{
  "schema_version": 1,
  "source_compilation_context": {
    "az": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/az.json",
      "updated": "2026-10-24"
    },
    "ca": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ca.json",
      "updated": "2026-10-25"
    },
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    },
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    },
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    },
    "or": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/or.json",
      "updated": "2026-10-26"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    },
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    },
    "wa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "stack-infrastructure",
    "label": "STACK Infrastructure"
  },
  "records": [
    {
      "id": "stack-chi01-il",
      "state": "il",
      "kind": "facility",
      "name": "STACK CHI01",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cook"
      ],
      "city": "Elk Grove Village",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chicago market with explicit CHI01section. Market80MW/32acresacrosstwo campuses, not CHI01alone. No inferred40MWforCHI02by subtraction. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/chicago/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
          "host": "dceo.illinois.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stackinfra.com/locations/americas/chicago/chi01/",
          "host": "www.stackinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.94469,
        "lng": -87.89061,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Chicago market with explicit CHI01section",
          "fields": {
            "chi01_campus_capacity_mw": 40,
            "power_basis": "capacity, not explicitly criticalIT",
            "chi01_campus_acres": 14,
            "named_city": "Elk Grove Village"
          },
          "notes": [
            "Market80MW/32acresacrosstwo campuses, not CHI01alone. No inferred40MWforCHI02by subtraction.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/chicago/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations",
          "fields": {
            "program_report_year": 2025,
            "program_register_as_of": "2025-12-31",
            "applications_received": 35,
            "approved_owner_operator_applications": 34,
            "operator_certificates_issued": 34,
            "tenant_certificates_issued": 91,
            "construction_credit_certificates_issued": 0,
            "total_investment_commitments_usd": 10665815092,
            "estimated_tax_benefits_usd": 666613443,
            "estimated_tax_benefit_calculation_percent": 6.25,
            "listed_new_job_commitments": 731,
            "investment_commitment_period_months": 60
          },
          "notes": [
            "34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 6",
          "scope": "The current STACK CHI01 campus page offers tours and describes services across CHI01A and CHI01B in Elk Grove Village. Operator listed service describes that campus service listing. It does not certify an exact opening day, full leased occupancy or the operating stage and realized load of every advertised component.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "The current STACK CHI01 campus page offers tours and describes services across CHI01A and CHI01B in Elk Grove Village. Operator listed service describes that campus service listing. It does not certify an exact opening day, full leased occupancy or the operating stage and realized load of every advertised component."
            }
          },
          "notes": [
            "The current STACK CHI01 campus page offers tours and describes services across CHI01A and CHI01B in Elk Grove Village. Operator listed service describes that campus service listing. It does not certify an exact opening day, full leased occupancy or the operating stage and realized load of every advertised component.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/chicago/chi01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current CHI01 explicitly names Elk Grove Village and CHI01A and CHI01B. Chicago is a marketed region, and the separate component descriptions do not become jurisdiction, measured capacity or physical building count findings.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current CHI01 explicitly names Elk Grove Village and CHI01A and CHI01B. Chicago is a marketed region, and the separate component descriptions do not become jurisdiction, measured capacity or physical building count findings."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current CHI01 explicitly names Elk Grove Village and CHI01A and CHI01B. Chicago is a marketed region, and the separate component descriptions do not become jurisdiction, measured capacity or physical building count findings.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/chicago/chi01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Elk Grove Village · Cook · Source context reviewed",
      "status_scope": "The current STACK CHI01 campus page offers tours and describes services across CHI01A and CHI01B in Elk Grove Village. Operator listed service describes that campus service listing. It does not certify an exact opening day, full leased occupancy or the operating stage and realized load of every advertised component.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17031"
      }
    },
    {
      "id": "stack-dfw01-plano-tx",
      "state": "tx",
      "kind": "facility",
      "name": "STACK DFW01 (Plano)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Collin"
      ],
      "city": "Plano",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two named Dallas market campuses. Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.20227,
        "lng": -96.58805,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "two named Dallas market campuses",
          "fields": {
            "dfw01_plano": {
              "advertised_total_power_mw": 80,
              "operational_buildings": 2,
              "expansion_capacity_mw": 48
            },
            "dfw02_lancaster": {
              "advertised_maximum_power_mw": 500,
              "campus_acres": 193
            },
            "regional_power_mw": 580,
            "regional_campuses": 2,
            "regional_acres": 240
          },
          "notes": [
            "Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "STACK explicitly describes two operational data centers at DFW01 in Plano, while the campus detail retains future expansion. This supports only an operating phase. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "STACK explicitly describes two operational data centers at DFW01 in Plano, while the campus detail retains future expansion. This supports only an operating phase. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "STACK explicitly describes two operational data centers at DFW01 in Plano, while the campus detail retains future expansion. This supports only an operating phase."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current market text names DFW01 in Plano with existing and expansion components and separately lists DFW02 in Lancaster. Those records, jurisdictions, quantities and stages are not merged.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current market text names DFW01 in Plano with existing and expansion components and separately lists DFW02 in Lancaster. Those records, jurisdictions, quantities and stages are not merged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current market text names DFW01 in Plano with existing and expansion components and separately lists DFW02 in Lancaster. Those records, jurisdictions, quantities and stages are not merged.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Plano · Collin · Source context reviewed",
      "status_scope": "STACK explicitly describes two operational data centers at DFW01 in Plano, while the campus detail retains future expansion. This supports only an operating phase. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48085"
      }
    },
    {
      "id": "stack-dfw02-lancaster-tx",
      "state": "tx",
      "kind": "facility",
      "name": "STACK DFW02 (Lancaster)",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Lancaster",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two named Dallas market campuses. Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/",
          "host": "www.stackinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.7399,
        "lng": -96.73584,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "two named Dallas market campuses",
          "fields": {
            "dfw01_plano": {
              "advertised_total_power_mw": 80,
              "operational_buildings": 2,
              "expansion_capacity_mw": 48
            },
            "dfw02_lancaster": {
              "advertised_maximum_power_mw": 500,
              "campus_acres": 193
            },
            "regional_power_mw": 580,
            "regional_campuses": 2,
            "regional_acres": 240
          },
          "notes": [
            "Market totals not per building. DFW01 48 MW expansion is within advertised campus offering, not automatically extra energized capacity. DFW02 up to 500 MW is offered capacity, not proof of delivery. Tax marketing is not an award.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "STACK Lancaster DFW02 planned-campus identity and program context.",
          "fields": {
            "current_source_scope": "The operator describes a Lancaster campus with planned critical capacity. The source does not separately establish an operating date or an accomplished construction milestone.",
            "texas_program_entries": [
              {
                "registered_name": "DFW02 LANCASTER (STACK)",
                "program": "qualifying large data center project",
                "registration_anchor": "LD112589-OW1",
                "program_effective_on": "2025-10-31",
                "exemption_end_on": null,
                "listed_owner_names": [
                  "SI DFW02A, LLC"
                ],
                "listed_occupant_names": [
                  "SI DFW02A, LLC"
                ],
                "listed_operator_names": [
                  "SI DFW02A, LLC",
                  "Stack Infrastructure III TRC, LLC"
                ]
              }
            ],
            "provider_brand": "STACK Infrastructure"
          },
          "notes": [
            "Planned campus capacity and an incentive registration do not certify operation; current status remains unclear. No construction status is inferred from a rendered campus image.",
            "Program effective and exemption-end dates are not physical opening, energization or closure dates. Listed program participants do not independently verify parcel title, legal corporate relationships or current tenant occupancy.",
            "No new map coordinates, precise pins, metered use or legacy MW totals are adopted."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Provider-role display refinement: the source establishes a developer brand, not current operating service.",
          "fields": {
            "provider_role": "developer"
          },
          "notes": [
            "The main provider fact is labeled Developer. The source does not resolve the campus operating stage; status remains unclear."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "texas_current_program_contexts": {
              "checked": "2026-10-17",
              "reference_rows": [
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "DFW02 LANCASTER (STACK)",
                  "program": "Qualifying large data center project",
                  "registration_number": "LD112589-OW1"
                }
              ],
              "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Current qualifying data-center and large-project registered lists"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_development",
              "scope": "STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/dfw02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lancaster · Dallas · Source context reviewed",
      "status_scope": "STACK lists DFW02 in Lancaster as planned development. Conflicting planned-capacity totals are not adopted, and physical construction or commissioning is not verified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48113"
      }
    },
    {
      "id": "stack-hillsboro-or",
      "state": "or",
      "kind": "facility",
      "name": "STACK Hillsboro Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washington"
      ],
      "city": "Hillsboro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Nick LaMora, HillsboroNewsTimes August8,2026 original city records/staff reporting: STACK filed July27at10:14 to REVISE existing2014three-phase approval, not a new permitted building or specified MW.120day July27moratorium reportedly allows this earlier filing to continue review, not approved changes. Aligned NE30th/glencoeswale preapplication about one hour later is NOT formal land-use filing and not exempt, separate unpinned concept. Wagon/Corny July21 applications nearly20/29ac respectively are not independently crosswalked to Hines/DigitalRealty rows.180day SIP-agreement pause separate from120day development pause/state enterprise-zone restrictions. August26/September15/October6rule milestones were future targets; no later adoption observed from this article. Signed enactments uninspected. Not all fields, current operation, permits, exact parcel or critical IT independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hillsboronewstimes.com/2026/08/08/data-center-proposals-filed-days-hours-before-hillsboro-moratorium-approved/",
          "host": "hillsboronewstimes.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stackinfra.com/locations/americas/portland/por01/",
          "host": "www.stackinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.stackinfra.com/locations/americas/portland/por02/",
          "host": "www.stackinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 45.54225,
        "lng": -123.01744,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Nick LaMora, HillsboroNewsTimes August8,2026 original city records/staff reporting: STACK filed July27at10:14 to REVISE existing2014three-phase approval, not a new permitted building or specified MW.120day July27moratorium reportedly allows this earlier filing to continue review, not approved changes. Aligned NE30th/glencoeswale preapplication about one hour later is NOT formal land-use filing and not exempt, separate unpinned concept. Wagon/Corny July21 applications nearly20/29ac respectively are not independently crosswalked to Hines/DigitalRealty rows.180day SIP-agreement pause separate from120day development pause/state enterprise-zone restrictions. August26/September15/October6rule milestones were future targets; no later adoption observed from this article. Signed enactments uninspected.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://hillsboronewstimes.com/2026/08/08/data-center-proposals-filed-days-hours-before-hillsboro-moratorium-approved/",
              "host": "hillsboronewstimes.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 69",
          "scope": "The complete original current provider roster describes distinct POR01 and POR02 campuses. This pass does not independently crosswalk the inherited generic new Hillsboro proposals to those exact existing components or a further campus. Private reporting about last minute applications before a municipal pause does not establish an original final project entitlement or a physical construction stage. The selected original City policy host was unavailable at robots, so its current ban scope and exact applicability were not independently read or applied to this record.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_stack_campuses_generic_new_proposal_crosswalk_held",
              "scope": "The complete original current provider roster describes distinct POR01 and POR02 campuses. This pass does not independently crosswalk the inherited generic new Hillsboro proposals to those exact existing components or a further campus. Private reporting about last minute applications before a municipal pause does not establish an original final project entitlement or a physical construction stage. The selected original City policy host was unavailable at robots, so its current ban scope and exact applicability were not independently read or applied to this record."
            },
            "source_read_scope": {
              "complete_current_original_por01_and_por02_roster_bodies_read": true,
              "existing_campuses_not_new_proposals": true,
              "city_policy_source_hold_retained": true,
              "no_citywide_ban_or_exact_property_exemption_inferred": true
            }
          },
          "notes": [
            "The complete original current provider roster describes distinct POR01 and POR02 campuses. This pass does not independently crosswalk the inherited generic new Hillsboro proposals to those exact existing components or a further campus. Private reporting about last minute applications before a municipal pause does not establish an original final project entitlement or a physical construction stage. The selected original City policy host was unavailable at robots, so its current ban scope and exact applicability were not independently read or applied to this record.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hillsboro · Washington · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "41067"
      }
    },
    {
      "id": "stack-infrastructure-goldendale-data-center-wa",
      "state": "wa",
      "kind": "facility",
      "name": "STACK Infrastructure Goldendale Data Center",
      "group": "proposed",
      "status": "Agency documented proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Klickitat"
      ],
      "city": "Goldendale",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported 958 MW interconnection request was in study phase, not executed service, commissioned critical IT or a binding power purchase. Social-profile 1 GW-plus aspiration is not separately additive capacity. Goldendale 1,200 MW is pumped-storage output, not sustained net generation or DC IT; the 80% comparison cannot prove contracted supply or annual energy. Roughly 700 acres and billions of gallons concern storage project, not automatically campus footprint or daily cooling demand. FERC hydro license and May 26 review petitions do not establish a court ruling, final DC permit or signed buyer. Owner did not disclose buyers; reporter’s inference of Stack as buyer remains attributed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-30",
          "The original Washington Department of Ecology site register dated October 30, 2025 describes prospective purchaser cleanup negotiations with STACK for proposed computing reuse at Columbia Gorge Aluminum. This dates the agency publication rather than an executed decree, completed cleanup, construction start or computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site",
          "host": "tricitiesbusinessnews.com",
          "date": "2026-05-28",
          "published": "2026-05-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://apps.ecology.wa.gov/publications/documents/2509041v.pdf",
          "host": "apps.ecology.wa.gov",
          "published": "2025-10-30",
          "date": "2025-10-30",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 45.86615,
        "lng": -120.83212,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Oregon Capital Chronicle reporting republished by Tri-Cities Area Journal of Business links a potential Stack Goldendale campus to planned pumped storage and documents Yakama cultural-resource opposition and federal appeals.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Reported 958 MW interconnection request was in study phase, not executed service, commissioned critical IT or a binding power purchase. Social-profile 1 GW-plus aspiration is not separately additive capacity. Goldendale 1,200 MW is pumped-storage output, not sustained net generation or DC IT; the 80% comparison cannot prove contracted supply or annual energy. Roughly 700 acres and billions of gallons concern storage project, not automatically campus footprint or daily cooling demand. FERC hydro license and May 26 review petitions do not establish a court ruling, final DC permit or signed buyer. Owner did not disclose buyers; reporter’s inference of Stack as buyer remains attributed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site",
              "host": "tricitiesbusinessnews.com",
              "date": "2026-05-28",
              "published": "2026-05-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_documented_named_goldendale_compute_reuse_proposal",
              "scope": "Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal."
            },
            "source_read_scope": {
              "original_register_physical_pages": [
                1,
                5
              ],
              "complete_ten_page_register_review_not_claimed": true,
              "historical_smelter_contamination_not_computing_finding": true,
              "negotiation_forecast_and_possible_comment_period_not_accomplished": true,
              "separate_energy_storage_project_not_merged": true
            }
          },
          "notes": [
            "Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://apps.ecology.wa.gov/publications/documents/2509041v.pdf",
              "host": "apps.ecology.wa.gov",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Goldendale · Klickitat · Source context reviewed",
      "status_scope": "Selected original October 30, 2025 State site register text explicitly names STACK Infrastructure USA III and a proposed purchase, cleanup and computing campus reuse of part of the former Columbia Gorge Aluminum smelter. This supports an agency documented proposal rather than construction or commissioned computing. The agency describes historical smelter contamination and planned negotiations, not pollution caused by computing or a completed cleanup. Expected negotiations ending in March 2026 and possible later comment opportunities do not establish an accomplished consent decree or an exact future hearing. The separate Goldendale energy storage project is not merged into this proposal.",
      "event_evidence": [
        {
          "date": "2025-10-30",
          "text": "The original Washington Department of Ecology site register dated October 30, 2025 describes prospective purchaser cleanup negotiations with STACK for proposed computing reuse at Columbia Gorge Aluminum. This dates the agency publication rather than an executed decree, completed cleanup, construction start or computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://apps.ecology.wa.gov/publications/documents/2509041v.pdf",
              "host": "apps.ecology.wa.gov",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53039"
      }
    },
    {
      "id": "stack-nal01-new-albany-oh",
      "state": "oh",
      "kind": "facility",
      "name": "STACK Infrastructure NAL01 (New Albany)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "New Albany",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Regional page names NAL01. Do not claim contracted/energized capacity from scalability language. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/new-albany/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stackinfra.com/locations/americas/new-albany/nal01/",
          "host": "www.stackinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.94866,
        "lng": -82.97672,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "advertised_campus_power_mw": 60,
            "power_basis": "scalable campus offering, not measured load",
            "campus_acres": 40,
            "campuses": 1
          },
          "notes": [
            "Regional page names NAL01. Do not claim contracted/energized capacity from scalability language.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/new-albany/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The New Albany market page explicitly lists NAL01. The provider brand offers scalable campus infrastructure; market safety, tax and land availability claims do not establish commissioning, permits or eligibility.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The New Albany market page explicitly lists NAL01. The provider brand offers scalable campus infrastructure; market safety, tax and land availability claims do not establish commissioning, permits or eligibility."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The New Albany market page explicitly lists NAL01. The provider brand offers scalable campus infrastructure; market safety, tax and land availability claims do not establish commissioning, permits or eligibility.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/new-albany/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "STACK current named NAL01 page presents separate A and B buildings, secured utility power and marketed critical capacity. It does not explicitly establish completed current customer compute service or the exact phase of every component in the inherited combined campus record. Available power, a tour invitation, a virtual experience and campus capacity are not commissioning. No individual building phases, inconsistent advertised totals, exact locations or roles are merged or promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_nal01_building_marketing_and_power_without_exact_combined_service_phase",
              "scope": "STACK current named NAL01 page presents separate A and B buildings, secured utility power and marketed critical capacity. It does not explicitly establish completed current customer compute service or the exact phase of every component in the inherited combined campus record. Available power, a tour invitation, a virtual experience and campus capacity are not commissioning. No individual building phases, inconsistent advertised totals, exact locations or roles are merged or promoted."
            }
          },
          "notes": [
            "STACK current named NAL01 page presents separate A and B buildings, secured utility power and marketed critical capacity. It does not explicitly establish completed current customer compute service or the exact phase of every component in the inherited combined campus record. Available power, a tour invitation, a virtual experience and campus capacity are not commissioning. No individual building phases, inconsistent advertised totals, exact locations or roles are merged or promoted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/new-albany/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.stackinfra.com/locations/americas/new-albany/nal01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39049"
      }
    },
    {
      "id": "stack-nova-loudoun-va",
      "state": "va",
      "kind": "facility",
      "name": "STACK NVA Loudoun 144MW Hyperscale Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Loudoun"
      ],
      "city": "Ashburn",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Planned144includesboth72buildings, not extra. Otherfeaturedworldwidesitefigures and4GW/6GWcorporatepipeline excluded. Exactopeningnotprovided. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-02-11",
          "STACK announced a planned Loudoun County campus. February 11, 2025 is the release date. The announced capacity and future delivery do not establish an opening, current construction or an operating load."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/",
          "host": "stackinfra.com",
          "date": "2025-02-11",
          "published": "2025-02-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.04921,
        "lng": -77.70738,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_campus_capacity_mw": 144,
            "planned_buildings": 2,
            "planned_capacity_each_building_mw": 72,
            "power_basis": "capacity, not explicitly criticalIT",
            "county": "Loudoun"
          },
          "notes": [
            "Planned144includesboth72buildings, not extra. Otherfeaturedworldwidesitefigures and4GW/6GWcorporatepipeline excluded. Exactopeningnotprovided.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/",
              "host": "stackinfra.com",
              "date": "2025-02-11",
              "published": "2025-02-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 7",
          "scope": "The February 11, 2025 STACK release announced a two building Loudoun campus. The release establishes that announcement, not current construction progress or completed delivery. Other market projects in the same release are separate campuses. Current physical stage remains unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "dated_announcement_current_physical_stage_held",
              "scope": "The February 11, 2025 STACK release announced a two building Loudoun campus. The release establishes that announcement, not current construction progress or completed delivery. Other market projects in the same release are separate campuses. Current physical stage remains unverified."
            }
          },
          "notes": [
            "The February 11, 2025 STACK release announced a two building Loudoun campus. The release establishes that announcement, not current construction progress or completed delivery. Other market projects in the same release are separate campuses. Current physical stage remains unverified.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/",
              "host": "www.stackinfra.com",
              "published": "2025-02-11",
              "date": "2025-02-11",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The February 11, 2025 announcement names a planned Loudoun campus with a 144 MW design. Other current portfolio and brochure figures do not establish an equivalent campus, updated measured capacity or a legal parcel. No transfer to NVA01 or other Loudoun codes.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The February 11, 2025 announcement names a planned Loudoun campus with a 144 MW design. Other current portfolio and brochure figures do not establish an equivalent campus, updated measured capacity or a legal parcel. No transfer to NVA01 or other Loudoun codes."
            },
            "provider_role": "developer"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The February 11, 2025 announcement names a planned Loudoun campus with a 144 MW design. Other current portfolio and brochure figures do not establish an equivalent campus, updated measured capacity or a legal parcel. No transfer to NVA01 or other Loudoun codes.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/",
              "host": "www.stackinfra.com",
              "published": "2025-02-11",
              "date": "2025-02-11",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ashburn · Loudoun · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-02-11",
          "text": "STACK announced a planned Loudoun County campus. February 11, 2025 is the release date. The announced capacity and future delivery do not establish an opening, current construction or an operating load.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/",
              "host": "www.stackinfra.com",
              "published": "2025-02-11",
              "date": "2025-02-11",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51107"
      }
    },
    {
      "id": "stack-nva01a-va",
      "state": "va",
      "kind": "facility",
      "name": "STACK NVA01A",
      "group": "proposed",
      "status": "Operator-listed delivery plan",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Loudoun"
      ],
      "city": "Sterling",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.0722,
        "lng": -77.55171,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "campus_critical_capacity_mw": 17,
            "buildings": 1,
            "campus_acres": 16,
            "nva01a_building_sqft": 180000
          },
          "notes": [
            "Campus and its one building describe the same 17 MW, not 34 MW. Available dedicated capacity is not contracted or measured consumption.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_delivery_plan",
              "scope": "STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current NVA01 text explicitly identifies NVA01A in Sterling and forecasts early access in the third quarter of 2026 and full commissioning in the fourth. An elapsed or current quarter target is not an event verified to have happened or current operating service.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current NVA01 text explicitly identifies NVA01A in Sterling and forecasts early access in the third quarter of 2026 and full commissioning in the fourth. An elapsed or current quarter target is not an event verified to have happened or current operating service."
            },
            "provider_role": "developer"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current NVA01 text explicitly identifies NVA01A in Sterling and forecasts early access in the third quarter of 2026 and full commissioning in the fourth. An elapsed or current quarter target is not an event verified to have happened or current operating service.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sterling · Loudoun · Source context reviewed",
      "status_scope": "STACK lists NVA01A early access in the third quarter and full commissioning targeted for the fourth quarter of 2026. These are delivery targets, not verified outcomes; actual commissioning and the precise physical construction phase remain unverified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51107"
      }
    },
    {
      "id": "stack-phx01-avondale-az",
      "state": "az",
      "kind": "facility",
      "name": "STACK Infrastructure PHX01 Campus",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Maricopa"
      ],
      "city": "Avondale",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Regional headline 500 MW differs from campus descriptions 225 plus 250 MW. Do not silently reconcile or allocate extra 25 MW. No operating milestone established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/phoenix/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stackinfra.com/locations/americas/phoenix/phx01/",
          "host": "www.stackinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.11819,
        "lng": -112.2594,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "phx01_avondale_advertised_critical_capacity_mw": 225,
            "regional_advertised_power_mw": 500,
            "regional_campuses": 2,
            "regional_acres": 155
          },
          "notes": [
            "Regional headline 500 MW differs from campus descriptions 225 plus 250 MW. Do not silently reconcile or allocate extra 25 MW. No operating milestone established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/phoenix/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 11",
          "scope": "The current STACK PHX01 page names the Avondale campus, offers a tour and describes available campus infrastructure. Operator listed service describes this named commercial campus offering. It does not establish fully delivered marketed capacity, every building opening, tenant occupancy or the stage of the distinct PHX02 proposal.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "The current STACK PHX01 page names the Avondale campus, offers a tour and describes available campus infrastructure. Operator listed service describes this named commercial campus offering. It does not establish fully delivered marketed capacity, every building opening, tenant occupancy or the stage of the distinct PHX02 proposal."
            }
          },
          "notes": [
            "The current STACK PHX01 page names the Avondale campus, offers a tour and describes available campus infrastructure. Operator listed service describes this named commercial campus offering. It does not establish fully delivered marketed capacity, every building opening, tenant occupancy or the stage of the distinct PHX02 proposal.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/phoenix/phx01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX01 explicitly names Avondale. PHX02 and its different marketed city, planned buildings and capacity remain separate.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX01 explicitly names Avondale. PHX02 and its different marketed city, planned buildings and capacity remain separate."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX01 explicitly names Avondale. PHX02 and its different marketed city, planned buildings and capacity remain separate.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/phoenix/phx01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Avondale · Maricopa · Source context reviewed",
      "status_scope": "The current STACK PHX01 page names the Avondale campus, offers a tour and describes available campus infrastructure. Operator listed service describes this named commercial campus offering. It does not establish fully delivered marketed capacity, every building opening, tenant occupancy or the stage of the distinct PHX02 proposal.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04013"
      }
    },
    {
      "id": "stack-phx02-phoenix-az",
      "state": "az",
      "kind": "facility",
      "name": "STACK Infrastructure PHX02 Campus",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Maricopa"
      ],
      "city": "Phoenix",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Designed capacity with dedicated substation, not proof of all buildings operating. Page also uses Skyway location label; exact street and county not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.68501,
        "lng": -112.50695,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_critical_capacity_mw": 250,
            "planned_buildings": 5,
            "campus_acres": 51,
            "published_market_location": "Central Phoenix"
          },
          "notes": [
            "Designed capacity with dedicated substation, not proof of all buildings operating. Page also uses Skyway location label; exact street and county not established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 7",
          "scope": "The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate."
            }
          },
          "notes": [
            "The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX02 is described as a designed five building campus in central Phoenix. The developer relationship is limited to this marketed development; a capacity design and substation description do not establish current commissioning or completed buildings.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX02 is described as a designed five building campus in central Phoenix. The developer relationship is limited to this marketed development; a capacity design and substation description do not establish current commissioning or completed buildings."
            },
            "provider_role": "developer"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. PHX02 is described as a designed five building campus in central Phoenix. The developer relationship is limited to this marketed development; a capacity design and substation description do not establish current commissioning or completed buildings.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/phoenix/phx02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Phoenix · Maricopa · Source context reviewed",
      "status_scope": "The current STACK PHX02 campus page describes a five building campus designed to deliver future critical capacity. Developer listed development describes that named planned campus offering. Tours and the planned capacity do not establish completed buildings, occupied service, commissioning or measured demand. PHX01 remains separate.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04013"
      }
    },
    {
      "id": "stack-por01-or",
      "state": "or",
      "kind": "facility",
      "name": "STACK POR01",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washington"
      ],
      "city": "Hillsboro",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. POR01 campus and two building sections. Campus 80 MW including future expansion does not reconcile with displayed building powers 5 plus 72 MW. Retain scope conflict; no total current IT capacity inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/portland/por01/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 45.63103,
        "lng": -123.14878,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "POR01 campus and two building sections",
          "fields": {
            "campus_advertised_power_mw": 80,
            "future_expansion_power_mw": 36,
            "campus_acres": 18,
            "campus_buildings": 2,
            "building_sections": [
              {
                "code": "POR01A",
                "advertised_power_mw": 5,
                "area_sqft": 65000
              },
              {
                "code": "POR01B",
                "advertised_power_mw": 72,
                "area_sqft": 215000
              }
            ]
          },
          "notes": [
            "Campus 80 MW including future expansion does not reconcile with displayed building powers 5 plus 72 MW. Retain scope conflict; no total current IT capacity inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por01/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The POR01 page explicitly distinguishes future expansion and POR01A and POR01B. Their capacities and the page total differ in scope and are not reconciled or adopted as delivered figures.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The POR01 page explicitly distinguishes future expansion and POR01A and POR01B. Their capacities and the page total differ in scope and are not reconciled or adopted as delivered figures."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The POR01 page explicitly distinguishes future expansion and POR01A and POR01B. Their capacities and the page total differ in scope and are not reconciled or adopted as delivered figures.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 69",
          "scope": "The complete original current POR01 campus body lists two component buildings and expressly includes a future expansion within its aggregate. This is a named provider campus listing without an independently read current physical stage or complete commissioned capacity for every component. Future expansion is not existing computing and the listed aggregate and component numbers are not reconciled or exported. No technical capacity, first opening day or new component identity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_por01_campus_listing_exact_commissioned_scope_held",
              "scope": "The complete original current POR01 campus body lists two component buildings and expressly includes a future expansion within its aggregate. This is a named provider campus listing without an independently read current physical stage or complete commissioned capacity for every component. Future expansion is not existing computing and the listed aggregate and component numbers are not reconciled or exported. No technical capacity, first opening day or new component identity is adopted."
            },
            "source_read_scope": {
              "complete_current_original_por01_body_read": true,
              "future_expansion_not_existing_capacity": true,
              "aggregate_and_component_quantities_not_reconciled_or_exported": true
            }
          },
          "notes": [
            "The complete original current POR01 campus body lists two component buildings and expressly includes a future expansion within its aggregate. This is a named provider campus listing without an independently read current physical stage or complete commissioned capacity for every component. Future expansion is not existing computing and the listed aggregate and component numbers are not reconciled or exported. No technical capacity, first opening day or new component identity is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hillsboro · Washington · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "41067"
      }
    },
    {
      "id": "stack-por02-or",
      "state": "or",
      "kind": "facility",
      "name": "STACK POR02",
      "group": "operating",
      "status": "Provider listed ready colocation capacity",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washington"
      ],
      "city": "Hillsboro",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Advertised power basis not explicitly IT. No precise energization date or measured load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/portland/por02/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stackinfra.com/wp-content/uploads/2020/11/POR02A_Brochure_031523.pdf",
          "host": "www.stackinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.stackinfra.com/wp-content/uploads/2021/03/STACK_PR_Uptime_Institute.pdf",
          "host": "www.stackinfra.com",
          "published": "2021-04-08",
          "date": "2021-04-08",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 45.47125,
        "lng": -123.11048,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "advertised_power_mw": 24,
            "campus_acres": 15,
            "campus_buildings": 1,
            "published_city": "Hillsboro, Oregon"
          },
          "notes": [
            "Advertised power basis not explicitly IT. No precise energization date or measured load.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por02/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current POR02 explicitly names Hillsboro and POR02A. The separate general Hillsboro proposal record and other Portland campus codes are not merged.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current POR02 explicitly names Hillsboro and POR02A. The separate general Hillsboro proposal record and other Portland campus codes are not merged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current POR02 explicitly names Hillsboro and POR02A. The separate general Hillsboro proposal record and other Portland campus codes are not merged.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 69",
          "scope": "The original current POR02 roster offers capacity and connectivity at its named single building campus. The original POR02A brochure describes immediately available RackReady data halls, and the separate 2021 issuer account documents earlier operations practice at POR02. Together these support provider listed ready colocation capacity rather than independently measured occupied computing load or current certification. The brochure has no independently established publication day, and its historical quantities and the older operations award are not recertified as current measured facts.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "provider_named_por02_ready_colocation_capacity",
              "scope": "The original current POR02 roster offers capacity and connectivity at its named single building campus. The original POR02A brochure describes immediately available RackReady data halls, and the separate 2021 issuer account documents earlier operations practice at POR02. Together these support provider listed ready colocation capacity rather than independently measured occupied computing load or current certification. The brochure has no independently established publication day, and its historical quantities and the older operations award are not recertified as current measured facts."
            },
            "source_read_scope": {
              "complete_current_original_por02_roster_body_read": true,
              "complete_original_three_page_por02a_brochure_text_read": true,
              "complete_original_two_page_operations_release_text_read": true,
              "old_award_not_current_certification": true,
              "brochure_path_not_publication_day": true,
              "no_measured_capacity_or_first_opening_export": true
            }
          },
          "notes": [
            "The original current POR02 roster offers capacity and connectivity at its named single building campus. The original POR02A brochure describes immediately available RackReady data halls, and the separate 2021 issuer account documents earlier operations practice at POR02. Together these support provider listed ready colocation capacity rather than independently measured occupied computing load or current certification. The brochure has no independently established publication day, and its historical quantities and the older operations award are not recertified as current measured facts.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.stackinfra.com/wp-content/uploads/2020/11/POR02A_Brochure_031523.pdf",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.stackinfra.com/wp-content/uploads/2021/03/STACK_PR_Uptime_Institute.pdf",
              "host": "www.stackinfra.com",
              "published": "2021-04-08",
              "date": "2021-04-08",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hillsboro · Washington · Source context reviewed",
      "status_scope": "The original current POR02 roster offers capacity and connectivity at its named single building campus. The original POR02A brochure describes immediately available RackReady data halls, and the separate 2021 issuer account documents earlier operations practice at POR02. Together these support provider listed ready colocation capacity rather than independently measured occupied computing load or current certification. The brochure has no independently established publication day, and its historical quantities and the older operations award are not recertified as current measured facts.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "41067"
      }
    },
    {
      "id": "stack-por03-or",
      "state": "or",
      "kind": "facility",
      "name": "STACK POR03",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washington"
      ],
      "city": "Hillsboro",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. POR03 campus operational versus future components. Explicit 72 MW operational critical capacity separated from near-term and expansion. Listed components total 193 MW versus approximately 200 MW headline. E/F combined area and power not repeated on each building. Water-use description is not measured withdrawal. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/portland/por03/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 45.61984,
        "lng": -123.02815,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "POR03 campus operational versus future components",
          "fields": {
            "campus_approximate_total_critical_capacity_mw": 200,
            "operational_critical_capacity_mw": 72,
            "near_term_capacity_mw": 25,
            "expansion_capacity_mw": 96,
            "campus_acres": 55,
            "campus_buildings": 6,
            "building_sections": [
              {
                "code": "POR03A",
                "area_sqft": 182000,
                "power_mw": 24
              },
              {
                "code": "POR03B",
                "area_sqft": 180000,
                "power_mw": 24
              },
              {
                "code": "POR03C",
                "area_sqft": 180000,
                "power_mw": 24
              },
              {
                "code": "POR03D",
                "area_sqft": 198000,
                "power_mw": 25
              },
              {
                "code": "POR03E/F",
                "combined_area_sqft": 530000,
                "combined_power_mw": 96
              }
            ]
          },
          "notes": [
            "Explicit 72 MW operational critical capacity separated from near-term and expansion. Listed components total 193 MW versus approximately 200 MW headline. E/F combined area and power not repeated on each building. Water-use description is not measured withdrawal.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por03/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "STACK explicitly distinguishes operational critical capacity at POR03 from near-term availability and expansion. This supports an operating phase, without adopting power totals or marking planned halls as commissioned. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "STACK explicitly distinguishes operational critical capacity at POR03 from near-term availability and expansion. This supports an operating phase, without adopting power totals or marking planned halls as commissioned. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "STACK explicitly distinguishes operational critical capacity at POR03 from near-term availability and expansion. This supports an operating phase, without adopting power totals or marking planned halls as commissioned."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por03/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. POR03 expressly separates operational, near term and expansion capacity and identifies POR03A to POR03F. Provider identity does not certify full campus completion or transfer phase dates, power or water claims.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. POR03 expressly separates operational, near term and expansion capacity and identifies POR03A to POR03F. Provider identity does not certify full campus completion or transfer phase dates, power or water claims."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. POR03 expressly separates operational, near term and expansion capacity and identifies POR03A to POR03F. Provider identity does not certify full campus completion or transfer phase dates, power or water claims.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/portland/por03/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hillsboro · Washington · Source context reviewed",
      "status_scope": "STACK explicitly distinguishes operational critical capacity at POR03 from near-term availability and expansion. This supports an operating phase, without adopting power totals or marking planned halls as commissioned. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "41067"
      }
    },
    {
      "id": "stack-svy01-ca",
      "state": "ca",
      "kind": "facility",
      "name": "STACK SVY01",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SVY01 campus with four building specifications. Building powers sum to 101 MW while campus rounded headline says 100 MW. No silent correction or extra capacity. Whole-campus row not four new records; area labels not explicit raised floor. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy01/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.20853,
        "lng": -121.59067,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "SVY01 campus with four building specifications",
          "fields": {
            "campus_advertised_power_mw": 100,
            "campus_acres": 19,
            "campus_buildings": 4,
            "building_sections": [
              {
                "code": "SVY01A",
                "area_sqft": 140000,
                "power_mw": 9
              },
              {
                "code": "SVY01B",
                "area_sqft": 240000,
                "power_mw": 32
              },
              {
                "code": "SVY01C",
                "area_sqft": 357000,
                "power_mw": 36
              },
              {
                "code": "SVY01D",
                "area_sqft": 300000,
                "power_mw": 24
              }
            ]
          },
          "notes": [
            "Building powers sum to 101 MW while campus rounded headline says 100 MW. No silent correction or extra capacity. Whole-campus row not four new records; area labels not explicit raised floor.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy01/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current SVY01 page offers campus capacity and customer service, with individual data-center components shown separately.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The campus envelope and listed components are not all treated as delivered or occupied capacity. The review does not count buildings, normalize IT load or certify each phase."
          },
          "notes": [
            "The campus envelope and listed components are not all treated as delivered or occupied capacity. The review does not count buildings, normalize IT load or certify each phase.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current SVY01 lists SVY01A to SVY01D as separate campus components. The retained grouped record is not a new physical facility census, and no building capacity, date or location is transferred.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current SVY01 lists SVY01A to SVY01D as separate campus components. The retained grouped record is not a new physical facility census, and no building capacity, date or location is transferred."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current SVY01 lists SVY01A to SVY01D as separate campus components. The retained grouped record is not a new physical facility census, and no building capacity, date or location is transferred.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Jose · Santa Clara · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current SVY01 page offers campus capacity and customer service, with individual data-center components shown separately. The campus envelope and listed components are not all treated as delivered or occupied capacity. The review does not count buildings, normalize IT load or certify each phase.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    },
    {
      "id": "stack-svy02-ca",
      "state": "ca",
      "kind": "facility",
      "name": "STACK SVY02",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "Santa Clara",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Power not explicitly critical IT. Dedicated substation not additional capacity. New facility description lacks exact opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy02/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.32196,
        "lng": -121.75846,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "advertised_power_mw": 48,
            "campus_acres": 9,
            "campus_buildings": 1,
            "building_area_sqft": 466000,
            "published_city": "Santa Clara, California"
          },
          "notes": [
            "Power not explicitly critical IT. Dedicated substation not additional capacity. New facility description lacks exact opening date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy02/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current SVY02 page offers campus capacity and customer service, with individual data-center components shown separately.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The campus envelope and listed components are not all treated as delivered or occupied capacity. The review does not count buildings, normalize IT load or certify each phase."
          },
          "notes": [
            "The campus envelope and listed components are not all treated as delivered or occupied capacity. The review does not count buildings, normalize IT load or certify each phase.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current SVY02 explicitly names Santa Clara and SVY02A. Former Memorex headquarters context is not proof of legal ownership, present title or an opening date.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current SVY02 explicitly names Santa Clara and SVY02A. Former Memorex headquarters context is not proof of legal ownership, present title or an opening date."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current SVY02 explicitly names Santa Clara and SVY02A. Former Memorex headquarters context is not proof of legal ownership, present title or an opening date.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/silicon-valley/svy02/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Santa Clara · Santa Clara · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current SVY02 page offers campus capacity and customer service, with individual data-center components shown separately. The campus envelope and listed components are not all treated as delivered or occupied capacity. The review does not count buildings, normalize IT load or certify each phase.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    },
    {
      "id": "stack-svy03a-hayward-ca",
      "state": "ca",
      "kind": "facility",
      "name": "STACK SVY03A",
      "group": "building",
      "status": "Agency reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Alameda"
      ],
      "city": "Hayward",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. STACK historical backup-power version versus later city account. EarlierMND67.2MWbackupdifferslaterHaywardcity76.6MWbackupreviewedRound7;dates/versionsmustremainseparate,donotsumoroverwriteIT.2025reviewnoticeisnotfinalCEC/localapprovaloropening. NoprovennumericcriticalITinthisnotice. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ceqanet.lci.ca.gov/2025030999",
          "host": "ceqanet.lci.ca.gov",
          "date": "2025-03-24",
          "published": "2025-03-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hayward-ca.gov/business/for-developers/data-center-development-applications",
          "host": "www.hayward-ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 37.6776,
        "lng": -121.86444,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "STACK historical backup-power version versus later city account",
          "fields": {
            "project_name": "SVY03A Data Center Campus",
            "applicant": "STACK Infrastructure",
            "notice_received_date": "2025-03-24",
            "locality": "Hayward, Alameda County, California",
            "site_acres": 11.3,
            "parcels": [
              "461-0085-016-00",
              "461-0085-052-01"
            ],
            "planned_data_center_stories": 3,
            "historical_reviewed_backup_generation_mw_max": 67.2,
            "power_basis": "emergency backup generation, not critical IT"
          },
          "notes": [
            "EarlierMND67.2MWbackupdifferslaterHaywardcity76.6MWbackupreviewedRound7;dates/versionsmustremainseparate,donotsumoroverwriteIT.2025reviewnoticeisnotfinalCEC/localapprovaloropening. NoprovennumericcriticalITinthisnotice.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ceqanet.lci.ca.gov/2025030999",
              "host": "ceqanet.lci.ca.gov",
              "date": "2025-03-24",
              "published": "2025-03-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 45",
          "scope": "The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_city_table_explicit_svy03a_construction",
              "scope": "The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted."
            }
          },
          "notes": [
            "The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks, filing receipts and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://www.hayward-ca.gov/business/for-developers/data-center-development-applications",
              "host": "www.hayward-ca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hayward · Alameda · Source context reviewed",
      "status_scope": "The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06001"
      }
    },
    {
      "id": "stack-trade-zone-park-san-jose-ca",
      "state": "ca",
      "kind": "facility",
      "name": "STACK Trade Zone Park (SVYDC 05 / SVYDC 06)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "San Jose",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Trade Zone mixed-development backup exemption. 91MWbackup serves twoDCbuildings plusadvanced-manufacturing support, not criticalIT.36times3MWand3times1MWnameplates not usable111MWIT. SPPE/EIR order not all local permits or operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2023-04-12",
          "The CEC project history records an April 12, 2023 order certifying the Trade Zone Park final environmental impact report and granting the small power plant exemption. The exemption is a jurisdiction and environmental action allowing local permitting. It is not a final construction permit, operation or delivery of both SVY data center buildings."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.energy.ca.gov/powerplant/tradezonepark",
          "host": "energy.ca.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.11784,
        "lng": -121.70954,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Trade Zone mixed-development backup exemption",
          "fields": {
            "energy_docket": "21-SPPE-02",
            "project_owner": "STACK Infrastructure",
            "energy_project_status": "exempted",
            "backup_generation_capacity_mw_max": 91,
            "data_center_buildings": [
              "SVYDC05",
              "SVYDC06"
            ],
            "location_description": "TradeZoneBoulevard and RingwoodAvenue,SanJose,California",
            "sppe_and_final_eir_order_date": "2023-04-12"
          },
          "notes": [
            "91MWbackup serves twoDCbuildings plusadvanced-manufacturing support, not criticalIT.36times3MWand3times1MWnameplates not usable111MWIT. SPPE/EIR order not all local permits or operating proof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.energy.ca.gov/powerplant/tradezonepark",
              "host": "energy.ca.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 16",
          "scope": "The CEC lists Trade Zone Park as Exempted and records an April 12, 2023 order certifying its final environmental impact report and granting a small power plant exemption. The proposal includes SVYDC 05 and SVYDC 06 plus an advanced manufacturing building and shared support infrastructure. The CEC explains that an exemption moves the project to local permitting and is not final construction or operating approval. Exact current physical stages of the two data center components remain unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "sppe_environmental_action_not_final_local_approval_or_individual_phase",
              "scope": "The CEC lists Trade Zone Park as Exempted and records an April 12, 2023 order certifying its final environmental impact report and granting a small power plant exemption. The proposal includes SVYDC 05 and SVYDC 06 plus an advanced manufacturing building and shared support infrastructure. The CEC explains that an exemption moves the project to local permitting and is not final construction or operating approval. Exact current physical stages of the two data center components remain unclear."
            },
            "regulatory_scope": {
              "cec_exemption_order_on": "2023-04-12",
              "sppe_distinct_from_final_local_permitting": true,
              "svydc05_and_svydc06_not_individually_operating_certified": true,
              "backup_generation_ratings_not_it_load": true
            }
          },
          "notes": [
            "The CEC lists Trade Zone Park as Exempted and records an April 12, 2023 order certifying its final environmental impact report and granting a small power plant exemption. The proposal includes SVYDC 05 and SVYDC 06 plus an advanced manufacturing building and shared support infrastructure. The CEC explains that an exemption moves the project to local permitting and is not final construction or operating approval. Exact current physical stages of the two data center components remain unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.energy.ca.gov/powerplant/tradezonepark",
              "host": "www.energy.ca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Jose · Santa Clara · Source context reviewed",
      "event_evidence": [
        {
          "date": "2023-04-12",
          "text": "The CEC project history records an April 12, 2023 order certifying the Trade Zone Park final environmental impact report and granting the small power plant exemption. The exemption is a jurisdiction and environmental action allowing local permitting. It is not a final construction permit, operation or delivery of both SVY data center buildings.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.energy.ca.gov/powerplant/tradezonepark",
              "host": "www.energy.ca.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06085"
      }
    },
    {
      "id": "t5-atlanta-i-ga",
      "state": "ga",
      "kind": "facility",
      "name": "STACK ATL01 (formerly T5@Atlanta)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Alpharetta",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator/name crosswalk hold. Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.74906,
        "lng": -84.40286,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "operator/name crosswalk hold",
          "fields": {
            "source_identifies_operator": "STACK",
            "source_identifies_site_code": "ATL01",
            "source_identifies_city": "Alpharetta, Georgia",
            "source_campus_critical_capacity_mw": 20,
            "source_campus_buildings": 2,
            "source_campus_acres": 18,
            "source_building_sections": [
              {
                "code": "ATL01A",
                "area_sqft": 105000,
                "power_mw": 8
              },
              {
                "code": "ATL01B",
                "area_sqft": 133000,
                "power_mw": 12
              }
            ]
          },
          "notes": [
            "Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current ATL01 explicitly names Alpharetta and ATL01A and ATL01B. The retained former T5 record ID stays unchanged; no legal T5 transaction, precise location or whole campus commissioning is inferred.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current ATL01 explicitly names Alpharetta and ATL01A and ATL01B. The retained former T5 record ID stays unchanged; no legal T5 transaction, precise location or whole campus commissioning is inferred."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current ATL01 explicitly names Alpharetta and ATL01A and ATL01B. The retained former T5 record ID stays unchanged; no legal T5 transaction, precise location or whole campus commissioning is inferred.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The current original ATL01 page offers named facility specifications and a tour, including separate building quantities. These marketing and capacity descriptions do not explicitly establish current customer computing or certify the commissioned scope of both buildings. Existing market identity remains intact and current exact physical operation stays held rather than inferred from available capacity or portfolio language.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_atl01_specifications_without_explicit_current_compute_phase",
              "scope": "The current original ATL01 page offers named facility specifications and a tour, including separate building quantities. These marketing and capacity descriptions do not explicitly establish current customer computing or certify the commissioned scope of both buildings. Existing market identity remains intact and current exact physical operation stays held rather than inferred from available capacity or portfolio language."
            }
          },
          "notes": [
            "The current original ATL01 page offers named facility specifications and a tour, including separate building quantities. These marketing and capacity descriptions do not explicitly establish current customer computing or certify the commissioned scope of both buildings. Existing market identity remains intact and current exact physical operation stays held rather than inferred from available capacity or portfolio language.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Alpharetta · Fulton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
