots response returned HTTP 403. Regional mining results, a sample investment animation and other Hut 8 facilities are not substituted. Salt Creek current physical phase remains unclear in this bounded captured review.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.hut8.com/our-platform",
              "host": "www.hut8.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Culberson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48109"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
