  "schema_version": 1,
  "source_compilation_context": {
    "az": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/az.json",
      "updated": "2026-10-24"
    },
    "ca": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ca.json",
      "updated": "2026-10-25"
    },
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    },
    "ia": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ia.json",
      "updated": "2026-10-24"
    },
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    },
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    },
    "mi": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mi.json",
      "updated": "2026-10-24"
    },
    "mn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mn.json",
      "updated": "2026-10-24"
    },
    "nc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nc.json",
      "updated": "2026-10-25"
    },
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    },
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    },
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    },
    "wa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wa.json",
      "updated": "2026-10-24"
    },
    "wi": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wi.json",
      "updated": "2026-10-25"
    },
    "wy": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wy.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "microsoft",
    "label": "Microsoft"
  },
  "records": [
    {
      "id": "microsoft-alluvion-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Alluvion Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
          "host": "wdmchamber.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.7305,
        "lng": -93.58559,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "named_campus": "Alluvion",
            "reported_total_floor_area_sqft": 1166000,
            "annual_property_tax_to_be_paid_usd": 8100000,
            "reported_public_infrastructure_built_usd": 45000000,
            "source_date": null
          },
          "notes": [
            "Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.",
            "6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
              "host": "wdmchamber.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-alviso-san-jose-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Microsoft Alviso Data Center Campus",
      "group": "building",
      "status": "Site development underway",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose (Alviso)",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft SJC02 named transmission-load draft resolution. Proposed outcome text does not prove final approval or operating status. Proposed 75-percent net-revenue refund cap plus ITCC over fifteen years is not an actual tax incentive paid. Redundant 115-kV line is not additional usable MW or a second data center. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. California adopted customer-load resolution. Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M594/K913/594913838.PDF",
          "host": "docs.cpuc.ca.gov",
          "date": "2026-01-15",
          "published": "2026-01-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M595/K970/595970063.PDF",
          "host": "docs.cpuc.ca.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/alviso-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2025-11-19",
          "date": "2025-11-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 37.16199,
        "lng": -121.73089,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Microsoft SJC02 named transmission-load draft resolution",
          "fields": {
            "draft_resolution": "E-5439",
            "draft_date": "2026-01-15",
            "utility_advice_letter": "7635-E",
            "utility_advice_letter_filed": "2025-07-01",
            "customer": "Microsoft Corporation",
            "project": "SJC02",
            "published_site_address": "1657 Alviso-Milpitas Road, San Jose, California",
            "proposed_customer_load_mw": 90,
            "power_basis": "whole customer transmission load, not explicit critical IT",
            "operation_target_month": "2027-01",
            "document_status": "DRAFT"
          },
          "notes": [
            "Proposed outcome text does not prove final approval or operating status. Proposed 75-percent net-revenue refund cap plus ITCC over fifteen years is not an actual tax incentive paid. Redundant 115-kV line is not additional usable MW or a second data center.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M594/K913/594913838.PDF",
              "host": "docs.cpuc.ca.gov",
              "date": "2026-01-15",
              "published": "2026-01-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "utility-decisions-round8-2026-10-14.json",
          "scope": "California adopted customer-load resolution",
          "fields": {
            "final_resolution": "E-5439",
            "adoption_effective_date": "2026-01-15",
            "issuance_date": "2026-01-20",
            "approved_subject": "customer-specific transmission energization agreement with modifications",
            "customer_load_mw": 90,
            "power_basis": "whole customer transmission load, not explicit critical IT",
            "published_site_address": "1657 Alviso-Milpitas Road, San Jose, California",
            "operator_operation_target_month": "2027-01",
            "annual_infrastructure_refund_limit_percent_net_revenue": 75,
            "income_tax_component_adjustment_additional": true,
            "refund_period_years": 15
          },
          "notes": [
            "Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M595/K970/595970063.PDF",
              "host": "docs.cpuc.ca.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft identifies the named Alviso development in California and reports initial earthmoving and soil remediation. HITT Contracting Inc. is described as the general contractor. The elapsed summer2026 site preparation forecast does not prove completion or operation. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies the named Alviso development in California and reports initial earthmoving and soil remediation. HITT Contracting Inc. is described as the general contractor. The elapsed summer2026 site preparation forecast does not prove completion or operation. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies the named Alviso development in California and reports initial earthmoving and soil remediation. HITT Contracting Inc. is described as the general contractor. The elapsed summer2026 site preparation forecast does not prove completion or operation. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/alviso-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-11-19",
              "date": "2025-11-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research followup 1",
          "scope": "The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_alviso_actual_earthmoving_and_soil_remediation",
              "scope": "The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation."
            },
            "source_read_scope": {
              "original_named_project_and_complete_construction_overview_read": true,
              "original_exact_source_capture_and_retrieval_receipt_reused": true,
              "no_new_network_request": true,
              "land_preparation_not_vertical_building_or_computing_operation": true,
              "summer2026_target_not_accomplished_completion": true,
              "fall2025_not_invented_exact_day": true
            }
          },
          "notes": [
            "The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/alviso-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-11-19",
              "date": "2025-11-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Jose (Alviso) · Santa Clara · Source context reviewed",
      "status_scope": "The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    },
    {
      "id": "microsoft-becker-mn",
      "state": "mn",
      "kind": "facility",
      "name": "Microsoft Becker Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Sherburne"
      ],
      "city": "Becker",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Land purchase is not data-center construction spending, secured utility service or commissioning. Microsoft declined to disclose project details. Google's canceled proposal and Elk River Technologies' separate land sale are not this site. No MW, specific design or final opening date is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.mprnews.org/story/2024/02/21/xcel-energy-sells-land-in-becker-to-microsoft-for-data-center",
          "host": "mprnews.org",
          "date": "2024-02-21",
          "published": "2024-02-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 45.42206,
        "lng": -93.77316,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "MPR reports Microsoft's purchase of about 295 Becker acres from Xcel for about 17.7 million USD, confirmed by Xcel and state property data cited by the reporter.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Land purchase is not data-center construction spending, secured utility service or commissioning. Microsoft declined to disclose project details. Google's canceled proposal and Elk River Technologies' separate land sale are not this site. No MW, specific design or final opening date is established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.mprnews.org/story/2024/02/21/xcel-energy-sells-land-in-becker-to-microsoft-for-data-center",
              "host": "mprnews.org",
              "date": "2024-02-21",
              "published": "2024-02-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Becker · Sherburne · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "27141"
      }
    },
    {
      "id": "microsoft-boydton-bn-campus-mecklenburg-va",
      "state": "va",
      "kind": "facility",
      "name": "Microsoft Boydton Campus (BN / Azure East US)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mecklenburg"
      ],
      "city": "Boydton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Source is SouthernVirginia regional fact sheet, not BN-only equipment or staffing. Upload path2021/11 does not independently prove publication day. Renewable-contract MW is not site IT demand, nor proof of hourly carbon-free operation. Water use below5% of year describes cooling use timing, not water volume. Generic no-noise/no-traffic and compliance statements are operator claims, not measured receptors, enforcement records or independent approvals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/wp-content/uploads/2021/11/Boydton-datacenter-fact-sheet.pdf",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/southern-virginia/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 36.68033,
        "lng": -78.36291,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "regional_12_month_weighted_pue": 1.147,
            "pue_period_end": "2021-07",
            "regional_operations_staff_scope": "More than505 full-time employees and contractors across SouthernVirginia campuses, historical brochure.",
            "regional_renewable_asset_contract_mw": [
              576,
              315
            ],
            "current_site_it_mw": null
          },
          "notes": [
            "Source is SouthernVirginia regional fact sheet, not BN-only equipment or staffing. Upload path2021/11 does not independently prove publication day.",
            "Renewable-contract MW is not site IT demand, nor proof of hourly carbon-free operation. Water use below5% of year describes cooling use timing, not water volume.",
            "Generic no-noise/no-traffic and compliance statements are operator claims, not measured receptors, enforcement records or independent approvals.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/wp-content/uploads/2021/11/Boydton-datacenter-fact-sheet.pdf",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft current Southern Virginia page explicitly says it operates a data center in Boydton. Operating phase describes existing Boydton service. It does not certify every campus expansion, a code for each building, all regional capacity, the stage of Chase City or an exact original opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_existing_boydton_operation",
              "scope": "Microsoft current Southern Virginia page explicitly says it operates a data center in Boydton. Operating phase describes existing Boydton service. It does not certify every campus expansion, a code for each building, all regional capacity, the stage of Chase City or an exact original opening day."
            }
          },
          "notes": [
            "Microsoft current Southern Virginia page explicitly says it operates a data center in Boydton. Operating phase describes existing Boydton service. It does not certify every campus expansion, a code for each building, all regional capacity, the stage of Chase City or an exact original opening day.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/southern-virginia/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boydton · Mecklenburg · Source context reviewed",
      "status_scope": "Microsoft current Southern Virginia page explicitly says it operates a data center in Boydton. Operating phase describes existing Boydton service. It does not certify every campus expansion, a code for each building, all regional capacity, the stage of Chase City or an exact original opening day.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51117"
      }
    },
    {
      "id": "microsoft-cheyenne-expansion-wy",
      "state": "wy",
      "kind": "facility",
      "name": "Microsoft Cheyenne Mega-Campus Expansion",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Laramie"
      ],
      "city": "Cheyenne",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming named recipient histories and planned project scopes. Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf",
          "host": "wyoleg.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/cheyenne-datacenter-update/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.26748,
        "lng": -104.62702,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Wyoming named recipient histories and planned project scopes",
          "fields": {
            "echostar_first_sales_tax_certification_year": 2011,
            "microsoft_cheyenne_certified_campuses": 3,
            "meta_cheyenne_first_sales_tax_certification_month": "2022-10",
            "meta_cheyenne_reported_phase1_planned_capex_usd_approx": 800000000,
            "meta_cheyenne_reported_phase1_expected_direct_nonconstruction_jobs": 60,
            "prometheus_casper_planned_power_gw": 1.5,
            "prometheus_casper_power_basis": "notexplicitIT"
          },
          "notes": [
            "Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf",
              "host": "wyoleg.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "Microsoft reports applications for two additional Cheyenne expansion areas in May 2026 and an actual May 28 community session. The inherited Mega Campus Expansion record has earlier multi campus tax certification context without an exact crosswalk to these two areas. Existing regional operation does not establish the individual expansion phase. The new applications remain scoped planning evidence while current physical stage and the individual phase match remain unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "new_expansion_applications_not_exact_inherited_phase_match",
              "scope": "Microsoft reports applications for two additional Cheyenne expansion areas in May 2026 and an actual May 28 community session. The inherited Mega Campus Expansion record has earlier multi campus tax certification context without an exact crosswalk to these two areas. Existing regional operation does not establish the individual expansion phase. The new applications remain scoped planning evidence while current physical stage and the individual phase match remain unclear."
            },
            "identity_scope": {
              "operator_reported_community_session_on": "2026-05-28",
              "operator_application_period": "May 2026",
              "two_expansion_areas_not_one_certified_physical_site": true,
              "inherited_megacampus_exact_crosswalk_established": false,
              "existing_cheyenne_operation_not_transferred_to_expansion": true
            }
          },
          "notes": [
            "Microsoft reports applications for two additional Cheyenne expansion areas in May 2026 and an actual May 28 community session. The inherited Mega Campus Expansion record has earlier multi campus tax certification context without an exact crosswalk to these two areas. Existing regional operation does not establish the individual expansion phase. The new applications remain scoped planning evidence while current physical stage and the individual phase match remain unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/cheyenne-datacenter-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cheyenne · Laramie · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "56021"
      }
    },
    {
      "id": "microsoft-columbia-quincy-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Microsoft Columbia Data Center (Quincy)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grant"
      ],
      "city": "Quincy",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Regional tax receipts, water shares, utility load and industrial-alliance jobs cannot be assigned to the individual Microsoft Columbia campus. H5's acquisitions, cooling and workforce are other facilities. Resident health concerns are not causal findings. Transmission-voltage kV is not MW capacity, and proposed infrastructure is not spare power available to any new site. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-03-28",
          "Ecology issued Approval Order 25AQ E009 for condition updates and generator bypass changes at Microsoft Columbia on March 28, 2025. This is a named air permit amendment, not an opening, measured emissions finding or certification that every campus phase is operational."
        ],
        [
          "2025-02-20",
          "Ecology Appendix B records that the Microsoft Columbia permit hearing was held on February 20, 2025 at the Quincy Business and Event Center, with a Spanish interpreter available virtually. Ecology reports no public attendance. Written comments in the separate extended comment period are not treated as testimony at this hearing."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.spokesman.com/stories/2026/jul/26/where-agriculture-meets-technology-inside-the-smal/",
          "host": "spokesman.com",
          "date": "2026-07-26",
          "published": "2026-07-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
          "host": "ecology.wa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
          "host": "ecology.wa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/quincy/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.grantcountywa.gov/172/Geographic-Information-Systems-GIS",
          "host": "www.grantcountywa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Original county GIS route and published organization identity"
        },
        {
          "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Site_address/FeatureServer/0/query?where=UPPER%28FULLADDR%29+LIKE+%271515+%25PORT%25INDUSTRIAL%25%27+OR+UPPER%28FULLADDR%29+LIKE+%27501+%25PORT%25INDUSTRIAL%25%27&outFields=%2A&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
          "host": "services2.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete municipal address points, coordinates not adopted"
        },
        {
          "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Parcels/FeatureServer/0/query?geometry=%7B%22x%22%3A-119.86320364040195%2C%22y%22%3A47.24020756429085%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=OBJECTID%2CPARCEL%2CRollYear%2CParcelType%2CParcelDescription%2CSitus%2CLastName%2CFirstName%2CAddress1%2CAddress2%2CCity%2CState%2CZip%2CTotalAcres%2CAssembledLegal%2CIncorporatedCity&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
          "host": "services2.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete exact joined source parcel polygon"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=501+Port+Industrial+Parkway%2C+Quincy%2C+WA+98848&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal original street query returns zero"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-119.86856708848796%2C47.23413928853755%2C-119.85401291151203%2C47.244020711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -119.86129,
        "lat": 47.23908,
        "precision": "approximate",
        "basis": "Approximate calculated center of complete Grant County source parcel 313675000, independently joined to the original state computing street 501 Port Industrial Parkway, Quincy, WA 98848. The literal Census query returns zero and is retained. One source parcel does not select a surveyed roof, legal title or complete campus. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Spokesman-Review reports Microsoft and other Quincy operators alongside local tax, utility-transmission and land-use debates, with Microsoft's local workforce attributed to its webpage.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Regional tax receipts, water shares, utility load and industrial-alliance jobs cannot be assigned to the individual Microsoft Columbia campus. H5's acquisitions, cooling and workforce are other facilities. Resident health concerns are not causal findings. Transmission-voltage kV is not MW capacity, and proposed infrastructure is not spare power available to any new site.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.spokesman.com/stories/2026/jul/26/where-agriculture-meets-technology-inside-the-smal/",
              "host": "spokesman.com",
              "date": "2026-07-26",
              "published": "2026-07-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 15",
          "scope": "Ecology issued Approval Order 25AQ E009 on March 28, 2025 for condition updates and generator bypass changes at the named existing Microsoft Columbia Data Center. This is a specific regulatory authorization while current individual physical stage remains unclear. It does not establish current cloud service, a completed campus expansion, actual emissions, operating compliance or an exact opening day. The operator regional account of Quincy service is not assigned to every named facility or phase.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_air_permit_amendment_approval_not_operating_certification",
              "scope": "Ecology issued Approval Order 25AQ E009 on March 28, 2025 for condition updates and generator bypass changes at the named existing Microsoft Columbia Data Center. This is a specific regulatory authorization while current individual physical stage remains unclear. It does not establish current cloud service, a completed campus expansion, actual emissions, operating compliance or an exact opening day. The operator regional account of Quincy service is not assigned to every named facility or phase."
            },
            "regulatory_scope": {
              "order_identifier": "25AQ E009",
              "order_issued_on": "2025-03-28",
              "public_hearing_held_on": "2025-02-20",
              "public_comment_period": "December 30, 2024 to February 27, 2025",
              "air_approval_not_whole_campus_or_service_certification": true,
              "source_pages_read": [
                1,
                3,
                27,
                28,
                29,
                30,
                31,
                32,
                33,
                34
              ],
              "generator_ratings_not_it_capacity": true
            }
          },
          "notes": [
            "Ecology issued Approval Order 25AQ E009 on March 28, 2025 for condition updates and generator bypass changes at the named existing Microsoft Columbia Data Center. This is a specific regulatory authorization while current individual physical stage remains unclear. It does not establish current cloud service, a completed campus expansion, actual emissions, operating compliance or an exact opening day. The operator regional account of Quincy service is not assigned to every named facility or phase.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://local.microsoft.com/communities/americas/quincy/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 60, 2026-10-24",
          "scope": "Explicit computing source identity and approximate source parcel center only. Existing status group unknown remains unchanged. No current computing operation, surveyed roof, legal title, tenant, role, physical milestone, technical quantity or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -119.86129,
                "lat": 47.23908,
                "precision": "approximate",
                "basis": "Approximate calculated center of complete Grant County source parcel 313675000, independently joined to the original state computing street 501 Port Industrial Parkway, Quincy, WA 98848. The literal Census query returns zero and is retained. One source parcel does not select a surveyed roof, legal title or complete campus. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "313675000",
                "identifier_field": "PARCEL",
                "objectid": 55018,
                "agency": "Grant County Washington GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "geometry_acquisition_date": null
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "One complete original county source polygon joined through an explicit original state computing street and county address identity. Its calculated center is approximate. No roof, title, whole campus, current operator ownership or accomplished physical stage is established.",
            "Explicit computing source identity and approximate source parcel center only. Existing status group unknown remains unchanged. No current computing operation, surveyed roof, legal title, tenant, role, physical milestone, technical quantity or complete campus is certified.",
            "The actual source frame shows multiple large roofs, surface yards and internal drives near a southern linear corridor, with other developed lots beyond it. The calculated source parcel center is retained without choosing a building, a phase or a computing floor. Image acquisition date and current operating stage are unknown.",
            "The inherited general area coordinate was not a reviewed computing property destination. The independently named original government computing street and complete exact county source parcel support this bounded reference inside the retained county. The measured inherited point offset is 761.5 metres. All predecessor coordinates and source versions remain in history. This is a reference correction without physical relocation, a new computing event, selected roof, ownership, current operation or whole campus certification."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original computing street letter and project summary, pages 1 and 3"
            },
            {
              "url": "https://www.grantcountywa.gov/172/Geographic-Information-Systems-GIS",
              "host": "www.grantcountywa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original county GIS route and published organization identity"
            },
            {
              "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Site_address/FeatureServer/0/query?where=UPPER%28FULLADDR%29+LIKE+%271515+%25PORT%25INDUSTRIAL%25%27+OR+UPPER%28FULLADDR%29+LIKE+%27501+%25PORT%25INDUSTRIAL%25%27&outFields=%2A&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
              "host": "services2.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete municipal address points, coordinates not adopted"
            },
            {
              "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Parcels/FeatureServer/0/query?geometry=%7B%22x%22%3A-119.86320364040195%2C%22y%22%3A47.24020756429085%2C%22spatialReference%22%3A%7B%22wkid%22%3A4326%7D%7D&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=OBJECTID%2CPARCEL%2CRollYear%2CParcelType%2CParcelDescription%2CSitus%2CLastName%2CFirstName%2CAddress1%2CAddress2%2CCity%2CState%2CZip%2CTotalAcres%2CAssembledLegal%2CIncorporatedCity&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
              "host": "services2.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete exact joined source parcel polygon"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=501+Port+Industrial+Parkway%2C+Quincy%2C+WA+98848&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal original street query returns zero"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-119.86856708848796%2C47.23413928853755%2C-119.85401291151203%2C47.244020711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Quincy · Grant · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-03-28",
          "text": "Ecology issued Approval Order 25AQ E009 for condition updates and generator bypass changes at Microsoft Columbia on March 28, 2025. This is a named air permit amendment, not an opening, measured emissions finding or certification that every campus phase is operational.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2025-02-20",
          "text": "Ecology Appendix B records that the Microsoft Columbia permit hearing was held on February 20, 2025 at the Quincy Business and Event Center, with a Spanish interpreter available virtually. Ecology reports no public attendance. Written comments in the separate extended comment period are not treated as testimony at this hearing.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    },
    {
      "id": "microsoft-conover-catawba-county-nc",
      "state": "nc",
      "kind": "facility",
      "name": "Microsoft Conover Data Center",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Catawba"
      ],
      "city": "Conover",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-23",
          "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Conover opening, an executed incentive amendment or three independent project announcements."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
          "host": "catawbacountync.gov",
          "date": "2026-06-23",
          "published": "2026-06-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
          "host": "www.conovernc.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/blog/lyle-creek-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2024-05-15",
          "date": "2024-05-15",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 35.66222,
        "lng": -81.21492,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Catawba multi-site joint statement",
          "fields": {
            "joint_statement_publication_date": "2026-06-23",
            "historical_project_announcement_month": "2022-11",
            "regional_planned_investment_usd_min": 1000000000,
            "regional_planned_data_centers": 4,
            "regional_development_period_years": 10,
            "announced_local_property_tax_commitment": "pay based on full value; local agreements being amended"
          },
          "notes": [
            "Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "catawbacountync.gov",
              "date": "2026-06-23",
              "published": "2026-06-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Conover record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "joint_county_programme_individual_stage_held",
              "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Conover record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear."
            },
            "programme_scope": {
              "joint_statement_on": "2026-06-23",
              "programme_municipalities": [
                "Conover",
                "Hickory",
                "Maiden"
              ],
              "individual_site_stage_verified": false,
              "projected_water_share_not_actual_withdrawal_or_site_allocation": true,
              "amendments_in_progress_not_executed_agreements": true
            }
          },
          "notes": [
            "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Conover record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "www.catawbacountync.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
              "host": "www.conovernc.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft identifies Lyle Creek near Highway16 in Catawba County. Its September2026 report concerns the first building and additional phases. Earlier Morgan Corp and later Whiting Turner descriptions are dated contractor context. Blasting descriptions, schedules and additional buildings do not create an observed nuisance outcome, opening or new site count. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies Lyle Creek near Highway16 in Catawba County. Its September2026 report concerns the first building and additional phases. Earlier Morgan Corp and later Whiting Turner descriptions are dated contractor context. Blasting descriptions, schedules and additional buildings do not create an observed nuisance outcome, opening or new site count. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies Lyle Creek near Highway16 in Catawba County. Its September2026 report concerns the first building and additional phases. Earlier Morgan Corp and later Whiting Turner descriptions are dated contractor context. Blasting descriptions, schedules and additional buildings do not create an observed nuisance outcome, opening or new site count. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/lyle-creek-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-05-15",
              "date": "2024-05-15",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research followup 1",
          "scope": "The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_lyle_creek_september2026_first_building_construction",
              "scope": "The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation."
            },
            "source_read_scope": {
              "original_named_project_and_complete_september_may_february2026_and_may2024_sections_read": true,
              "source_publication_day_distinct_from_month_only_update": true,
              "actual_exterior_interior_and_mechanical_work_not_forecast_alone": true,
              "no_independent_uptime_harm_or_contractor_operator_role_finding": true,
              "original_exact_capture_and_retrieval_receipt_reused": true,
              "no_new_network_request": true
            }
          },
          "notes": [
            "The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/lyle-creek-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-05-15",
              "date": "2024-05-15",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Conover · Catawba · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-06-23",
          "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Conover opening, an executed incentive amendment or three independent project announcements.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "www.catawbacountync.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
              "host": "www.conovernc.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "status_scope": "The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "37035"
      }
    },
    {
      "id": "microsoft-dorr-township-mi",
      "state": "mi",
      "kind": "facility",
      "name": "Microsoft Dorr Township Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Allegan"
      ],
      "city": "Dorr Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No signed ordinance or exact start/expiry retained. Residents allegations about health, water and taxes are not independently adopted effects. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-02-26",
          "Signed Dorr Township minutes record authorization of a 12 month temporary moratorium on new or expanded data centers on February 26, 2026, by six votes to zero. This approval concerns the moratorium, not approval or cancellation of the Microsoft project, an operating shutdown or a verified legal effective day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/",
          "host": "wilcoxnewspapers.com",
          "date": "2026-03-04",
          "published": "2026-03-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
          "host": "www.dorrtownshipmi.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 42.59129,
        "lng": -85.88848,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "twelve-month-moratorium-reported",
            "reported_finding": "TownBroadcast reporting republished by Wilcox says Dorr Township approved twelve-month pause after debate over shorter period.",
            "report_display_date": "2026-03-04",
            "independently_verified_current_status": null
          },
          "notes": [
            "No signed ordinance or exact start/expiry retained. Residents allegations about health, water and taxes are not independently adopted effects.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/",
              "host": "wilcoxnewspapers.com",
              "date": "2026-03-04",
              "published": "2026-03-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "Signed Dorr Township minutes record residents expressing concerns about the Microsoft data center on February 26, 2026. The Board authorized signature of an ordinance imposing a temporary moratorium on new or expanded data centers for 12 months by six votes to zero, after amending an initial nine month motion. This is a township regulatory action. Current individual project construction, permit disposition, operation, the ordinance legal effective day and later amendment history remain unverified. The moratorium is not a project cancellation or a physical shutdown.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "township_moratorium_and_public_comments_physical_stage_held",
              "scope": "Signed Dorr Township minutes record residents expressing concerns about the Microsoft data center on February 26, 2026. The Board authorized signature of an ordinance imposing a temporary moratorium on new or expanded data centers for 12 months by six votes to zero, after amending an initial nine month motion. This is a township regulatory action. Current individual project construction, permit disposition, operation, the ordinance legal effective day and later amendment history remain unverified. The moratorium is not a project cancellation or a physical shutdown."
            },
            "regulatory_scope": {
              "board_action_on": "2026-02-26",
              "minutes_recorded_final_vote": "6 to 0",
              "minutes_recorded_moratorium_duration": "12 months",
              "ordinance_effective_day_established": false,
              "later_ordinance_amendment_history_verified": false,
              "township_not_countywide_rule": true,
              "signed_minutes_pdf_pages_visually_read": [
                1,
                2
              ]
            }
          },
          "notes": [
            "Signed Dorr Township minutes record residents expressing concerns about the Microsoft data center on February 26, 2026. The Board authorized signature of an ordinance imposing a temporary moratorium on new or expanded data centers for 12 months by six votes to zero, after amending an initial nine month motion. This is a township regulatory action. Current individual project construction, permit disposition, operation, the ordinance legal effective day and later amendment history remain unverified. The moratorium is not a project cancellation or a physical shutdown.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
              "host": "www.dorrtownshipmi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Dorr Township · Allegan · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-02-26",
          "text": "Signed Dorr Township minutes record authorization of a 12 month temporary moratorium on new or expanded data centers on February 26, 2026, by six votes to zero. This approval concerns the moratorium, not approval or cancellation of the Microsoft project, an operating shutdown or a verified legal effective day.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
              "host": "www.dorrtownshipmi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "26005"
      }
    },
    {
      "id": "microsoft-douglasville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Douglasville Data Center Campus",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide qualification thresholds, no named-site award. Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
          "host": "dor.georgia.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.7182,
        "lng": -84.75584,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "statewide qualification thresholds, no named-site award",
          "fields": {},
          "notes": [
            "Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
              "host": "dor.georgia.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."
            }
          },
          "notes": [
            "Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."
          ],
          "sources": [
            {
              "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
              "host": "dor.georgia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted."
            },
            "tax_source_scope": {
              "county_threshold_table_not_named_facility_registration": true,
              "incentive_threshold_not_actual_expenditure_or_operation": true
            }
          },
          "notes": [
            "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "status_scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "microsoft-east-point-ben-hill-road-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft East Point Data Center (Ben Hill Road)",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "East Point",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft regional Georgia context without exact Ben Hill match. Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/blog/east-point-georgia-datacenter-project-update/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.83707,
        "lng": -84.43133,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Microsoft regional Georgia context without exact Ben Hill match",
          "fields": {
            "operator_region_label": "South Fulton County, Georgia",
            "regional_workforce_forecast": "hundreds of fulltime employees and contractors across operational facilities by end2026",
            "regional_cooling_description": "direct evaporative, no cooling water below29.4degreesCelsius"
          },
          "notes": [
            "Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities."
            },
            "component_scope": {
              "site_phase_from_current_project_page": "Construction",
              "regional_jobs_not_allocated_to_site": true,
              "community_feedback_historical_context": "Microsoft describes neighborhood feedback and rock excavation discussions, including a February 26, 2024 information session. Its account is an operator statement, not an independently published formal complaint or regulator finding."
            }
          },
          "notes": [
            "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/blog/east-point-georgia-datacenter-project-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/",
              "host": "local.microsoft.com",
              "published": "2024-06-17",
              "date": "2024-06-17",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Point · Fulton · Source context reviewed",
      "status_scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "microsoft-east-wenatchee-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Microsoft East Wenatchee Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "East Wenatchee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. JasonTaylor KPQ December13,2022 original utility-spokesperson interviews distinguish Douglas County PUD TRANSMISSION/DISTRIBUTION from electricity bought from THIRD PARTY. Reported180MW concerns three Microsoft county buildings, not180MWITeach or allhydro fromWellsDam. Agreement January6,2023-December31,2029 asreported, actual executedcontract/commissioning/current amendments unread. One building had grandopening but was about to operate; another underconstruction. Ceremony is not energization.875UrbanIndustrialWay is substation address, not a new exact data-center parcel. Historical delivery tariff charges/kWh/kW demand are delivery components not all-in2026energy price; no unsupported rate sum. Microsoft reportedly paid substation, receipt unread. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/",
          "host": "kpq.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/quincy/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-central-washington/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 47.67091,
        "lng": -119.68559,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "JasonTaylor KPQ December13,2022 original utility-spokesperson interviews distinguish Douglas County PUD TRANSMISSION/DISTRIBUTION from electricity bought from THIRD PARTY. Reported180MW concerns three Microsoft county buildings, not180MWITeach or allhydro fromWellsDam. Agreement January6,2023-December31,2029 asreported, actual executedcontract/commissioning/current amendments unread.",
            "One building had grandopening but was about to operate; another underconstruction. Ceremony is not energization.875UrbanIndustrialWay is substation address, not a new exact data-center parcel. Historical delivery tariff charges/kWh/kW demand are delivery components not all-in2026energy price; no unsupported rate sum. Microsoft reportedly paid substation, receipt unread.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/",
              "host": "kpq.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 15",
          "scope": "Microsoft regional sources distinguish existing East Wenatchee operation from additional East Wenatchee development. One community landing page mentions only the development while its linked explanatory page also mentions existing operation. The inherited record derives from a utility agreement, with no exact facility or phase crosswalk established here. Existing city service and future development are retained as separate contexts, leaving this individual physical stage unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "mixed_existing_and_future_city_context_individual_phase_held",
              "scope": "Microsoft regional sources distinguish existing East Wenatchee operation from additional East Wenatchee development. One community landing page mentions only the development while its linked explanatory page also mentions existing operation. The inherited record derives from a utility agreement, with no exact facility or phase crosswalk established here. Existing city service and future development are retained as separate contexts, leaving this individual physical stage unclear."
            },
            "identity_scope": {
              "regional_existing_operation_claim_retained": true,
              "regional_new_development_claim_retained": true,
              "individual_inherited_record_phase_match_verified": false
            }
          },
          "notes": [
            "Microsoft regional sources distinguish existing East Wenatchee operation from additional East Wenatchee development. One community landing page mentions only the development while its linked explanatory page also mentions existing operation. The inherited record derives from a utility agreement, with no exact facility or phase crosswalk established here. Existing city service and future development are retained as separate contexts, leaving this individual physical stage unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/quincy/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-central-washington/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Wenatchee · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53017"
      }
    },
    {
      "id": "microsoft-el-mirage-az",
      "state": "az",
      "kind": "facility",
      "name": "Microsoft El Mirage Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Maricopa"
      ],
      "city": "El Mirage",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.59323,
        "lng": -112.41484,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "operator_named_operating_market": "El Mirage",
            "county_context": "Maricopa",
            "current_exact_building_status": null,
            "site_it_mw": null
          },
          "notes": [
            "Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 3",
          "scope": "Microsoft explicitly names operation in El Mirage in its Arizona regional page. The earlier review already retains that city service context. The regional statement does not identify an individual building or expansion phase represented by the inherited campus record. Preserve the existing unclear exact stage and do not convert regional service into all campus commissioning.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Microsoft explicitly names operation in El Mirage in its Arizona regional page. The earlier review already retains that city service context. The regional statement does not identify an individual building or expansion phase represented by the inherited campus record. Preserve the existing unclear exact stage and do not convert regional service into all campus commissioning."
            }
          },
          "notes": [
            "Microsoft explicitly names operation in El Mirage in its Arizona regional page. The earlier review already retains that city service context. The regional statement does not identify an individual building or expansion phase represented by the inherited campus record. Preserve the existing unclear exact stage and do not convert regional service into all campus commissioning."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 04, October 22, 2026",
          "scope": "Microsoft explicitly says it operates datacenters in El Mirage and Goodyear. This supports a provider brand operator role for the existing El Mirage city campus context, not an individual building, parcel, legal owner or commissioning finding. The source page modification date is not a physical milestone. Existing status remains unchanged.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft explicitly says it operates datacenters in El Mirage and Goodyear. This supports a provider brand operator role for the existing El Mirage city campus context, not an individual building, parcel, legal owner or commissioning finding. The source page modification date is not a physical milestone. Existing status remains unchanged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Microsoft explicitly says it operates datacenters in El Mirage and Goodyear. This supports a provider brand operator role for the existing El Mirage city campus context, not an individual building, parcel, legal owner or commissioning finding. The source page modification date is not a physical milestone. Existing status remains unchanged.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
              "host": "local.microsoft.com",
              "published": "2021-08-26",
              "date": "2021-08-26",
              "checked": "2026-10-22",
              "label": "First party named community development or operation statement"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "El Mirage · Maricopa · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04013"
      }
    },
    {
      "id": "microsoft-elk-grove-village-il",
      "state": "il",
      "kind": "facility",
      "name": "Microsoft Elk Grove Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cook"
      ],
      "city": "Elk Grove Village",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
          "host": "dceo.illinois.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.75955,
        "lng": -87.85869,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations",
          "fields": {
            "program_report_year": 2025,
            "program_register_as_of": "2025-12-31",
            "applications_received": 35,
            "approved_owner_operator_applications": 34,
            "operator_certificates_issued": 34,
            "tenant_certificates_issued": 91,
            "construction_credit_certificates_issued": 0,
            "total_investment_commitments_usd": 10665815092,
            "estimated_tax_benefits_usd": 666613443,
            "estimated_tax_benefit_calculation_percent": 6.25,
            "listed_new_job_commitments": 731,
            "investment_commitment_period_months": 60
          },
          "notes": [
            "34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S3-Illinois-DCEO-2025-20261015",
          "scope": "Illinois DCEO 2025 program entry for Microsoft Corporation in Elk Grove Village. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.",
          "fields": {
            "reported_program_party": "Microsoft Corporation",
            "reported_program_locality": "Elk Grove Village",
            "mou_year_reported": 2020,
            "program_report_as_of": "2025-12-31",
            "investment_commitment_usd": 252000000,
            "formula_based_tax_benefit_estimate_usd": 15750000,
            "new_jobs_in_program_table": 20,
            "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.",
            "program_identity_scope": "Explicit facility designation or company/locality association with the existing Microsoft Elk Grove Data Center research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."
          },
          "notes": [
            "The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.",
            "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.",
            "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Elk Grove Village · Cook · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17031"
      }
    },
    {
      "id": "microsoft-fairwater-fayetteville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Fairwater Atlanta (Azure AI Superfactory)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fayette"
      ],
      "city": "Fayetteville",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fayette generic incentives not Fairwater awarded benefits. Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-11-12",
          "Microsoft published its named Fairwater Atlanta operating account on November 12, 2025. The source reports operation beginning in October without an exact day. November 12 is the publication date, not a manufactured opening day or an operating certification for every Georgia campus."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://fayettega.org/doing-business/incentives-tax-rates/",
          "host": "fayettega.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
          "host": "news.microsoft.com",
          "published": "2025-11-12",
          "date": "2025-11-12",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.4136,
        "lng": -84.49495,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Fayette generic incentives not Fairwater awarded benefits",
          "fields": {
            "publisher": "Fayette County Development Authority",
            "scope": "generic incentive eligibility page",
            "tax_table_year": 2021
          },
          "notes": [
            "Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://fayettega.org/doing-business/incentives-tax-rates/",
              "host": "fayettega.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_named_fairwater_operation",
              "scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name."
            },
            "identity_and_date_scope": {
              "matched_named_facility": "Fairwater Atlanta",
              "inherited_fayetteville_jurisdiction_newly_certified": false,
              "exact_opening_day_established": false,
              "operating_start_month_reported": "October 2025",
              "network_total_not_site_capacity": true,
              "cooling_design_not_measured_total_water_use": true
            }
          },
          "notes": [
            "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fayetteville · Fayette · Source context reviewed",
      "status_scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
      "event_evidence": [
        {
          "date": "2025-11-12",
          "text": "Microsoft published its named Fairwater Atlanta operating account on November 12, 2025. The source reports operation beginning in October without an exact day. November 12 is the publication date, not a manufactured opening day or an operating certification for every Georgia campus.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13113"
      }
    },
    {
      "id": "microsoft-fernley-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Microsoft Victory Logistics District Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lyon"
      ],
      "city": "Fernley",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. RobSabo/NNBW report publishedNevadaAppeal April17,2025 describes purchase300.7acres rawland atVictoryLogisticsDistrict for70.5M, citingLyonpublicrecords. Deed not directlyread. Microsoft declined to state development plans; article says DC only IF that is eventualdirection. Landpurchase mustnotbecome approved/underconstructionDC or70.5Mconstructioncapex. 1997Nevadapresence not Fernleyfacilityopening. MarkIV120Mgrading/600acres/1600acresdevelopmentready and4300acrepark are broaderparkplans, notMicrosoft-ownedacreage/spend. ProposedEaglesubstation/privategenerationnotdeliveredITorapprovedESA. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nevadaappeal.com/news/2025/apr/17/microsoft-buy-300-acres-in-fernley-lyon-county-victory-logistics-district/",
          "host": "nevadaappeal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.01992,
        "lng": -119.18839,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "RobSabo/NNBW report publishedNevadaAppeal April17,2025 describes purchase300.7acres rawland atVictoryLogisticsDistrict for70.5M, citingLyonpublicrecords. Deed not directlyread. Microsoft declined to state development plans; article says DC only IF that is eventualdirection. Landpurchase mustnotbecome approved/underconstructionDC or70.5Mconstructioncapex.",
            "1997Nevadapresence not Fernleyfacilityopening. MarkIV120Mgrading/600acres/1600acresdevelopmentready and4300acrepark are broaderparkplans, notMicrosoft-ownedacreage/spend. ProposedEaglesubstation/privategenerationnotdeliveredITorapprovedESA.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://www.nevadaappeal.com/news/2025/apr/17/microsoft-buy-300-acres-in-fernley-lyon-county-victory-logistics-district/",
              "host": "nevadaappeal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fernley · Lyon · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32019"
      }
    },
    {
      "id": "microsoft-firecracker-rome-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Data Center Campus - Rome, GA",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Floyd"
      ],
      "city": "Rome",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending. Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
          "host": "allongeorgia.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://developromefloyd.com/targeted-sectors/technology/",
          "host": "developromefloyd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
          "host": "developromefloyd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 34.231,
        "lng": -85.21116,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending.",
            "Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
              "host": "allongeorgia.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."
            }
          },
          "notes": [
            "The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."
          ],
          "sources": [
            {
              "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
              "host": "allongeorgia.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://developromefloyd.com/targeted-sectors/technology/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "distinct_coosa_proposal_and_firecracker_current_stage_hold",
              "scope": "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage."
            },
            "identity_hold": {
              "coosa_school_proposal_distinct_from_microsoft_huffaker_purchase": true,
              "republication_not_independent_permit_verification": true,
              "current_firecracker_stage_verified": false,
              "minutes_request_state": "HTTP404"
            }
          },
          "notes": [
            "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rome · Floyd · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13115"
      }
    },
    {
      "id": "microsoft-gaines-township-mi",
      "state": "mi",
      "kind": "facility",
      "name": "Microsoft Gaines Township Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kent"
      ],
      "city": "Gaines Township",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. No specific development plans had been provided. The existing Switch Pyramid's water use and history are not Microsoft site facts. Requested rezoning is not an observed approval; historic purchase price is land consideration, not project capex or current power demand. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-15",
          "Gaines Charter Township certified minutes record the Planning Commission public hearing on the Microsoft rezoning request on April 15, 2026. The hearing included public concerns and company answers. The certified PDF has an incomplete motion continuation, so this event does not assert a final rezoning decision, current construction or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wgvunews.org/news/2025-12-16/gaines-township-to-consider-rezoning-for-future-microsoft-data-center",
          "host": "wgvunews.org",
          "date": "2025-12-16",
          "published": "2025-12-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070",
          "host": "www.gainestownship.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/blog/gaines-charter-township-public-meeting/",
          "host": "local.microsoft.com",
          "published": "2026-03-10",
          "date": "2026-03-10",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/michigan/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.03214,
        "lng": -85.5493,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WGVU reports Microsoft's rezoning request for an additional Gaines Township parcel adjoining its former Steelcase land, with a December 18 public hearing scheduled.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No specific development plans had been provided. The existing Switch Pyramid's water use and history are not Microsoft site facts. Requested rezoning is not an observed approval; historic purchase price is land consideration, not project capex or current power demand.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wgvunews.org/news/2025-12-16/gaines-township-to-consider-rezoning-for-future-microsoft-data-center",
              "host": "wgvunews.org",
              "date": "2025-12-16",
              "published": "2025-12-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "The certified April 15, 2026 Gaines Charter Township Planning Commission minutes record the Microsoft rezoning public hearing, public comments, company answers and a tabling motion. The certified PDF omits the motion continuation before its signed certification page; the separate May packet includes a draft continuation. No final township rezoning outcome, a vote count for that motion, present physical construction or operation is inferred from the incomplete certified sequence. Proposed conditions and company assurances remain proposals and attributed statements.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "certified_hearing_and_incomplete_motion_sequence_current_stage_held",
              "scope": "The certified April 15, 2026 Gaines Charter Township Planning Commission minutes record the Microsoft rezoning public hearing, public comments, company answers and a tabling motion. The certified PDF omits the motion continuation before its signed certification page; the separate May packet includes a draft continuation. No final township rezoning outcome, a vote count for that motion, present physical construction or operation is inferred from the incomplete certified sequence. Proposed conditions and company assurances remain proposals and attributed statements."
            },
            "source_read_scope": {
              "certified_minutes_pages_text_read": [
                1,
                2,
                3,
                4,
                5,
                6,
                7,
                8,
                9,
                10,
                11
              ],
              "certified_pages_visually_read": [
                4,
                8,
                11,
                12
              ],
              "certification_signature_dated": "2026-05-28",
              "certified_sequence_missing_motion_continuation": true,
              "draft_may_packet_not_final_vote_proof": true,
              "kent_county_gaines_distinct_from_genesee_county_gaines": true
            }
          },
          "notes": [
            "The certified April 15, 2026 Gaines Charter Township Planning Commission minutes record the Microsoft rezoning public hearing, public comments, company answers and a tabling motion. The certified PDF omits the motion continuation before its signed certification page; the separate May packet includes a draft continuation. No final township rezoning outcome, a vote count for that motion, present physical construction or operation is inferred from the incomplete certified sequence. Proposed conditions and company assurances remain proposals and attributed statements.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070",
              "host": "www.gainestownship.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check69, October24,2026",
          "scope": "The named Microsoft recap identifies datacenter project concepts discussed in Gaines Charter Township. Its March 3, 2026 meeting and March 10, 2026 publisher metadata remain distinct. Developer per source is a prospective project association, not an approved final design, land title or current construction finding. Regional water and utility price pledges do not establish measured site outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The named Microsoft recap identifies datacenter project concepts discussed in Gaines Charter Township. Its March 3, 2026 meeting and March 10, 2026 publisher metadata remain distinct. Developer per source is a prospective project association, not an approved final design, land title or current construction finding. Regional water and utility price pledges do not establish measured site outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The named Microsoft recap identifies datacenter project concepts discussed in Gaines Charter Township. Its March 3, 2026 meeting and March 10, 2026 publisher metadata remain distinct. Developer per source is a prospective project association, not an approved final design, land title or current construction finding. Regional water and utility price pledges do not establish measured site outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/gaines-charter-township-public-meeting/",
              "host": "local.microsoft.com",
              "published": "2026-03-10",
              "date": "2026-03-10",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/communities/americas/michigan/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gaines Township · Kent · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-04-15",
          "text": "Gaines Charter Township certified minutes record the Planning Commission public hearing on the Microsoft rezoning request on April 15, 2026. The hearing included public concerns and company answers. The certified PDF has an incomplete motion continuation, so this event does not assert a final rezoning decision, current construction or operation.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070",
              "host": "www.gainestownship.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "26081"
      }
    },
    {
      "id": "microsoft-ginger-east-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ginger East Data Center",
      "group": "building",
      "status": "Agency-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status. GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/",
          "host": "gowestdesmoines.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/",
          "host": "gowestdesmoines.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2025-01-08",
          "date": "2025-01-08",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.6408,
        "lng": -93.59669,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "source_republished_report_date": "2024-07-17",
            "campus_address": "1475 SE Maffitt Lake Road",
            "historical_building_permits": 2,
            "area_each_sqft": 244676,
            "permit_valuation_each_usd": 384000000,
            "reported_contractor": "Weitz"
          },
          "notes": [
            "City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status.",
            "GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/",
              "host": "gowestdesmoines.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_reported_construction",
              "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion."
            }
          },
          "notes": [
            "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/",
              "host": "gowestdesmoines.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-01-08",
              "date": "2025-01-08",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "status_scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-ginger-west-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ginger West Data Center",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.70395,
        "lng": -93.52293,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "construction_completion_target": "Summer2028; season precision only",
            "general_contractor": "Turner Construction",
            "actual_operational_date": null
          },
          "notes": [
            "Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted."
            },
            "construction_scope": {
              "estimated_completion_period": "summer 2028",
              "source_explicitly_separates_completion_from_operation": true,
              "physical_operation_verified": false
            }
          },
          "notes": [
            "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-01-08",
              "date": "2025-01-08",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "status_scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-goodyear-az",
      "state": "az",
      "kind": "facility",
      "name": "Microsoft Goodyear Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Maricopa"
      ],
      "city": "Goodyear",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.21507,
        "lng": -112.72265,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "operator_named_operating_market": "Goodyear",
            "county_context": "Maricopa",
            "current_exact_building_status": null,
            "site_it_mw": null
          },
          "notes": [
            "Preferred historical link redirects to Arizona regional operator page. It says datacenters operate in both cities, but does not verify individual expansion parcels, size, opening or investment. Global community commitments are not project-specific executed agreements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 3",
          "scope": "Microsoft explicitly names operation in Goodyear in its Arizona regional page. The earlier review already retains that city service context. The regional statement does not identify an individual building or expansion phase represented by the inherited campus record. Preserve the existing unclear exact stage and do not convert regional service into all campus commissioning.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Microsoft explicitly names operation in Goodyear in its Arizona regional page. The earlier review already retains that city service context. The regional statement does not identify an individual building or expansion phase represented by the inherited campus record. Preserve the existing unclear exact stage and do not convert regional service into all campus commissioning."
            }
          },
          "notes": [
            "Microsoft explicitly names operation in Goodyear in its Arizona regional page. The earlier review already retains that city service context. The regional statement does not identify an individual building or expansion phase represented by the inherited campus record. Preserve the existing unclear exact stage and do not convert regional service into all campus commissioning."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 04, October 22, 2026",
          "scope": "Microsoft explicitly says it operates datacenters in El Mirage and Goodyear. This supports a provider brand operator role for the existing Goodyear city campus context, not an individual building, parcel, legal owner or commissioning finding. The source page modification date is not a physical milestone. Existing status remains unchanged.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft explicitly says it operates datacenters in El Mirage and Goodyear. This supports a provider brand operator role for the existing Goodyear city campus context, not an individual building, parcel, legal owner or commissioning finding. The source page modification date is not a physical milestone. Existing status remains unchanged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Microsoft explicitly says it operates datacenters in El Mirage and Goodyear. This supports a provider brand operator role for the existing Goodyear city campus context, not an individual building, parcel, legal owner or commissioning finding. The source page modification date is not a physical milestone. Existing status remains unchanged.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-phoenix/",
              "host": "local.microsoft.com",
              "published": "2021-08-26",
              "date": "2021-08-26",
              "checked": "2026-10-22",
              "label": "First party named community development or operation statement"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Goodyear · Maricopa · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04013"
      }
    },
    {
      "id": "microsoft-granger-in",
      "state": "in",
      "kind": "facility",
      "name": "Microsoft Granger Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Joseph"
      ],
      "city": "Granger",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting",
          "host": "wvpe.org",
          "date": "2026-02-19",
          "published": "2026-02-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/st-joseph-county-public-meeting-recap/",
          "host": "local.microsoft.com",
          "published": "2026-05-20",
          "date": "2026-05-20",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://mishawaka.in.gov/news/city-of-mishawaka-and-regional-partners-sign-mou-to-support-water-sewer-service-and-wastewater-expansion/",
          "host": "mishawaka.in.gov",
          "published": "2025-08-26",
          "date": "2025-08-26",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.62769,
        "lng": -86.30205,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WVPE reports a Granger community panel on Microsoft's proposed campus and a county official still negotiating a development agreement under an NDA.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting",
              "host": "wvpe.org",
              "date": "2026-02-19",
              "published": "2026-02-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "primary_concept_and_regional_utility_planning_not_current_site_stage",
              "scope": "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode."
            },
            "scope_limits": {
              "operator_meeting_on": "2026-05-19",
              "city_regional_mou_release_on": "2025-08-26",
              "mou_not_built_utility_service": true,
              "laporte_not_granger": true,
              "existing_concern_item_not_duplicated": true
            }
          },
          "notes": [
            "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/st-joseph-county-public-meeting-recap/",
              "host": "local.microsoft.com",
              "published": "2026-05-20",
              "date": "2026-05-20",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://mishawaka.in.gov/news/city-of-mishawaka-and-regional-partners-sign-mou-to-support-water-sewer-service-and-wastewater-expansion/",
              "host": "mishawaka.in.gov",
              "published": "2025-08-26",
              "date": "2025-08-26",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Granger · St. Joseph · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18141"
      }
    },
    {
      "id": "microsoft-heath-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Microsoft Heath Data Center",
      "group": "building",
      "status": "Site development underway",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Heath",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.11236,
        "lng": -82.53349,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "latest_dated_update": "2026-07",
            "reported_activity": "Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.",
            "general_contractor": "Ames Construction",
            "vertical_construction_schedule": "Not determined/awaiting detail in March2026 update.",
            "older_mass_grading_forecast": "February through November2026",
            "actual_operational_date": null,
            "reported_access": "Thornwood Drive construction entrance; second off Lees Road planned"
          },
          "notes": [
            "Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.",
            "Future tree-removal or work-hour text does not establish a new hearing or current road closure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_preliminary_site_development",
              "scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred."
            },
            "phase_scope": {
              "reported_activity_period": "July 2026",
              "preliminary_site_works_distinct_from_vertical_construction": true,
              "datacenter_operation_verified": false,
              "month_not_converted_into_exact_start_day": true
            }
          },
          "notes": [
            "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
              "host": "local.microsoft.com",
              "published": "2026-03-02",
              "date": "2026-03-02",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Heath · Licking · Source context reviewed",
      "status_scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "microsoft-hebron-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Microsoft Hebron Data Center",
      "group": "building",
      "status": "Site development underway",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Hebron",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.03946,
        "lng": -82.45869,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "latest_dated_update": "2026-07",
            "reported_activity": "Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.",
            "general_contractor": "Ames Construction",
            "vertical_construction_schedule": "Not determined/awaiting detail in March2026 update.",
            "older_mass_grading_forecast": "February through November2026",
            "actual_operational_date": null,
            "reported_access": "Temporary Canyon Road entrance; permanent east entrance by industrial park planned"
          },
          "notes": [
            "Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.",
            "Future tree-removal or work-hour text does not establish a new hearing or current road closure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_preliminary_site_development",
              "scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred."
            },
            "phase_scope": {
              "reported_activity_period": "July 2026",
              "preliminary_site_works_distinct_from_vertical_construction": true,
              "datacenter_operation_verified": false,
              "month_not_converted_into_exact_start_day": true
            }
          },
          "notes": [
            "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-11-13",
              "date": "2025-11-13",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hebron · Licking · Source context reviewed",
      "status_scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "microsoft-hickory-catawba-county-nc",
      "state": "nc",
      "kind": "facility",
      "name": "Microsoft Hickory Data Center",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Catawba"
      ],
      "city": "Hickory",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-23",
          "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Hickory opening, an executed incentive amendment or three independent project announcements."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
          "host": "conovernc.gov",
          "date": "2026-06-23",
          "published": "2026-06-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
          "host": "www.catawbacountync.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/blog/stover-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2024-09-19",
          "date": "2024-09-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 35.67175,
        "lng": -81.22532,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Catawba multi-site joint statement",
          "fields": {
            "joint_statement_publication_date": "2026-06-23",
            "historical_project_announcement_month": "2022-11",
            "regional_planned_investment_usd_min": 1000000000,
            "regional_planned_data_centers": 4,
            "regional_development_period_years": 10,
            "announced_local_property_tax_commitment": "pay based on full value; local agreements being amended"
          },
          "notes": [
            "Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
              "host": "conovernc.gov",
              "date": "2026-06-23",
              "published": "2026-06-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Hickory record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "joint_county_programme_individual_stage_held",
              "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Hickory record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear."
            },
            "programme_scope": {
              "joint_statement_on": "2026-06-23",
              "programme_municipalities": [
                "Conover",
                "Hickory",
                "Maiden"
              ],
              "individual_site_stage_verified": false,
              "projected_water_share_not_actual_withdrawal_or_site_allocation": true,
              "amendments_in_progress_not_executed_agreements": true
            }
          },
          "notes": [
            "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Hickory record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "www.catawbacountync.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
              "host": "www.conovernc.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft identifies the Hickory and Stover project in Catawba County. The May2026 account distinguishes utility and foundation work from a forecast steel milestone. Dated Ames and Clayco contractor accounts remain separate. The postponed church information session and later site meeting are not a facility street or future hearing. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies the Hickory and Stover project in Catawba County. The May2026 account distinguishes utility and foundation work from a forecast steel milestone. Dated Ames and Clayco contractor accounts remain separate. The postponed church information session and later site meeting are not a facility street or future hearing. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies the Hickory and Stover project in Catawba County. The May2026 account distinguishes utility and foundation work from a forecast steel milestone. Dated Ames and Clayco contractor accounts remain separate. The postponed church information session and later site meeting are not a facility street or future hearing. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/stover-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-09-19",
              "date": "2024-09-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research followup 1",
          "scope": "The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_hickory_may2026_foundations_and_utilities",
              "scope": "The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred."
            },
            "source_read_scope": {
              "original_named_project_complete_may_and_february2026_and_earlier_construction_session_sections_read": true,
              "month_only_update_not_invented_exact_day": true,
              "june_steel_target_not_actual_installation": true,
              "meeting_venue_not_site_location_change": true,
              "past_rescheduled_session_not_completed_meeting": true,
              "original_exact_capture_and_retrieval_receipt_reused": true,
              "no_new_network_request": true
            }
          },
          "notes": [
            "The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/stover-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-09-19",
              "date": "2024-09-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hickory · Catawba · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-06-23",
          "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Hickory opening, an executed incentive amendment or three independent project announcements.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "www.catawbacountync.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
              "host": "www.conovernc.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "status_scope": "The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "37035"
      }
    },
    {
      "id": "microsoft-hoffman-estates-il",
      "state": "il",
      "kind": "facility",
      "name": "Microsoft Hoffman Estates Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cook"
      ],
      "city": "Hoffman Estates",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
          "host": "dceo.illinois.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.87313,
        "lng": -87.72601,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations",
          "fields": {
            "program_report_year": 2025,
            "program_register_as_of": "2025-12-31",
            "applications_received": 35,
            "approved_owner_operator_applications": 34,
            "operator_certificates_issued": 34,
            "tenant_certificates_issued": 91,
            "construction_credit_certificates_issued": 0,
            "total_investment_commitments_usd": 10665815092,
            "estimated_tax_benefits_usd": 666613443,
            "estimated_tax_benefit_calculation_percent": 6.25,
            "listed_new_job_commitments": 731,
            "investment_commitment_period_months": 60
          },
          "notes": [
            "34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S3-Illinois-DCEO-2025-20261015",
          "scope": "Illinois DCEO 2025 program entry for Microsoft Corporation in Hoffman Estates. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.",
          "fields": {
            "reported_program_party": "Microsoft Corporation",
            "reported_program_locality": "Hoffman Estates",
            "mou_year_reported": 2021,
            "program_report_as_of": "2025-12-31",
            "investment_commitment_usd": 275000000,
            "formula_based_tax_benefit_estimate_usd": 17187500,
            "new_jobs_in_program_table": 20,
            "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.",
            "program_identity_scope": "Explicit facility designation or company/locality association with the existing Microsoft Hoffman Estates Data Center research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."
          },
          "notes": [
            "The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.",
            "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.",
            "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "The 2025 Illinois data center annual report lists a 2021 Microsoft programme entry for Hoffman Estates. The table reports an investment commitment, estimated tax benefits and new jobs within the programme, and the report describes certification through memoranda of understanding. Those entries do not certify physical construction, delivered capacity or current operation. No exact facility opening, current physical phase or new quantity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "tax_programme_entry_not_physical_stage",
              "scope": "The 2025 Illinois data center annual report lists a 2021 Microsoft programme entry for Hoffman Estates. The table reports an investment commitment, estimated tax benefits and new jobs within the programme, and the report describes certification through memoranda of understanding. Those entries do not certify physical construction, delivered capacity or current operation. No exact facility opening, current physical phase or new quantity is adopted."
            }
          },
          "notes": [
            "The 2025 Illinois data center annual report lists a 2021 Microsoft programme entry for Hoffman Estates. The table reports an investment commitment, estimated tax benefits and new jobs within the programme, and the report describes certification through memoranda of understanding. Those entries do not certify physical construction, delivered capacity or current operation. No exact facility opening, current physical phase or new quantity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hoffman Estates · Cook · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17031"
      }
    },
    {
      "id": "microsoft-kenosha-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Microsoft Kenosha Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kenosha"
      ],
      "city": "Kenosha",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. We Energies regional map not Kenosha project proof. Generic service territory and customer totals do not establish a Microsoft Kenosha interconnection, contracted MW or energized campus. No exact-site utility agreement, build stage or opening evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.we-energies.com/company/area",
          "host": "we-energies.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 42.57671,
        "lng": -88.04203,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "We Energies regional map not Kenosha project proof",
          "fields": {
            "publisher": "We Energies",
            "scope": "utility general service-area page"
          },
          "notes": [
            "Generic service territory and customer totals do not establish a Microsoft Kenosha interconnection, contracted MW or energized campus. No exact-site utility agreement, build stage or opening evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.we-energies.com/company/area",
              "host": "we-energies.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kenosha · Kenosha · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55059"
      }
    },
    {
      "id": "microsoft-lowell-township-mi",
      "state": "mi",
      "kind": "facility",
      "name": "Microsoft Lowell Township Data Center",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kent"
      ],
      "city": "Lowell Township",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/",
          "host": "gandernewsroom.com",
          "date": "2026-10-08",
          "published": "2026-10-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/wp-content/uploads/2026/03/202603_Boards_Lowell_Charter_Township.pdf",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/blog/lowell-charter-township-public-meeting/",
          "host": "local.microsoft.com",
          "published": "2026-03-10",
          "date": "2026-03-10",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.04839,
        "lng": -85.56704,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "TheGander’s MarchURLdirectory explicitly updatedOctober 8 reports named Michiganproject stages:DeepGreenLansingAprilwithdrawal;Pavilionrezoningwithdrawal;Morleyunfiledconcept;HarborFarmzpropertymarketing;Lowellutilitytalksstalled;OaklandUniversityduediligence;Yorkwithdrawal;Solonpauseextension;Tonduunfiledconcept.",
            "independently_verified_current_operating_status": null,
            "site_stage_scope": "Municipal service/development talks suspended, not project withdrawal"
          },
          "notes": [
            "Update date is not everyprojectevent. Oakland 26 MWisplannedundefinedbasisandtrusteesauthorizedduediligence,notfinalconstruction. HarborFarmz 4 acresforsaleaspossibleDCisnotanannounced/permittedcampus. GenHhydroconceptisnotgenerationlicense/IT. Lowellpausedmunicipalnegotiations is not MSwithdrawal or siteclosure. Deedrestrictionclaims, moratoriumdates/exceptions andcourtoutcomesneedoriginalrecords. UP 1000 acreportdoesnotnameTelkite/KSawyer,address,operatororfiledapplication,so noexactTelkitecredit. OthercampusMW/taxes/poll 70 percent/oppositionclaimsmustnotbeassignedacrossthis 10-IDgroup. NoOctober 14 futurevoteorNovemberrecalloutcomeassumed.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/",
              "host": "gandernewsroom.com",
              "date": "2026-10-08",
              "published": "2026-10-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_early_planning_proposal",
              "scope": "Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist."
            },
            "date_and_approval_scope": {
              "pdf_first_page_visually_read": true,
              "exact_meeting_day_established": false,
              "operator_intention_to_seek_rezoning_not_actual_approval": true
            }
          },
          "notes": [
            "Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/wp-content/uploads/2026/03/202603_Boards_Lowell_Charter_Township.pdf",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check69, October24,2026",
          "scope": "The Microsoft recap identifies prospective datacenter planning in Lowell Charter Township. Microsoft says it is considering a land purchase; no completed acquisition is established. The March 5, 2026 community meeting and March 10, 2026 publisher metadata are distinct clocks. Developer per source is a prospective project association, not a rezoning approval or current construction finding. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The Microsoft recap identifies prospective datacenter planning in Lowell Charter Township. Microsoft says it is considering a land purchase; no completed acquisition is established. The March 5, 2026 community meeting and March 10, 2026 publisher metadata are distinct clocks. Developer per source is a prospective project association, not a rezoning approval or current construction finding. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The Microsoft recap identifies prospective datacenter planning in Lowell Charter Township. Microsoft says it is considering a land purchase; no completed acquisition is established. The March 5, 2026 community meeting and March 10, 2026 publisher metadata are distinct clocks. Developer per source is a prospective project association, not a rezoning approval or current construction finding. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/lowell-charter-township-public-meeting/",
              "host": "local.microsoft.com",
              "published": "2026-03-10",
              "date": "2026-03-10",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lowell Township · Kent · Source context reviewed",
      "status_scope": "Microsoft community boards explicitly describe a proposed data center in Lowell Charter Township and say the programme is early in planning, with rezoning intended after community consultation. Operator listed development describes that proposal only. No exact meeting day is established from the PDF filename, and the boards do not prove approved zoning, current physical construction or operation. The township homepage robots redirect remains an access route hold, not evidence that no municipal records exist.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "26081"
      }
    },
    {
      "id": "microsoft-maiden-catawba-county-nc",
      "state": "nc",
      "kind": "facility",
      "name": "Microsoft Maiden Data Center",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Catawba"
      ],
      "city": "Maiden",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-23",
          "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Maiden opening, an executed incentive amendment or three independent project announcements."
        ],
        [
          "2024-04-01",
          "Microsoft reports that Boyd Farm construction began April 1, 2024 with clearing and grading. This is the issuer reported preliminary site construction day, rather than first vertical building, computing commissioning or a completed later forecast."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
          "host": "catawbacountync.gov",
          "date": "2026-06-23",
          "published": "2026-06-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
          "host": "www.conovernc.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2024-04-30",
          "date": "2024-04-30",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 35.64236,
        "lng": -81.21318,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Catawba multi-site joint statement",
          "fields": {
            "joint_statement_publication_date": "2026-06-23",
            "historical_project_announcement_month": "2022-11",
            "regional_planned_investment_usd_min": 1000000000,
            "regional_planned_data_centers": 4,
            "regional_development_period_years": 10,
            "announced_local_property_tax_commitment": "pay based on full value; local agreements being amended"
          },
          "notes": [
            "Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "catawbacountync.gov",
              "date": "2026-06-23",
              "published": "2026-06-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Maiden record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "joint_county_programme_individual_stage_held",
              "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Maiden record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear."
            },
            "programme_scope": {
              "joint_statement_on": "2026-06-23",
              "programme_municipalities": [
                "Conover",
                "Hickory",
                "Maiden"
              ],
              "individual_site_stage_verified": false,
              "projected_water_share_not_actual_withdrawal_or_site_allocation": true,
              "amendments_in_progress_not_executed_agreements": true
            }
          },
          "notes": [
            "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Maiden record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "www.catawbacountync.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
              "host": "www.conovernc.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft identifies Boyd Farms off Zeb Haynes Road in Maiden. Its May2026 update names Clark Construction, separate from the earlier Morgan account. Possible controlled blasting remains conditional on approval. Neither an elapsed construction forecast nor a conditional rock removal request is a verified outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies Boyd Farms off Zeb Haynes Road in Maiden. Its May2026 update names Clark Construction, separate from the earlier Morgan account. Possible controlled blasting remains conditional on approval. Neither an elapsed construction forecast nor a conditional rock removal request is a verified outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies Boyd Farms off Zeb Haynes Road in Maiden. Its May2026 update names Clark Construction, separate from the earlier Morgan account. Possible controlled blasting remains conditional on approval. Neither an elapsed construction forecast nor a conditional rock removal request is a verified outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-04-30",
              "date": "2024-04-30",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research followup 1",
          "scope": "The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_boyd_farm_may2026_construction",
              "scope": "The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm."
            },
            "source_read_scope": {
              "original_named_project_complete_may2026_and_earlier_construction_timeline_and_rock_sections_read": true,
              "explicit_april1_2024_start_not_announcement_or_computing_commissioning": true,
              "potential_blasting_not_actual_harm": true,
              "month_only_update_not_invented_exact_day": true,
              "original_exact_capture_and_retrieval_receipt_reused": true,
              "no_new_network_request": true
            }
          },
          "notes": [
            "The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-04-30",
              "date": "2024-04-30",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Maiden · Catawba · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-06-23",
          "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Maiden opening, an executed incentive amendment or three independent project announcements.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
              "host": "www.catawbacountync.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
              "host": "www.conovernc.gov",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2024-04-01",
          "text": "Microsoft reports that Boyd Farm construction began April 1, 2024 with clearing and grading. This is the issuer reported preliminary site construction day, rather than first vertical building, computing commissioning or a completed later forecast.",
          "kind": "construction_start",
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-04-30",
              "date": "2024-04-30",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "status_scope": "The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "37035"
      }
    },
    {
      "id": "microsoft-malaga-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Microsoft Malaga Campus",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chelan"
      ],
      "city": "Malaga",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Old first-phase forecast is not observed completion or2026 operation. Operator explicitly separates construction from operability. Three campus buildings are not three commissioned buildings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/quincy/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 47.86883,
        "lng": -120.61872,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "campus_corridor": "Malaga-Alcoa Highway",
            "first_building_construction_start_forecast": "2023-06",
            "first_building_completion_forecast": "Early2026",
            "additional_buildings": 2,
            "additional_timing": "Driven by demand",
            "historical_community_session": "2023-03-29",
            "actual_operational_date": null
          },
          "notes": [
            "Old first-phase forecast is not observed completion or2026 operation. Operator explicitly separates construction from operability. Three campus buildings are not three commissioned buildings.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 15",
          "scope": "Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_development_with_expired_forecasts_unverified",
              "scope": "Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability."
            },
            "date_scope": {
              "old_first_construction_target": "June 2023",
              "old_building_start_target": "May 2024",
              "old_completion_target": "early 2026",
              "forecast_occurrences_verified": false,
              "exact_physical_day_established": false
            }
          },
          "notes": [
            "Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/quincy/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/blog/malaga-datacenter-project-overview/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Malaga · Chelan · Source context reviewed",
      "status_scope": "Microsoft current Washington community page explicitly says it is developing data centers in Malaga. Operator listed development describes this named programme. The older project page forecasts June 2023 site work, May 2024 building work and completion in early 2026. Those future tense historical forecasts and the passed target date do not establish actual construction completion or operation, and the source explicitly separates construction completion from availability.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53007"
      }
    },
    {
      "id": "microsoft-mount-pleasant-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Microsoft Mount Pleasant Data Center Campus",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Racine"
      ],
      "city": "Mount Pleasant",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Completionnotexactcommissioningdate. Final2027fundinguseawaitsbudgetapproval; redirectedpaymentnotnewautomaticannualsiteinvestment. Do not assign550+campusemployees to eachbuilding. VillageSeptember28reportestablishesfirstbuildingcompletedSummer2026;secondconstructionexpected2028;additionalcampusplanspreliminary. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-23",
          "Microsoft published its first Mount Pleasant facility operating announcement on June 23, 2026. It separately reports equipment startup activities during April. June 23 is the release date, not a manufactured exact opening day or completion of every campus phase."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.mtpleasantwi.gov/m/newsflash/home/detail/639",
          "host": "mtpleasantwi.gov",
          "date": "2026-09-28",
          "published": "2026-09-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
          "host": "news.microsoft.com",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 42.74745,
        "lng": -88.06152,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "Mount Pleasant",
            "county": "Racine",
            "first_building_completed": "2026 summer",
            "second_building_status": "under construction",
            "second_building_completion_forecast": "2028",
            "campus_employees_min": 550,
            "annual_incentive_redirect_usd": 5000000,
            "village_share_usd": 4900000,
            "rcedc_share_usd": 100000
          },
          "notes": [
            "Completionnotexactcommissioningdate.",
            "Final2027fundinguseawaitsbudgetapproval; redirectedpaymentnotnewautomaticannualsiteinvestment.",
            "Do not assign550+campusemployees to eachbuilding.",
            "VillageSeptember28reportestablishesfirstbuildingcompletedSummer2026;secondconstructionexpected2028;additionalcampusplanspreliminary.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.mtpleasantwi.gov/m/newsflash/home/detail/639",
              "host": "mtpleasantwi.gov",
              "date": "2026-09-28",
              "published": "2026-09-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_first_facility_operation",
              "scope": "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted."
            },
            "phase_and_date_scope": {
              "reported_operating_component": "first Mount Pleasant facility",
              "startup_period_reported": "April 2026",
              "release_date": "2026-06-23",
              "exact_opening_day_established": false,
              "all_campus_phases_complete": false
            }
          },
          "notes": [
            "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
              "host": "news.microsoft.com",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft reports its first Mount Pleasant facility operational in the June23,2026 release, while identifying the adjacent second facility as still under construction. The operator role is bounded to the existing first facility; this does not make the whole campus complete or the2028 expansion forecast an outcome. Regional spending and employment totals are not adopted as facility figures. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft reports its first Mount Pleasant facility operational in the June23,2026 release, while identifying the adjacent second facility as still under construction. The operator role is bounded to the existing first facility; this does not make the whole campus complete or the2028 expansion forecast an outcome. Regional spending and employment totals are not adopted as facility figures. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Microsoft reports its first Mount Pleasant facility operational in the June23,2026 release, while identifying the adjacent second facility as still under construction. The operator role is bounded to the existing first facility; this does not make the whole campus complete or the2028 expansion forecast an outcome. Regional spending and employment totals are not adopted as facility figures. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
              "host": "news.microsoft.com",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Mount Pleasant · Racine · Source context reviewed",
      "status_scope": "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted.",
      "event_evidence": [
        {
          "date": "2026-06-23",
          "text": "Microsoft published its first Mount Pleasant facility operating announcement on June 23, 2026. It separately reports equipment startup activities during April. June 23 is the release date, not a manufactured exact opening day or completion of every campus phase.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
              "host": "news.microsoft.com",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55101"
      }
    },
    {
      "id": "microsoft-mountain-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Mountain Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
          "host": "wdmchamber.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.65942,
        "lng": -94.03741,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "named_campus": "Mountain",
            "reported_total_floor_area_sqft": 415000,
            "annual_property_tax_to_be_paid_usd": 1600000,
            "reported_public_infrastructure_built_usd": 10000000,
            "source_date": null
          },
          "notes": [
            "Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.",
            "6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
              "host": "wdmchamber.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Dallas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    },
    {
      "id": "microsoft-mwh-quincy-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Microsoft MWH Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grant"
      ],
      "city": "Quincy",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. state permit index with three named source contexts. State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2022-09-27",
          "Ecology issued Approval Order 22AQ E035 on September 27, 2022 approving renewable diesel as an additional emergency engine fuel option at Microsoft MWH. The order concerns the existing facility and a fuel option. It is not an original opening, a new construction start or proof of actual fuel use."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
          "host": "ecology.wa.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ecology.wa.gov/getattachment/36d0e87e-dfce-44fc-b067-ed5760976950/20220927MicrosoftMWH.pdf",
          "host": "ecology.wa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/quincy/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.grantcountywa.gov/172/Geographic-Information-Systems-GIS",
          "host": "www.grantcountywa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Original county GIS route and published organization identity"
        },
        {
          "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Site_address/FeatureServer/0/query?where=UPPER%28FULLADDR%29+LIKE+%271515+%25PORT%25INDUSTRIAL%25%27+OR+UPPER%28FULLADDR%29+LIKE+%27501+%25PORT%25INDUSTRIAL%25%27&outFields=%2A&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
          "host": "services2.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete municipal address points, coordinates not adopted"
        },
        {
          "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Parcels/FeatureServer/0/query?where=UPPER%28Situs%29+LIKE+%271515+%25PORT%25INDUSTRIAL%25%27+OR+UPPER%28Situs%29+LIKE+%27501+%25PORT%25INDUSTRIAL%25%27&outFields=OBJECTID%2CPARCEL%2CRollYear%2CParcelType%2CParcelDescription%2CSitus%2CLastName%2CFirstName%2CAddress1%2CAddress2%2CCity%2CState%2CZip%2CTotalAcres%2CAssembledLegal%2CIncorporatedCity&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
          "host": "services2.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete exact joined source parcel polygon"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1515+Port+Industrial+Parkway%2C+Quincy%2C+WA+98848&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal original street query returns zero"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-119.89225693054587%2C47.232989288537546%2C-119.87770306945413%2C47.24287071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -119.88498,
        "lat": 47.23793,
        "precision": "approximate",
        "basis": "Approximate calculated center of complete Grant County source parcel 313769000, independently joined to the original state computing street 1515 Port Industrial Parkway, Quincy, WA 98848. The literal Census query returns zero and is retained. One source parcel does not select a surveyed roof, legal title or complete campus. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "state permit index with three named source contexts",
          "fields": {
            "actapio_east_wenatchee_listed_approval_order": "18AQ-C226",
            "microsoft_mwh_listed_approval_order": "22AQ-E035",
            "microsoft_mwh_order_date": "2022-09-27",
            "olympia_listed_health_impact_document_date": "2010-09-16"
          },
          "notes": [
            "State explicitly says list is not every Washington data center. Air permits and health assessments not current IT capacity or proof all phases opened. Olympia HIA is not a stated construction permit. Distinct Actapio Wenatchee order08AQ-C071 not conflated with East Wenatchee.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
              "host": "ecology.wa.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 15",
          "scope": "Ecology issued Approval Order 22AQ E035 on September 27, 2022 approving renewable diesel as an additional fuel option for emergency generators at the named existing Microsoft MWH Data Center. The current Ecology directory continues to list this authorization, while current individual physical stage remains unclear. Its permission for construction and operation is regulatory language, not proof that a new physical construction phase or cloud service began. Current building operation, actual fuel use, measured emissions and an exact opening day remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_existing_generator_fuel_amendment_not_new_physical_milestone",
              "scope": "Ecology issued Approval Order 22AQ E035 on September 27, 2022 approving renewable diesel as an additional fuel option for emergency generators at the named existing Microsoft MWH Data Center. The current Ecology directory continues to list this authorization, while current individual physical stage remains unclear. Its permission for construction and operation is regulatory language, not proof that a new physical construction phase or cloud service began. Current building operation, actual fuel use, measured emissions and an exact opening day remain unverified."
            },
            "regulatory_scope": {
              "order_identifier": "22AQ E035",
              "order_issued_on": "2022-09-27",
              "fuel_option_approval_not_actual_consumption": true,
              "source_first_page_visually_read": true,
              "emergency_engine_ratings_not_it_load": true
            }
          },
          "notes": [
            "Ecology issued Approval Order 22AQ E035 on September 27, 2022 approving renewable diesel as an additional fuel option for emergency generators at the named existing Microsoft MWH Data Center. The current Ecology directory continues to list this authorization, while current individual physical stage remains unclear. Its permission for construction and operation is regulatory language, not proof that a new physical construction phase or cloud service began. Current building operation, actual fuel use, measured emissions and an exact opening day remain unverified.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/air-climate/air-quality/data-centers",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://ecology.wa.gov/getattachment/36d0e87e-dfce-44fc-b067-ed5760976950/20220927MicrosoftMWH.pdf",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://local.microsoft.com/communities/americas/quincy/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 60, 2026-10-24",
          "scope": "Explicit computing source identity and approximate source parcel center only. Existing status group unknown remains unchanged. No current computing operation, surveyed roof, legal title, tenant, role, physical milestone, technical quantity or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -119.88498,
                "lat": 47.23793,
                "precision": "approximate",
                "basis": "Approximate calculated center of complete Grant County source parcel 313769000, independently joined to the original state computing street 1515 Port Industrial Parkway, Quincy, WA 98848. The literal Census query returns zero and is retained. One source parcel does not select a surveyed roof, legal title or complete campus. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "313769000",
                "identifier_field": "PARCEL",
                "objectid": 55101,
                "agency": "Grant County Washington GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "geometry_acquisition_date": null
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "One complete original county source polygon joined through an explicit original state computing street and county address identity. Its calculated center is approximate. No roof, title, whole campus, current operator ownership or accomplished physical stage is established.",
            "Explicit computing source identity and approximate source parcel center only. Existing status group unknown remains unchanged. No current computing operation, surveyed roof, legal title, tenant, role, physical milestone, technical quantity or complete campus is certified.",
            "The actual source frame shows several large rectangular roofs across the northern part of the frame, open and graded areas through its center and south, an east road and a linear transport corridor to the south. The calculated source parcel center is retained without selecting any roof or interpreting the image as current construction or operation.",
            "The inherited general area coordinate was not a reviewed computing property destination. The independently named original government computing street and complete exact county source parcel support this bounded reference inside the retained county. The measured inherited point offset is 197.0 metres. All predecessor coordinates and source versions remain in history. This is a reference correction without physical relocation, a new computing event, selected roof, ownership, current operation or whole campus certification."
          ],
          "sources": [
            {
              "url": "https://ecology.wa.gov/getattachment/36d0e87e-dfce-44fc-b067-ed5760976950/20220927MicrosoftMWH.pdf",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original computing street letter and project summary, pages 1 and 3"
            },
            {
              "url": "https://www.grantcountywa.gov/172/Geographic-Information-Systems-GIS",
              "host": "www.grantcountywa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original county GIS route and published organization identity"
            },
            {
              "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Site_address/FeatureServer/0/query?where=UPPER%28FULLADDR%29+LIKE+%271515+%25PORT%25INDUSTRIAL%25%27+OR+UPPER%28FULLADDR%29+LIKE+%27501+%25PORT%25INDUSTRIAL%25%27&outFields=%2A&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
              "host": "services2.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete municipal address points, coordinates not adopted"
            },
            {
              "url": "https://services2.arcgis.com/hQZvdtFxRzJpMtdS/arcgis/rest/services/Parcels/FeatureServer/0/query?where=UPPER%28Situs%29+LIKE+%271515+%25PORT%25INDUSTRIAL%25%27+OR+UPPER%28Situs%29+LIKE+%27501+%25PORT%25INDUSTRIAL%25%27&outFields=OBJECTID%2CPARCEL%2CRollYear%2CParcelType%2CParcelDescription%2CSitus%2CLastName%2CFirstName%2CAddress1%2CAddress2%2CCity%2CState%2CZip%2CTotalAcres%2CAssembledLegal%2CIncorporatedCity&returnGeometry=true&outSR=4326&resultRecordCount=30&f=json",
              "host": "services2.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete exact joined source parcel polygon"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1515+Port+Industrial+Parkway%2C+Quincy%2C+WA+98848&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal original street query returns zero"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-119.89225693054587%2C47.232989288537546%2C-119.87770306945413%2C47.24287071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Quincy · Grant · Source context reviewed",
      "event_evidence": [
        {
          "date": "2022-09-27",
          "text": "Ecology issued Approval Order 22AQ E035 on September 27, 2022 approving renewable diesel as an additional emergency engine fuel option at Microsoft MWH. The order concerns the existing facility and a fuel option. It is not an original opening, a new construction start or proof of actual fuel use.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://ecology.wa.gov/getattachment/36d0e87e-dfce-44fc-b067-ed5760976950/20220927MicrosoftMWH.pdf",
              "host": "ecology.wa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    },
    {
      "id": "microsoft-northlake-il",
      "state": "il",
      "kind": "facility",
      "name": "Microsoft Northlake Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cook"
      ],
      "city": "Northlake",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
          "host": "dceo.illinois.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.8791,
        "lng": -87.91187,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations",
          "fields": {
            "program_report_year": 2025,
            "program_register_as_of": "2025-12-31",
            "applications_received": 35,
            "approved_owner_operator_applications": 34,
            "operator_certificates_issued": 34,
            "tenant_certificates_issued": 91,
            "construction_credit_certificates_issued": 0,
            "total_investment_commitments_usd": 10665815092,
            "estimated_tax_benefits_usd": 666613443,
            "estimated_tax_benefit_calculation_percent": 6.25,
            "listed_new_job_commitments": 731,
            "investment_commitment_period_months": 60
          },
          "notes": [
            "34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S3-Illinois-DCEO-2025-20261015",
          "scope": "Illinois DCEO 2025 program entry for Microsoft Corporation in Northlake. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.",
          "fields": {
            "reported_program_party": "Microsoft Corporation",
            "reported_program_locality": "Northlake",
            "mou_year_reported": 2021,
            "program_report_as_of": "2025-12-31",
            "investment_commitment_usd": 388134927,
            "formula_based_tax_benefit_estimate_usd": 24258433,
            "new_jobs_in_program_table": 20,
            "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.",
            "program_identity_scope": "Explicit facility designation or company/locality association with the existing Microsoft Northlake Data Center research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."
          },
          "notes": [
            "The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.",
            "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.",
            "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "The 2025 Illinois data center annual report lists a 2021 Microsoft programme entry for Northlake. The table reports an investment commitment, estimated tax benefits and new jobs within the programme, and the report describes certification through memoranda of understanding. Those entries do not certify physical construction, delivered capacity or current operation. No exact facility opening, current physical phase or new quantity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "tax_programme_entry_not_physical_stage",
              "scope": "The 2025 Illinois data center annual report lists a 2021 Microsoft programme entry for Northlake. The table reports an investment commitment, estimated tax benefits and new jobs within the programme, and the report describes certification through memoranda of understanding. Those entries do not certify physical construction, delivered capacity or current operation. No exact facility opening, current physical phase or new quantity is adopted."
            }
          },
          "notes": [
            "The 2025 Illinois data center annual report lists a 2021 Microsoft programme entry for Northlake. The table reports an investment commitment, estimated tax benefits and new jobs within the programme, and the report describes certification through memoranda of understanding. Those entries do not certify physical construction, delivered capacity or current operation. No exact facility opening, current physical phase or new quantity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Northlake · Cook · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17031"
      }
    },
    {
      "id": "microsoft-orchard-parkway-san-jose-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Microsoft San Jose Data Center Campus (SJ04)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SJDC04 environmental review and backup-power scope. 97.8MWexplicitlybackup,notIT. Stated32x3+2x0.5+2x0.8equals98.6MWnameplate, not97.8; preserve published effective generation distinction/rounding hold rather than overwrite. Notice of preparation is review start, not project approval or operations. CEC says it determines exemption only, not construction approval. No tenant lease read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ceqanet.lci.ca.gov/2023020229",
          "host": "ceqanet.lci.ca.gov",
          "date": "2023-02-09",
          "published": "2023-02-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.26012,
        "lng": -121.61625,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "SJDC04 environmental review and backup-power scope",
          "fields": {
            "project_name": "San Jose Data Center04",
            "cec_case": "22-SPPE-02",
            "notice_received_date": "2023-02-09",
            "site_acres_approx": 22.29,
            "parcels": [
              "101-02-020",
              "101-02-019"
            ],
            "cross_streets": "Orchard Parkway and Component Drive, San Jose",
            "planned_data_center_buildings": 2,
            "published_backup_generation_mw_max": 97.8,
            "critical_it_mw": null
          },
          "notes": [
            "97.8MWexplicitlybackup,notIT. Stated32x3+2x0.5+2x0.8equals98.6MWnameplate, not97.8; preserve published effective generation distinction/rounding hold rather than overwrite. Notice of preparation is review start, not project approval or operations. CEC says it determines exemption only, not construction approval. No tenant lease read.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ceqanet.lci.ca.gov/2023020229",
              "host": "ceqanet.lci.ca.gov",
              "date": "2023-02-09",
              "published": "2023-02-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 8",
          "scope": "The February 2023 state entry is a Notice of Preparation of a Draft Environmental Impact Report for San Jose Data Center 04. It explicitly says CEC would determine exemption from its jurisdiction rather than approve construction of the campus. The old notice does not establish a current final exemption, local permits, construction or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_environmental_preparation_not_construction_approval",
              "scope": "The February 2023 state entry is a Notice of Preparation of a Draft Environmental Impact Report for San Jose Data Center 04. It explicitly says CEC would determine exemption from its jurisdiction rather than approve construction of the campus. The old notice does not establish a current final exemption, local permits, construction or operation."
            },
            "environmental_review_context": {
              "notice_received_on": "2023-02-09",
              "document_type": "Notice of Preparation of Draft EIR",
              "construction_approval_established": false
            }
          },
          "notes": [
            "The February 2023 state entry is a Notice of Preparation of a Draft Environmental Impact Report for San Jose Data Center 04. It explicitly says CEC would determine exemption from its jurisdiction rather than approve construction of the campus. The old notice does not establish a current final exemption, local permits, construction or operation.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://ceqanet.lci.ca.gov/2023020229",
              "host": "ceqanet.lci.ca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Jose · Santa Clara · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    },
    {
      "id": "microsoft-osmium-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Osmium Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Warren"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Municipal economic-development project label Completed is not an exact commissioning day or metered IT load. Do not publish generic job/benefit copy as guaranteed positions or an executed tax award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/",
          "host": "gowestdesmoines.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.33441,
        "lng": -93.56141,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "municipal_development_stage": "Completed in2025, year precision only",
            "address": "5855 SW Kerry Street",
            "total_size_sqft": 1700000,
            "actual_operational_date": null
          },
          "notes": [
            "Municipal economic-development project label Completed is not an exact commissioning day or metered IT load. Do not publish generic job/benefit copy as guaranteed positions or an executed tax award.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/",
              "host": "gowestdesmoines.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The city project page marks Microsoft Osmium construction Completed in 2025. It does not supply an exact completion day or expressly certify customer operation and commissioning. Completed construction is not converted into operating status, an opening day or a delivered operating capacity. Physical service stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "construction_completed_year_without_operating_certification",
              "scope": "The city project page marks Microsoft Osmium construction Completed in 2025. It does not supply an exact completion day or expressly certify customer operation and commissioning. Completed construction is not converted into operating status, an opening day or a delivered operating capacity. Physical service stage remains unclear."
            },
            "completion_scope": {
              "city_reported_construction_completion_year": 2025,
              "exact_completion_day_established": false,
              "customer_service_operation_explicitly_certified": false
            }
          },
          "notes": [
            "The city project page marks Microsoft Osmium construction Completed in 2025. It does not supply an exact completion day or expressly certify customer operation and commissioning. Completed construction is not converted into operating status, an opening day or a delivered operating capacity. Physical service stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/",
              "host": "gowestdesmoines.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Warren · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19181"
      }
    },
    {
      "id": "microsoft-palmetto-fulton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Palmetto Data Center",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Palmetto",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft Palmetto construction chronology. October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.78294,
        "lng": -84.50774,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Microsoft Palmetto construction chronology",
          "fields": {
            "operator_site_name": "Palmetto datacenter",
            "locality": "Palmetto, Georgia",
            "construction_start": "2024-04",
            "construction_start_precision": "month",
            "historical_construction_completion_estimate": "beginning of2025-10",
            "operator_community_information_session_date": "2024-07-23",
            "general_contractor": "Turner Construction Company"
          },
          "notes": [
            "October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day."
            },
            "date_scope": {
              "reported_construction_start_month": "2024-04",
              "exact_start_day_established": false,
              "older_completion_forecast": "beginning of October 2025",
              "forecast_occurrence_verified": false
            }
          },
          "notes": [
            "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-07-03",
              "date": "2024-07-03",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Palmetto · Fulton · Source context reviewed",
      "status_scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "microsoft-pecos-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Microsoft Pecos Data Center Campus",
      "group": "proposed",
      "status": "Operator-announced plan",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Reeves"
      ],
      "city": "Pecos",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity. Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions. No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
          "host": "blogs.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 31.35984,
        "lng": -103.7334,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "announcement_date": "2026-06-22",
            "announced_capacity_mw": 2000,
            "capacity_basis": "Approximately2GW datacenter capacity; explicit criticalIT basis not stated.",
            "current_verified_it_mw": null,
            "investment": "Multibillion dollar campus planned over five to seven years; no exact total.",
            "construction_jobs_forecast_peak": "More than6000",
            "permanent_jobs_forecast": "Hundreds, no exact count",
            "initial_power_strategy": "Proposed behind-the-meter natural gas generation funded by Microsoft; later grid connection anticipated",
            "cooling": "Planned closed-loop design; cooling initial fill distinct from all-site lifecycle use."
          },
          "notes": [
            "Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity.",
            "Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions.",
            "No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
              "host": "blogs.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-announced plan",
              "basis": "Microsoft’s June 22, 2026 announcement says it will build the Pecos campus over a multi-year period.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective."
          },
          "notes": [
            "The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
              "host": "blogs.microsoft.com",
              "published": "2026-06-22",
              "date": "2026-06-22",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
              "host": "blogs.microsoft.com",
              "published": "2026-06-22",
              "date": "2026-06-22",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pecos · Reeves · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. Microsoft’s June 22, 2026 announcement says it will build the Pecos campus over a multi-year period. The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48389"
      }
    },
    {
      "id": "microsoft-person-county-roxboro-nc",
      "state": "nc",
      "kind": "facility",
      "name": "Microsoft Person County Mega Park",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Person"
      ],
      "city": "Roxboro",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending. Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/",
          "host": "wral.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/person-county-datacenter-project/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 36.39002,
        "lng": -78.97174,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending.",
            "Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/",
              "host": "wral.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_planning_with_preliminary_preparation",
              "scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation."
            },
            "phase_scope": {
              "source_update_period": "April 2026",
              "operator_explicit_phase": "planning",
              "road_work_forecast_is_not_completed_occurrence": true,
              "vertical_datacenter_construction_verified": false
            }
          },
          "notes": [
            "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/person-county-datacenter-project/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/person-county-datacenter-project/",
              "host": "local.microsoft.com",
              "published": "2026-05-01",
              "date": "2026-05-01",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Roxboro · Person · Source context reviewed",
      "status_scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "37145"
      }
    },
    {
      "id": "microsoft-ruthenium-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ruthenium Data Center",
      "group": "proposed",
      "status": "City-listed planned development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ruthenium proposed project and county identity. Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/",
          "host": "gowestdesmoines.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.33074,
        "lng": -94.01553,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Ruthenium proposed project and county identity",
          "fields": {
            "publisher": "West Des Moines economic development",
            "project": "Microsoft Ruthenium",
            "stage_as_published": "Proposed",
            "location": "Veterans Parkway at Woodland Avenue",
            "county": "Madison, Iowa",
            "reported_city_microsoft_campus_ordinal": 6
          },
          "notes": [
            "Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/",
              "host": "gowestdesmoines.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_listed_proposed_development",
              "scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity."
            }
          },
          "notes": [
            "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/",
              "host": "gowestdesmoines.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Madison · Source context reviewed",
      "status_scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19121"
      }
    },
    {
      "id": "microsoft-san-antonio-expansion-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Microsoft San Antonio SAT89/SAT90 Data Centers",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Medina"
      ],
      "city": "Castroville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge every parcel into one building or treat land counts as operating-site counts. Original filings, abatement agreement and water service were not read. The regional water number and claimed percentage appear inconsistent and are excluded; speculative worldwide-power forecasts and the article's Binghamton geography error are not adopted. No critical IT MW established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://sanantonioreport.org/medina-county-farmland-data-centers-strain/",
          "host": "sanantonioreport.org",
          "date": "2024-08-25",
          "published": "2024-08-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://data.texas.gov/resource/msah-s2rv.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
          "host": "data.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Texas Commission on Environmental Quality source context"
        }
      ],
      "loc": {
        "lat": 29.35542,
        "lng": -99.11024,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "San Antonio Report distinguishes Microsoft's SAT82 expansion from SAT80-1, SAT80-2 and other Medina/Bexar sites, reporting a nearly 500-million-USD filing and a county official's 15-year, 80-percent abatement description.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Do not merge every parcel into one building or treat land counts as operating-site counts. Original filings, abatement agreement and water service were not read. The regional water number and claimed percentage appear inconsistent and are excluded; speculative worldwide-power forecasts and the article's Binghamton geography error are not adopted. No critical IT MW established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://sanantonioreport.org/medina-county-farmland-data-centers-strain/",
              "host": "sanantonioreport.org",
              "date": "2024-08-25",
              "published": "2024-08-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "texas-registry-2026-10-17",
          "scope": "Official Texas registry source context, with initial eligibility and component triage. Not a physical-site census or current-stage review.",
          "fields": {
            "texas_registry_air_context": {
              "regulated_entity": "RN111896825",
              "registry_name": [
                "MICROSOFT SAT 8990 DATA CENTER PROJECT SITE"
              ],
              "program_contexts": [
                {
                  "program": "AIRNSR",
                  "identifiers": [
                    "182686"
                  ]
                }
              ],
              "association_scope": "Explicit Microsoft SAT8990 project and Medina County match the inherited SAT89/SAT90 expansion; blank street remains unknown and AIRNSR is not signed issuance/current stage.",
              "limits": "Registry authorizations, emissions reporting and historical customer affiliations can overlap. ACTIVE is a registry value, not proof of signed permit issuance, current operation, title or complete campus buildout. No generator MW, coordinates, street address or physical stage is promoted."
            }
          },
          "notes": [
            "AIRNSR and AIROP entries are registry contexts, not substitutes for signed permits. AIREI is emissions reporting, not a permit. Customer and status dates are not opening, completion or current ownership dates.",
            "The extract is a selected portion of Central Registry and the name/industry query is incomplete for all generator permits. Nonmatches are not evidence of absence."
          ],
          "sources": [
            {
              "url": "https://data.texas.gov/resource/msah-s2rv.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
              "host": "data.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Texas Commission on Environmental Quality source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Castroville · Medina · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48325"
      }
    },
    {
      "id": "microsoft-silver-springs-lyon-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Microsoft Silver Springs Data Center Campus",
      "group": "building",
      "status": "Operator-reported site preparation",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lyon"
      ],
      "city": "Silver Springs",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. energy-infrastructure decision without exact campus match. Decision concerns NV Energy transmission right-of-way and345kVline, not a named Microsoft data-center approval or345MWload. No site capacity, current operation, campus parcel or investment adopted. June17toJuly17,2026appeal window does not establish appeal outcome. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold",
          "host": "blm.gov",
          "date": "2026-06-18",
          "published": "2026-06-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2026-09-28",
          "date": "2026-09-28",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        },
        {
          "url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_03052026-1993",
          "host": "www.lyon-county.org",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        },
        {
          "url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_02102026-1977",
          "host": "www.lyon-county.org",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 39.05224,
        "lng": -119.22368,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "energy-infrastructure decision without exact campus match",
          "fields": {},
          "notes": [
            "Decision concerns NV Energy transmission right-of-way and345kVline, not a named Microsoft data-center approval or345MWload. No site capacity, current operation, campus parcel or investment adopted. June17toJuly17,2026appeal window does not establish appeal outcome.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold",
              "host": "blm.gov",
              "date": "2026-06-18",
              "published": "2026-06-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_site_preparation",
              "scope": "Microsoft reports early site preparation, earthmoving and utility relocation in September 2026. County minutes independently identify the Microsoft campus and Nighthawk infrastructure approval, not the present civil-work milestone. This is operator-reported preparation, not energized or completed buildings. The substation address and 345/120 kV voltage are not a campus building address or MW."
            }
          },
          "notes": [
            "Microsoft reports early site preparation, earthmoving and utility relocation in September 2026. County minutes independently identify the Microsoft campus and Nighthawk infrastructure approval, not the present civil-work milestone. This is operator-reported preparation, not energized or completed buildings. The substation address and 345/120 kV voltage are not a campus building address or MW."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2026-09-28",
              "date": "2026-09-28",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_03052026-1993",
              "host": "www.lyon-county.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_02102026-1977",
              "host": "www.lyon-county.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold",
              "host": "www.blm.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Silver Springs data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft describes early site work and names Q&D Construction LLC as general contractor. Dust control, staggered traffic and expected construction stages are source statements, not verified effects, a completion or an opening.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Silver Springs data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft describes early site work and names Q&D Construction LLC as general contractor. Dust control, staggered traffic and expected construction stages are source statements, not verified effects, a completion or an opening."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Silver Springs data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft describes early site work and names Q&D Construction LLC as general contractor. Dust control, staggered traffic and expected construction stages are source statements, not verified effects, a completion or an opening."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2026-09-28",
              "date": "2026-09-28",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Silver Springs · Lyon · Source context reviewed",
      "status_scope": "Microsoft reports early site preparation, earthmoving and utility relocation in September 2026. County minutes independently identify the Microsoft campus and Nighthawk infrastructure approval, not the present civil-work milestone. This is operator-reported preparation, not energized or completed buildings. The substation address and 345/120 kV voltage are not a campus building address or MW.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32019"
      }
    },
    {
      "id": "microsoft-tyrone-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Tyrone Campus (Project Rita)",
      "group": "approved",
      "status": "Zoning approved",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fayette"
      ],
      "city": "Tyrone",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tyrone dated land-use and operator water forecast summary. Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-02-22",
          "The Town of Tyrone lists the Planning Commission public hearing for the Microsoft rezoning on February 22, 2024. A hearing is separate from the later Council zoning approval and from construction permits."
        ],
        [
          "2024-03-21",
          "The Town of Tyrone lists the Council public hearing for the Microsoft rezoning on March 21, 2024. This is the hearing date, not final approval or a physical milestone."
        ],
        [
          "2024-03-28",
          "The Town of Tyrone dates Council zoning approval for the Microsoft project to March 28, 2024. This is zoning approval only. Site plan review, land disturbance permits, building permits and operation remain separate."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tyronega.gov/datacenter",
          "host": "tyronega.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/wp-content/uploads/2026/07/Tyrone-May-26-Boards.pdf",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.42187,
        "lng": -84.50398,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Tyrone dated land-use and operator water forecast summary",
          "fields": {
            "town_council_zoning_approval_date": "2024-03-28",
            "town_reported_permit_status_as_of": "2026-06-02",
            "town_reported_permit_status": "no site plan,land-disturbance or building-permit applications submitted",
            "town_reported_local_incentive_status": "no abatement offered or requested",
            "operator_estimated_operational_water_gallons_per_day_approx": 4000
          },
          "notes": [
            "Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "tyronega.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "town_zoning_approval_with_later_permits_separate",
              "scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation."
            },
            "regulatory_scope": {
              "zoning_approval_on": "2024-03-28",
              "permit_application_absence_account_as_of": "2026-06-02",
              "later_permit_activity_checked_through_today": false,
              "town_explanation_not_countywide_rule_or_legal_advice": true,
              "operator_concept_board_is_draft_not_approved_site_plan": true
            },
            "community_session_date_conflict": {
              "operator_web_invitation": "May 19, 2026",
              "operator_board_footer": "May 26, 2026",
              "exact_session_day_resolved": false,
              "neither_day_added_as_accomplished_timeline_event": true
            }
          },
          "notes": [
            "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/wp-content/uploads/2026/07/Tyrone-May-26-Boards.pdf",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
              "host": "local.microsoft.com",
              "published": "2026-05-01",
              "date": "2026-05-01",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tyrone · Fayette · Source context reviewed",
      "status_scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
      "event_evidence": [
        {
          "date": "2024-02-22",
          "text": "The Town of Tyrone lists the Planning Commission public hearing for the Microsoft rezoning on February 22, 2024. A hearing is separate from the later Council zoning approval and from construction permits.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2024-03-21",
          "text": "The Town of Tyrone lists the Council public hearing for the Microsoft rezoning on March 21, 2024. This is the hearing date, not final approval or a physical milestone.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2024-03-28",
          "text": "The Town of Tyrone dates Council zoning approval for the Microsoft project to March 28, 2024. This is zoning approval only. Site plan review, land disturbance permits, building permits and operation remain separate.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13113"
      }
    },
    {
      "id": "microsoft-van-meter-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Van Meter Data Center (Vision Park)",
      "group": "approved",
      "status": "Development agreement approved",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Van Meter",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Land acquisition and contemplated seventh centralIowa campus are historical, not a filed/approved/operating site inOctober2026. Purchase price is land, not buildout capex. FirstVanMeter site is not firstDallasCounty site; nearby WestDesMoines properties and USD15millionMadison land deal are separate. No IT, water or RFS independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-23",
          "Van Meter workshop minutes record Council approval of Resolution 2026 25 authorizing a Microsoft development agreement on March 23, 2026, by five votes to zero. The minutes appear on page 8 of the April 13 packet. This is the recorded authorization, not an operating milestone, a completed construction permit or proof that all agreement conditions were met."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.aol.com/microsofts-van-meter-data-center-120442101.html",
          "host": "aol.com",
          "date": "2024-02-02",
          "published": "2024-02-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.vanmeteria.gov/wp-content/uploads/4.13.2026-Regular-Business-Meeting-Packet-Final.pdf",
          "host": "www.vanmeteria.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.70956,
        "lng": -94.02065,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "Des Moines Register article syndicated on AOL reports Microsoft bought more than221acres plus193acres in January2024 for nearlyUSD40million near360th/Richland and365thStreet, VanMeter. City administrator said plans had not yet arrived for review.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Land acquisition and contemplated seventh centralIowa campus are historical, not a filed/approved/operating site inOctober2026. Purchase price is land, not buildout capex. FirstVanMeter site is not firstDallasCounty site; nearby WestDesMoines properties and USD15millionMadison land deal are separate. No IT, water or RFS independently verified.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.aol.com/microsofts-van-meter-data-center-120442101.html",
              "host": "aol.com",
              "date": "2024-02-02",
              "published": "2024-02-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "council_recorded_development_agreement_approval",
              "scope": "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation."
            },
            "regulatory_scope": {
              "recorded_council_authorization_on": "2026-03-23",
              "minutes_embedded_in_april_packet": true,
              "unsigned_march_resolution_draft_not_used_as_vote_proof": true,
              "physical_stage_current_not_established": true
            }
          },
          "notes": [
            "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.vanmeteria.gov/wp-content/uploads/4.13.2026-Regular-Business-Meeting-Packet-Final.pdf",
              "host": "www.vanmeteria.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Van Meter · Dallas · Source context reviewed",
      "status_scope": "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation.",
      "event_evidence": [
        {
          "date": "2026-03-23",
          "text": "Van Meter workshop minutes record Council approval of Resolution 2026 25 authorizing a Microsoft development agreement on March 23, 2026, by five votes to zero. The minutes appear on page 8 of the April 13 packet. This is the recorded authorization, not an operating milestone, a completed construction permit or proof that all agreement conditions were met.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.vanmeteria.gov/wp-content/uploads/4.13.2026-Regular-Business-Meeting-Packet-Final.pdf",
              "host": "www.vanmeteria.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}