{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    },
    "mi": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mi.json",
      "updated": "2026-10-24"
    },
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "switch",
    "label": "Switch"
  },
  "records": [
    {
      "id": "switch-apex-industrial-park-north-las-vegas-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Apex Industrial Park Land Position",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "North Las Vegas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. OonaMilliken NevadaIndependent publicmetadataJune17,2026: Switchbought300+acresApexNorthLasVegasforfutureDCdevelopment. Exactparcel/titleclosedate/currentconstructionunread; separate54acresouthernLasVegaspurchase/57000sfexpansionnotApexscope. HendersonJuly21consideration/180dayPROPOSEDpause inDIFFERENTcitynotApexban. Company17centerswordingambiguousgeography, notcertifiedUS/Clarksites. GoogleHenderson352Mgal2024sourceviaLVRJnotSwitchwater. Closedloop99%recyclednotzero use; waterlawcurrentapplicationnotcertified. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://thenevadaindependent.com/article/henderson-considers-data-center-pause-amid-construction-boom-across-clark-county",
          "host": "thenevadaindependent.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.18284,
        "lng": -115.19667,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "OonaMilliken NevadaIndependent publicmetadataJune17,2026: Switchbought300+acresApexNorthLasVegasforfutureDCdevelopment. Exactparcel/titleclosedate/currentconstructionunread; separate54acresouthernLasVegaspurchase/57000sfexpansionnotApexscope.",
            "HendersonJuly21consideration/180dayPROPOSEDpause inDIFFERENTcitynotApexban. Company17centerswordingambiguousgeography, notcertifiedUS/Clarksites. GoogleHenderson352Mgal2024sourceviaLVRJnotSwitchwater. Closedloop99%recyclednotzero use; waterlawcurrentapplicationnotcertified.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://thenevadaindependent.com/article/henderson-considers-data-center-pause-amid-construction-boom-across-clark-county",
              "host": "thenevadaindependent.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "North Las Vegas · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-atlanta-the-keep-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Switch Atlanta: The KEEP",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Lithia Springs",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/atlanta/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 33.69813,
        "lng": -84.79106,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "Switch currently markets colocation at its Atlanta KEEP campus. The page separately describes future expansion and up-to capacity upon completion. The label applies to campus service context, not every expansion building or delivered future MW."
            }
          },
          "notes": [
            "Switch currently markets colocation at its Atlanta KEEP campus. The page separately describes future expansion and up-to capacity upon completion. The label applies to campus service context, not every expansion building or delivered future MW."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/atlanta/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The existing Keep campus and the separately listed Keep 2.0 expansion stay distinct. Marketed Atlanta does not resolve municipal jurisdiction.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The existing Keep campus and the separately listed Keep 2.0 expansion stay distinct. Marketed Atlanta does not resolve municipal jurisdiction."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The existing Keep campus and the separately listed Keep 2.0 expansion stay distinct. Marketed Atlanta does not resolve municipal jurisdiction.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/atlanta/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lithia Springs · Douglas · Source context reviewed",
      "status_scope": "Switch currently markets colocation at its Atlanta KEEP campus. The page separately describes future expansion and up-to capacity upon completion. The label applies to campus service context, not every expansion building or delivered future MW.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "switch-citadel-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch CITADEL Campus",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only capture. HTTP200contains title only, no substantive captured campus specifications. This is not verification of claimed full-buildcapacity or currentoperation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/citadel/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/tahoe-reno/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 39.40249,
        "lng": -119.55218,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "title-only capture",
          "fields": {},
          "notes": [
            "HTTP200contains title only, no substantive captured campus specifications. This is not verification of claimed full-buildcapacity or currentoperation.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/citadel/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "Switch currently markets CITADEL campus colocation in Tahoe Reno, with future multi-gigawatt expansion described separately. The inherited approximate center and Storey display-outline discrepancy remain a location hold pending address and primary geography review; no point is moved to fit a polygon."
            }
          },
          "notes": [
            "Switch currently markets CITADEL campus colocation in Tahoe Reno, with future multi-gigawatt expansion described separately. The inherited approximate center and Storey display-outline discrepancy remain a location hold pending address and primary geography review; no point is moved to fit a polygon."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/tahoe-reno/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.switch.com/citadel/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. This is the campus record only. The source does not name Tahoe Reno 1, 2 or 3 and no role, service milestone or value is transferred to those separate records.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. This is the campus record only. The source does not name Tahoe Reno 1, 2 or 3 and no role, service milestone or value is transferred to those separate records."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. This is the campus record only. The source does not name Tahoe Reno 1, 2 or 3 and no role, service milestone or value is transferred to those separate records.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/tahoe-reno/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "status_scope": "Switch currently markets CITADEL campus colocation in Tahoe Reno, with future multi-gigawatt expansion described separately. The inherited approximate center and Storey display-outline discrepancy remain a location hold pending address and primary geography review; no point is moved to fit a polygon.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-edge-1-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Edge 1",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Las Vegas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.104,
        "lng": -114.83977,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "unmatched Switch deployment context only",
          "fields": {},
          "notes": [
            "Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The Switch/CoreWeave announcement does not name EDGE 1. Deployment elsewhere at Switch is not this building’s status."
            }
          },
          "notes": [
            "The Switch/CoreWeave announcement does not name EDGE 1. Deployment elsewhere at Switch is not this building’s status."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete original Switch account says CoreWeave deployed the GB300 platform within Switch AI Factory infrastructure. The substantive text does not independently identify the inherited exact building code. A running workload elsewhere within a provider network does not establish service at this specific component or certify an entire campus. The earlier November 2024 installation reference is a month only account, not an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "provider_ai_workload_account_exact_building_code_held",
              "scope": "The complete original Switch account says CoreWeave deployed the GB300 platform within Switch AI Factory infrastructure. The substantive text does not independently identify the inherited exact building code. A running workload elsewhere within a provider network does not establish service at this specific component or certify an entire campus. The earlier November 2024 installation reference is a month only account, not an exact opening day."
            },
            "source_read_scope": {
              "complete_original_substantive_release_body_read": true,
              "shared_primary_source_not_multiple_building_verification": true,
              "exact_building_code_unverified": true,
              "no_first_opening_or_capacity_export": true
            }
          },
          "notes": [
            "The complete original Switch account says CoreWeave deployed the GB300 platform within Switch AI Factory infrastructure. The substantive text does not independently identify the inherited exact building code. A running workload elsewhere within a provider network does not establish service at this specific component or certify an entire campus. The earlier November 2024 installation reference is a month only account, not an exact opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Las Vegas · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-keep-2-atlanta-north-cartersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Switch KEEP 2.0 Atlanta North Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Switch phased regional-impact application. 126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061",
          "host": "apps.dca.ga.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/atlanta/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party exact campus text, scoped provider relationship reviewed"
        }
      ],
      "loc": {
        "lat": 34.23145,
        "lng": -84.87327,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Switch phased regional-impact application",
          "fields": {
            "dri_id": "4061",
            "project_name": "SwitchKEEP2.0AtlantaNorthCampus",
            "initial_phase_site_acres": 126,
            "initial_phase_buildings": 1,
            "initial_phase_completion_target": "2026-Q2",
            "overall_project_completion_target_year": 2046,
            "published_location_description": "south ofOldAlabamaRoad/BatesRoad intersection towardPauldingCountyline,CityofCartersville"
          },
          "notes": [
            "126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061",
              "host": "apps.dca.ga.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/atlanta/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "switch-las-19-enterprise-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch LAS 19",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Enterprise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Zoning approval is not operating availability or critical IT; no MW disclosed. Existing campus area above 2 million squarefeet is separate from the expansion. Under 1,000 gallons/day is developer estimate of public water for bathrooms/kitchenettes with proposed closed-loop cooling, not independently metered lifetime or all-source consumption. Audet substation supply description is not examined executed service. Other Nevada counts, regional 5900 MW forecasts, DRI water-equivalence comparisons and Google Henderson 205 million-gallon 2024 use cannot be assigned to this Switch expansion. Henderson future vote/other cities’ policies are separate jurisdictions and not original ordinance reviews. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://lasvegassun.com/news/2026/jun/23/switch-wins-las-vegas-expansion-approval-even-as-d/",
          "host": "lasvegassun.com",
          "date": "2026-06-23",
          "published": "2026-06-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.43402,
        "lng": -115.07325,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Las Vegas Sun reports Clark County unanimously approved Switch’s 56,800-square-foot/nine-acre expansion onJune 17, with landscaping/tree waiver withdrawn and pedestrian-barrier commitment.",
            "independently_verified_current_operating_status": null,
            "reported_zoning_approval_date": "2026-06-17",
            "reported_additional_building_sqft": 56800,
            "operating_expansion_verified": false
          },
          "notes": [
            "Zoning approval is not operating availability or critical IT; no MW disclosed. Existing campus area above 2 million squarefeet is separate from the expansion. Under 1,000 gallons/day is developer estimate of public water for bathrooms/kitchenettes with proposed closed-loop cooling, not independently metered lifetime or all-source consumption. Audet substation supply description is not examined executed service. Other Nevada counts, regional 5900 MW forecasts, DRI water-equivalence comparisons and Google Henderson 205 million-gallon 2024 use cannot be assigned to this Switch expansion. Henderson future vote/other cities’ policies are separate jurisdictions and not original ordinance reviews.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://lasvegassun.com/news/2026/jun/23/switch-wins-las-vegas-expansion-approval-even-as-d/",
              "host": "lasvegassun.com",
              "date": "2026-06-23",
              "published": "2026-06-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Enterprise · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-las-vegas-10-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Las Vegas 10",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Las Vegas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.99776,
        "lng": -115.12726,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "unmatched Switch deployment context only",
          "fields": {},
          "notes": [
            "Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The Switch/CoreWeave announcement does not name LAS VEGAS 10. Company-wide deployment is not building-level evidence."
            }
          },
          "notes": [
            "The Switch/CoreWeave announcement does not name LAS VEGAS 10. Company-wide deployment is not building-level evidence."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete original Switch account says CoreWeave deployed the GB300 platform within Switch AI Factory infrastructure. The substantive text does not independently identify the inherited exact building code. A running workload elsewhere within a provider network does not establish service at this specific component or certify an entire campus. The earlier November 2024 installation reference is a month only account, not an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "provider_ai_workload_account_exact_building_code_held",
              "scope": "The complete original Switch account says CoreWeave deployed the GB300 platform within Switch AI Factory infrastructure. The substantive text does not independently identify the inherited exact building code. A running workload elsewhere within a provider network does not establish service at this specific component or certify an entire campus. The earlier November 2024 installation reference is a month only account, not an exact opening day."
            },
            "source_read_scope": {
              "complete_original_substantive_release_body_read": true,
              "shared_primary_source_not_multiple_building_verification": true,
              "exact_building_code_unverified": true,
              "no_first_opening_or_capacity_export": true
            }
          },
          "notes": [
            "The complete original Switch account says CoreWeave deployed the GB300 platform within Switch AI Factory infrastructure. The substantive text does not independently identify the inherited exact building code. A running workload elsewhere within a provider network does not establish service at this specific component or certify an entire campus. The earlier November 2024 installation reference is a month only account, not an exact opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Las Vegas · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-las-vegas-11-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Las Vegas 11",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Las Vegas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.30488,
        "lng": -114.76849,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "unmatched Switch deployment context only",
          "fields": {},
          "notes": [
            "Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The Switch/CoreWeave announcement does not name LAS VEGAS 11. Company-wide deployment is not building-level evidence."
            }
          },
          "notes": [
            "The Switch/CoreWeave announcement does not name LAS VEGAS 11. Company-wide deployment is not building-level evidence."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_ai_workload_exact_numbered_building_held",
              "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day."
            },
            "source_read_scope": {
              "complete_original_substantive_release_body_read": true,
              "same_actual_raw_capture_reused": true,
              "building_code_not_independently_identified": true,
              "no_new_capacity_opening_role_or_location_claim": true
            }
          },
          "notes": [
            "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Las Vegas · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-las-vegas-12-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Las Vegas 12",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Las Vegas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.32102,
        "lng": -115.27105,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Switch’s sustainability page describes broader Nevada energy and historical design claims, not LAS VEGAS 12 completion or operation."
            }
          },
          "notes": [
            "Switch’s sustainability page describes broader Nevada energy and historical design claims, not LAS VEGAS 12 completion or operation."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete original Switch sustainable design body describes Nevada solar projects and broad campus efficiency and energy claims. The selected body does not independently identify the exact LAS12 computing component or its present physical stage. Energy generation, a provider wide environmental claim and a dated award reference do not establish this building commissioned or closed. No estimated performance or renewable energy quantity is adopted as measured site fact.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_sustainability_account_exact_las12_stage_held",
              "scope": "The complete original Switch sustainable design body describes Nevada solar projects and broad campus efficiency and energy claims. The selected body does not independently identify the exact LAS12 computing component or its present physical stage. Energy generation, a provider wide environmental claim and a dated award reference do not establish this building commissioned or closed. No estimated performance or renewable energy quantity is adopted as measured site fact."
            },
            "source_read_scope": {
              "complete_original_substantive_design_body_read": true,
              "no_form_or_map_opened": true,
              "provider_wide_energy_claim_not_exact_building_service": true,
              "no_measured_performance_export": true
            }
          },
          "notes": [
            "The complete original Switch sustainable design body describes Nevada solar projects and broad campus efficiency and energy claims. The selected body does not independently identify the exact LAS12 computing component or its present physical stage. Energy generation, a provider wide environmental claim and a dated award reference do not establish this building commissioned or closed. No estimated performance or renewable energy quantity is adopted as measured site fact.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Las Vegas · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-las-vegas-5-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Las Vegas 5",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Las Vegas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.94998,
        "lng": -114.89034,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "unmatched Switch deployment context only",
          "fields": {},
          "notes": [
            "Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The Switch/CoreWeave announcement does not name LAS VEGAS 5. Company-wide deployment is not building-level evidence."
            }
          },
          "notes": [
            "The Switch/CoreWeave announcement does not name LAS VEGAS 5. Company-wide deployment is not building-level evidence."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_ai_workload_exact_numbered_building_held",
              "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day."
            },
            "source_read_scope": {
              "complete_original_substantive_release_body_read": true,
              "same_actual_raw_capture_reused": true,
              "building_code_not_independently_identified": true,
              "no_new_capacity_opening_role_or_location_claim": true
            }
          },
          "notes": [
            "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Las Vegas · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-las-vegas-7-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Las Vegas 7",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Enterprise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.50798,
        "lng": -114.92252,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "unmatched Switch deployment context only",
          "fields": {},
          "notes": [
            "Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The Switch/CoreWeave announcement does not name LAS VEGAS 7. Company-wide deployment is not building-level evidence."
            }
          },
          "notes": [
            "The Switch/CoreWeave announcement does not name LAS VEGAS 7. Company-wide deployment is not building-level evidence."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_ai_workload_exact_numbered_building_held",
              "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day."
            },
            "source_read_scope": {
              "complete_original_substantive_release_body_read": true,
              "same_actual_raw_capture_reused": true,
              "building_code_not_independently_identified": true,
              "no_new_capacity_opening_role_or_location_claim": true
            }
          },
          "notes": [
            "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Enterprise · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-las-vegas-9-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Las Vegas 9",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Las Vegas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unmatched Switch deployment context only. Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.05432,
        "lng": -115.2918,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "unmatched Switch deployment context only",
          "fields": {},
          "notes": [
            "Corporate deployment article identifies no exact Las Vegas building or street. GPU platform names are not electrical MW and cannot verify six bound facility records. November 2024 is a previous GB200 announcement, not the GB300 deployment date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The Switch/CoreWeave announcement does not name LAS VEGAS 9. Company-wide deployment is not building-level evidence."
            }
          },
          "notes": [
            "The Switch/CoreWeave announcement does not name LAS VEGAS 9. Company-wide deployment is not building-level evidence."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_ai_workload_exact_numbered_building_held",
              "scope": "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day."
            },
            "source_read_scope": {
              "complete_original_substantive_release_body_read": true,
              "same_actual_raw_capture_reused": true,
              "building_code_not_independently_identified": true,
              "no_new_capacity_opening_role_or_location_claim": true
            }
          },
          "notes": [
            "The complete retained original Switch account describes a CoreWeave GB300 deployment within Switch AI Factory infrastructure without independently identifying this exact inherited building code. This is the same actual primary capture reviewed for related records, rather than separate verification of each building. A current workload somewhere in a provider network does not certify every campus component, and the older month only installation reference does not establish an exact opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/coreweave-deploys-industry-first-nvidia-gb300-nvl72-in-switchs-ai-factory-solution/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Las Vegas · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32003"
      }
    },
    {
      "id": "switch-pyramid-campus-grand-rapids-mi",
      "state": "mi",
      "kind": "facility",
      "name": "Switch Pyramid Campus",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kent"
      ],
      "city": "Gaines Township",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Publicationdate from article:published_time, not2024modifieddate. Firstphaseopen does not energize full320MWdesign. Power basis not explicitlyIT. Later2017grandopeningceremony is not first operatingdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. 2017proposal does not establish current tariff approval, measured renewable supply or campusMW.1.8Marea describes planned campus, not completed firstphase.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/",
          "host": "switch.com",
          "date": "2017-03-09",
          "published": "2017-03-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/switch-leads-consumers-energys-program-bring-100-renewable-energy-michigan-businesses/",
          "host": "switch.com",
          "date": "2017-05-15",
          "published": "2017-05-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/grand-rapids/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party exact campus text, scoped provider relationship reviewed"
        },
        {
          "url": "https://www.switch.com/schneider-electric-and-switch-expand-partnership-with-1-9-billion-supply-capacity-agreement-to-power-ai-factories/",
          "host": "www.switch.com",
          "published": "2025-11-19",
          "date": "2025-11-19",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.06521,
        "lng": -85.52395,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "first_phase_opening_announcement_date": "2017-03-09",
            "full_campus_design_area_sqft_max": 1800000,
            "full_campus_design_power_mw_max": 320,
            "first_phase_design_area_sqft_min_exclusive": 225000,
            "subsequent_grand_rapids1_planned_area_sqft": 471248
          },
          "notes": [
            "Publicationdate from article:published_time, not2024modifieddate. Firstphaseopen does not energize full320MWdesign. Power basis not explicitlyIT. Later2017grandopeningceremony is not first operatingdate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/",
              "host": "switch.com",
              "date": "2017-03-09",
              "published": "2017-03-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_reported_opening_month": "2017-03",
            "historical_renewable_program_stage": "proposed to Michigan PSC"
          },
          "notes": [
            "2017proposal does not establish current tariff approval, measured renewable supply or campusMW.1.8Marea describes planned campus, not completed firstphase.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-leads-consumers-energys-program-bring-100-renewable-energy-michigan-businesses/",
              "host": "switch.com",
              "date": "2017-05-15",
              "published": "2017-05-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The current page explicitly names Pyramid. The older first phase opening story is not used as a current whole campus operating or completion finding.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The current page explicitly names Pyramid. The older first phase opening story is not used as a current whole campus operating or completion finding."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The current page explicitly names Pyramid. The older first phase opening story is not used as a current whole campus operating or completion finding.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/grand-rapids/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 52",
          "scope": "The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_campus_service",
              "scope": "The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented."
            },
            "source_read_scope": {
              "selected_sections": [
                "Current Grand Rapids campus account",
                "November 2025 release operating campus paragraph",
                "Historical first phase opening and later planned buildings"
              ],
              "all_future_phases_not_operating": true,
              "technical_quantities_not_exported": true
            }
          },
          "notes": [
            "The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/grand-rapids/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.switch.com/schneider-electric-and-switch-expand-partnership-with-1-9-billion-supply-capacity-agreement-to-power-ai-factories/",
              "host": "www.switch.com",
              "published": "2025-11-19",
              "date": "2025-11-19",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gaines Township · Kent · Source context reviewed",
      "status_scope": "The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "26081"
      }
    },
    {
      "id": "switch-tahoe-reno-1-the-citadel-campus-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Tahoe Reno 1 (The Citadel Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
          "host": "switch.com",
          "date": "2020-07-21",
          "published": "2020-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.46521,
        "lng": -119.47891,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "offsite/behind-meter generation portfolio, not IT capacity",
          "fields": {
            "project_type": "solar and battery development portfolio",
            "solar_power_mw_portfolio": 555,
            "battery_energy_mwh_portfolio": 800,
            "storey_solar_power_mw": 127,
            "storey_battery_energy_mwh": 240
          },
          "notes": [
            "Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "switch.com",
              "date": "2020-07-21",
              "published": "2020-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete original Switch article describes solar and battery development groundbreakings and refers broadly to the Tahoe Reno provider ecosystem. It does not independently establish current commissioned computing at the inherited Tahoe Reno 1 component. Solar construction, battery capacity and the older market description are not transferred to a specific data center building, and no exact article day or present computing stage is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_energy_groundbreaking_exact_compute_component_held",
              "scope": "The complete original Switch article describes solar and battery development groundbreakings and refers broadly to the Tahoe Reno provider ecosystem. It does not independently establish current commissioned computing at the inherited Tahoe Reno 1 component. Solar construction, battery capacity and the older market description are not transferred to a specific data center building, and no exact article day or present computing stage is inferred."
            },
            "source_read_scope": {
              "complete_original_energy_release_text_read": true,
              "energy_project_not_computing_building": true,
              "undated_article_not_exact_event": true,
              "capacity_roles_and_locations_unchanged": true
            }
          },
          "notes": [
            "The complete original Switch article describes solar and battery development groundbreakings and refers broadly to the Tahoe Reno provider ecosystem. It does not independently establish current commissioned computing at the inherited Tahoe Reno 1 component. Solar construction, battery capacity and the older market description are not transferred to a specific data center building, and no exact article day or present computing stage is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-tahoe-reno-2-the-citadel-campus-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Tahoe Reno 2 (The Citadel Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
          "host": "switch.com",
          "date": "2020-07-21",
          "published": "2020-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.4685,
        "lng": -119.58154,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "offsite/behind-meter generation portfolio, not IT capacity",
          "fields": {
            "project_type": "solar and battery development portfolio",
            "solar_power_mw_portfolio": 555,
            "battery_energy_mwh_portfolio": 800,
            "storey_solar_power_mw": 127,
            "storey_battery_energy_mwh": 240
          },
          "notes": [
            "Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "switch.com",
              "date": "2020-07-21",
              "published": "2020-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_energy_development_exact_tahoe_numbered_building_held",
              "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events."
            },
            "source_read_scope": {
              "complete_original_energy_release_text_read": true,
              "same_actual_raw_capture_reused": true,
              "energy_projects_not_numbered_compute_buildings": true,
              "no_exact_opening_or_capacity_export": true
            }
          },
          "notes": [
            "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-tahoe-reno-3-the-citadel-campus-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Tahoe Reno 3 (The Citadel Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
          "host": "switch.com",
          "date": "2020-07-21",
          "published": "2020-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.39274,
        "lng": -119.5038,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "offsite/behind-meter generation portfolio, not IT capacity",
          "fields": {
            "project_type": "solar and battery development portfolio",
            "solar_power_mw_portfolio": 555,
            "battery_energy_mwh_portfolio": 800,
            "storey_solar_power_mw": 127,
            "storey_battery_energy_mwh": 240
          },
          "notes": [
            "Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "switch.com",
              "date": "2020-07-21",
              "published": "2020-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_energy_development_exact_tahoe_numbered_building_held",
              "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events."
            },
            "source_read_scope": {
              "complete_original_energy_release_text_read": true,
              "same_actual_raw_capture_reused": true,
              "energy_projects_not_numbered_compute_buildings": true,
              "no_exact_opening_or_capacity_export": true
            }
          },
          "notes": [
            "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-the-rock-round-rock-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Switch: The Rock (Round Rock)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Williamson"
      ],
      "city": "Round Rock",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
      "date": "",
      "events": [
        [
          "2021-06-02",
          "Switch published its planned Rock campus announcement on June 2, 2021. The original account describes a planned campus and anticipated site preparation, without independently establishing accomplished construction, computing service or a first opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/",
          "host": "switch.com",
          "date": "2021-06-02",
          "published": "2021-06-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/austin/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 30.66469,
        "lng": -97.61875,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "historical_planned_round_rock_area_sqft_min_exclusive": 1500000,
            "historical_site_preparation_target": "2021summer",
            "regional_power_mw": 185,
            "regional_power_scope": "Texas ecosystem including acquired Austin and Houston properties"
          },
          "notes": [
            "185MWnot RoundRock-onlycapacity.60MWand500karea belong acquiredDataFoundryproperties. Announced2021sitework not currentdeliveredstatus.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/",
              "host": "switch.com",
              "date": "2021-06-02",
              "published": "2021-06-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The June 2, 2021 announcement names The Rock beside Dell headquarters in Round Rock. Its site preparation and future capacity targets are historical intentions, not events verified to have happened. Austin is a marketed region and the Data Foundry acquisition is a separate component.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The June 2, 2021 announcement names The Rock beside Dell headquarters in Round Rock. Its site preparation and future capacity targets are historical intentions, not events verified to have happened. Austin is a marketed region and the Data Foundry acquisition is a separate component."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The June 2, 2021 announcement names The Rock beside Dell headquarters in Round Rock. Its site preparation and future capacity targets are historical intentions, not events verified to have happened. Austin is a marketed region and the Data Foundry acquisition is a separate component.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/",
              "host": "www.switch.com",
              "published": "2021-06-02",
              "date": "2021-06-02",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 64",
          "scope": "The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_rock_proposal_not_datafoundry_operation",
              "scope": "The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event."
            },
            "source_read_scope": {
              "complete_original2021_announcement_body_read": true,
              "selected_original_current_austin_body_read": true,
              "datafoundry_operations_not_forced_rock_service": true,
              "summer2021_forecast_not_accomplished": true
            }
          },
          "notes": [
            "The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/",
              "host": "www.switch.com",
              "published": "2021-06-02",
              "date": "2021-06-02",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.switch.com/austin/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Round Rock · Williamson · Source context reviewed",
      "status_scope": "The complete original June 2, 2021 Switch announcement identifies the planned Rock campus at the Dell headquarters area. The current Austin page repeats the Rock identity and anticipated growth, separately describing acquired Data Foundry Austin and Houston service. This supports a listed proposal without independently establishing current Rock construction, commissioned computing or a first opening day. Existing Data Foundry operations and undated power, security and connectivity specifications are not transferred to the Rock. The older summer site preparation forecast is not an accomplished event.",
      "event_evidence": [
        {
          "date": "2021-06-02",
          "text": "Switch published its planned Rock campus announcement on June 2, 2021. The original account describes a planned campus and anticipated site preparation, without independently establishing accomplished construction, computing service or a first opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/",
              "host": "www.switch.com",
              "published": "2021-06-02",
              "date": "2021-06-02",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48491"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
