{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    },
    "ky": {
      "attribution": {
        "research": "Data Centers Atlas research from county and city records, Public Service Commission filings, company announcements and local news, linked on each record.",
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/"
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "geocoder": "U.S. Census Bureau geocoder (public domain)",
        "geometry": {
          "license": "ODbL 1.0",
          "credit": "OpenStreetMap contributors",
          "url": "https://www.openstreetmap.org/copyright",
          "note": "Matched building centers are adapted separately from the inventory; not surveyed parcels"
        }
      },
      "source_data_url": "https://datacentersatlas.com/data/ky.json",
      "updated": "2026-10-24"
    },
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    },
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "powerhouse-data-centers",
    "label": "PowerHouse Data Centers"
  },
  "records": [
    {
      "id": "powerhouse-95-spotsylvania-va",
      "state": "va",
      "kind": "facility",
      "name": "PowerHouse 95",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Spotsylvania"
      ],
      "city": "Spotsylvania",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026. Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established. No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia",
          "host": "powerhousedata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-95",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 38.23054,
        "lng": -77.66807,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "PowerHouse hosts a DCD article republication; ReadMore points to the original DCD story. Distinguish operator-hosted reporting from a new issuer announcement. Page has no explicit article date; October2025 target is historical, not upcoming from October2026.",
            "Named PowerHouse95/PH95North campus: reported completed145acre purchase and construction start, up to800MW ACROSS THREE SUBSTATIONS and up toeight three-story buildings/3.5Msf planned. First300MW substation was TARGETED October2025; actual delivery not established.",
            "No criticalIT basis, executed service agreement or current ready-for-service established. The separate SpotsyTechno/Tributary and Amazon/HuntersRidge references are other projects; do not transfer their approvals, SCC delivery terms or capacities to PowerHouse95.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia",
              "host": "powerhousedata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "PowerHouse lists PowerHouse 95 as a development with a construction and delivery schedule.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "PowerHouse lists PowerHouse 95 as a development with a construction and delivery schedule."
            }
          },
          "notes": [
            "The page gives different delivery and power-delivery forecasts. None establishes actual operation or a completed physical milestone."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-95",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The original PowerHouse 95 project and market pages identify its Spotsylvania development association. The project headline delivery quarter and power timeline differ; neither an elapsed forecast nor a design figure becomes verified current operation or measured load. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original PowerHouse 95 project and market pages identify its Spotsylvania development association. The project headline delivery quarter and power timeline differ; neither an elapsed forecast nor a design figure becomes verified current operation or measured load. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original PowerHouse 95 project and market pages identify its Spotsylvania development association. The project headline delivery quarter and power timeline differ; neither an elapsed forecast nor a design figure becomes verified current operation or measured load. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-95",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Spotsylvania · Spotsylvania · Source context reviewed",
      "status_scope": "PowerHouse lists PowerHouse 95 as a development with a construction and delivery schedule.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51177"
      }
    },
    {
      "id": "powerhouse-abx-1-va",
      "state": "va",
      "kind": "facility",
      "name": "PowerHouse ABX-1",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Loudoun"
      ],
      "city": "Ashburn",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. PowerHouse ABX-1 delivered shell and later sale. 60MWmaximumutilitynotcriticalIToractualconsumption. Developablearea notallraisedfloor/tenantITspace. Shell/powerdeliverynotexactcustomeroperationalopeningday. Pagehasnoexactstreetmunicipalityinsavedbody;ABXcodealoneinsufficientparcel. No deed/salepriceorenergizedITcertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-abx-1",
          "host": "powerhousedata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-announces-lease-agreement-with-cyrusone-for-abx-1-data-center-powered-shell",
          "host": "www.powerhousedata.com",
          "published": "2023-05-12",
          "date": "2023-05-12",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.03462,
        "lng": -77.66492,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "PowerHouse ABX-1 delivered shell and later sale",
          "fields": {
            "developer": "PowerHouse",
            "project": "ABX-1",
            "site_acres": 10,
            "developable_sqft": 265850,
            "buildings": 1,
            "stories": 2,
            "maximum_utility_capacity_mw": 60,
            "developer_reported_delivery_month": "2023-10",
            "developer_reported_sale_quarter": "2024-Q4",
            "developer_described_power_delivery": "complete"
          },
          "notes": [
            "60MWmaximumutilitynotcriticalIToractualconsumption. Developablearea notallraisedfloor/tenantITspace. Shell/powerdeliverynotexactcustomeroperationalopeningday. Pagehasnoexactstreetmunicipalityinsavedbody;ABXcodealoneinsufficientparcel. No deed/salepriceorenergizedITcertified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-abx-1",
              "host": "powerhousedata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "PowerHouse describes ABX1 construction and power delivery as complete and lists delivery in October 2023 and sale in the fourth quarter of 2024. These are shell and power delivery statements. An exact tenant service opening, actual IT operation or a day within either period is not established.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "PowerHouse describes ABX1 construction and power delivery as complete and lists delivery in October 2023 and sale in the fourth quarter of 2024. These are shell and power delivery statements. An exact tenant service opening, actual IT operation or a day within either period is not established."
            }
          },
          "notes": [
            "PowerHouse describes ABX1 construction and power delivery as complete and lists delivery in October 2023 and sale in the fourth quarter of 2024. These are shell and power delivery statements. An exact tenant service opening, actual IT operation or a day within either period is not established."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-abx-1",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The May 12, 2023 first party lease announcement identifies PowerHouse as the ABX1 powered shell developer. The current project page describes delivery in October 2023 and a sale in Q4 2024. This is a historical development association, not a current PowerHouse owner or operator claim. The named CyrusOne lease is not newly confirmed tenant operation. No exact delivery or sale day, address or power measurement is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The May 12, 2023 first party lease announcement identifies PowerHouse as the ABX1 powered shell developer. The current project page describes delivery in October 2023 and a sale in Q4 2024. This is a historical development association, not a current PowerHouse owner or operator claim. The named CyrusOne lease is not newly confirmed tenant operation. No exact delivery or sale day, address or power measurement is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The May 12, 2023 first party lease announcement identifies PowerHouse as the ABX1 powered shell developer. The current project page describes delivery in October 2023 and a sale in Q4 2024. This is a historical development association, not a current PowerHouse owner or operator claim. The named CyrusOne lease is not newly confirmed tenant operation. No exact delivery or sale day, address or power measurement is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-announces-lease-agreement-with-cyrusone-for-abx-1-data-center-powered-shell",
              "host": "www.powerhousedata.com",
              "published": "2023-05-12",
              "date": "2023-05-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-abx-1",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ashburn · Loudoun · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51107"
      }
    },
    {
      "id": "powerhouse-ctp-02-va",
      "state": "va",
      "kind": "facility",
      "name": "PowerHouse CTP-02",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chesterfield"
      ],
      "city": "Chester",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/data-center/ctp-2",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 37.37263,
        "lng": -77.62127,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule."
            }
          },
          "notes": [
            "Calendar ranges and delivery forecasts do not establish actual construction progress or commissioning. The combined CTP page does not establish a separate completed stage for each building."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/ctp-2",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/ctp-2",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Chester · Chesterfield · Source context reviewed",
      "status_scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51041"
      }
    },
    {
      "id": "powerhouse-hobart-lake-county-in",
      "state": "in",
      "kind": "facility",
      "name": "PowerHouse Hobart",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Hobart",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW. DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
          "host": "powerhousedata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.43828,
        "lng": -87.36586,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW.",
            "DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "powerhousedata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."
            }
          },
          "notes": [
            "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hobart · Lake · Source context reviewed",
      "status_scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "powerhouse-louisville-ky",
      "kind": "project",
      "name": "PowerHouse Data Centers - Louisville (Camp Ground Road)",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "crypto": false,
      "type": "data center",
      "counties": [
        "Jefferson"
      ],
      "city": "Louisville",
      "who": "PowerHouse Data Centers / Poe Companies",
      "end_user": "",
      "mw": 400,
      "power": "Up to 525 MW maximum utility power in the current operator plan",
      "power_note": "Different non-additive source scopes: current up-to-525 MW utility maximum; January 2025 reported 335 MW access, up-to-402 MW expansion and 130 MW October 2026 availability forecast. The older 400 MW campus headline remains unclassified and legacy numeric MW stays 400. No approved service, delivered IT, metered use or accomplished opening is established.",
      "investment": "",
      "jobs": "",
      "acres": "153",
      "utility": "LG&E",
      "water": "Louisville Water",
      "incentives": "",
      "note": "Developer and planning approval reporting; forecast opening is not proof of operation",
      "date": "2026-03-05",
      "events": [
        [
          "2025-01-16",
          "PowerHouse, Poe and LG&E announced the Louisville development and utility-access forecasts. The date is an announcement, not a proved construction start, power delivery or opening."
        ]
      ],
      "timeline": [],
      "sources": [
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
          "host": "powerhousedata.com",
          "date": "2025-01-16"
        },
        {
          "url": "https://www.lpm.org/news/2026-03-05/west-louisville-data-center-approved-despite-opposition",
          "host": "lpm.org",
          "date": "2026-03-05"
        },
        {
          "url": "https://www.powerhousedata.com/data-center/ph-louisville",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Current Louisville project specifications"
        },
        {
          "url": "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer",
          "host": "lge-ku.com",
          "published": "2025-01-16",
          "date": "2025-01-16",
          "checked": "2026-10-16",
          "label": "Original utility announcement"
        },
        {
          "url": "https://www.poecompanies.com/poe-properties/camp-ground-industrial/",
          "host": "www.poecompanies.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Developer project page"
        }
      ],
      "loc": {
        "lat": 38.21342,
        "lng": -85.6393,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "state": "KY",
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Jefferson County · 400 MW · PowerHouse Data Centers / Poe Companies",
      "reviewed_evidence": [
        {
          "overlay": "PowerHouse utility and water-source depth October 16",
          "scope": "Targeted primary developer/utility power and planned water-source review only. Not current construction, legal approval, precise location, physical-site identity or whole-state certification.",
          "fields": {
            "utility_maximum": {
              "maximum_utility_power_mw": 525,
              "technical_as_of": null,
              "scope": "Advertised maximum utility power for a development; not approved service, IT load or metered demand."
            },
            "historical_power_scopes": {
              "announcement_date": "2025-01-16",
              "campus_headline_mw": 400,
              "initial_power_access_reported_mw": 335,
              "near_term_expansion_up_to_mw": 402,
              "first_availability_forecast_mw": 130,
              "scope": "The 400 MW headline has no explicit IT or gross measure, so it stays unclassified. The other figures describe utility access or forecasts. No quantities are added."
            },
            "delivery_targets": {
              "first_130_mw_availability_target": "2026-10",
              "original_first_building_target": "Q4 2026",
              "current_delivery_target": "Q4 2026",
              "current_power_delivery_target": "Q4 2026",
              "actual_delivery_day": null,
              "scope": "Published targets only; October availability, switch-station completion and first-building operation have not been verified as accomplished."
            },
            "timeline_headings": {
              "site_development_timeline": "Q1 2025 to Q2 2027",
              "entitlements_design": "Q4 2024 to Q1 2025",
              "construction_delivery": "Q4 2026",
              "power_delivery": "Q4 2026",
              "scope": "Literal heading/value pairs from the current project page, not actual construction or opening dates."
            },
            "developer_role": "PowerHouse and Poe describe a development joint venture. Poe labels the property In Development. This identifies developers, not a current end-user operator, legal parcel owner or corporate parent.",
            "water_supply_plan": "The developer and utility name Louisville Water Company infrastructure for the future campus. No facility withdrawal or consumption quantity, water right, cooling type or permit is established. The Ohio River flow statistic is not facility water use.",
            "land_and_building_scope": {
              "current_operator_acres": 154,
              "current_developable_square_feet": 1800000,
              "current_operator_buildings_up_to": 6,
              "inherited_acres_text": "153",
              "scope": "Current advertised plan, not surveyed acreage, constructed floor area or six completed buildings. The prior 153-acre display is retained pending plan/parcel review."
            },
            "location_hold": "The existing county context remains unplotted. Operator/developer pages and renderings do not establish a reviewed parcel or precise campus point; the Poe footer office is not the project address.",
            "construction_status_scope": "This power/water review does not reverify physical construction or change the inherited Under construction label. Prospective construction, utility targets and architectural renderings cannot certify a completed milestone or operation.",
            "visual_source_scope": "Three architectural renderings on the project page were visually read through the public browser. They are design illustrations, not dated construction photography, cadastral geometry or an aerial inspection.",
            "source_date_scope": "January 16, 2025 is the original announcement date. Current operator/developer pages do not publish technical as-of dates. The October 16, 2026 retrieval date is a field check, not publication, approval or delivery."
          },
          "notes": [
            "Keep 525 MW utility maximum separate from the older unclassified 400 MW campus headline, 335 MW access statement, up-to-402 MW expansion and 130 MW availability forecast.",
            "Q4 2026 and October 2026 are targets, not completed service, construction or operation. Current technical dates remain unknown.",
            "Planning, later court attachments and contractor-permit/address/building-count conflicts remain separate research. No agency or legal claim from those unadopted leads is made here.",
            "Retain the rejected house-point hold and all old non-power display values. No numeric legacy MW, acreage, address, site stage, permit, incentive or building identity is changed."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/ph-louisville",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current Louisville project specifications"
            },
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
              "host": "www.powerhousedata.com",
              "published": "2025-01-16",
              "date": "2025-01-16",
              "checked": "2026-10-16",
              "label": "Original campus announcement"
            },
            {
              "url": "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer",
              "host": "lge-ku.com",
              "published": "2025-01-16",
              "date": "2025-01-16",
              "checked": "2026-10-16",
              "label": "Original utility announcement"
            },
            {
              "url": "https://www.poecompanies.com/poe-properties/camp-ground-industrial/",
              "host": "www.poecompanies.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Developer project page"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "event_evidence": [
        {
          "date": "2025-01-16",
          "text": "PowerHouse, Poe and LG&E announced the Louisville development and utility-access forecasts. The date is an announcement, not a proved construction start, power delivery or opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
              "host": "www.powerhousedata.com",
              "published": "2025-01-16",
              "date": "2025-01-16",
              "checked": "2026-10-16",
              "label": "Original campus announcement"
            },
            {
              "url": "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer",
              "host": "lge-ku.com",
              "published": "2025-01-16",
              "date": "2025-01-16",
              "checked": "2026-10-16",
              "label": "Original utility announcement"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "utility_capacity",
          "value": 525,
          "unit": "MW",
          "basis": "forecast",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-16",
          "scope": "Current undated operator plan: up to 525 MW maximum utility power. Not approved service, critical IT, energized capacity or metered consumption. Not additive with historical access/expansion/availability statements.",
          "sources": [
            "https://www.powerhousedata.com/data-center/ph-louisville"
          ]
        },
        {
          "measure": "utility_capacity",
          "value": 335,
          "unit": "MW",
          "basis": "operator_reported_capacity",
          "as_of": "2025-01-16",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Historical developer/utility announcement reports access secured to an initial 335 MW. This is the reported access scope, not an independently read service approval/contract or confirmation of delivered power.",
          "sources": [
            "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
            "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer"
          ]
        },
        {
          "measure": "utility_capacity",
          "value": 402,
          "unit": "MW",
          "basis": "forecast",
          "as_of": "2025-01-16",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Historical near-term expansion up to 402 MW; a future utility-access envelope, not extra capacity to add to 335 or 525 MW. Actual delivery and approved service are unverified.",
          "sources": [
            "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
            "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer"
          ]
        },
        {
          "measure": "utility_capacity",
          "value": 130,
          "unit": "MW",
          "basis": "forecast",
          "as_of": "2025-01-16",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Historical first 130 MW utility availability forecast for October 2026, not an IT load or proved energized first phase. Actual delivery day is unknown.",
          "sources": [
            "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
            "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer"
          ]
        }
      ],
      "typed_water_facts": [
        {
          "measure": "supply_source",
          "value": "Planned campus access to Louisville Water Company infrastructure.",
          "unit": null,
          "as_of": "2025-01-16",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "basis": "operator_reported_statement",
          "scope": "Prospective named-supplier statement in the original developer/utility announcement and undated developer page. Not measured withdrawal or consumption, a water right, cooling type or a permit. The Ohio River flow statistic is not facility water use.",
          "sources": [
            "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
            "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer",
            "https://www.poecompanies.com/poe-properties/camp-ground-industrial/"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "county_context_only",
        "county_display": "21111"
      }
    },
    {
      "id": "powerhouse-provident-grand-prairie-tx",
      "state": "tx",
      "kind": "facility",
      "name": "PowerHouse Grand Prairie Campus",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ellis"
      ],
      "city": "Grand Prairie",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/",
          "host": "dallasinnovates.com",
          "date": "2025-09-29",
          "published": "2025-09-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-grand-prairie",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus",
          "host": "www.powerhousedata.com",
          "published": "2025-02-25",
          "date": "2025-02-25",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.33979,
        "lng": -96.84357,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Dallas Innovates mentions a proposed 360,000-square-foot, 300-million-USD PowerHouse/Provident Grand Prairie building and 2027 completion while covering university cooling research.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Research targets and proof-of-concept schedules do not establish deployed technology or measured performance at this campus. Other developments and their MW are separate. The Grand Prairie and Wilmer paragraphs repeat the same size/value/schedule; original project records are needed before treating those as independently confirmed. No current IT MW or construction outcome is established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/",
              "host": "dallasinnovates.com",
              "date": "2025-09-29",
              "published": "2025-09-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted."
            }
          },
          "notes": [
            "PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-grand-prairie",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The February 25, 2025 first party announcement identifies PowerHouse and Provident as joint development partners outside Grand Prairie in northern Ellis County. This is not exclusive ownership or the unrelated Caldwell County proposal. The announcement and current project page show different acreage, phase and delivery scopes; no combined quantity or completion day is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The February 25, 2025 first party announcement identifies PowerHouse and Provident as joint development partners outside Grand Prairie in northern Ellis County. This is not exclusive ownership or the unrelated Caldwell County proposal. The announcement and current project page show different acreage, phase and delivery scopes; no combined quantity or completion day is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The February 25, 2025 first party announcement identifies PowerHouse and Provident as joint development partners outside Grand Prairie in northern Ellis County. This is not exclusive ownership or the unrelated Caldwell County proposal. The announcement and current project page show different acreage, phase and delivery scopes; no combined quantity or completion day is adopted. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus",
              "host": "www.powerhousedata.com",
              "published": "2025-02-25",
              "date": "2025-02-25",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-grand-prairie",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Grand Prairie · Ellis · Source context reviewed",
      "status_scope": "PowerHouse currently lists a Grand Prairie development and prospective delivery and power schedules. This supports the named development only. The earlier small building news context is not silently reconciled with the larger campus specification. No quantity, parcel, role, construction milestone or operating service is promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48139"
      }
    },
    {
      "id": "powerhouse-reno-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "PowerHouse Reno Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. PowerHouse Reno republished historical development report. UndatedoperatorrepublicationattributesgroundbreakingtoRenoGazetteJournalandthisMonday;noexactceremonydayinferred. Q32025targetunobserved,notcurrentopenstatus.30DC/2.3GWcompanypipelineotherprojectsnotReno. No executedleaseoractualcapexinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-01-19",
          "PowerHouse announced a site acquisition for its Reno development. This is the release date and does not establish the exact closing, construction start or opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center",
          "host": "powerhousedata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno",
          "host": "www.powerhousedata.com",
          "published": "2024-01-19",
          "date": "2024-01-19",
          "checked": "2026-10-22",
          "label": "Reviewed company identity source"
        },
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-reno",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed company identity source"
        },
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno-2",
          "host": "www.powerhousedata.com",
          "published": "2024-01-19",
          "date": "2024-01-19",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.49158,
        "lng": -119.54115,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "PowerHouse Reno republished historical development report",
          "fields": {
            "developer_publication": "PowerHouse",
            "project": "Reno campus",
            "location": "Tahoe Reno Industrial Center, Storey County, Nevada",
            "planned_campus_capacity_mw": 65,
            "power_basis": "campus capacity, not explicit IT",
            "site_acres": 49,
            "planned_buildings": 3,
            "each_building_stories": 2,
            "total_planned_building_sqft": 900000,
            "first_building_historical_target": "2025-Q3",
            "campus_completion_target_year": 2028
          },
          "notes": [
            "UndatedoperatorrepublicationattributesgroundbreakingtoRenoGazetteJournalandthisMonday;noexactceremonydayinferred. Q32025targetunobserved,notcurrentopenstatus.30DC/2.3GWcompanypipelineotherprojectsnotReno. No executedleaseoractualcapexinreviewedbody.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center",
              "host": "powerhousedata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno",
              "host": "www.powerhousedata.com",
              "published": "2024-01-19",
              "date": "2024-01-19",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            },
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-reno",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "PowerHouse lists Reno with delivery in April 2026 and a historical construction schedule. An expired target does not establish completion. The dated January 19, 2024 release describes the site acquisition announcement. The undated groundbreaking republication and current page do not establish present operating service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "PowerHouse lists Reno with delivery in April 2026 and a historical construction schedule. An expired target does not establish completion. The dated January 19, 2024 release describes the site acquisition announcement. The undated groundbreaking republication and current page do not establish present operating service."
            }
          },
          "notes": [
            "PowerHouse lists Reno with delivery in April 2026 and a historical construction schedule. An expired target does not establish completion. The dated January 19, 2024 release describes the site acquisition announcement. The undated groundbreaking republication and current page do not establish present operating service."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno-2",
              "host": "www.powerhousedata.com",
              "published": "2024-01-19",
              "date": "2024-01-19",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-reno",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-01-19",
          "text": "PowerHouse announced a site acquisition for its Reno development. This is the release date and does not establish the exact closing, construction start or opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno-2",
              "host": "www.powerhousedata.com",
              "published": "2024-01-19",
              "date": "2024-01-19",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "powerhouse-uhland-caldwell-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "PowerHouse Caldwell County Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Caldwell"
      ],
      "city": "Uhland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 29.83666,
        "lng": -97.61968,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Uhland · Caldwell · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48055"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
