{
  "schema_version": 1,
  "source_compilation_context": {
    "ca": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ca.json",
      "updated": "2026-10-25"
    },
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    },
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    },
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "prologis",
    "label": "Prologis"
  },
  "records": [
    {
      "id": "prologis-326-charcot-avenue-san-jose-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Prologis 326 Charcot Avenue Data Center (North San José)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 99 MW is total power, not confirmed critical IT. Office space is included in the described complex rather than automatically additive. Proposed developer-funded upgrades and carbon-free enrollment are intentions, not executed service or measured emissions. PG&E's regional queue and unnamed power-hookup projects are not available spare capacity or this site's approvals. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.pressdemocrat.com/2026/09/25/tech-san-jose-data-pge-ai-property-economy-build-real-estate-prologis/",
          "host": "pressdemocrat.com",
          "date": "2026-09-25",
          "published": "2026-09-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.14672,
        "lng": -121.65518,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Bay Area News Group reports Prologis' Charcot proposal with city and state utility decisions still pending, construction forecast for 2028 and operation possibly in 2030.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The 99 MW is total power, not confirmed critical IT. Office space is included in the described complex rather than automatically additive. Proposed developer-funded upgrades and carbon-free enrollment are intentions, not executed service or measured emissions. PG&E's regional queue and unnamed power-hookup projects are not available spare capacity or this site's approvals.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.pressdemocrat.com/2026/09/25/tech-san-jose-data-pge-ai-property-economy-build-real-estate-prologis/",
              "host": "pressdemocrat.com",
              "date": "2026-09-25",
              "published": "2026-09-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Jose · Santa Clara · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    },
    {
      "id": "prologis-allen-township-northampton-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Prologis Allen Township Data Center (2500 Liberty Drive)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Northampton"
      ],
      "city": "Allen Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The regional letter recommendation is not the same vote or all permits. Existing warehouse floor area does not establish powered/occupied DC area. Water, cooling, noise and electrical demands were still questions. A likely-first regional description is not an independently verified superlative or operating status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.lehighvalleypublicmedia.org/northampton-county/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center",
          "host": "lehighvalleypublicmedia.org",
          "date": "2026-04-22",
          "published": "2026-04-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 40.75455,
        "lng": -75.30748,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Lehigh Valley Public Media reports Allen Township's March approval for a Prologis warehouse conversion and a regional planning committee's request for more operational/resource details.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The regional letter recommendation is not the same vote or all permits. Existing warehouse floor area does not establish powered/occupied DC area. Water, cooling, noise and electrical demands were still questions. A likely-first regional description is not an independently verified superlative or operating status.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.lehighvalleypublicmedia.org/northampton-county/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center",
              "host": "lehighvalleypublicmedia.org",
              "date": "2026-04-22",
              "published": "2026-04-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "DEP lists an unnamed Verdantas and Prologis proposal in Allen Township without the inherited 2500 Liberty Drive address. An accepted original exact component crosswalk was not established. A shared company and municipality alone does not prove current physical stage at that individual warehouse conversion. Regional permit context remains separate from the individual project. Existing identity, roles, quantities and locations remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "broad_company_and_municipality_row_without_accepted_individual_component_crosswalk",
              "scope": "DEP lists an unnamed Verdantas and Prologis proposal in Allen Township without the inherited 2500 Liberty Drive address. An accepted original exact component crosswalk was not established. A shared company and municipality alone does not prove current physical stage at that individual warehouse conversion. Regional permit context remains separate from the individual project. Existing identity, roles, quantities and locations remain unchanged."
            },
            "tracker_scope": {
              "project_id": "10000034",
              "original_project_and_related_permit_csv_read": true,
              "no_data_center_operation_inferred": true,
              "no_coordinate_or_role_promotion": true,
              "individual_component_crosswalk_accepted": false
            }
          },
          "notes": [
            "DEP lists an unnamed Verdantas and Prologis proposal in Allen Township without the inherited 2500 Liberty Drive address. An accepted original exact component crosswalk was not established. A shared company and municipality alone does not prove current physical stage at that individual warehouse conversion. Regional permit context remains separate from the individual project. Existing identity, roles, quantities and locations remain unchanged.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Allen Township · Northampton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42095"
      }
    },
    {
      "id": "prologis-mila-trenton-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Prologis Project Mila",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Butler"
      ],
      "city": "Trenton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary stage lead only, original deed/siteplan/adoption/conditions unreviewed. Site-plan approval is not final building permit or operation; fall2026construction/early2029firstservice are forecasts, not observed.250MWdemandbasisnotcriticalIT.140jobs/120000USDannualutilityfees are developer forecasts, utilitychargesnotpropertytax or netpublicbenefit. Threepercentyearwatercooling not gallons/actualwithdrawal. Tracker applies AEPOhiotariff without inspected site-specific utility territory/account; do not assume applicability.85percentminimum-bill terms not proof100percentinfrastructurefunded. Risk84/100is tracker score, not scientificrisk. City-versus-countyauthorityneedslawrecord; signaturecollectionnotadoptedballotban. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-19",
          "The original Trenton staff report records Council approval of the Prologis commercial and industrial fence permit on March 19, 2026. This dates the limited fence action, without final whole campus permission, vertical construction or commissioned service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://stopohiodatacenters.org/butler-county",
          "host": "stopohiodatacenters.org",
          "date": "2026-04-26",
          "published": "2026-04-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550",
          "host": "www.ci.trenton.oh.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://trentonoh.gov/DocumentCenter/View/2403/Prologis-and-Staff-Public-Forum-Agenda-?bidId=",
          "host": "trentonoh.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://ci.trenton.oh.us/AgendaCenter/ViewFile/Minutes/_04022026-551",
          "host": "ci.trenton.oh.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.41756,
        "lng": -84.57365,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "Commercial Ohio tracker reports TrentonPlanningCommission approved ProjectMila site plan March30,2026 on already-industrial141acres sold toPrologis forUSD7.75million inOctober2025. Four220353squarefootbuildings plus16150utility/1503security sum899065squarefeet.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Secondary stage lead only, original deed/siteplan/adoption/conditions unreviewed. Site-plan approval is not final building permit or operation; fall2026construction/early2029firstservice are forecasts, not observed.250MWdemandbasisnotcriticalIT.140jobs/120000USDannualutilityfees are developer forecasts, utilitychargesnotpropertytax or netpublicbenefit. Threepercentyearwatercooling not gallons/actualwithdrawal. Tracker applies AEPOhiotariff without inspected site-specific utility territory/account; do not assume applicability.85percentminimum-bill terms not proof100percentinfrastructurefunded. Risk84/100is tracker score, not scientificrisk. City-versus-countyauthorityneedslawrecord; signaturecollectionnotadoptedballotban.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://stopohiodatacenters.org/butler-county",
              "host": "stopohiodatacenters.org",
              "date": "2026-04-26",
              "published": "2026-04-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 62",
          "scope": "The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_mila_proposal_and_limited_infrastructure_context",
              "scope": "The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits."
            },
            "source_read_scope": {
              "original_march30_packet_selected_physical_pages1through9_read": true,
              "complete29page_forum_text_read": true,
              "physical_page10_forecast_timeline_viewed": true,
              "stepdown_yard_grading_explicitly_not_vertical_construction": true,
              "original_april2_selected_pages5_6_7_9_read": true,
              "physical_april2_page5_group_account_viewed": true,
              "private_resident_details_excluded": true,
              "no_financial_technical_role_or_location_export": true
            }
          },
          "notes": [
            "The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550",
              "host": "www.ci.trenton.oh.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://trentonoh.gov/DocumentCenter/View/2403/Prologis-and-Staff-Public-Forum-Agenda-?bidId=",
              "host": "trentonoh.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://ci.trenton.oh.us/AgendaCenter/ViewFile/Minutes/_04022026-551",
              "host": "ci.trenton.oh.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Trenton · Butler · Source context reviewed",
      "status_scope": "The original City staff report and hosted Prologis presentation explicitly identify the proposed Mila campus. This supports a listed proposal without certifying present vertical construction or computing operation. The presentation reports electrical yard grading and expressly says this does not indicate vertical construction. Its undated schedule graphic and preliminary financial and water tables are forecasts. The March 30 packet records a March 16 fence recommendation and March 19 Council fence permit approval, while detailed engineering review and whole site permission remain separate. Design models and public assurances are not measured noise, water use or accomplished benefits.",
      "event_evidence": [
        {
          "date": "2026-03-19",
          "text": "The original Trenton staff report records Council approval of the Prologis commercial and industrial fence permit on March 19, 2026. This dates the limited fence action, without final whole campus permission, vertical construction or commissioned service.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550",
              "host": "www.ci.trenton.oh.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39017"
      }
    },
    {
      "id": "prologis-rue-ferrari-san-jose-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Prologis 5853 Rue Ferrari",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rue Ferrari R&D conversion does not establish DC classification. Notice describesR&D/laboratoryusewithbackups/cooling,notexplicitapproveddata-centeruse. HoldDCclassificationwithoutseparatepermitdefinition.140jobsfieldnotautomaticallycurrentDCpermanentjobs. Multi-citylocationlistnotmultiplesites.300000sqftisexistingbuildingnotnewaddition. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-12-10",
          "The city Notice of Determination records approval of the Rue Ferrari site development permit amendment on December 10, 2025. The source describes research and laboratory use. It does not establish an operating data center or an opening date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ceqanet.lci.ca.gov/2022010266/2",
          "host": "ceqanet.lci.ca.gov",
          "date": "2025-12-18",
          "published": "2025-12-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.32502,
        "lng": -121.66546,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Rue Ferrari R&D conversion does not establish DC classification",
          "fields": {
            "project_name": "5853 Rue Ferrari Project",
            "agency_approval_date": "2025-12-10",
            "notice_posted_date": "2025-12-18",
            "address": "5853 Rue Ferrari, San Jose, California",
            "parcel": "678-05-057",
            "site_gross_acres_approx": 17.4,
            "existing_building_sqft_approx": 300000,
            "approved_use_description": "research and development/laboratory use conversion of existing warehouse",
            "applicant": "Prologis LP",
            "critical_it_mw": null
          },
          "notes": [
            "Notice describesR&D/laboratoryusewithbackups/cooling,notexplicitapproveddata-centeruse. HoldDCclassificationwithoutseparatepermitdefinition.140jobsfieldnotautomaticallycurrentDCpermanentjobs. Multi-citylocationlistnotmultiplesites.300000sqftisexistingbuildingnotnewaddition.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ceqanet.lci.ca.gov/2022010266/2",
              "host": "ceqanet.lci.ca.gov",
              "date": "2025-12-18",
              "published": "2025-12-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 8",
          "scope": "The December 2025 city Notice of Determination describes the Rue Ferrari permit amendment as a change to research and laboratory use with supporting utility and backup equipment. Its December 10 approval does not establish current operation or resolve the inherited data center classification. Source use descriptions and the inherited label remain separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "research_lab_use_description_and_physical_stage_hold",
              "scope": "The December 2025 city Notice of Determination describes the Rue Ferrari permit amendment as a change to research and laboratory use with supporting utility and backup equipment. Its December 10 approval does not establish current operation or resolve the inherited data center classification. Source use descriptions and the inherited label remain separate."
            },
            "identity_classification_hold": {
              "documented_use": "research and development facility supporting research and laboratory uses",
              "inherited_data_center_classification_certified": false,
              "site_permit_amendment_approved_on": "2025-12-10",
              "notice_posted_on": "2025-12-18"
            }
          },
          "notes": [
            "The December 2025 city Notice of Determination describes the Rue Ferrari permit amendment as a change to research and laboratory use with supporting utility and backup equipment. Its December 10 approval does not establish current operation or resolve the inherited data center classification. Source use descriptions and the inherited label remain separate.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://ceqanet.lci.ca.gov/2022010266/2",
              "host": "ceqanet.lci.ca.gov",
              "published": "2025-12-18",
              "date": "2025-12-18",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Jose · Santa Clara · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-12-10",
          "text": "The city Notice of Determination records approval of the Rue Ferrari site development permit amendment on December 10, 2025. The source describes research and laboratory use. It does not establish an operating data center or an opening date.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://ceqanet.lci.ca.gov/2022010266/2",
              "host": "ceqanet.lci.ca.gov",
              "published": "2025-12-18",
              "date": "2025-12-18",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    },
    {
      "id": "prologis-shelbyville-in",
      "state": "in",
      "kind": "facility",
      "name": "Prologis Shelbyville Data Center Campus",
      "group": "approved",
      "status": "City reported land use approval",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Shelby"
      ],
      "city": "Shelbyville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-06",
          "Shelbyville current City account records April 6, 2026 Council approval of the amended annexation and rezoning ordinance 26 3052 and the Prologis economic development agreement. The City says separate applications, permits and regulatory approvals are required before construction. This is the land use and agreement action, not a physical start or opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
          "host": "shelbyville.in.gov",
          "date": "2026-04-06",
          "published": "2026-04-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.52346,
        "lng": -85.79164,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "municipal_action_date": "2026-04-06",
            "annexation_and_rezoning_approved": true,
            "economic_development_resolution": "2026-06",
            "resolution_vote": "4-2-1",
            "site_acres_approx": 429,
            "buildings_up_to": 11,
            "estimated_investment_usd_approx": 2000000000
          },
          "notes": [
            "City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
              "host": "shelbyville.in.gov",
              "date": "2026-04-06",
              "published": "2026-04-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_annexation_rezoning_and_agreement_approval_not_construction_permission",
              "scope": "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed."
            }
          },
          "notes": [
            "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
              "host": "www.shelbyville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Shelbyville · Shelby · Source context reviewed",
      "status_scope": "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed.",
      "event_evidence": [
        {
          "date": "2026-04-06",
          "text": "Shelbyville current City account records April 6, 2026 Council approval of the amended annexation and rezoning ordinance 26 3052 and the Prologis economic development agreement. The City says separate applications, permits and regulatory approvals are required before construction. This is the land use and agreement action, not a physical start or opening.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
              "host": "www.shelbyville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18145"
      }
    },
    {
      "id": "prologis-silver-creek-valley-san-jose-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Prologis Silver Creek Valley Road Data Center",
      "group": "proposed",
      "status": "State environmental review",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower. GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them",
          "host": "kqed.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects",
          "host": "www.sanjoseca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Access-check target"
        },
        {
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf",
          "host": "www.energy.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5977+Silver+Creek+Valley+Road%2C+San+Jose%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Literal unique calculated street range and county geography"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.79420951111057%2C37.25237528853755%2C-121.78179448888945%2C37.262256711462456&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -121.788002,
        "lat": 37.257316,
        "precision": "address",
        "basis": "Officially filed project street 5977 Silver Creek Valley Road, San Jose, CA matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower.",
            "GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them",
              "host": "kqed.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The September 2026 KQED account provides Silver Creek Valley proposal context. The original city listing was access-limited. Microsoft’s Alviso construction, Google’s research proposal and STEM Park’s figures are separate projects. No technical quantity or final site decision is adopted from this news account."
            }
          },
          "notes": [
            "The September 2026 KQED account provides Silver Creek Valley proposal context. The original city listing was access-limited. Microsoft’s Alviso construction, Google’s research proposal and STEM Park’s figures are separate projects. No technical quantity or final site decision is adopted from this news account."
          ],
          "sources": [
            {
              "url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them",
              "host": "www.kqed.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects",
              "host": "www.sanjoseca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 16",
          "scope": "The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_proposal_in_state_environmental_review",
              "scope": "The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation."
            },
            "regulatory_scope": {
              "cec_application_status": "Under Review",
              "sppe_not_final_local_construction_or_operating_approval": true,
              "backup_generation_not_it_capacity": true,
              "physical_construction_or_operation_verified": false
            }
          },
          "notes": [
            "The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf",
              "host": "www.energy.ca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 51, October 23, 2026",
          "scope": "Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -121.788002,
                "lat": 37.257316,
                "precision": "address",
                "basis": "Officially filed project street 5977 Silver Creek Valley Road, San Jose, CA matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains proposed. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "5977 Silver Creek Valley Road, San Jose, CA",
              "county_fips": [
                "06085"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Officially filed project street reference only. Existing Native status remains proposed. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.",
            "The calculated reference lies at a road edge beside open land and industrial forms, with residential blocks farther west. The image does not establish construction, site clearing, operation or the proposed facility footprint. No neighboring residential roof is selected. Imagery acquisition date is unknown and may predate construction.",
            "The earlier inherited approximate inventory point is not a reviewed destination. This explicit official project street review retains its exact predecessor and corrects only the map reference. No physical relocation, current physical milestone or surveyed boundary is inferred.",
            "Source Received, Posted, agenda, agreement and retrieval clocks remain separate from physical events. Corporate and agency contact addresses, generator yards, neighboring streets and map coordinates are not adopted. Canonical address and all protected Native facts remain exact."
          ],
          "sources": [
            {
              "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf",
              "host": "www.energy.ca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact official project street and bounded facility identity"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5977+Silver+Creek+Valley+Road%2C+San+Jose%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Literal unique calculated street range and county geography"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.79420951111057%2C37.25237528853755%2C-121.78179448888945%2C37.262256711462456&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Filed project street reference, not a surveyed building or parcel",
      "summary": "San Jose · Santa Clara · Source context reviewed",
      "status_scope": "The CEC current page identifies the proposed data center at 5977 Silver Creek Valley Road and marks its backup generating facility exemption application Under Review. State environmental review describes this specific proposal and review process. The generators support emergency backup and their ratings are not IT capacity or actual demand. An application under review is not a granted exemption, local land use approval, construction start or operation."
    },
    {
      "id": "prologis-stem-park-zanker-road-san-jose-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Prologis STEM Park",
      "group": "proposed",
      "status": "Selected development proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower. GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified. SanJoseInside November10,2025 reproducesCITYrelease: PrologisPREFERREDdeveloper159acreSTEMbufferland Hwy237/Zanker. November18councilnegotiationagreementstillfuture, laterenvironmentalreview/publichearings/finaldevelopmentGROUNDLEASEfuture, notfullyexecutedlease/deedpurchase/operatingcampus. 6000jobs/30Mannualtaxforecast mixedDCandadvancedmanufacturingnot6000DCops. First250MWavailability andfuture496MWscope not746MWsum. Regional2000MWrequests and2000MWtransmissionexpansion notPrologisIT. Leaseproceedsintendedratepayerbenefitnotverifiedpayment.",
      "date": "",
      "events": [
        [
          "2025-11-18",
          "San Jose Council minutes record adoption of Resolution RES2025 395 on November 18, 2025, selecting Prologis as preferred developer and authorizing exclusive negotiations for the wastewater facility buffer lands. The action includes climate, recycled water, habitat and workforce negotiation directions. This is selection and negotiation authority, not final project entitlements, construction authorization or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them",
          "host": "kqed.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/",
          "host": "sanjoseinside.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects",
          "host": "www.sanjoseca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Access-check target"
        },
        {
          "url": "https://sanjose.legistar.com/LegislationDetail.aspx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=80646EC3-65DB-4799-838C-78DF960F1F10&ID=7723763&Options=&Search=",
          "host": "sanjose.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://sanjose.legistar.com/View.ashx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=3BA48E4A-A115-4917-A5FA-E341AC37105E&ID=1328261&M=M",
          "host": "sanjose.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://sanjose.legistar.com/View.ashx?GUID=45941F3A-0A60-42A1-8F04-B09281C6E2F3&ID=14917877&M=F",
          "host": "sanjose.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 37.18006,
        "lng": -121.78346,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "JosephGeha KQED September14updated16,2026 originalon-locationinterviews/photosidentifySilverCreekValleyRoadproposedDC; pairedwithpreceding516000sfroadcontext, notoperator/parcelcertification. Prologis159acreSTEM/496MWmixedDCANDRESEARCH isdifferentAlvisoproject, notSilverCreekpower.",
            "GoogleAlviso250MWR&D andMicrosoft99MW/224GENotherprojectsnotSilverCreek. Dedicatedcitypowerpact/publicbenefitsnotallapprovedindividualcampuses. No actualhealthharm/cumulativeairmodelestablishedbyresidentconcerns; sourcebroadercity60SantaClara/20SanJosecountsnotcensus. Visibleoriginalmainreportread, hydrationpayloadignored.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them",
              "host": "kqed.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "SanJoseInside November10,2025 reproducesCITYrelease: PrologisPREFERREDdeveloper159acreSTEMbufferland Hwy237/Zanker. November18councilnegotiationagreementstillfuture, laterenvironmentalreview/publichearings/finaldevelopmentGROUNDLEASEfuture, notfullyexecutedlease/deedpurchase/operatingcampus.",
            "6000jobs/30Mannualtaxforecast mixedDCandadvancedmanufacturingnot6000DCops. First250MWavailability andfuture496MWscope not746MWsum. Regional2000MWrequests and2000MWtransmissionexpansion notPrologisIT. Leaseproceedsintendedratepayerbenefitnotverifiedpayment.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.sanjoseinside.com/news/prologis-inc-wins-bid-for-one-of-the-largest-economic-development-projects-in-south-bay/",
              "host": "sanjoseinside.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The KQED account describes exclusive negotiations for the 159-acre wastewater buffer site. Negotiations are not conveyance, a construction permit or operating service. The combined research/data-center power proposal has a different scope from another headline figure. The original city listing was access-limited; current stage remains unresolved."
            }
          },
          "notes": [
            "The KQED account describes exclusive negotiations for the 159-acre wastewater buffer site. Negotiations are not conveyance, a construction permit or operating service. The combined research/data-center power proposal has a different scope from another headline figure. The original city listing was access-limited; current stage remains unresolved."
          ],
          "sources": [
            {
              "url": "https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them",
              "host": "www.kqed.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects",
              "host": "www.sanjoseca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 16",
          "scope": "The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "selected_proposal_with_future_entitlements_and_negotiations",
              "scope": "The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted."
            },
            "regulatory_scope": {
              "preferred_proposal_selection_on": "2025-11-18",
              "council_minutes_pages_visually_read": [
                15,
                16
              ],
              "staff_proposal_memo_page_read": 5,
              "ceqa_and_final_development_agreement_remain_future_steps": true,
              "project_negotiation_conditions_not_citywide_or_countywide_rules": true,
              "negotiation_authority_not_executed_final_agreement": true
            }
          },
          "notes": [
            "The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://sanjose.legistar.com/LegislationDetail.aspx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=80646EC3-65DB-4799-838C-78DF960F1F10&ID=7723763&Options=&Search=",
              "host": "sanjose.legistar.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://sanjose.legistar.com/View.ashx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=3BA48E4A-A115-4917-A5FA-E341AC37105E&ID=1328261&M=M",
              "host": "sanjose.legistar.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://sanjose.legistar.com/View.ashx?GUID=45941F3A-0A60-42A1-8F04-B09281C6E2F3&ID=14917877&M=F",
              "host": "sanjose.legistar.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Jose · Santa Clara · Source context reviewed",
      "status_scope": "The adopted November 18, 2025 Council action selected Prologis as the preferred developer for the regional wastewater facility buffer lands and authorized exclusive negotiations. The staff memorandum describes the selected data center and advanced manufacturing proposal. Selected development proposal describes that planning context only. The decision is a developer selection and negotiation authority, with CEQA and development agreement work described as future steps. It is not zoning approval, an executed final ground lease, completed utility capacity or operation. No new provider role is adopted.",
      "event_evidence": [
        {
          "date": "2025-11-18",
          "text": "San Jose Council minutes record adoption of Resolution RES2025 395 on November 18, 2025, selecting Prologis as preferred developer and authorizing exclusive negotiations for the wastewater facility buffer lands. The action includes climate, recycled water, habitat and workforce negotiation directions. This is selection and negotiation authority, not final project entitlements, construction authorization or operation.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://sanjose.legistar.com/View.ashx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=3BA48E4A-A115-4917-A5FA-E341AC37105E&ID=1328261&M=M",
              "host": "sanjose.legistar.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
