{
  "schema_version": 1,
  "source_compilation_context": {
    "ia": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ia.json",
      "updated": "2026-10-24"
    },
    "mn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mn.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    },
    "ut": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ut.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "tract",
    "label": "Tract"
  },
  "records": [
    {
      "id": "tract-altoona-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Tract Altoona Technology Park",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Altoona",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Altoona announced entitled land campus and future capacity. Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-01",
          "The City of Altoona economic development site published its Tract campus announcement on October 1, 2025. The account describes planned development and prior land use work without independently establishing actual computing construction or service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
          "host": "altoonanow.org",
          "date": "2025-10-01",
          "published": "2025-10-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.63098,
        "lng": -93.54798,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Altoona announced entitled land campus and future capacity",
          "fields": {
            "publisher": "City of Altoona economic development",
            "company": "Tract",
            "announcement_date": "2025-10-01",
            "reported_entitled_acres": 453,
            "expected_capacity_gw_min_exclusive": 1,
            "power_basis": "campus capacity, not explicit critical IT",
            "city_reported_processes": [
              "annexation",
              "rezoning",
              "development agreement"
            ]
          },
          "notes": [
            "Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
              "host": "altoonanow.org",
              "date": "2025-10-01",
              "published": "2025-10-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 65",
          "scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_named_tract_altoona_proposal",
              "scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host."
            },
            "source_read_scope": {
              "complete_original_visible_text_bodies_read": true
            }
          },
          "notes": [
            "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.",
            "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."
          ],
          "sources": [
            {
              "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
              "host": "altoonanow.org",
              "published": "2025-10-01",
              "date": "2025-10-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Altoona · Polk · Source context reviewed",
      "status_scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.",
      "event_evidence": [
        {
          "date": "2025-10-01",
          "text": "The City of Altoona economic development site published its Tract campus announcement on October 1, 2025. The account describes planned development and prior land use work without independently establishing actual computing construction or service.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
              "host": "altoonanow.org",
              "published": "2025-10-01",
              "date": "2025-10-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "tract-caldwell-valley-uhland-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Tract Caldwell Valley Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Caldwell"
      ],
      "city": "Uhland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Corrected named-site crosswalk; source does not verify PowerHouse Uhland.. Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://centexdatacenters.org/projects/tract-caldwell-county",
          "host": "centexdatacenters.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/",
          "host": "muskin-elam.com",
          "date": "2025-05-08",
          "published": "2025-05-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 29.85155,
        "lng": -97.63594,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Corrected named-site crosswalk; source does not verify PowerHouse Uhland.",
          "fields": {
            "reported_context": "Tracker describes Tract Caldwell Valley land expansion inJanuary2026 toward2973acres and4GWultimate masterplan; initial360MWdesign and250MWcontracted timeline conflict in scope.",
            "critical_it_mw": null,
            "verified_texas_water_use_gpd": null
          },
          "notes": [
            "Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://centexdatacenters.org/projects/tract-caldwell-county",
              "host": "centexdatacenters.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round38-2026-10-14.json",
          "scope": "Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.",
          "fields": {
            "reported_context": "Public MuskinElam syndication ofJustinSayers/AustinBusinessJournal reporting quotesTractCIO:1515acresacquired,initial360MWplanned2028,2GWconservativeandapproximately4GWconditionalonrighton-siteenergymixovertenyears. HorizontalinfrastructureestimatedUSD50-to100million;fullcapexnotreleased.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/",
              "host": "muskin-elam.com",
              "date": "2025-05-08",
              "published": "2025-05-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Uhland · Caldwell · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48055"
      }
    },
    {
      "id": "tract-eagle-mountain-ut",
      "state": "ut",
      "kind": "facility",
      "name": "Tract Eagle Mountain Data Center Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Utah"
      ],
      "city": "Eagle Mountain",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. QTS proposed administrative amendment with separate CRA context. Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.utah.gov/pmn/files/1158232.pdf",
          "host": "utah.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.07189,
        "lng": -111.59478,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "QTS proposed administrative amendment with separate CRA context",
          "fields": {
            "qts_proposed_amendment_agenda_date": "2024-08-20",
            "qts_proposed_amendment_subject": "permitcustomerpersonalpropertytaxreimbursementdirectlytoendclients",
            "document_status": "agenda,staffrecommendation,draftresolution andproposedamendment; executionnotestablished"
          },
          "notes": [
            "Blankvotechecklist/signaturelines do notproveadoption. TripleTailCRA1170.44acres isseparateprojectareaagenda item, not automaticallyTractdatacenterfootprintorQTSsite. QTSIparticipationpapers notproofnewFairfieldQTSIIsite. No proposedreimbursementformulaasactualpaymentor currentaward. Full132pagePDFrecoverednormally after4MBhold.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.utah.gov/pmn/files/1158232.pdf",
              "host": "utah.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "Selected original redevelopment packet pages describe a future computing complex and separate QTS participation agreement business. They do not independently establish the exact Tract company project crosswalk or current physical construction. A redevelopment plan, tax participation amendment and a different named campus are not this record commissioned computing. The complete 132 page packet was not reviewed. No developer, tenant, ownership, capacity or location is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "selected_redevelopment_packet_exact_tract_campus_crosswalk_held",
              "scope": "Selected original redevelopment packet pages describe a future computing complex and separate QTS participation agreement business. They do not independently establish the exact Tract company project crosswalk or current physical construction. A redevelopment plan, tax participation amendment and a different named campus are not this record commissioned computing. The complete 132 page packet was not reviewed. No developer, tenant, ownership, capacity or location is changed."
            },
            "source_read_scope": {
              "original_132_page_packet_selected_physical_pages20_21_22_43_read": true,
              "complete_packet_not_claimed": true,
              "separate_qts_item_not_tract_project": true,
              "tax_plan_not_current_computing_service": true
            }
          },
          "notes": [
            "Selected original redevelopment packet pages describe a future computing complex and separate QTS participation agreement business. They do not independently establish the exact Tract company project crosswalk or current physical construction. A redevelopment plan, tax participation amendment and a different named campus are not this record commissioned computing. The complete 132 page packet was not reviewed. No developer, tenant, ownership, capacity or location is changed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.utah.gov/pmn/files/1158232.pdf",
              "host": "www.utah.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Eagle Mountain · Utah · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49049"
      }
    },
    {
      "id": "tract-norwalk-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Tract Norwalk Data Center Park (Project West)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Warren"
      ],
      "city": "Norwalk",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Norwalk infrastructure due-diligence proposal and qualified forecasts. Developer infrastructure agreement vote explicitly not approval to build a data center. Water capacity reserved not actual use. No tax incentives offered statement qualified by non-tax fee waiver and possible future benefits. City rate-protection advocacy not independently approved utility tariff or measured bill outcome. No exact vote outcome or operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.norwalk.iowa.gov/news_detail_T5_R273.php",
          "host": "norwalk.iowa.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.34628,
        "lng": -93.57437,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Norwalk infrastructure due-diligence proposal and qualified forecasts",
          "fields": {
            "historical_hearing_scheduled_date": "2026-03-05",
            "historical_hearing_scheduled_local_time": "18:00",
            "proposed_developer_water_capacity_dedication_gallons_per_day": 400000,
            "city_industrial_reserved_capacity_gallons_per_day": 650000,
            "city_projected_full_build_annual_new_property_tax_usd_approx": 5000000,
            "all_taxing_entities_projected_annual_new_property_tax_usd_approx": 15000000,
            "proposed_non_tax_incentive": "sanitary sewer district fee waiver"
          },
          "notes": [
            "Developer infrastructure agreement vote explicitly not approval to build a data center. Water capacity reserved not actual use. No tax incentives offered statement qualified by non-tax fee waiver and possible future benefits. City rate-protection advocacy not independently approved utility tariff or measured bill outcome. No exact vote outcome or operating proof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.norwalk.iowa.gov/news_detail_T5_R273.php",
              "host": "norwalk.iowa.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Norwalk · Warren · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19181"
      }
    },
    {
      "id": "tract-rosemount-technology-park-mn",
      "state": "mn",
      "kind": "facility",
      "name": "Tract Rosemount Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dakota"
      ],
      "city": "Rosemount",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tract Rosemount secondary institutional withdrawal report. Regional article compiles media/public sources; not direct signed Tract withdrawal or current2026 status. Second Rosemount tract not automatically all Tract holdings and not Meta Rosemount. No precise parcel/name match from reviewed narrative; exact preferred record unresolved. Regional facility counts have explicit hyperscale definition and date, not all current data centers. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district",
          "host": "minneapolisfed.org",
          "date": "2025-10-07",
          "published": "2025-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 44.64482,
        "lng": -93.02251,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Tract Rosemount secondary institutional withdrawal report",
          "fields": {
            "publisher_role": "Federal Reserve Bank of Minneapolis regional analysis",
            "publication_date": "2025-10-07",
            "inventory_asof": "2025-10-01",
            "reported_tract_stage": "pulled out of a second Rosemount site, attributed to city planning officials"
          },
          "notes": [
            "Regional article compiles media/public sources; not direct signed Tract withdrawal or current2026 status. Second Rosemount tract not automatically all Tract holdings and not Meta Rosemount. No precise parcel/name match from reviewed narrative; exact preferred record unresolved. Regional facility counts have explicit hyperscale definition and date, not all current data centers.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district",
              "host": "minneapolisfed.org",
              "date": "2025-10-07",
              "published": "2025-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-F1-label-review-2026-10-20",
          "scope": "The Minneapolis Fed's October 2025 regional analysis attributes Tract's withdrawal from a second Rosemount site to city planning officials. The exact second-site relationship to this inherited record is not independently established. No current stage or connection to Meta's separate Rosemount site is adopted.",
          "fields": {
            "identity_label_context": {
              "previous_name": "Tract Rosemount Technology Park (withdrawn)",
              "plain_name": "Tract Rosemount Technology Park",
              "interpretation": "The Minneapolis Fed's October 2025 regional analysis attributes Tract's withdrawal from a second Rosemount site to city planning officials. The exact second-site relationship to this inherited record is not independently established. No current stage or connection to Meta's separate Rosemount site is adopted.",
              "outcome_wording_is_not_identity": true
            }
          },
          "notes": [
            "The Minneapolis Fed's October 2025 regional analysis attributes Tract's withdrawal from a second Rosemount site to city planning officials. The exact second-site relationship to this inherited record is not independently established. No current stage or connection to Meta's separate Rosemount site is adopted.",
            "Inherited inventory name: Tract Rosemount Technology Park (withdrawn). The wording is retained as provenance, not as an independently verified outcome.",
            "An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."
          ],
          "sources": [
            {
              "url": "https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district",
              "host": "www.minneapolisfed.org",
              "published": "2025-10-07",
              "date": "2025-10-07",
              "checked": "2026-10-20",
              "label": "Federal Reserve Bank of Minneapolis"
            }
          ],
          "checked": "2026-10-20",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rosemount · Dakota · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "27037"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
