  "schema_version": 1,
  "source_compilation_context": {
    "ca": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ca.json",
      "updated": "2026-10-25"
    },
    "co": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/co.json",
      "updated": "2026-10-26"
    },
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    },
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    },
    "mn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mn.json",
      "updated": "2026-10-24"
    },
    "nc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nc.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "t5",
    "label": "T5 Data Centers"
  },
  "records": [
    {
      "id": "t5-atlanta-iv-palmetto-ga",
      "state": "ga",
      "kind": "facility",
      "name": "T5 @ Atlanta IV",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Palmetto",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://t5datacenters.com/locations/t5-atlanta-iv/",
          "host": "t5datacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Access-check target"
        },
        {
          "url": "https://t5datacenters.com/locations/",
          "host": "t5datacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 33.81838,
        "lng": -84.47496,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {},
          "notes": [
            "The old Atlanta IV URL is unavailable, and the current T5 locations page yielded a category shell without named campus content in the ordinary browser view. Search-index wording is not current captured evidence. No closure is inferred. This attempt receives no freshness credit or stage change."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/locations/t5-atlanta-iv/",
              "host": "t5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            },
            {
              "url": "https://t5datacenters.com/locations/",
              "host": "t5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Palmetto · Fulton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "t5-charlotte-nc",
      "state": "nc",
      "kind": "facility",
      "name": "T5@Charlotte",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cleveland"
      ],
      "city": "Kings Mountain",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. 2022reportdoesnot independentlyestablish2026status or exactaddress. Perfect assessmentscore isnot measured uptime guarantee. OperatorSeptember14,2022reportsM&OStampofApprovalrenewalforT5Charlotte;differentfromTierdesign/facilitycertificate. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2022-09-14",
          "T5 Data Centers published its Charlotte Management and Operations renewal account September 14, 2022. This dates the provider publication, not an independently verified assessment day, a Tier certification, physical opening or present computing service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://t5datacenters.com/resources/t5-charlotte-stamp-of-approval/",
          "host": "t5datacenters.com",
          "date": "2022-09-14",
          "published": "2022-09-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.33366,
        "lng": -81.55547,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "historic_operation_evidence_date": "2022-09-14",
            "assessment": "Uptime M&O Stamp of Approval renewal"
          },
          "notes": [
            "2022reportdoesnot independentlyestablish2026status or exactaddress.",
            "Perfect assessmentscore isnot measured uptime guarantee.",
            "OperatorSeptember14,2022reportsM&OStampofApprovalrenewalforT5Charlotte;differentfromTierdesign/facilitycertificate.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-charlotte-stamp-of-approval/",
              "host": "t5datacenters.com",
              "date": "2022-09-14",
              "published": "2022-09-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 57",
          "scope": "The original September 14, 2022 provider account describes a Management and Operations Stamp of Approval renewal at T5 Charlotte and historical facility management. It does not establish present computing service, a current certification, an exact original opening day or independent current Uptime Institute verification. The old location link returned an ordinary observed redirect whose destination was HTTP 404. That missing page is not evidence of physical closure or a provider identity change. No rating, Tier, role or technical field is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_provider_account_current_service_held",
              "scope": "The original September 14, 2022 provider account describes a Management and Operations Stamp of Approval renewal at T5 Charlotte and historical facility management. It does not establish present computing service, a current certification, an exact original opening day or independent current Uptime Institute verification. The old location link returned an ordinary observed redirect whose destination was HTTP 404. That missing page is not evidence of physical closure or a provider identity change. No rating, Tier, role or technical field is promoted."
            },
            "source_read_scope": {
              "original_provider_date_and_historical_assessment_account_read": true,
              "m_and_o_not_tier_certification": true,
              "ordinary_location_redirect_then404_retained": true,
              "http404_not_physical_closure": true,
              "current_original_service_page_not_verified": true
            }
          },
          "notes": [
            "The original September 14, 2022 provider account describes a Management and Operations Stamp of Approval renewal at T5 Charlotte and historical facility management. It does not establish present computing service, a current certification, an exact original opening day or independent current Uptime Institute verification. The old location link returned an ordinary observed redirect whose destination was HTTP 404. That missing page is not evidence of physical closure or a provider identity change. No rating, Tier, role or technical field is promoted.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-charlotte-stamp-of-approval/",
              "host": "t5datacenters.com",
              "published": "2022-09-14",
              "date": "2022-09-14",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kings Mountain · Cleveland · Source context reviewed",
      "event_evidence": [
        {
          "date": "2022-09-14",
          "text": "T5 Data Centers published its Charlotte Management and Operations renewal account September 14, 2022. This dates the provider publication, not an independently verified assessment day, a Tier certification, physical opening or present computing service.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-charlotte-stamp-of-approval/",
              "host": "t5datacenters.com",
              "published": "2022-09-14",
              "date": "2022-09-14",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "37045"
      }
    },
    {
      "id": "t5-chicago-ii-il",
      "state": "il",
      "kind": "facility",
      "name": "T5 Chicago II",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cook"
      ],
      "city": "Elk Grove Village",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2022-11-08",
          "T5 published its Chicago II second phase and availability release on November 8, 2022. The account describes leasing and future delivery. This is the publication date, not a first opening or proof that the full forecast phase became available."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
          "host": "dceo.illinois.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://t5datacenters.com/resources/t5-chicagoii-final-phase/",
          "host": "t5datacenters.com",
          "published": "2022-11-08",
          "date": "2022-11-08",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://t5datacenters.com/locations/",
          "host": "t5datacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.70845,
        "lng": -87.83399,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations",
          "fields": {
            "program_report_year": 2025,
            "program_register_as_of": "2025-12-31",
            "applications_received": 35,
            "approved_owner_operator_applications": 34,
            "operator_certificates_issued": 34,
            "tenant_certificates_issued": 91,
            "construction_credit_certificates_issued": 0,
            "total_investment_commitments_usd": 10665815092,
            "estimated_tax_benefits_usd": 666613443,
            "estimated_tax_benefit_calculation_percent": 6.25,
            "listed_new_job_commitments": 731,
            "investment_commitment_period_months": 60
          },
          "notes": [
            "34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S3-Illinois-DCEO-2025-20261015",
          "scope": "Illinois DCEO 2025 program entry for T5@Chicago II, LLC in Elk Grove Village. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.",
          "fields": {
            "reported_program_party": "T5@Chicago II, LLC",
            "reported_program_locality": "Elk Grove Village",
            "mou_year_reported": 2020,
            "program_report_as_of": "2025-12-31",
            "investment_commitment_usd": 250000000,
            "formula_based_tax_benefit_estimate_usd": 15625000,
            "new_jobs_in_program_table": 20,
            "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.",
            "program_identity_scope": "Explicit facility designation or company/locality association with the existing T5 Chicago II research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."
          },
          "notes": [
            "The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.",
            "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.",
            "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 17",
          "scope": "T5 November 8, 2022 release describes a leased first phase and plans for a second phase at Chicago II in Elk Grove Village. Leasing, turnkey availability within a future period and security specifications are not an explicit current operating account. The current directory render has no individual Chicago project cards. Exact current physical phase, later delivery and any subsequent operator association remain unclear. A historical completed projects listing from search is not substituted for the captured current directory.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_leasing_and_future_phase_not_current_operating_status",
              "scope": "T5 November 8, 2022 release describes a leased first phase and plans for a second phase at Chicago II in Elk Grove Village. Leasing, turnkey availability within a future period and security specifications are not an explicit current operating account. The current directory render has no individual Chicago project cards. Exact current physical phase, later delivery and any subsequent operator association remain unclear. A historical completed projects listing from search is not substituted for the captured current directory."
            }
          },
          "notes": [
            "T5 November 8, 2022 release describes a leased first phase and plans for a second phase at Chicago II in Elk Grove Village. Leasing, turnkey availability within a future period and security specifications are not an explicit current operating account. The current directory render has no individual Chicago project cards. Exact current physical phase, later delivery and any subsequent operator association remain unclear. A historical completed projects listing from search is not substituted for the captured current directory.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-chicagoii-final-phase/",
              "host": "t5datacenters.com",
              "published": "2022-11-08",
              "date": "2022-11-08",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://t5datacenters.com/locations/",
              "host": "t5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Elk Grove Village · Cook · Source context reviewed",
      "event_evidence": [
        {
          "date": "2022-11-08",
          "text": "T5 published its Chicago II second phase and availability release on November 8, 2022. The account describes leasing and future delivery. This is the publication date, not a first opening or proof that the full forecast phase became available.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-chicagoii-final-phase/",
              "host": "t5datacenters.com",
              "published": "2022-11-08",
              "date": "2022-11-08",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17031"
      }
    },
    {
      "id": "t5-chicago-iii-northlake-il",
      "state": "il",
      "kind": "facility",
      "name": "T5 @ Chicago III (Northlake)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cook"
      ],
      "city": "Northlake",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2023-10-03",
          "T5 published its Chicago III Northlake acquisition announcement on October 3, 2023. An acquisition and future development plan are not an exact construction start or opening."
        ],
        [
          "2025-04-03",
          "Clune published an account of visits to its active Prime Elk Grove and T5 Northlake construction projects on April 3, 2025. This is the report publication day; the exact tour day, later completion and operation are not established by that account."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
          "host": "dceo.illinois.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://t5datacenters.com/resources/t5-data-centers-acquires-third-location-in-tier-one-chicago-market/",
          "host": "t5datacenters.com",
          "published": "2023-10-03",
          "date": "2023-10-03",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.clunegc.com/chicago-sun-times-chicago-areas-data-center-push-continues-as-developer-t5-breaks-ground-on-northlake-facility/",
          "host": "www.clunegc.com",
          "published": "2024-09-07",
          "date": "2024-09-07",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.clunegc.com/clune-celebrates-international-data-center-day-with-revolution-workshop/",
          "host": "www.clunegc.com",
          "published": "2025-04-03",
          "date": "2025-04-03",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://t5datacenters.com/locations/",
          "host": "t5datacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.92816,
        "lng": -87.71225,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations",
          "fields": {
            "program_report_year": 2025,
            "program_register_as_of": "2025-12-31",
            "applications_received": 35,
            "approved_owner_operator_applications": 34,
            "operator_certificates_issued": 34,
            "tenant_certificates_issued": 91,
            "construction_credit_certificates_issued": 0,
            "total_investment_commitments_usd": 10665815092,
            "estimated_tax_benefits_usd": 666613443,
            "estimated_tax_benefit_calculation_percent": 6.25,
            "listed_new_job_commitments": 731,
            "investment_commitment_period_months": 60
          },
          "notes": [
            "34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S3-Illinois-DCEO-2025-20261015",
          "scope": "Illinois DCEO 2025 program entry for T5@Chicago III, LP in Northlake. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.",
          "fields": {
            "reported_program_party": "T5@Chicago III, LP",
            "reported_program_locality": "Northlake",
            "mou_year_reported": 2024,
            "program_report_as_of": "2025-12-31",
            "investment_commitment_usd": 252000000,
            "formula_based_tax_benefit_estimate_usd": 15750000,
            "new_jobs_in_program_table": 20,
            "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.",
            "program_identity_scope": "Explicit facility designation or company/locality association with the existing T5 @ Chicago III (Northlake) research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."
          },
          "notes": [
            "The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.",
            "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.",
            "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 17",
          "scope": "T5 announced the Northlake Chicago III acquisition on October 3, 2023. Clune subsequently identified it as its construction project and described an active project visit in its April 3, 2025 report. Those sources establish historical project and construction accounts, while their completion targets remain forecasts. The current T5 directory has category headings without individual Chicago cards in both captured HTML and an anonymous headless render. Exact current physical phase and operation remain unclear; the missing cards do not establish closure or a new provider role.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_named_construction_accounts_current_phase_held",
              "scope": "T5 announced the Northlake Chicago III acquisition on October 3, 2023. Clune subsequently identified it as its construction project and described an active project visit in its April 3, 2025 report. Those sources establish historical project and construction accounts, while their completion targets remain forecasts. The current T5 directory has category headings without individual Chicago cards in both captured HTML and an anonymous headless render. Exact current physical phase and operation remain unclear; the missing cards do not establish closure or a new provider role."
            },
            "source_scope": {
              "current_directory_no_individual_chicago_cards": true,
              "headless_directory_receipt": "cohort-17-t5-rendered-directory.json",
              "contractor_report_period": "April 2025",
              "historical_construction_not_current_operation": true,
              "contractor_completion_forecast_not_actual_delivery": true
            }
          },
          "notes": [
            "T5 announced the Northlake Chicago III acquisition on October 3, 2023. Clune subsequently identified it as its construction project and described an active project visit in its April 3, 2025 report. Those sources establish historical project and construction accounts, while their completion targets remain forecasts. The current T5 directory has category headings without individual Chicago cards in both captured HTML and an anonymous headless render. Exact current physical phase and operation remain unclear; the missing cards do not establish closure or a new provider role.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-data-centers-acquires-third-location-in-tier-one-chicago-market/",
              "host": "t5datacenters.com",
              "published": "2023-10-03",
              "date": "2023-10-03",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.clunegc.com/chicago-sun-times-chicago-areas-data-center-push-continues-as-developer-t5-breaks-ground-on-northlake-facility/",
              "host": "www.clunegc.com",
              "published": "2024-09-07",
              "date": "2024-09-07",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.clunegc.com/clune-celebrates-international-data-center-day-with-revolution-workshop/",
              "host": "www.clunegc.com",
              "published": "2025-04-03",
              "date": "2025-04-03",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://t5datacenters.com/locations/",
              "host": "t5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Northlake · Cook · Source context reviewed",
      "event_evidence": [
        {
          "date": "2023-10-03",
          "text": "T5 published its Chicago III Northlake acquisition announcement on October 3, 2023. An acquisition and future development plan are not an exact construction start or opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-data-centers-acquires-third-location-in-tier-one-chicago-market/",
              "host": "t5datacenters.com",
              "published": "2023-10-03",
              "date": "2023-10-03",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        },
        {
          "date": "2025-04-03",
          "text": "Clune published an account of visits to its active Prime Elk Grove and T5 Northlake construction projects on April 3, 2025. This is the report publication day; the exact tour day, later completion and operation are not established by that account.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.clunegc.com/clune-celebrates-international-data-center-day-with-revolution-workshop/",
              "host": "www.clunegc.com",
              "published": "2025-04-03",
              "date": "2025-04-03",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17031"
      }
    },
    {
      "id": "t5-chicago-iv-grayslake-il",
      "state": "il",
      "kind": "facility",
      "name": "T5 Chicago IV (CHI IV)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Grayslake",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-05-02",
          "T5 published its May 2, 2024 original Grayslake campus announcement. Development and the stated fourth quarter 2027 capacity target were prospective; this dates the issuer publication rather than an accomplished construction or computing start."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
          "host": "dceo.illinois.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/",
          "host": "t5datacenters.com",
          "published": "2024-05-02",
          "date": "2024-05-02",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 42.33479,
        "lng": -88.01649,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations",
          "fields": {
            "program_report_year": 2025,
            "program_register_as_of": "2025-12-31",
            "applications_received": 35,
            "approved_owner_operator_applications": 34,
            "operator_certificates_issued": 34,
            "tenant_certificates_issued": 91,
            "construction_credit_certificates_issued": 0,
            "total_investment_commitments_usd": 10665815092,
            "estimated_tax_benefits_usd": 666613443,
            "estimated_tax_benefit_calculation_percent": 6.25,
            "listed_new_job_commitments": 731,
            "investment_commitment_period_months": 60
          },
          "notes": [
            "34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S3-Illinois-DCEO-2025-20261015",
          "scope": "Illinois DCEO 2025 program entry for T5@Chicago IV, LP in Grayslake. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.",
          "fields": {
            "reported_program_party": "T5@Chicago IV, LP",
            "reported_program_locality": "Grayslake",
            "mou_year_reported": 2025,
            "program_report_as_of": "2025-12-31",
            "investment_commitment_usd": 250000000,
            "formula_based_tax_benefit_estimate_usd": 15625000,
            "new_jobs_in_program_table": 20,
            "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.",
            "program_identity_scope": "Explicit facility designation or company/locality association with the existing T5 Chicago IV (CHI IV) research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."
          },
          "notes": [
            "The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.",
            "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.",
            "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."
          ],
          "sources": [
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 60",
          "scope": "The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_grayslake_planned_campus",
              "scope": "The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes."
            },
            "source_read_scope": {
              "complete_original_dated_issuer_main_body_read": true,
              "state_annual_report_table_physical_pages8and9_read_and_viewed": true,
              "table_underserved_flag_not_operating_flag": true,
              "separate_chicagoiii_northlake_not_grayslake": true,
              "no_quantity_role_or_location_export": true
            }
          },
          "notes": [
            "The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/",
              "host": "t5datacenters.com",
              "published": "2024-05-02",
              "date": "2024-05-02",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf",
              "host": "dceo.illinois.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Grayslake · Lake · Source context reviewed",
      "status_scope": "The original May 2, 2024 T5 release announces a planned Grayslake campus, says development will begin and gives a future fourth quarter 2027 capacity target. This supports a listed proposal, without independently accomplished construction or computing service. The State 2025 annual report table separately names T5 at Chicago IV in Grayslake, which is an incentive program record and not operation. Chicago III in Northlake is a distinct project and is not merged. Investment commitments, estimated tax benefits, employment and target capacity remain prospective or administrative rather than achieved physical outcomes.",
      "event_evidence": [
        {
          "date": "2024-05-02",
          "text": "T5 published its May 2, 2024 original Grayslake campus announcement. Development and the stated fourth quarter 2027 capacity target were prospective; this dates the issuer publication rather than an accomplished construction or computing start.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/",
              "host": "t5datacenters.com",
              "published": "2024-05-02",
              "date": "2024-05-02",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17097"
      }
    },
    {
      "id": "t5-chicago-v-elk-grove-village-il",
      "state": "il",
      "kind": "facility",
      "name": "T5 @ Chicago V (CHI V)",
      "group": "proposed",
      "status": "Announced development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cook"
      ],
      "city": "Elk Grove Village",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical acquisition announcement and future delivery target. Separate Grayslake 1.2 GW campus excluded. Utility secured does not prove construction started or commissioned. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-03-26",
          "T5 published its CHI V acquisition and planned development announcement on March 26, 2025. Construction is described prospectively and 2028 occupancy is a target. The publication date is not an exact construction start, utility energization or opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html",
          "host": "prnewswire.com",
          "date": "2025-03-26",
          "published": "2025-03-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.84342,
        "lng": -87.90156,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "acquired_site_acres": 7,
            "planned_building_sqft": 220000,
            "planned_critical_it_mw": 36,
            "occupancy_target_year": 2028
          },
          "notes": [
            "Historical acquisition announcement and future delivery target. Separate Grayslake 1.2 GW campus excluded. Utility secured does not prove construction started or commissioned.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html",
              "host": "prnewswire.com",
              "date": "2025-03-26",
              "published": "2025-03-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 17",
          "scope": "T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "dated_chiv_acquisition_and_future_development_not_operation",
              "scope": "T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation."
            },
            "date_scope": {
              "announcement_on": "2025-03-26",
              "occupancy_target_year": "2028",
              "forecast_occurrence_verified": false,
              "current_directory_missing_cards_not_closure": true
            }
          },
          "notes": [
            "T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html",
              "host": "www.prnewswire.com",
              "published": "2025-03-26",
              "date": "2025-03-26",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Elk Grove Village · Cook · Source context reviewed",
      "status_scope": "T5 March 26, 2025 release announces acquisition of the CHI V site in Elk Grove Village and describes a planned new facility with occupancy targeted in 2028. Announced development describes this dated proposal. The release says construction will begin shortly, which is future intent rather than evidence that it began. The current directory render did not contain individual Chicago cards. Neither the historical acquisition nor the future occupancy target establishes current physical construction, complete commissioning or operation.",
      "event_evidence": [
        {
          "date": "2025-03-26",
          "text": "T5 published its CHI V acquisition and planned development announcement on March 26, 2025. Construction is described prospectively and 2028 occupancy is a target. The publication date is not an exact construction start, utility energization or opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html",
              "host": "www.prnewswire.com",
              "published": "2025-03-26",
              "date": "2025-03-26",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17031"
      }
    },
    {
      "id": "t5-colorado-springs-co",
      "state": "co",
      "kind": "facility",
      "name": "T5@Colorado Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "El Paso"
      ],
      "city": "Colorado Springs",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. 100 MW is advertised site electrical availability, not critical IT, current operating capacity or an executed 2026 service agreement. First phase Q 1 2014 was a forecast, not completion evidence. Quoted 4.4 cents/kWh and 97 percent possible free-cooling hours are historical marketing figures, not current tariffs, measured PUE or energy mix.400 to 600 jobs are forecasts with unclear phase/permanency; tax-incentive generalities are not site awards. Other Colorado Springs companies are separate facilities. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.datacenterknowledge.com/investing/t5-plans-800-million-campus-in-colorado-springs",
          "host": "datacenterknowledge.com",
          "date": "2013-04-23",
          "published": "2013-04-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.78924,
        "lng": -104.52182,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Data Center Knowledge reports T 5’s historical 64-acre Colorado Springs proposal with 800 million-dollar campus plan and 100 MW available-power description.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "100 MW is advertised site electrical availability, not critical IT, current operating capacity or an executed 2026 service agreement. First phase Q 1 2014 was a forecast, not completion evidence. Quoted 4.4 cents/kWh and 97 percent possible free-cooling hours are historical marketing figures, not current tariffs, measured PUE or energy mix.400 to 600 jobs are forecasts with unclear phase/permanency; tax-incentive generalities are not site awards. Other Colorado Springs companies are separate facilities.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.datacenterknowledge.com/investing/t5-plans-800-million-campus-in-colorado-springs",
              "host": "datacenterknowledge.com",
              "date": "2013-04-23",
              "published": "2013-04-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Colorado Springs · El Paso · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "08041"
      }
    },
    {
      "id": "t5-minneapolis-1001-third-avenue-mn",
      "state": "mn",
      "kind": "facility",
      "name": "T5@Minneapolis (1001 Third Avenue South)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hennepin"
      ],
      "city": "Minneapolis",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cloud Capital Minneapolis acquisition context with exact-site gap. 21currentplus10potential=31not52. ExactT5/1001ThirdAvenuepropertycrosswalknotstatedbyrelease;capacitynotcanonicaluntilmatched. Corporate26globalassets/5.5BAUMnotthiscampuscapex/count. No saleprice,originalopeningdayorcompletedexpansion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/",
          "host": "cloudcapital.com",
          "date": "2026-01-13",
          "published": "2026-01-13",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 44.99659,
        "lng": -93.52204,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Cloud Capital Minneapolis acquisition context with exact-site gap",
          "fields": {
            "buyers": [
              "Cloud Capital",
              "Arcapita"
            ],
            "acquisition_announcement_date": "2026-01-13",
            "reported_market": "Minneapolis, Minnesota",
            "reported_stabilized_capacity_mw": 21,
            "planned_expansion_mw": 10,
            "planned_total_capacity_mw": 31,
            "power_basis": "data-center capacity, not explicitly critical IT",
            "tenant_description": "unnamed sovereign AI/cloud inference provider, primarily longterm leased"
          },
          "notes": [
            "21currentplus10potential=31not52. ExactT5/1001ThirdAvenuepropertycrosswalknotstatedbyrelease;capacitynotcanonicaluntilmatched. Corporate26globalassets/5.5BAUMnotthiscampuscapex/count. No saleprice,originalopeningdayorcompletedexpansion.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/",
              "host": "cloudcapital.com",
              "date": "2026-01-13",
              "published": "2026-01-13",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 58",
          "scope": "The original January 13, 2026 Cloud Capital issuer release reports a Minneapolis acquisition, existing leased capacity and a planned expansion. The selected body does not independently name the exact inherited street address or T5 relationship. A leased asset and projected income are not proof of present computing deployment at that precise record. No exact site crosswalk, computing operation, current provider role, expansion completion or technical quantity is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_city_level_acquisition_exact_site_and_compute_held",
              "scope": "The original January 13, 2026 Cloud Capital issuer release reports a Minneapolis acquisition, existing leased capacity and a planned expansion. The selected body does not independently name the exact inherited street address or T5 relationship. A leased asset and projected income are not proof of present computing deployment at that precise record. No exact site crosswalk, computing operation, current provider role, expansion completion or technical quantity is promoted."
            },
            "source_read_scope": {
              "complete_dated_original_issuer_release_body_read": true,
              "exact_street_and_t5_not_named_in_selected_body": true,
              "lease_and_income_not_compute": true,
              "no_financial_quantity_or_role_export": true
            }
          },
          "notes": [
            "The original January 13, 2026 Cloud Capital issuer release reports a Minneapolis acquisition, existing leased capacity and a planned expansion. The selected body does not independently name the exact inherited street address or T5 relationship. A leased asset and projected income are not proof of present computing deployment at that precise record. No exact site crosswalk, computing operation, current provider role, expansion completion or technical quantity is promoted.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/",
              "host": "cloudcapital.com",
              "published": "2026-01-13",
              "date": "2026-01-13",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Minneapolis · Hennepin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "27053"
      }
    },
    {
      "id": "t5-silicon-valley-newark-ca",
      "state": "ca",
      "kind": "facility",
      "name": "T5@Silicon Valley",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Alameda"
      ],
      "city": "Newark",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Serverfarm portfolio page does not match T5 Newark. ServerfarmgenericportfolioindexlistsSantaClaracomings oonandLAX1butdoesnotidentifyT5Newarksite. Newarknotmatched,tenant/ownershipcrosswalknotproven. OthermarketcapacitiesnotadoptedforboundID. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2020-10-06",
          "The October 6, 2020 publication date of the original T5 release announces the Newark acquisition and a planned additional building. It is not the acquisition closing date, an expansion completion date or a physical opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.serverfarmllc.com/data-centers/",
          "host": "serverfarmllc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://t5datacenters.com/resources/t5-data-centers-announces-new-enterprise-data-center-in-silicon-valley-ca/",
          "host": "t5datacenters.com",
          "published": "2020-10-06",
          "date": "2020-10-06",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 37.63891,
        "lng": -121.93233,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Serverfarm portfolio page does not match T5 Newark",
          "fields": {},
          "notes": [
            "ServerfarmgenericportfolioindexlistsSantaClaracomings oonandLAX1butdoesnotidentifyT5Newarksite. Newarknotmatched,tenant/ownershipcrosswalknotproven. OthermarketcapacitiesnotadoptedforboundID.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.serverfarmllc.com/data-centers/",
              "host": "serverfarmllc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "T5’s October 2020 announcement identifies a Newark acquisition and distinguishes an existing 17 critical MW building from an additional planned 32.1 MW. These historical figures do not prove current operation, completed expansion or 49.1 MW delivered. The inherited Serverfarm directory is not T5 Newark identity evidence."
            }
          },
          "notes": [
            "T5’s October 2020 announcement identifies a Newark acquisition and distinguishes an existing 17 critical MW building from an additional planned 32.1 MW. These historical figures do not prove current operation, completed expansion or 49.1 MW delivered. The inherited Serverfarm directory is not T5 Newark identity evidence."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-data-centers-announces-new-enterprise-data-center-in-silicon-valley-ca/",
              "host": "t5datacenters.com",
              "published": "2020-10-06",
              "date": "2020-10-06",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.serverfarmllc.com/data-centers/",
              "host": "www.serverfarmllc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 46",
          "scope": "The original October 6, 2020 release reports acquisition of an existing Newark enterprise data center and describes a planned additional building. The historical existing building, forecast expansion and general current T5 services do not establish the present stage of this exact campus in October 2026. Current status remains unclear and no additional building completion, physical opening, tenancy or capacity is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_newark_acquisition_current_stage_held",
              "scope": "The original October 6, 2020 release reports acquisition of an existing Newark enterprise data center and describes a planned additional building. The historical existing building, forecast expansion and general current T5 services do not establish the present stage of this exact campus in October 2026. Current status remains unclear and no additional building completion, physical opening, tenancy or capacity is promoted."
            }
          },
          "notes": [
            "The original October 6, 2020 release reports acquisition of an existing Newark enterprise data center and describes a planned additional building. The historical existing building, forecast expansion and general current T5 services do not establish the present stage of this exact campus in October 2026. Current status remains unclear and no additional building completion, physical opening, tenancy or capacity is promoted.",
            "Existing identities, provider roles, locations, jurisdiction, quantities and physical opening fields remain unchanged. Publication, administrative filing and withdrawal dates are not physical opening dates."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-data-centers-announces-new-enterprise-data-center-in-silicon-valley-ca/",
              "host": "t5datacenters.com",
              "published": "2020-10-06",
              "date": "2020-10-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Newark · Alameda · Source context reviewed",
      "event_evidence": [
        {
          "date": "2020-10-06",
          "text": "The October 6, 2020 publication date of the original T5 release announces the Newark acquisition and a planned additional building. It is not the acquisition closing date, an expansion completion date or a physical opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://t5datacenters.com/resources/t5-data-centers-announces-new-enterprise-data-center-in-silicon-valley-ca/",
              "host": "t5datacenters.com",
              "published": "2020-10-06",
              "date": "2020-10-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "06001"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}