{
  "schema_version": 1,
  "source_compilation_context": {
    "az": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/az.json",
      "updated": "2026-10-24"
    },
    "ca": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ca.json",
      "updated": "2026-10-25"
    },
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    },
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    },
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    },
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    },
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    },
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    },
    "wa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Linked company names and sourced roles retain their separate meaning in each record. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "companies",
    "key": "vantage-data-centers",
    "label": "Vantage Data Centers"
  },
  "records": [
    {
      "id": "vantage-ashburn-ii-va2-va",
      "state": "va",
      "kind": "facility",
      "name": "Vantage Ashburn II (VA2)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Loudoun"
      ],
      "city": "Sterling",
      "address": "22435 Glenn Drive, Sterling, VA 20164",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Page uses future tense; named campus specification not evidence every building is delivered. No exact opening inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/",
          "host": "vantage-dc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000",
          "host": "gisdata.deq.virginia.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Virginia DEQ air-site registry"
        },
        {
          "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_ncs=518210&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
          "host": "echodata.epa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact separate named Ashburn II campus address"
        },
        {
          "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/5/query?where=PA_MCPI%3D%27032155119000%27&outFields=OBJECTID%2CPA_TYPE%2CPA_MCPI&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json",
          "host": "logis.loudoun.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "One exact shared MCPI reference polygon"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.43370555123455%2C38.99448591088753%2C-77.42561444876544%2C39.00077408911247&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        },
        {
          "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/5?f=pjson",
          "host": "logis.loudoun.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Original October 23 county parcel field capture unchanged"
        },
        {
          "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2/query?where=AD_ADDRESS%3D22435+AND+UPPER%28AM_STR_NAME%29%3D%27GLENN%27&outFields=OBJECTID%2CAD_ADDRESS%2CAD_MCPI%2CAD_LOUD_ID%2CAD_POINT_TYPE%2CAM_TOWN%2CAM_ZIP%2CAM_DIR_PREF%2CAM_STR_NAME%2CAM_STR_TYPE%2CAM_DIR_SUF%2CAM_STATE%2CFULL_ADDRESS%2CFULL_ADDRESS_TSZ&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json",
          "host": "logis.loudoun.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact county address with same MCPI"
        },
        {
          "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2?f=pjson",
          "host": "logis.loudoun.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Original October 23 county address field capture unchanged"
        }
      ],
      "loc": {
        "lng": -77.42966,
        "lat": 38.99763,
        "precision": "approximate",
        "basis": "Approximate county reference parcel center for the current named Vantage Ashburn II VA2 campus address 22435 Glenn Drive, Sterling, VA 20164. Exact MCPI 032155119000 only, not a roof, surveyed title, independent building, tenant unit or full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains operating."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "campus_acres": 18,
            "campus_buildings": 3,
            "planned_critical_it_mw": 96,
            "planned_campus_area_sqft": 800000,
            "published_address": "22435 Glenn Drive, Sterling, VA20164"
          },
          "notes": [
            "Page uses future tense; named campus specification not evidence every building is delivered. No exact opening inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/",
              "host": "vantage-dc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Virginia-DEQ-20261015",
          "scope": "DEQ reports an operating air site at the operator-listed Ashburn II campus address.",
          "fields": {
            "agency_registration_number": "74242",
            "agency_air_operational_status": "Operating",
            "agency_registered_address": "22435 Glenn Drive, Sterling, VA, 20164",
            "agency_principal_product": "Data Center",
            "published_address": "22435 Glenn Drive, Sterling, VA 20164",
            "current_status": "partly operating",
            "epa_frs_registry_id": "110071894274",
            "identity_link_basis": "Exact federal air-system identifier matches DEQ registration: VA0000005110774242"
          },
          "notes": [
            "The operator page describes future three-building campus scope. Agency-listed operation does not certify all planned buildings or the full 96 MW design figure. No capacity total adopted.",
            "The DEQ dataset warns of source errors, collection-scale and currency limits. A registration operational classification is separate from an issued permit, whole-campus completion and parcel precision."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000",
              "host": "gisdata.deq.virginia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Virginia DEQ air-site registry"
            },
            {
              "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_ncs=518210&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
              "host": "echodata.epa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 36, October 23, 2026",
          "scope": "Approximate remains approximate. One bounded county reference parcel only. Existing native status remains operating.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -77.42966,
                "lat": 38.99763,
                "precision": "approximate",
                "basis": "Approximate county reference parcel center for the current named Vantage Ashburn II VA2 campus address 22435 Glenn Drive, Sterling, VA 20164. Exact MCPI 032155119000 only, not a roof, surveyed title, independent building, tenant unit or full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains operating."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "032155119000",
                "identifier_field": "PA_MCPI",
                "objectid": 98272,
                "agency": "Loudoun County GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "official_address_feature_sha256": "b2a1b2ef4429d450abe98405e7ceadef6f40ee23420b55021de5b44f922e6c6d",
                "county_parcel_type": "P",
                "county_address_point_type": "2",
                "county_code_meanings_inferred": false
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "The current exact Vantage campus address list names Ashburn II at 22435 Glenn Drive, Sterling, VA 20164, matching this retained VA2 canonical street. Exact Census query has no match, and no street coordinate is guessed. One current county address, OBJECTID 134425 and Loudoun ID 279272, supplies the complete same street, town and postal with MCPI 032155119000. One county parcel, OBJECTID 98272, shares this exact MCPI. The address point lies inside its polygon. Only the mathematical parcel center is adopted, as approximate. Raw parcel type P and address point type 2 have no inferred legal unit, roof or physical meanings. Actually viewed imagery contains woodland and commercial forms with unknown acquisition date, possibly predating campus development. No VA21, VA21B, VA22 or other independent roof, building count, tenant unit, ownership, title or complete campus is certified. Native operating status, canonical address and all physical facts remain exact.",
            "All protected identity, native status, physical dates, quantities, roles, canonical address and jurisdiction wrappers remain exact. Raw parcel geometry is not exported.",
            "Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. No residential roof is selected."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact separate named Ashburn II campus address"
            },
            {
              "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/5/query?where=PA_MCPI%3D%27032155119000%27&outFields=OBJECTID%2CPA_TYPE%2CPA_MCPI&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json",
              "host": "logis.loudoun.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "One exact shared MCPI reference polygon"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.43370555123455%2C38.99448591088753%2C-77.42561444876544%2C39.00077408911247&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            },
            {
              "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/5?f=pjson",
              "host": "logis.loudoun.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original October 23 county parcel field capture unchanged"
            },
            {
              "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2/query?where=AD_ADDRESS%3D22435+AND+UPPER%28AM_STR_NAME%29%3D%27GLENN%27&outFields=OBJECTID%2CAD_ADDRESS%2CAD_MCPI%2CAD_LOUD_ID%2CAD_POINT_TYPE%2CAM_TOWN%2CAM_ZIP%2CAM_DIR_PREF%2CAM_STR_NAME%2CAM_STR_TYPE%2CAM_DIR_SUF%2CAM_STATE%2CFULL_ADDRESS%2CFULL_ADDRESS_TSZ&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json",
              "host": "logis.loudoun.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact county address with same MCPI"
            },
            {
              "url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2?f=pjson",
              "host": "logis.loudoun.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original October 23 county address field capture unchanged"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate county reference parcel, not a surveyed building or full campus",
      "summary": "Sterling · Loudoun · Source context reviewed",
      "status_scope": "DEQ reports an operating air site at the operator-listed Ashburn II campus address."
    },
    {
      "id": "vantage-douglasville-campus-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Vantage Data Centers Douglasville Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
          "host": "insidetowers.com",
          "date": "2024-08-16",
          "published": "2024-08-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.72975,
        "lng": -84.77552,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.",
            "independently_verified_current_operating_status": null,
            "site_specific_scope": "Douglasville1700000sqft/December2025forecast; Stacks Road is a different campus"
          },
          "notes": [
            "Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
              "host": "insidetowers.com",
              "date": "2024-08-16",
              "published": "2024-08-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "vantage-frontier-shackelford-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Vantage Frontier Campus",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Shackelford"
      ],
      "city": "",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
          "host": "vantage-dc.com",
          "date": "2025-08-19",
          "published": "2025-08-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 32.73597,
        "lng": -99.35405,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_investment_usd_min_exclusive": 25000000000,
            "planned_gpu_compute_capacity_gw": 1.4,
            "campus_acres": 1200,
            "planned_buildings": 10,
            "planned_area_sqft": 3700000,
            "construction_stage_at_release": "begun",
            "first_building_delivery_target": "2026-H2",
            "forecast_jobs_construction_and_operations_min_exclusive": 5000
          },
          "notes": [
            "Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
              "host": "vantage-dc.com",
              "date": "2025-08-19",
              "published": "2025-08-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Under construction",
              "basis": "Vantage’s August 19, 2025 announcement explicitly says construction had begun on the named Frontier campus. The current Shackelford County page continues to describe the first building’s delivery as scheduled for the second half of 2026.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity."
          },
          "notes": [
            "The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
              "host": "vantage-dc.com",
              "published": "2025-08-19",
              "date": "2025-08-19",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            },
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
              "host": "vantage-dc.com",
              "published": "2025-08-19",
              "date": "2025-08-19",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Shackelford · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. Vantage’s August 19, 2025 announcement explicitly says construction had begun on the named Frontier campus. The current Shackelford County page continues to describe the first building’s delivery as scheduled for the second half of 2026. The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48417"
      }
    },
    {
      "id": "vantage-nv1-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Vantage Data Centers NV1",
      "group": "proposed",
      "status": "Provider listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-07-15",
          "Vantage dated its original NV1 campus announcement July 15, 2025. The announcement projects a first building opening in the second quarter of 2026. This records the announcement day without treating that forecast as an accomplished opening or commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
          "host": "vantage-dc.com",
          "date": "2025-07-15",
          "published": "2025-07-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.50668,
        "lng": -119.51037,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_capacity_mw": 224,
            "power_basis": "campus capacity, IT versus gross unspecified in release",
            "planned_investment_usd_approx": 3000000000,
            "campus_acres_approx": 137,
            "planned_buildings": 4,
            "planned_area_sqft_min_exclusive": 1000000,
            "first_building_opening_target": "2026-Q2",
            "first_two_buildings_lease_status": "fully leased at announcement",
            "forecast_combined_construction_operations_jobs_min_exclusive": 1200
          },
          "notes": [
            "Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "date": "2025-07-15",
              "published": "2025-07-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "published": "2025-07-15",
              "date": "2025-07-15",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "provider_listed_nv1_proposal",
              "scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted."
            },
            "source_read_scope": {
              "complete_original_announcement_body_read": true,
              "forecast_opening_not_current_completion": true,
              "leased_capacity_not_operational_capacity": true
            }
          },
          "notes": [
            "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "published": "2025-07-15",
              "date": "2025-07-15",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "status_scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.",
      "event_evidence": [
        {
          "date": "2025-07-15",
          "text": "Vantage dated its original NV1 campus announcement July 15, 2025. The announcement projects a first building opening in the second quarter of 2026. This records the announcement day without treating that forecast as an accomplished opening or commissioning.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "published": "2025-07-15",
              "date": "2025-07-15",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "vantage-oh1-new-albany-licking-county-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Vantage Data Centers OH1",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Johnstown",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Target does not prove delivery by2026. Combined construction/long-term jobs not permanent-only.",
      "date": "",
      "events": [
        [
          "2024-10-25",
          "Vantage published its OH1 campus announcement October 25, 2024 and reported an onsite groundbreaking ceremony that day. This is the dated company account, not independent proof of actual excavation or achievement of the later opening forecast."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=PID%3D96538&outFields=PID,Parcel,OwnerName,SiteAddress&returnGeometry=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
          "host": "vantage-dc.com",
          "date": "2024-10-25",
          "published": "2024-10-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.14721,
        "lng": -82.5222,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 1,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 96538,
                "Parcel": "095-111756-00.009",
                "OwnerName": "VANTAGE DATA CENTERS OH11 LLC",
                "SiteAddress": "2914 HORIZON CT NW"
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=PID%3D96538&outFields=PID,Parcel,OwnerName,SiteAddress&returnGeometry=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "groundbreaking_date": "2024-10-25",
            "planned_investment_usd_min_exclusive": 2000000000,
            "campus_acres": 70,
            "planned_it_capacity_mw": 192,
            "planned_area_sqft_min_exclusive": 1500000,
            "first_building_opening_target": "late2025",
            "forecast_combined_construction_operations_jobs_min_exclusive": 1500
          },
          "notes": [
            "Target does not prove delivery by2026. Combined construction/long-term jobs not permanent-only.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "date": "2024-10-25",
              "published": "2024-10-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 25, 2024 OH1 announcement describes New Albany development and a late 2025 first building target. The reported ceremony and target are not adopted as new timeline events or current operating status.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 25, 2024 OH1 announcement describes New Albany development and a late 2025 first building target. The reported ceremony and target are not adopted as new timeline events or current operating status."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 25, 2024 OH1 announcement describes New Albany development and a late 2025 first building target. The reported ceremony and target are not adopted as new timeline events or current operating status.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "published": "2024-10-25",
              "date": "2024-10-25",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "The current named OH1 page still forecasts its first building operational by December 2025 and later phases through 2028. The October 25, 2024 original release reports a celebratory groundbreaking. A past forecast, a ceremony and generic campus capabilities do not verify present individual building service or all campus completion. The existing exact physical phase remains unclear. Current address and quantity fields are not changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_oh1_elapsed_opening_forecast_and_historic_ceremony_not_current_completion",
              "scope": "The current named OH1 page still forecasts its first building operational by December 2025 and later phases through 2028. The October 25, 2024 original release reports a celebratory groundbreaking. A past forecast, a ceremony and generic campus capabilities do not verify present individual building service or all campus completion. The existing exact physical phase remains unclear. Current address and quantity fields are not changed."
            }
          },
          "notes": [
            "The current named OH1 page still forecasts its first building operational by December 2025 and later phases through 2028. The October 25, 2024 original release reports a celebratory groundbreaking. A past forecast, a ceremony and generic campus capabilities do not verify present individual building service or all campus completion. The existing exact physical phase remains unclear. Current address and quantity fields are not changed.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "published": "2024-10-25",
              "date": "2024-10-25",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Johnstown · Licking · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-10-25",
          "text": "Vantage published its OH1 campus announcement October 25, 2024 and reported an onsite groundbreaking ceremony that day. This is the dated company account, not independent proof of actual excavation or achievement of the later opening forecast.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "published": "2024-10-25",
              "date": "2024-10-25",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "vantage-oh2-millersport-fairfield-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Vantage Data Centers OH2 (Millersport Campus)",
      "group": "proposed",
      "status": "Project listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fairfield"
      ],
      "city": "Millersport",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vantage Millersport explicit IT and building/job categories. 2550headlinejobscombinesconstructionandoperations,not2550permanent.7totalbuildingsnot7DCs;up-to4DCs.696ITnotgasplantnameplate/currentenergizedIT.2.1Bplannedinfrastructureinvestmentnotactualspent/tenantcomputeinvestment. NoRFSdayorsignedpermits/sourceplantapprovalread. Ratepayerclaimnotindependentutilityfinding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantagemillersportcampus.com/",
          "host": "vantagemillersportcampus.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantagemillersportcampus.com/construction-updates/",
          "host": "vantagemillersportcampus.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.76468,
        "lng": -82.64493,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Vantage Millersport explicit IT and building/job categories",
          "fields": {
            "developer": "Vantage",
            "project": "OH2 Millersport campus",
            "location": "Lancaster Newark Road and Blacklick Road, Village of Millersport, Ohio",
            "planned_critical_it_mw": 696,
            "campus_acres": 352,
            "total_planned_buildings": 7,
            "data_center_buildings_max": 4,
            "planned_data_center_area_sqft": 2500000,
            "planned_investment_usd_min_exclusive": 2100000000,
            "expected_construction_jobs_min_exclusive": 2500,
            "expected_vantage_permanent_fulltime_positions_min_exclusive": 50,
            "power_plan": "adjacent natural gas facility"
          },
          "notes": [
            "2550headlinejobscombinesconstructionandoperations,not2550permanent.7totalbuildingsnot7DCs;up-to4DCs.696ITnotgasplantnameplate/currentenergizedIT.2.1Bplannedinfrastructureinvestmentnotactualspent/tenantcomputeinvestment. NoRFSdayorsignedpermits/sourceplantapprovalread. Ratepayerclaimnotindependentutilityfinding.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantagemillersportcampus.com/",
              "host": "vantagemillersportcampus.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_millersport_development_and_planned_activity_calendar",
              "scope": "The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation."
            }
          },
          "notes": [
            "The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://vantagemillersportcampus.com/",
              "host": "vantagemillersportcampus.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://vantagemillersportcampus.com/construction-updates/",
              "host": "vantagemillersportcampus.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Millersport · Fairfield · Source context reviewed",
      "status_scope": "The current named Millersport site describes a campus being developed and publishes a monthly activity calendar through December 2026. Project listed development applies to that explicit company proposal. The calendar mixes elapsed, current and future planned grading, utility and foundation activities; it is not a certified completed work log. No listed month becomes an accomplished construction start or completion day. The adjacent proposed gas generation facility, future benefits and forecast costs are separate from data center operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39045"
      }
    },
    {
      "id": "vantage-phoenix-campus-goodyear-az-az",
      "state": "az",
      "kind": "facility",
      "name": "Vantage Phoenix Campus (Goodyear, AZ)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Maricopa"
      ],
      "city": "Goodyear",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vantage Goodyear full-campus IT and address scope. Fullfive-building future campus, not176MWcurrentlyenergized.69kVvoltage not ITMWor certified substation surplus. Near-zeroWUEdesign not measured zero domestic water. Operator green-building claims not independently audited. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/phoenix-arizona/",
          "host": "vantage-dc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact separate named campus address section"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=45+S.+Bullard+Avenue%2C+Goodyear%2C+AZ+85338&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique calculated street range and retained county match"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-112.37919792710773%2C33.44620441589253%2C-112.37166151953028%2C33.452492594117466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -112.37543,
        "lat": 33.449349,
        "precision": "approximate",
        "basis": "Approximate named Vantage Phoenix campus at Goodyear campus service area at 45 S. Bullard Avenue, Goodyear, AZ 85338, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains unknown."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-discovery-review-round8-2026-10-14.json",
          "scope": "Vantage Goodyear full-campus IT and address scope",
          "fields": {
            "campus_code": "AZ1",
            "published_address": "45 S Bullard Avenue, Goodyear, AZ85338",
            "planned_campus_acres": 50,
            "planned_data_center_buildings": 5,
            "fullbuild_critical_it_mw": 176,
            "fullbuild_area_sqft_min_exclusive": 1000000
          },
          "notes": [
            "Fullfive-building future campus, not176MWcurrentlyenergized.69kVvoltage not ITMWor certified substation surplus. Near-zeroWUEdesign not measured zero domestic water. Operator green-building claims not independently audited.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/phoenix-arizona/",
              "host": "vantage-dc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 11",
          "scope": "The Vantage AZ1 page combines present campus amenity descriptions, AZ11 and AZ12 construction certifications, and future language for a five building campus. It does not specify the current delivered and operating stage of every phase. Construction certification, marketed capacity and planned near zero cooling water intensity are not verified operating capacity, actual water use or full campus completion. Physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "mixed_present_and_future_campus_copy_stage_held",
              "scope": "The Vantage AZ1 page combines present campus amenity descriptions, AZ11 and AZ12 construction certifications, and future language for a five building campus. It does not specify the current delivered and operating stage of every phase. Construction certification, marketed capacity and planned near zero cooling water intensity are not verified operating capacity, actual water use or full campus completion. Physical stage remains unclear."
            },
            "phase_scope": {
              "campus": "AZ1",
              "named_certification_components": [
                "AZ11",
                "AZ12"
              ],
              "all_phase_completion_verified": false,
              "design_water_intensity_is_not_measured_water_use": true
            }
          },
          "notes": [
            "The Vantage AZ1 page combines present campus amenity descriptions, AZ11 and AZ12 construction certifications, and future language for a five building campus. It does not specify the current delivered and operating stage of every phase. Construction certification, marketed capacity and planned near zero cooling water intensity are not verified operating capacity, actual water use or full campus completion. Physical stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/phoenix-arizona/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The current AZ1 page says Vantage is building five data centers and describes a fully developed future campus. Developer is supported; present completion, marketed power and the status of individual AZ11 or AZ12 buildings are not adopted.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The current AZ1 page says Vantage is building five data centers and describes a fully developed future campus. Developer is supported; present completion, marketed power and the status of individual AZ11 or AZ12 buildings are not adopted."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The current AZ1 page says Vantage is building five data centers and describes a fully developed future campus. Developer is supported; present completion, marketed power and the status of individual AZ11 or AZ12 buildings are not adopted.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/phoenix-arizona/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 36, October 23, 2026",
          "scope": "Approximate remains approximate. Named campus service area only. Existing native status remains unknown.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -112.37543,
                "lat": 33.449349,
                "precision": "approximate",
                "basis": "Approximate named Vantage Phoenix campus at Goodyear campus service area at 45 S. Bullard Avenue, Goodyear, AZ 85338, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains unknown."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "45 S. Bullard Avenue, Goodyear, AZ 85338",
              "county_fips": [
                "04013"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The current official Vantage North American data center list explicitly separates Phoenix at 45 S. Bullard Avenue, Santa Clara II at 737 Mathew Street and Santa Clara III at 2590 Walsh Avenue. This record uses only its exact corresponding named campus section. Current individual Santa Clara pages explicitly identify CA2 and CA3. CA3 is described with future wording and native proposed remains proposed. CA2 includes mixed current and future marketing, which does not establish a physical stage. Each review adopts only an approximate named campus service area at the calculated street reference. No independent building, unit, full campus boundary, commissioning date, operator quantity or native status is inferred. Company business offices and map provider coordinates are excluded.",
            "Raw Census input, match and coordinates remain exact. Only the public point rounds to six decimals below 0.1 metre displacement, which is not a survey accuracy claim.",
            "Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. No residential roof is selected."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact separate named campus address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=45+S.+Bullard+Avenue%2C+Goodyear%2C+AZ+85338&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique calculated street range and retained county match"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-112.37919792710773%2C33.44620441589253%2C-112.37166151953028%2C33.452492594117466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate campus service area, not a confirmed parcel or building",
      "summary": "Goodyear · Maricopa · Source context reviewed"
    },
    {
      "id": "vantage-pittsboro-in",
      "state": "in",
      "kind": "facility",
      "name": "Vantage Pittsboro Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hendricks"
      ],
      "city": "Pittsboro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county",
          "host": "insideindianabusiness.com",
          "date": "2025-02-07",
          "published": "2025-02-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.townofpittsboro.org/DocumentCenter/View/1168/2026-10-27-PC-Agenda_V3?bidId=",
          "host": "www.townofpittsboro.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.townofpittsboro.org/agendacenter",
          "host": "www.townofpittsboro.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.78044,
        "lng": -86.52192,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside INdiana Business publicly readable article describes Vantage’s 618-acre Pittsboro rezoning request, with about 285 acres intended for the data center and three buildings described as 256/96/48 MW.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county",
              "host": "insideindianabusiness.com",
              "date": "2025-02-07",
              "published": "2025-02-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_pittsboro_current_agenda_exact_vantage_stage_held",
              "scope": "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service."
            },
            "source_read_scope": {
              "complete_original_oct27_agenda4page_text_read": true,
              "old_staff_pdf_url_returned_html_custom404": true,
              "observed1167_self_redirect_stopped": true,
              "independent1168_original_pdf_read": true,
              "no_generic_landscape_concern_assigned_exact_vantage": true
            }
          },
          "notes": [
            "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.townofpittsboro.org/DocumentCenter/View/1168/2026-10-27-PC-Agenda_V3?bidId=",
              "host": "www.townofpittsboro.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.townofpittsboro.org/agendacenter",
              "host": "www.townofpittsboro.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pittsboro · Hendricks · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18063"
      }
    },
    {
      "id": "vantage-quincy-wa11-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Vantage Quincy WA11",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grant"
      ],
      "city": "Quincy",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. WA13delivery and resulting whole campus. WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/",
          "host": "vantage-dc.com",
          "date": "2023-10-18",
          "published": "2023-10-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/quincy-washington/",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party exact campus or code text, scoped provider relationship reviewed"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2101+M+Street%2C+NE%2C+Quincy%2C+WA+98848&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique calculated street range and retained county match"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-119.82002669751897%2C47.245356180168535%2C-119.81076330142504%2C47.25164435839347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -119.815395,
        "lat": 47.2485,
        "precision": "approximate",
        "basis": "Approximate shared Vantage Quincy WA1 campus service area for WA11 explicitly named in the current campus page, at 2101 M Street, NE, Quincy, WA 98848 matched to one Census street range inside retained Grant County. Not a separately identified WA11 building, roof, surveyed parcel or completed full campus. Aerial acquisition date is unknown. Existing native status remains unknown."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "WA13delivery and resulting whole campus",
          "fields": {
            "wa13_delivery_announcement": "2023-10-18",
            "wa13_area_sqft": 530000,
            "wa13_it_capacity_mw": 64,
            "resulting_campus_it_capacity_mw": 89,
            "campus_acres": 68,
            "resulting_campus_area_sqft_approx": 775000,
            "campus_buildings": 3,
            "operator_reported_campus_investment_usd_min_exclusive": 1000000000
          },
          "notes": [
            "WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/",
              "host": "vantage-dc.com",
              "date": "2023-10-18",
              "published": "2023-10-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The current WA1 campus page explicitly names WA11 within its certification section and offers Vantage service. That exact naming supports provider identity only; neither certification nor the campus address is independently adopted or transferred.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The current WA1 campus page explicitly names WA11 within its certification section and offers Vantage service. That exact naming supports provider identity only; neither certification nor the campus address is independently adopted or transferred."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The current WA1 campus page explicitly names WA11 within its certification section and offers Vantage service. That exact naming supports provider identity only; neither certification nor the campus address is independently adopted or transferred.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/quincy-washington/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 37, October 23, 2026",
          "scope": "Approximate shared parent campus service area only, not a separately identified WA11 building. Existing native status remains unknown. All protected identity, role, quantity and date wrappers remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -119.815395,
                "lat": 47.2485,
                "precision": "approximate",
                "basis": "Approximate shared Vantage Quincy WA1 campus service area for WA11 explicitly named in the current campus page, at 2101 M Street, NE, Quincy, WA 98848 matched to one Census street range inside retained Grant County. Not a separately identified WA11 building, roof, surveyed parcel or completed full campus. Aerial acquisition date is unknown. Existing native status remains unknown."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2101 M Street, NE, Quincy, WA 98848",
              "county_fips": [
                "53025"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Current exact Quincy WA1 campus page explicitly names WA11 in its code context and publishes the campus street. Candidate is an approximate shared campus service area only, never a separately resolved WA11 building or roof. No certification, status, quantity or independent building count is adopted; WA13 is not named by this page and remains held.",
            "Approximate shared parent campus service area only, not a separately identified WA11 building. Existing native status remains unknown. All protected identity, role, quantity and date wrappers remain exact.",
            "Actually viewed industrial forms, paved access and parking beside open agricultural ground. Only the shared parent campus service area is referenced. No separately identified WA11 roof, exact parcel or completed full campus is certified. Acquisition date is unknown and may predate development.",
            "Unique Census county and retained county polygon both contain the reference. Coordinates round to six decimals with displacement below 0.1 metre, not a positional accuracy claim. No current operator relationship, certification, physical milestone, source quantity, title or independent building count is adopted."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/quincy-washington/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current exact named service property or parent campus address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2101+M+Street%2C+NE%2C+Quincy%2C+WA+98848&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique calculated street range and retained county match"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-119.82002669751897%2C47.245356180168535%2C-119.81076330142504%2C47.25164435839347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate parent campus service area, not a separately identified building",
      "summary": "Quincy · Grant · Source context reviewed"
    },
    {
      "id": "vantage-santa-clara-i-ca1-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Vantage Santa Clara I (CA1)",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "Santa Clara",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vantage Santa Clara campus electrical and area scope with PUE error hold. Substation ratings are not150MWcriticalIT.335Kdata-center-space headline and gallery building areas have differing scope; no canonical gross total inferred. Published PUEunder1claim is physically implausible under standard whole-facility definition and quarantined, not silently changed to1.1. LEED/largest ranking not independently verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/",
          "host": "vantage-dc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2820+Northwestern+Parkway%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        }
      ],
      "loc": {
        "lat": 37.372730407499,
        "lng": -121.972052115503,
        "precision": "address",
        "basis": "Published Vantage Data Centers facility address 2820 Northwestern Parkway, Santa Clara, CA 95051 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-discovery-review-round8-2026-10-14.json",
          "scope": "Vantage Santa Clara campus electrical and area scope with PUE error hold",
          "fields": {
            "campus_code": "CA1",
            "published_address": "2820 Northwestern Parkway, Santa Clara, CA95051",
            "campus_acres": 21,
            "operator_named_buildings": 6,
            "advertised_campus_critical_it_mw": 77,
            "advertised_data_center_space_sqft": 335000,
            "onsite_substation_ratings_mw_each": [
              50,
              50,
              50
            ]
          },
          "notes": [
            "Substation ratings are not150MWcriticalIT.335Kdata-center-space headline and gallery building areas have differing scope; no canonical gross total inferred. Published PUEunder1claim is physically implausible under standard whole-facility definition and quarantined, not silently changed to1.1. LEED/largest ranking not independently verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/",
              "host": "vantage-dc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current Santa Clara I page describes campus service, customer uptime and support by its in-house operations team.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "Santa Clara II retains future wording about portions of full buildout. The service label does not certify all listed buildings or capacities as delivered, occupied or metered; CA3 is separate."
          },
          "notes": [
            "Santa Clara II retains future wording about portions of full buildout. The service label does not certify all listed buildings or capacities as delivered, occupied or metered; CA3 is separate.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 10, October 22, 2026",
          "scope": "Official facility street reference only. No canonical address, status, physical date, quantity, company role, jurisdiction, title, parcel, full campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 37.372730407499,
                "lng": -121.972052115503,
                "precision": "address",
                "basis": "Published Vantage Data Centers facility address 2820 Northwestern Parkway, Santa Clara, CA 95051 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2820 Northwestern Parkway, Santa Clara, CA 95051",
              "county_fips": [
                "06085"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The current official operator numeric address section identifies this existing record. Corporate headquarters and related facility cards are excluded. The blank native address wrapper remains exact.",
            "The numeric street, name, type and directions are explicitly matched to the single Census result. State and existing county agree. This is a calculated street reference, not a roof, parcel, suite, independent building count or full campus boundary. Status, dates, quantities, roles, jurisdiction and all earlier source wrappers remain exact.",
            "The official CA1 campus address section prints 2820 Northwestern Parkway. One calculated street reference is used for the existing campus record. Aerial context shows industrial building forms. No complete campus or individual roof is inferred."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official named facility numeric street section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2820+Northwestern+Parkway%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. Current CA1 offers named campus service; CA12 and CA13 gallery labels do not create independent building locations, service milestones or certification findings.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. Current CA1 offers named campus service; CA12 and CA13 gallery labels do not create independent building locations, service milestones or certification findings."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. Current CA1 offers named campus service; CA12 and CA13 gallery labels do not create independent building locations, service milestones or certification findings.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-i-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Santa Clara · Santa Clara · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current Santa Clara I page describes campus service, customer uptime and support by its in-house operations team. Santa Clara II retains future wording about portions of full buildout. The service label does not certify all listed buildings or capacities as delivered, occupied or metered; CA3 is separate."
    },
    {
      "id": "vantage-santa-clara-ii-ca2-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Vantage Santa Clara II (CA2)",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "Santa Clara",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Future tense persists in undated page.152MWcombinedCA1+CA2is not CA2alone; transformer ratings not added toIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/",
          "host": "vantage-dc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact separate named campus address section"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=737+Mathew+Street%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique calculated street range and retained county match"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.95132477409473%2C37.360079881178535%2C-121.94341316848926%2C37.36636805940347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -121.947369,
        "lat": 37.363224,
        "precision": "approximate",
        "basis": "Approximate named Vantage Santa Clara II, explicitly CA2 campus service area at 737 Mathew Street, Santa Clara, CA 95051, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains operating."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "campus_acres": 9,
            "campus_buildings": 3,
            "critical_it_mw": 75,
            "campus_area_sqft": 541000,
            "published_address": "737 Mathew Street, Santa Clara, CA95051"
          },
          "notes": [
            "Future tense persists in undated page.152MWcombinedCA1+CA2is not CA2alone; transformer ratings not added toIT.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/",
              "host": "vantage-dc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current Santa Clara II page describes campus service, customer uptime and support by its in-house operations team.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "Santa Clara II retains future wording about portions of full buildout. The service label does not certify all listed buildings or capacities as delivered, occupied or metered; CA3 is separate."
          },
          "notes": [
            "Santa Clara II retains future wording about portions of full buildout. The service label does not certify all listed buildings or capacities as delivered, occupied or metered; CA3 is separate.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. Current CA2 offers named campus service while retaining future full campus language. That mixed scope does not establish completion of all three buildings.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. Current CA2 offers named campus service while retaining future full campus language. That mixed scope does not establish completion of all three buildings."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. Current CA2 offers named campus service while retaining future full campus language. That mixed scope does not establish completion of all three buildings.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 36, October 23, 2026",
          "scope": "Approximate remains approximate. Named campus service area only. Existing native status remains operating.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -121.947369,
                "lat": 37.363224,
                "precision": "approximate",
                "basis": "Approximate named Vantage Santa Clara II, explicitly CA2 campus service area at 737 Mathew Street, Santa Clara, CA 95051, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains operating."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "737 Mathew Street, Santa Clara, CA 95051",
              "county_fips": [
                "06085"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The current official Vantage North American data center list explicitly separates Phoenix at 45 S. Bullard Avenue, Santa Clara II at 737 Mathew Street and Santa Clara III at 2590 Walsh Avenue. This record uses only its exact corresponding named campus section. Current individual Santa Clara pages explicitly identify CA2 and CA3. CA3 is described with future wording and native proposed remains proposed. CA2 includes mixed current and future marketing, which does not establish a physical stage. Each review adopts only an approximate named campus service area at the calculated street reference. No independent building, unit, full campus boundary, commissioning date, operator quantity or native status is inferred. Company business offices and map provider coordinates are excluded.",
            "Raw Census input, match and coordinates remain exact. Only the public point rounds to six decimals below 0.1 metre displacement, which is not a survey accuracy claim.",
            "Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. No residential roof is selected."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact separate named campus address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=737+Mathew+Street%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique calculated street range and retained county match"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.95132477409473%2C37.360079881178535%2C-121.94341316848926%2C37.36636805940347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            },
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/santa-clara-ii-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Separate current CA2 identity section, physical marketing not adopted"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate campus service area, not a confirmed parcel or building",
      "summary": "Santa Clara · Santa Clara · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current Santa Clara II page describes campus service, customer uptime and support by its in-house operations team. Santa Clara II retains future wording about portions of full buildout. The service label does not certify all listed buildings or capacities as delivered, occupied or metered; CA3 is separate."
    },
    {
      "id": "vantage-santa-clara-iii-ca3-ca",
      "state": "ca",
      "kind": "facility",
      "name": "Vantage Santa Clara III (CA3)",
      "group": "proposed",
      "status": "Operator-listed plan",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Santa Clara"
      ],
      "city": "Santa Clara",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Future tense;216MWallthreeSantaClaralocations is not CA3alone. Design near-zeroWUEis not measured current usage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/data-center/santa-clara-iii-california/",
          "host": "vantage-dc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact separate named campus address section"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2590+Walsh+Avenue%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique calculated street range and retained county match"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.97800287545826%2C37.36814421975653%2C-121.97009041943974%2C37.374432397981465&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -121.974047,
        "lat": 37.371288,
        "precision": "approximate",
        "basis": "Approximate named Vantage Santa Clara III, explicitly CA3 campus service area at 2590 Walsh Avenue, Santa Clara, CA 95051, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains proposed."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "campus_acres_approx": 8,
            "data_centers": 1,
            "planned_critical_it_mw": 64,
            "planned_area_sqft": 486000,
            "published_address": "2590 Walsh Avenue, Santa Clara, CA95051"
          },
          "notes": [
            "Future tense;216MWallthreeSantaClaralocations is not CA3alone. Design near-zeroWUEis not measured current usage.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center/santa-clara-iii-california/",
              "host": "vantage-dc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed plan",
              "basis": "The current Santa Clara III page describes CA3 and its facilities in future terms, including capacity upon completion.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "A current directory entry, rendering and specification envelope are not proof of construction or operation. CA1 and CA2 service does not establish CA3 completion."
          },
          "notes": [
            "A current directory entry, rendering and specification envelope are not proof of construction or operation. CA1 and CA2 service does not establish CA3 completion.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center/santa-clara-iii-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. CA3 is explicitly described as a future third site. The old singular data center URL remains reachable and is retained exactly; proposed figures are not delivered capacity.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. CA3 is explicitly described as a future third site. The old singular data center URL remains reachable and is retained exactly; proposed figures are not delivered capacity."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. CA3 is explicitly described as a future third site. The old singular data center URL remains reachable and is retained exactly; proposed figures are not delivered capacity.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center/santa-clara-iii-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 36, October 23, 2026",
          "scope": "Approximate remains approximate. Named campus service area only. Existing native status remains proposed.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -121.974047,
                "lat": 37.371288,
                "precision": "approximate",
                "basis": "Approximate named Vantage Santa Clara III, explicitly CA3 campus service area at 2590 Walsh Avenue, Santa Clara, CA 95051, matched to one Census street range inside the retained county. Not a confirmed parcel, independent building, tenant unit or completed full campus. Aerial acquisition date is unknown and may predate construction. Existing native status remains proposed."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2590 Walsh Avenue, Santa Clara, CA 95051",
              "county_fips": [
                "06085"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The current official Vantage North American data center list explicitly separates Phoenix at 45 S. Bullard Avenue, Santa Clara II at 737 Mathew Street and Santa Clara III at 2590 Walsh Avenue. This record uses only its exact corresponding named campus section. Current individual Santa Clara pages explicitly identify CA2 and CA3. CA3 is described with future wording and native proposed remains proposed. CA2 includes mixed current and future marketing, which does not establish a physical stage. Each review adopts only an approximate named campus service area at the calculated street reference. No independent building, unit, full campus boundary, commissioning date, operator quantity or native status is inferred. Company business offices and map provider coordinates are excluded.",
            "Raw Census input, match and coordinates remain exact. Only the public point rounds to six decimals below 0.1 metre displacement, which is not a survey accuracy claim.",
            "Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. No residential roof is selected."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact separate named campus address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2590+Walsh+Avenue%2C+Santa+Clara%2C+CA+95051&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique calculated street range and retained county match"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.97800287545826%2C37.36814421975653%2C-121.97009041943974%2C37.374432397981465&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            },
            {
              "url": "https://vantage-dc.com/data-center/santa-clara-iii-california/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Separate current CA3 future wording keeps area approximate"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate campus service area, not a confirmed parcel or building",
      "summary": "Santa Clara · Santa Clara · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current Santa Clara III page describes CA3 and its facilities in future terms, including capacity upon completion. A current directory entry, rendering and specification envelope are not proof of construction or operation. CA1 and CA2 service does not establish CA3 completion."
    },
    {
      "id": "vantage-stafford-va4-va",
      "state": "va",
      "kind": "facility",
      "name": "Vantage Data Centers VA4 Stafford Campus",
      "group": "proposed",
      "status": "Operator listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Stafford"
      ],
      "city": "",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-11-06",
          "Vantage published its VA4 campus announcement on November 6, 2025 and reported a groundbreaking celebration held that day. This records the company release and ceremony account, not an independently verified physical construction start, completed phase or data center opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/",
          "host": "vantage-dc.com",
          "date": "2025-11-06",
          "published": "2025-11-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/?trk=article-ssr-frontend-pulse_little-text-block",
          "host": "vantage-dc.com",
          "published": "2025-11-06",
          "date": "2025-11-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/fredericksburg-va",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact current VA4 campus service street"
        },
        {
          "url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0/query?where=STNO+%3D+%27225%27+AND+UPPER%28STNAME%29+LIKE+%27%25CENTREPORT%25%27&outFields=%2A&returnGeometry=true&outSR=4326&f=json",
          "host": "services1.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "One exact complete service street county reference parcel"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.47239037696575%2C38.38428844412504%2C-77.46092962303426%2C38.39327155587495&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        },
        {
          "url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0?f=pjson",
          "host": "services1.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact public parcel layer fields and reference mapping"
        },
        {
          "url": "https://staffordva-gis.maps.arcgis.com/sharing/rest/portals/self?f=pjson",
          "host": "staffordva-gis.maps.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact public county portal identity and general reference disclaimer"
        },
        {
          "url": "https://staffordcountyva.gov/government/gis_(maps)/index.php",
          "host": "staffordcountyva.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Official county GIS page links the same Stafford GIS public portal"
        }
      ],
      "loc": {
        "lng": -77.46666,
        "lat": 38.38878,
        "precision": "approximate",
        "basis": "Approximate mathematical center of the exact Stafford County parcel at the current named Vantage VA4 service street 225 Centreport Parkway, Fredericksburg, VA 22406. Parcel OBJECTID 47128, raw PRCLID 37        30 and normalized agency PARCEL_ID_NSP 3730 remain explicit. County reference mapping only, not a surveyed boundary, roof, future hall or completed full campus. Postal city does not override Stafford County. Aerial date is unknown and may predate development. Existing native status remains proposed."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "groundbreaking_date": "2025-11-06",
            "county": "Stafford",
            "planned_investment_usd": 2000000000,
            "planned_it_capacity_mw": 192,
            "campus_acres": 82,
            "planned_buildings": 3,
            "planned_area_sqft_approx": 929000,
            "first_building_opening_target": "late2027",
            "forecast_construction_jobs": 1100,
            "forecast_permanent_operations_jobs_min": 50
          },
          "notes": [
            "Fredericksburgregion is not municipalityassignment.782MW/8Bstatewide totals excluded. Target is future, not operating.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/",
              "host": "vantage-dc.com",
              "date": "2025-11-06",
              "published": "2025-11-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 20",
          "scope": "The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_development_listing_and_historical_ceremony_not_operation",
              "scope": "The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates."
            },
            "source_scope": {
              "current_first_building_target": "late 2027",
              "target_occurrence_not_verified": true,
              "groundbreaking_celebration_not_excavation_verification": true
            }
          },
          "notes": [
            "The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/?trk=article-ssr-frontend-pulse_little-text-block",
              "host": "vantage-dc.com",
              "published": "2025-11-06",
              "date": "2025-11-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/fredericksburg-va",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The November 6, 2025 VA4 source names Stafford County within the marketed Fredericksburg region. Late 2027 is a future target, and neither the regional label nor a reported ceremony changes jurisdiction, stage or milestones here.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The November 6, 2025 VA4 source names Stafford County within the marketed Fredericksburg region. Late 2027 is a future target, and neither the regional label nor a reported ceremony changes jurisdiction, stage or milestones here."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The November 6, 2025 VA4 source names Stafford County within the marketed Fredericksburg region. Late 2027 is a future target, and neither the regional label nor a reported ceremony changes jurisdiction, stage or milestones here.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/",
              "host": "vantage-dc.com",
              "published": "2025-11-06",
              "date": "2025-11-06",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 39, October 23, 2026",
          "scope": "Approximate remains approximate. One bounded county reference parcel only. Existing native status remains proposed.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -77.46666,
                "lat": 38.38878,
                "precision": "approximate",
                "basis": "Approximate mathematical center of the exact Stafford County parcel at the current named Vantage VA4 service street 225 Centreport Parkway, Fredericksburg, VA 22406. Parcel OBJECTID 47128, raw PRCLID 37        30 and normalized agency PARCEL_ID_NSP 3730 remain explicit. County reference mapping only, not a surveyed boundary, roof, future hall or completed full campus. Postal city does not override Stafford County. Aerial date is unknown and may predate development. Existing native status remains proposed."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": " 37        30",
                "identifier_field": "PRCLID",
                "normalized_agency_identifier": "3730",
                "objectid": 47128,
                "agency": "Stafford County GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "county_codes_inferred": false
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "The current operator VA4 campus section gives 225 Centreport Parkway, Fredericksburg, Virginia 22406. One current Stafford county parcel has FULLADD 225 CENTREPORT PKWY, STNO 225, STNAME CENTREPORT, suffix PKWY and postal city FREDERICKSBURG ZIP 22406. The official county GIS page links the Stafford GIS portal, whose org id qKiA6JuCrE2l72iL is the exact parcel service org. The retained Stafford county is corroborated by polygon containment. Postal Fredericksburg does not become the independent city jurisdiction. No owner, future building, technical or physical marketing claim is adopted.",
            "The earlier inherited inventory reference was not verified and is about 6.15 km from the exact current VA4 operator street and unique county parcel. Current named operator street and county situs fields agree on 225 Centreport Parkway, and the calculated parcel center lies inside retained Stafford County. This evidence replaces only the unsupported inherited reference with an approximate county parcel area; no future hall, roof, full campus extent or physical stage is certified.",
            "Actually viewed wooded and open ground with streets and nearby commercial forms. Acquisition date is unknown and may predate the planned development. No particular residence, future roof, current physical stage or full campus boundary is selected.",
            "Raw parcel and component codes have no invented legal, title, ownership, unit or physical meanings. Only the mathematical center is used. Raw polygon geometry is retained in research and not exported as a full campus boundary."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact current VA4 campus service street"
            },
            {
              "url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0/query?where=STNO+%3D+%27225%27+AND+UPPER%28STNAME%29+LIKE+%27%25CENTREPORT%25%27&outFields=%2A&returnGeometry=true&outSR=4326&f=json",
              "host": "services1.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "One exact complete service street county reference parcel"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.47239037696575%2C38.38428844412504%2C-77.46092962303426%2C38.39327155587495&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            },
            {
              "url": "https://services1.arcgis.com/qKiA6JuCrE2l72iL/arcgis/rest/services/Parcels/FeatureServer/0?f=pjson",
              "host": "services1.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact public parcel layer fields and reference mapping"
            },
            {
              "url": "https://staffordva-gis.maps.arcgis.com/sharing/rest/portals/self?f=pjson",
              "host": "staffordva-gis.maps.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact public county portal identity and general reference disclaimer"
            },
            {
              "url": "https://staffordcountyva.gov/government/gis_(maps)/index.php",
              "host": "staffordcountyva.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official county GIS page links the same Stafford GIS public portal"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate county reference parcel, not a confirmed building or full campus",
      "summary": "Stafford · Source context reviewed",
      "status_scope": "The current Vantage VA4 page describes the Fredericksburg region campus in future terms, with a first building target in late 2027. Operator listed development describes that current listing. The November 6, 2025 release reports a groundbreaking celebration that day; a ceremony does not independently certify current excavation, individual building completion or operational service. Future phase targets, planned utility infrastructure and design specifications are not actual delivered quantities or opening dates.",
      "event_evidence": [
        {
          "date": "2025-11-06",
          "text": "Vantage published its VA4 campus announcement on November 6, 2025 and reported a groundbreaking celebration held that day. This records the company release and ceremony account, not an independently verified physical construction start, completed phase or data center opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/?trk=article-ssr-frontend-pulse_little-text-block",
              "host": "vantage-dc.com",
              "published": "2025-11-06",
              "date": "2025-11-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ]
    },
    {
      "id": "vantage-wa13-quincy-wa",
      "state": "wa",
      "kind": "facility",
      "name": "Vantage WA13",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grant"
      ],
      "city": "Quincy",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. WA13delivery and resulting whole campus. WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/",
          "host": "vantage-dc.com",
          "date": "2023-10-18",
          "published": "2023-10-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 47.08004,
        "lng": -119.51703,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "WA13delivery and resulting whole campus",
          "fields": {
            "wa13_delivery_announcement": "2023-10-18",
            "wa13_area_sqft": 530000,
            "wa13_it_capacity_mw": 64,
            "resulting_campus_it_capacity_mw": 89,
            "campus_acres": 68,
            "resulting_campus_area_sqft_approx": 775000,
            "campus_buildings": 3,
            "operator_reported_campus_investment_usd_min_exclusive": 1000000000
          },
          "notes": [
            "WA13capacity is included in89MWcampus; not89MWforWA11and64extra.1B+investment wholecampus since2011. Utility hydro generation excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/",
              "host": "vantage-dc.com",
              "date": "2023-10-18",
              "published": "2023-10-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 18, 2023 announcement explicitly reports Vantage development of WA13 as the third Quincy facility. Only that source dated developer relationship is adopted. No current operator identity, opening date, stage, whole campus certification or point is inferred for WA11, WA12 or WA13.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 18, 2023 announcement explicitly reports Vantage development of WA13 as the third Quincy facility. Only that source dated developer relationship is adopted. No current operator identity, opening date, stage, whole campus certification or point is inferred for WA11, WA12 or WA13."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 18, 2023 announcement explicitly reports Vantage development of WA13 as the third Quincy facility. Only that source dated developer relationship is adopted. No current operator identity, opening date, stage, whole campus certification or point is inferred for WA11, WA12 or WA13.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/",
              "host": "vantage-dc.com",
              "published": "2023-10-18",
              "date": "2023-10-18",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Quincy · Grant · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "53025"
      }
    },
    {
      "id": "vantage-westlake-south-fulton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Vantage Data Centers Westlake",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "South Fulton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
          "host": "insidetowers.com",
          "date": "2024-08-16",
          "published": "2024-08-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.70983,
        "lng": -84.50903,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.",
            "independently_verified_current_operating_status": null,
            "site_specific_scope": "Westlake754000sqft/January2028forecast"
          },
          "notes": [
            "Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
              "host": "insidetowers.com",
              "date": "2024-08-16",
              "published": "2024-08-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "South Fulton · Fulton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
