  "schema_version": 1,
  "source_compilation_context": {
    "mi": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mi.json",
      "updated": "2026-10-24"
    },
    "nm": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nm.json",
      "updated": "2026-10-24"
    },
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    },
    "wi": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wi.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "stargate",
    "label": "Stargate"
  },
  "records": [
    {
      "id": "stargate-abilene-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Stargate Abilene",
      "group": "operating",
      "status": "First phase reported operating",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Taylor"
      ],
      "city": "Abilene",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [
        [
          "2025-09-30",
          "Crusoe published its named Abilene Stargate first phase operational account on September 30, 2025. It reported early training and inference workloads on Oracle Cloud Infrastructure. This dates the issuer release rather than an inferred first workload or whole campus opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/",
          "host": "texasstandard.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
          "host": "www.crusoe.ai",
          "published": "2025-09-30",
          "date": "2025-09-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.crusoe.ai/resources/blog/crusoes-2025-impact-report",
          "host": "www.crusoe.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.oracle.com/latam/data-centers/abilene/",
          "host": "www.oracle.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.oracle.com/latam/data-centers/",
          "host": "www.oracle.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.3165,
        "lng": -99.90637,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/",
              "host": "texasstandard.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 64",
          "scope": "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_stargate_first_phase_reported_running_workloads",
              "scope": "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses."
            },
            "source_read_scope": {
              "complete_retained_crusoe_release_and_impact_account_bodies_read": true,
              "complete_original_oracle_abilene_body_read": true,
              "selected_original_oracle_roster_body_and_abilene_header_read": true,
              "archival_captures_keep_original_retrievals": true,
              "original_openai_access_hold_retained": true,
              "first_phase_not_entire_campus_or_separate_microsoft_campus": true,
              "oracle_january2026_currency_footer_retained": true,
              "crusoe_template_publication_conflicts_not_repaired": true,
              "no_quantity_role_location_or_exact_opening_export": true
            }
          },
          "notes": [
            "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
              "host": "www.crusoe.ai",
              "published": "2025-09-30",
              "date": "2025-09-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.crusoe.ai/resources/blog/crusoes-2025-impact-report",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.oracle.com/latam/data-centers/abilene/",
              "host": "www.oracle.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.oracle.com/latam/data-centers/",
              "host": "www.oracle.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Abilene · Taylor · Source context reviewed",
      "status_scope": "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses.",
      "event_evidence": [
        {
          "date": "2025-09-30",
          "text": "Crusoe published its named Abilene Stargate first phase operational account on September 30, 2025. It reported early training and inference workloads on Oracle Cloud Infrastructure. This dates the issuer release rather than an inferred first workload or whole campus opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
              "host": "www.crusoe.ai",
              "published": "2025-09-30",
              "date": "2025-09-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48441"
      }
    },
    {
      "id": "stargate-lordstown-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Stargate Lordstown Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Trumbull"
      ],
      "city": "Lordstown",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. WFMJ AllyRoss September25,2025 originalreport quotesSoftBankspokesperson thatLordstownStargateDCusesasmallpartofexistingFoxconnformerGMmanufacturingfootprint.1.5GW announcedfigure is COMBINEDwithMilamCountyTexas, notLordstownalone. InitialsiteMWnotdisclosed. Originalissuerannouncementbelow confirmsgroup scope. Inheritedplanned1500MWcalledlongtermLordstownceiling isnotestablishedbythesetwosources; recommendnullsitecapacityuntilsite-specificevidence. Closed-loop/design-not-use-waterclaims notmeasuredzeroannualwater. Proof-of-conceptshowroom/AIservermanufacturing anddatacenterare distinctuses, notwholeindustrialcomplexoperatingIT. CurrentRFSnotobserved. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. OpenAI originalSeptember23,2025announcement confirmsLordstownandMilamCountyTWOsitescan scaleTOGETHERto1.5GWover18months, not1.5GWeach/Lordstownceiling. Lordstowngroundbreakingand2026operatingtargethistoricalnotobservedRFS. Pairedcapacityisnotsite-specificIT. Nearly7GWplanned/$400Boverthreeyears/500B10GWcommitmentcoverbroaderStargateportfolio, notspentLordstowncapex oroperatingUScensus.4.5GWOracleagreement/5.5GWincludingpotential600MWexpansionareoverlappingscopes, notadditiveeveryfigure. October22,2025updateidentifiesMidwestsiteWisconsin, separateLordstown. AuthorclaimsAbileneearlyworkloadsnotLordstownoperation.",
      "date": "",
      "events": [
        [
          "2025-09-23",
          "The original SoftBank joint issuer publication carries a Texas September 23, 2025 dateline announcing the Lordstown Stargate selection, with host publication on September 24. This dates the announcement account and does not establish the exact groundbreaking day or achievement of the projected 2026 opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wfmj.com/archives/data-center-to-occupy-small-part-of-lordstown-ai-hub-feature-advanced-design/article_533f268a-ec1d-5378-9ccb-ceec7d6d343e.html",
          "host": "wfmj.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://openai.com/index/five-new-stargate-sites/?trk=article-ssr-frontend-pulse_little-text-block",
          "host": "openai.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://group.softbank/en/news/press/20250924",
          "host": "group.softbank",
          "published": "2025-09-24",
          "date": "2025-09-24",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.lordstown.com/wp-content/uploads/April-6-2026-1.pdf",
          "host": "www.lordstown.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.supremecourt.ohio.gov/rod/docs/pdf/0/2026/2026-Ohio-4073.pdf",
          "host": "www.supremecourt.ohio.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.29107,
        "lng": -80.75894,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json",
          "scope": "Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.",
          "fields": {},
          "notes": [
            "WFMJ AllyRoss September25,2025 originalreport quotesSoftBankspokesperson thatLordstownStargateDCusesasmallpartofexistingFoxconnformerGMmanufacturingfootprint.1.5GW announcedfigure is COMBINEDwithMilamCountyTexas, notLordstownalone. InitialsiteMWnotdisclosed. Originalissuerannouncementbelow confirmsgroup scope.",
            "Inheritedplanned1500MWcalledlongtermLordstownceiling isnotestablishedbythesetwosources; recommendnullsitecapacityuntilsite-specificevidence. Closed-loop/design-not-use-waterclaims notmeasuredzeroannualwater. Proof-of-conceptshowroom/AIservermanufacturing anddatacenterare distinctuses, notwholeindustrialcomplexoperatingIT. CurrentRFSnotobserved.",
            "Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."
          ],
          "sources": [
            {
              "url": "https://www.wfmj.com/archives/data-center-to-occupy-small-part-of-lordstown-ai-hub-feature-advanced-design/article_533f268a-ec1d-5378-9ccb-ceec7d6d343e.html",
              "host": "wfmj.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json",
          "scope": "Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.",
          "fields": {},
          "notes": [
            "OpenAI originalSeptember23,2025announcement confirmsLordstownandMilamCountyTWOsitescan scaleTOGETHERto1.5GWover18months, not1.5GWeach/Lordstownceiling. Lordstowngroundbreakingand2026operatingtargethistoricalnotobservedRFS. Pairedcapacityisnotsite-specificIT.",
            "Nearly7GWplanned/$400Boverthreeyears/500B10GWcommitmentcoverbroaderStargateportfolio, notspentLordstowncapex oroperatingUScensus.4.5GWOracleagreement/5.5GWincludingpotential600MWexpansionareoverlappingscopes, notadditiveeveryfigure. October22,2025updateidentifiesMidwestsiteWisconsin, separateLordstown. AuthorclaimsAbileneearlyworkloadsnotLordstownoperation.",
            "Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."
          ],
          "sources": [
            {
              "url": "https://openai.com/index/five-new-stargate-sites/?trk=article-ssr-frontend-pulse_little-text-block",
              "host": "openai.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 62",
          "scope": "The complete original SoftBank publication is dated September 24, 2025 and carries a Texas September 23 dateline announcing the Lordstown Stargate selection. Its older reported groundbreaking and next year opening target do not independently establish present 2026 construction or computing service. Selected April 6, 2026 Village minutes distinguish a small Foxconn engineering demonstration, component manufacturing and storage from a full scale Stargate campus; the representative expressly limits his account to Foxconn property. The separately read October 20 Supreme Court opinion concerns Bristolville 25, not this inherited Stargate record. No factory activity, another project court outcome or old forecast becomes exact present computing status.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_stargate_announcement_factory_and_bristolville_subjects_separate_current_stage_held",
              "scope": "The complete original SoftBank publication is dated September 24, 2025 and carries a Texas September 23 dateline announcing the Lordstown Stargate selection. Its older reported groundbreaking and next year opening target do not independently establish present 2026 construction or computing service. Selected April 6, 2026 Village minutes distinguish a small Foxconn engineering demonstration, component manufacturing and storage from a full scale Stargate campus; the representative expressly limits his account to Foxconn property. The separately read October 20 Supreme Court opinion concerns Bristolville 25, not this inherited Stargate record. No factory activity, another project court outcome or old forecast becomes exact present computing status."
            },
            "source_read_scope": {
              "complete_original_softbank_joint_issuer_body_read": true,
              "texas_announcement_dateline_distinct_from_host_publication": true,
              "original_openai403_retained_without_alternate_openai_request": true,
              "original_lordstown_selected_physical_pages19_23_24_25_26_27_read": true,
              "foxconn_engineering_and_manufacturing_not_full_stargate_identity": true,
              "complete19page_original_october20_slip_opinion_read": true,
              "bristolville_case_not_stargate_outcome": true,
              "no_roles_locations_or_quantities_changed": true
            }
          },
          "notes": [
            "The complete original SoftBank publication is dated September 24, 2025 and carries a Texas September 23 dateline announcing the Lordstown Stargate selection. Its older reported groundbreaking and next year opening target do not independently establish present 2026 construction or computing service. Selected April 6, 2026 Village minutes distinguish a small Foxconn engineering demonstration, component manufacturing and storage from a full scale Stargate campus; the representative expressly limits his account to Foxconn property. The separately read October 20 Supreme Court opinion concerns Bristolville 25, not this inherited Stargate record. No factory activity, another project court outcome or old forecast becomes exact present computing status.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://group.softbank/en/news/press/20250924",
              "host": "group.softbank",
              "published": "2025-09-24",
              "date": "2025-09-24",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.lordstown.com/wp-content/uploads/April-6-2026-1.pdf",
              "host": "www.lordstown.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.supremecourt.ohio.gov/rod/docs/pdf/0/2026/2026-Ohio-4073.pdf",
              "host": "www.supremecourt.ohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lordstown · Trumbull · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-09-23",
          "text": "The original SoftBank joint issuer publication carries a Texas September 23, 2025 dateline announcing the Lordstown Stargate selection, with host publication on September 24. This dates the announcement account and does not establish the exact groundbreaking day or achievement of the projected 2026 opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://group.softbank/en/news/press/20250924",
              "host": "group.softbank",
              "published": "2025-09-24",
              "date": "2025-09-24",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39155"
      }
    },
    {
      "id": "stargate-port-washington-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Stargate Lighthouse Campus",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ozaukee"
      ],
      "city": "Port Washington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.",
      "date": "",
      "events": [
        [
          "2025-12-18",
          "The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
          "host": "vantage-dc.com",
          "date": "2025-10-22",
          "published": "2025-10-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
          "host": "revenue.wi.gov",
          "date": "2026-06-25",
          "published": "2026-06-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/",
          "host": "www.weitz.com",
          "published": "2025-12-18",
          "date": "2025-12-18",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.39307,
        "lng": -87.96147,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "campus_name": "Lighthouse",
            "planned_investment_usd_min_exclusive": 15000000000,
            "planned_data_centers": 4,
            "planned_ai_capacity_gw_approx": 1,
            "scheduled_completion_year": 2028,
            "total_acres": 672,
            "development_acres": 500,
            "regional_infrastructure_commitment_usd_min": 175000000,
            "forecast_construction_jobs_min_exclusive": 4000,
            "forecast_long_term_jobs_min_exclusive": 1000
          },
          "notes": [
            "Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
              "host": "vantage-dc.com",
              "date": "2025-10-22",
              "published": "2025-10-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Wisconsin named certificate register with scoped building descriptions",
          "fields": {
            "certification_register_as_of": "2025-10-31",
            "listed_certifications": [
              {
                "entity": "Epic Hosting LLC",
                "date": "2024-09-24",
                "location": "Milky Way,Verona,WI",
                "scope": "Utility Building3and additions"
              },
              {
                "entity": "Degas LLC",
                "date": "2025-02-18",
                "location": "County RoadA,Beaver Dam,WI",
                "scope": "to be constructed"
              },
              {
                "entity": "Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC",
                "date": "2025-10-31",
                "location": "Port Washington,WI",
                "scope": "four buildings at531,533,701and723E Lake Drive"
              }
            ]
          },
          "notes": [
            "Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
              "host": "revenue.wi.gov",
              "date": "2026-06-25",
              "published": "2026-06-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_contractor_reported_construction_with_future_completion_target",
              "scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted."
            }
          },
          "notes": [
            "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/",
              "host": "www.weitz.com",
              "published": "2025-12-18",
              "date": "2025-12-18",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Port Washington · Ozaukee · Source context reviewed",
      "status_scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.",
      "event_evidence": [
        {
          "date": "2025-12-18",
          "text": "The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/",
              "host": "www.weitz.com",
              "published": "2025-12-18",
              "date": "2025-12-18",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55089"
      }
    },
    {
      "id": "stargate-project-jupiter-dona-ana-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Stargate Project Jupiter",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dona Ana"
      ],
      "city": "Santa Teresa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition. 360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification. Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement. No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.",
      "date": "",
      "events": [
        [
          "2026-04-27",
          "Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/",
          "host": "elpasomatters.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
          "host": "oracle.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.35265,
        "lng": -106.83267,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition.",
            "360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/",
              "host": "elpasomatters.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement.",
            "No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
              "host": "oracle.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_explicit_jupiter_construction_account",
              "scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred."
            },
            "source_read_scope": {
              "complete_original_issuer_release_and_forward_looking_limits_read": true,
              "explicit_construction_not_inferred_from_power_design": true,
              "future_environmental_and_rate_assurances_not_measured_findings": true,
              "no_capacity_or_role_changes": true
            }
          },
          "notes": [
            "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
              "host": "www.oracle.com",
              "published": "2026-04-27",
              "date": "2026-04-27",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Santa Teresa · Dona Ana · Source context reviewed",
      "status_scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.",
      "event_evidence": [
        {
          "date": "2026-04-27",
          "text": "Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
              "host": "www.oracle.com",
              "published": "2026-04-27",
              "date": "2026-04-27",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35013"
      }
    },
    {
      "id": "stargate-saline-township-mi",
      "state": "mi",
      "kind": "facility",
      "name": "Stargate The Barn Campus",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washtenaw"
      ],
      "city": "Saline Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Michigan final storage-project approval, separate from DC IT. 1.383GWand332MWareENERGYSTORAGEpowernotSalineAIcriticalIToradditionalDCload.332isfirstsubsetoftotal1.383not1.715GW. Orderapprovesstorageandcontracts,notallDCconstructionorenergization. CustomerfundingundertheESAandno-rate-increasefindingforthisapprovalnotunlimitedfuturebillguarantee;costallocation/recoveryreservedforfutureappropriate ratecase. Storagecrediteligibilitycompanyclaimnotactualtaxcreditpaid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397",
          "host": "adms.apps.lara.state.mi.us",
          "date": "2026-03-27",
          "published": "2026-03-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.walbridge.com/about/news-events/news-item/walbridge-is-building-the-largest-project-in-its-110-year-history-right-here-in-michigan/",
          "host": "www.walbridge.com",
          "published": "2026-05-05",
          "date": "2026-05-05",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 42.22763,
        "lng": -83.83656,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Michigan final storage-project approval, separate from DC IT",
          "fields": {
            "regulator": "Michigan Public Service Commission",
            "case": "U-21990",
            "order_date": "2026-03-27",
            "action": "approvedColdCreek,FishCreek,PineRiverstorageprojectsandrelatedcontracts",
            "customer": "Green Chile Ventures LLC, Oracle subsidiary",
            "earlier_special_contract_approval_date": "2025-12-18",
            "dte_conditions_acceptance_date": "2026-01-15",
            "authorized_storage_resource_total_gw": 1.383,
            "storage_projects_this_order_mw": 332,
            "projects": [
              {
                "name": "Cold Creek",
                "county": "Branch, Michigan",
                "storage_dispatchable_mw": 100
              },
              {
                "name": "Fish Creek",
                "county": "Montcalm, Michigan",
                "storage_dispatchable_mw": 132
              },
              {
                "name": "Pine River",
                "county": "Gratiot, Michigan",
                "storage_dispatchable_mw": 100
              }
            ],
            "expected_storage_commercial_operation_no_later_than": "2027-Q2",
            "cost_allocation_recovery_method_approved_by_this_order": false
          },
          "notes": [
            "1.383GWand332MWareENERGYSTORAGEpowernotSalineAIcriticalIToradditionalDCload.332isfirstsubsetoftotal1.383not1.715GW. Orderapprovesstorageandcontracts,notallDCconstructionorenergization. CustomerfundingundertheESAandno-rate-increasefindingforthisapprovalnotunlimitedfuturebillguarantee;costallocation/recoveryreservedforfutureappropriate ratecase. Storagecrediteligibilitycompanyclaimnotactualtaxcreditpaid.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397",
              "host": "adms.apps.lara.state.mi.us",
              "date": "2026-03-27",
              "published": "2026-03-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Under construction",
              "basis": "Walbridge’s May 5, 2026 release identifies itself as general contractor for Related Digital’s Saline Township campus for Oracle and OpenAI and reports substantial trade work already completed at the site.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This is the contractor’s direct report of physical work. It is separate from the MPSC storage approvals and does not establish completed data halls, operational capacity, a precise first-work date or an unconditional customer-bill guarantee."
          },
          "notes": [
            "This is the contractor’s direct report of physical work. It is separate from the MPSC storage approvals and does not establish completed data halls, operational capacity, a precise first-work date or an unconditional customer-bill guarantee.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://www.walbridge.com/about/news-events/news-item/walbridge-is-building-the-largest-project-in-its-110-year-history-right-here-in-michigan/",
              "host": "www.walbridge.com",
              "published": "2026-05-05",
              "date": "2026-05-05",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Saline Township · Washtenaw · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. Walbridge’s May 5, 2026 release identifies itself as general contractor for Related Digital’s Saline Township campus for Oracle and OpenAI and reports substantial trade work already completed at the site. This is the contractor’s direct report of physical work. It is separate from the MPSC storage approvals and does not establish completed data halls, operational capacity, a precise first-work date or an unconditional customer-bill guarantee.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "26161"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}