{
  "schema_version": 1,
  "record_types": {
    "regulator_record": "Regulator record",
    "permit_and_comment": "Permit and comment",
    "formal_complaint": "Formal complaint",
    "legal_action": "Legal action",
    "public_concern_on_record": "Public concern on the record",
    "news_report": "News report"
  },
  "categories": {
    "noise": "Noise",
    "water_use": "Water use",
    "water_quality_discharge": "Water quality and discharge",
    "air_generators": "Air and generators",
    "power_rates": "Power and electric rates",
    "light": "Light",
    "traffic_construction": "Traffic and construction",
    "land_use_zoning": "Land use and zoning",
    "wildlife_wetlands_stormwater": "Wildlife, wetlands and stormwater",
    "heat": "Heat",
    "health": "Health",
    "other": "Other"
  },
  "statuses": [
    "open",
    "pending",
    "resolved",
    "dismissed",
    "withdrawn",
    "unknown"
  ],
  "sort_note": "Newest recorded activity first, using the latest known event, disposition, item-source publication or verified company-response publication date. A source-check date never moves an item up the list.",
  "limits": "Counts are unique documented items, not a measure of harm or a ranking of sites. Coverage is incomplete. An empty list does not establish that no concern was raised. A published allegation is not an Atlas finding. Case disposition is separate from Atlas publication corrections. This export contains current Atlas items, including documented historical withdrawn cases.",
  "correction_url": "https://shaunwilsondesigns.com/contact/",
  "coverage": {
    "as_of": "2026-10-24",
    "current_items": 206,
    "unique_subjects": 176,
    "site_campus_project_subjects": 142,
    "county_subjects": 34,
    "states_with_items": 49,
    "items_by_state": {
      "ak": 2,
      "al": 3,
      "ar": 1,
      "az": 8,
      "ca": 18,
      "co": 2,
      "ct": 1,
      "de": 3,
      "fl": 3,
      "ga": 10,
      "hi": 1,
      "ia": 4,
      "id": 1,
      "il": 10,
      "in": 10,
      "ks": 2,
      "ky": 5,
      "la": 3,
      "ma": 2,
      "md": 4,
      "me": 2,
      "mi": 8,
      "mn": 3,
      "mo": 9,
      "ms": 1,
      "mt": 2,
      "nc": 7,
      "nd": 1,
      "ne": 3,
      "nh": 1,
      "nj": 2,
      "nm": 3,
      "nv": 3,
      "ny": 4,
      "oh": 4,
      "ok": 3,
      "or": 4,
      "pa": 7,
      "ri": 1,
      "sc": 5,
      "sd": 1,
      "tn": 6,
      "tx": 4,
      "ut": 5,
      "va": 10,
      "wa": 3,
      "wi": 5,
      "wv": 5,
      "wy": 1
    },
    "items_by_type": {
      "regulator_record": 17,
      "permit_and_comment": 41,
      "formal_complaint": 0,
      "legal_action": 18,
      "public_concern_on_record": 89,
      "news_report": 41
    },
    "items_by_category": {
      "noise": 80,
      "water_use": 89,
      "water_quality_discharge": 34,
      "air_generators": 75,
      "power_rates": 83,
      "light": 16,
      "traffic_construction": 19,
      "land_use_zoning": 104,
      "wildlife_wetlands_stormwater": 36,
      "heat": 7,
      "health": 27,
      "other": 67
    },
    "items_by_status": {
      "open": 0,
      "pending": 5,
      "resolved": 17,
      "dismissed": 3,
      "withdrawn": 6,
      "unknown": 175
    },
    "checked_within120": 206,
    "checked_over120": 0,
    "recheck_interval_days": 120,
    "items_requiring_recheck": 180,
    "rechecks_due": 0,
    "latest_checked_on": "2026-10-24",
    "earliest_checked_on": "2026-10-18",
    "scope": "Counts are unique documented items, not a measure of harm or a ranking of sites. Coverage is incomplete. An empty list does not establish that no concern was raised. A published allegation is not an Atlas finding. Multiple categories do not increase the unique item total. States with items are not completely reviewed states. Concern checks do not advance facility status, location, technical-field freshness or primary-field scores. Status applies only to the described item or proceeding; a resolved procedural petition does not resolve underlying allegations."
  },
  "items": [
    {
      "id": "concern:va-gwu-amazon-opposition-preliminary-alternative",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The exact day on which the underlying opposition was raised is not established. The October 20 board negotiation action is a separate dated procedural event.",
      "published_on": "2026-10-22",
      "source_date_note": "October 22, 2026 is the county release publication date. It is not the first day of the underlying public opposition.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:281ecc27422f19e666d41759"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Loudoun County reported significant opposition to data center development at the Amazon GWU campus and announced preliminary alternative use terms. The county described an intent to withdraw the data center application while final agreements still required negotiation. This records attributed opposition and a preliminary response, not a completed withdrawal or a finding of environmental harm.",
      "quote": null,
      "operator_response": {
        "organization": "Amazon Web Services",
        "summary": "Amazon Web Services stated an intent to withdraw the data center application according to Loudoun County. The county reported that final agreements remained to be negotiated.",
        "source_ids": [
          "source:281ecc27422f19e666d41759"
        ],
        "published_on": "2026-10-22",
        "checked_on": "2026-10-22",
        "relationship": "Agency published statement relates to the same named proposal and its future land use or mitigation approach.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:amazon-bridgefield-tech-center-ashburn-loudoun-va",
      "record_id": "amazon-bridgefield-tech-center-ashburn-loudoun-va",
      "subject_label": "Bridgefield Tech Center",
      "actor": {
        "kind": "agency",
        "label": "Loudoun County",
        "source_ids": [
          "source:281ecc27422f19e666d41759"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:281ecc27422f19e666d41759",
          "url": "https://www.loudoun.gov/m/newsflash/Home/Detail/10944",
          "publisher": "Loudoun County",
          "source_type": "government_record",
          "published_on": "2026-10-22",
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:ca-san-diego-mayoral-resource-housing-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": "2026-10-22",
      "event_date_note": "The official account expressly dates this institutional public statement October 22, 2026. This is not the first earlier community complaint, a final Council vote or the moratorium effective day.",
      "published_on": "2026-10-22",
      "source_date_note": "The source expressly dates its public statement. This is separate from a legal effective day or the first earlier community complaint.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:0e2dd3f219e5089bcd29b010"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of San Diego published concerns raised by the Mayor about potential data center demands on water, electricity costs, housing opportunities, infrastructure and neighborhoods while directing staff to prepare regulations and a proposed pause. The statement concerns City policy within San Diego County. It does not enact the future Council proposal, establish actual utility increases or find harm at an individual facility.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:06073",
      "record_id": null,
      "subject_label": "San Diego County",
      "actor": {
        "kind": "agency",
        "label": "City of San Diego",
        "source_ids": [
          "source:0e2dd3f219e5089bcd29b010"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:0e2dd3f219e5089bcd29b010",
          "url": "https://www.sandiego.gov/mayor/mayor-gloria-signs-executive-order-directing-moratorium-data-centers-san-diego",
          "publisher": "City of San Diego",
          "source_type": "government_record",
          "published_on": "2026-10-22",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:pa-smithfield-gateway-technical-noise-and-application-review-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "pa",
      "record_type": "permit_and_comment",
      "categories": [
        "noise",
        "land_use_zoning",
        "power_rates",
        "other"
      ],
      "event_on": "2026-09-11",
      "event_date_note": "The technical review letter is dated September 11, 2026.",
      "published_on": "2026-09-11",
      "source_date_note": "This is the date printed on the original agency document. The first online posting day was not independently established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:be159948d1f1e8e3b5885d2c",
        "source:f8ee3098780703dd4690dd11"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Smithfield Township consulting engineer T&M Associates requested additional Smithfield Gateway conditional use information and identified unresolved issues in the sound analysis, modeled equipment and barrier dimensions, electrical disturbance review and project information. These are technical application comments, not findings of actual noise from an operating facility or a final conditional use denial. The later published applicant correspondence offers revisions and a procedural hearing schedule without establishing completed compliance.",
      "quote": null,
      "operator_response": {
        "organization": "DEPG applicant representatives",
        "summary": "DEPG applicant representatives said they intended to revise the plans and address engineering comments, with technical noise matters treated separately. The Township published correspondence also records agreement to a limited party status and scheduling hearing. These are applicant statements and a procedural agreement, not independent verification that the concerns are resolved or a permit has been granted.",
        "source_ids": [
          "source:f8ee3098780703dd4690dd11"
        ],
        "published_on": "2026-10-21",
        "checked_on": "2026-10-23",
        "relationship": "The correspondence identifies representatives of the named applicants. This attribution does not establish a data center operator role or change any provider relationship.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:depg-smithfield-gateway-data-center-monroe-pa",
      "record_id": "depg-smithfield-gateway-data-center-monroe-pa",
      "subject_label": "Smithfield Gateway Data Center",
      "actor": {
        "kind": "agency",
        "label": "Smithfield Township consulting engineer",
        "source_ids": [
          "source:be159948d1f1e8e3b5885d2c",
          "source:f8ee3098780703dd4690dd11"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:be159948d1f1e8e3b5885d2c",
          "url": "https://smithfieldtownship.com/wp-content/uploads/2026/09/Smithfield-Gateway-Data-Center_Conditional-Use-Review-No.-2.pdf",
          "publisher": "Smithfield Township",
          "source_type": "government_record",
          "published_on": "2026-09-11",
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:f8ee3098780703dd4690dd11",
          "url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf",
          "publisher": "Smithfield Township",
          "source_type": "government_record",
          "published_on": "2026-10-21",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ia-hancock-mcni-kiow-land-use-report-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "ia",
      "record_type": "news_report",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The newer report does not establish an exact executed withdrawal, filing or agency event day. The earlier relative Wednesday vote description is not converted to an unverified exact date.",
      "published_on": "2026-10-17",
      "source_date_note": "The original current report JSON-LD records October 17, 2026 publication and a later same-day modification. The earlier report is dated September 10, 2026. Neither substitutes for an unverified formal filing day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later formal application or appeal disposition is unknown in this bounded review. A reported landowner decision about a business deal is distinct from a verified project withdrawal, final agency appeal outcome or resolution of every land-use objection.",
      "source_ids": [
        "source:4715cc734398040bfdf3bf52",
        "source:60e2d85bf714c828528e0bd5"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "KIOW reported a county supervisor's account that a landowner was withdrawing from a proposed MCNI data-center land deal. Its earlier report described public opposition and an appealable agricultural-to-industrial rezoning denial. These are the outlet's accounts, not independently inspected land, zoning or appeal records, formal project withdrawal or a final environmental determination.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:mcni-concord-township-hancock-county-ia",
      "record_id": "mcni-concord-township-hancock-county-ia",
      "subject_label": "MCNI Concord Township Data Center",
      "actor": {
        "kind": "outlet",
        "label": "KIOW",
        "source_ids": [
          "source:4715cc734398040bfdf3bf52"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:4715cc734398040bfdf3bf52",
          "url": "https://kiow.com/2026/10/17/proposed-hancock-county-data-center-hits-major-roadblock/",
          "publisher": "KIOW",
          "source_type": "news",
          "published_on": "2026-10-17",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:60e2d85bf714c828528e0bd5",
          "url": "https://kiow.com/2026/09/10/rezoning-change-in-hancock-county-denied/",
          "publisher": "KIOW",
          "source_type": "news",
          "published_on": "2026-09-10",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:sc-valara-selc-reported-contested-case-request-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "sc",
      "record_type": "legal_action",
      "categories": [
        "air_generators",
        "health"
      ],
      "event_on": "2026-10-16",
      "event_date_note": "The counsel release expressly states that it filed the request that day, October 16, 2026. This is the filing counsel's stated date; no independent court stamp or docket acceptance was inspected.",
      "published_on": "2026-10-16",
      "source_date_note": "The original counsel release is explicitly dated October 16, 2026. Publication of the actual filed request packet and an original signed permit was not established.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current court disposition is unknown in this bounded review. Counsel reported filing a request; the requested remand and construction restriction are not an order, verified injunction or final merits outcome.",
      "source_ids": [
        "source:7da3a4eb88d864032d2eab88"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Southern Environmental Law Center reported filing a request for a contested-case hearing on Valara's air permit, alleging errors in emissions calculations and public participation. It requested remand and restrictions on turbine construction. These are counsel's account, allegations and requested relief, not court findings or an independently inspected injunction.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:northmark-valara-spartanburg-sc",
      "record_id": "northmark-valara-spartanburg-sc",
      "subject_label": "NorthMark Strategies Spartanburg High-Performance Computing Center",
      "actor": {
        "kind": "public_group",
        "label": "Southern Environmental Law Center",
        "source_ids": [
          "source:7da3a4eb88d864032d2eab88"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:7da3a4eb88d864032d2eab88",
          "url": "https://www.selc.org/press-release/selc-appeals-valara-air-permit-approval/",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": "2026-10-16",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ok-project-spring-opmx-reported-water-consultation-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "ok",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The reports describe several interviews, council discussions and legislative actions without one independently inspected exact concern-event day for this item. Event date remains unknown; neither an interview nor a source-check day is substituted.",
      "published_on": "2026-10-16",
      "source_date_note": "The original OPMX follow-up was published October 16, 2026; its earlier water and consultation report was published June 25. The project page displays a January 14 update, but its exact first publication date is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present mineral-lease and project disposition and outcome of the documented water questions are unknown in this bounded review. OPMX reported that a separate approval-authority bill did not become law. That report is not a verified project approval, denial, final lease decision or resolution of every concern.",
      "source_ids": [
        "source:c6578642103dca13f477c535",
        "source:df72b15320219483df8f1034"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Oklahoma Public Media Exchange reported Osage tribal officials' questions about water and consultation for Google's proposed Project Spring in Sand Springs. An October follow-up reported that a separate tribal-approval bill did not become law. These are outlet accounts; that legislative outcome does not establish project approval or resolution of the water questions.",
      "quote": null,
      "operator_response": {
        "organization": "White Rose Partners",
        "summary": "White Rose Partners stated on the Project Spring page that initial phases would use non-evaporative cooling and that later water decisions would be coordinated with Sand Springs. These are developer plans, not measured water use, permanent whole-campus commitments or verified approvals.",
        "source_ids": [
          "source:4152abff078e9310ea79ae86"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original developer page explicitly identifies the same Sand Springs proposal. Its plans relate to the reported water questions, but it is not a verified Google-authored statement or an express answer to the later tribal bill. First publication date is unknown.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:google-spring-sand-springs-ok",
      "record_id": "google-spring-sand-springs-ok",
      "subject_label": "Project Spring (Sand Springs)",
      "actor": {
        "kind": "outlet",
        "label": "Oklahoma Public Media Exchange",
        "source_ids": [
          "source:c6578642103dca13f477c535"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:4152abff078e9310ea79ae86",
          "url": "https://www.projectspringok.com/",
          "publisher": "White Rose Partners, Project Spring",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:c6578642103dca13f477c535",
          "url": "https://www.kgou.org/indigenous-news/2026-06-25/as-data-centers-eye-oklahoma-tribes-weigh-the-costs",
          "publisher": "Oklahoma Public Media Exchange",
          "source_type": "news",
          "published_on": "2026-06-25",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:df72b15320219483df8f1034",
          "url": "https://www.kgou.org/indigenous-news/2026-10-16/osage-bills-about-data-center-operations-reopening-immersion-school-fail-after-pocket-vetoes",
          "publisher": "Oklahoma Public Media Exchange",
          "source_type": "news",
          "published_on": "2026-10-16",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-vernon-cbe-cbd-comment-2026",
      "version": 2,
      "subject_kind": "project",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators",
        "power_rates",
        "health"
      ],
      "event_on": "2026-09-04",
      "event_date_note": "The retained original filing or effective order provides this exact event date.",
      "published_on": "2026-09-04",
      "source_date_note": "The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The individual comment outcome has not been established by this bounded original-source review. A project-page process label is not its disposition.",
      "source_ids": [
        "source:73ae34d553adff93b7658216",
        "source:1e8c75890a60ec6d5e4718ce"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Communities for a Better Environment and Center for Biological Diversity filed comments disputing separate review of adjacent generator facilities and requesting analysis of cumulative air emissions, energy demand and public health for Goodman Energy Park. The groups' arguments and predictions are not agency findings, verified health effects or an Atlas decision to merge facilities.",
      "quote": null,
      "operator_response": {
        "organization": "GIC Vernon LLC",
        "summary": "GIC Vernon LLC filed a response disputing the groups' proposed aggregation of the neighboring generator facilities and their air-quality, public-health and cumulative-operation arguments. The applicant cited its own modeling and permitting interpretation. These are company arguments in a public filing, not an agency ruling or independently verified Atlas conclusions.",
        "source_ids": [
          "source:53a8ddddb911b78166e0812b"
        ],
        "published_on": "2026-10-14",
        "checked_on": "2026-10-18",
        "relationship": "The applicant reply expressly identifies the September 4 comment TN272337 and answers it in the Vernon exemption proceeding. Its October 13 body date differs from October 14 docket publication. The response does not establish that separate facilities should be merged in the Atlas.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "Corrected spacing in the response relationship dates. Source dates, attribution, subject and disposition are unchanged.",
      "subject_id": "site:goodman-energy-park-vernon-ca",
      "record_id": "goodman-energy-park-vernon-ca",
      "subject_label": "Goodman Energy Park Data Center",
      "actor": {
        "kind": "public_group",
        "label": "Communities for a Better Environment and Center for Biological Diversity",
        "source_ids": [
          "source:73ae34d553adff93b7658216"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:1e8c75890a60ec6d5e4718ce",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:53a8ddddb911b78166e0812b",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273125&DocumentContentId=120867",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2026-10-14",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:73ae34d553adff93b7658216",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=272337&DocumentContentId=120032",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2026-09-04",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:oh-aligned-chillicothe-resource-news-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "oh",
      "record_type": "news_report",
      "categories": [
        "power_rates",
        "water_use",
        "water_quality_discharge",
        "noise"
      ],
      "event_on": "2026-10-12",
      "event_date_note": "The original article identifies the October 12, 2026 council session in its embedded-video captions; October 13 is publication. Videos and audio were not reviewed.",
      "published_on": "2026-10-13",
      "source_date_note": "Scioto Post displays October 13, 2026. The separate identity/context article from The Post displays August 31. Publication days are distinct from the October 12 meeting.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of these reported concerns is not established by this bounded review.",
      "source_ids": [
        "source:7732c4fc9c2e7f5a423ccfc2",
        "source:0047a62235d35f7676f565af"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Scioto Post reported continued council discussion of power use, water consumption, wastewater and noise concerns about a possible data center at the former Chillicothe paper mill. The article also reported a council member describing utility staff projections; those positions are not measured impacts or an independently inspected engineering study.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:aligned-chillicothe-ross-oh",
      "record_id": "aligned-chillicothe-ross-oh",
      "subject_label": "Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)",
      "actor": {
        "kind": "outlet",
        "label": "Scioto Post",
        "source_ids": [
          "source:7732c4fc9c2e7f5a423ccfc2"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:0047a62235d35f7676f565af",
          "url": "https://www.thepostathens.com/article/2026/08/data-center-chillicothe-moratorium-southeast-ohio",
          "publisher": "The Post",
          "source_type": "news",
          "published_on": "2026-08-31",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:7732c4fc9c2e7f5a423ccfc2",
          "url": "https://www.sciotopost.com/data-center-concerns-continue-in-chillicothe-council/",
          "publisher": "Scioto Post",
          "source_type": "news",
          "published_on": "2026-10-13",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-rb-inyokern-resident-filing-20261012",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "noise",
        "heat",
        "air_generators",
        "land_use_zoning"
      ],
      "event_on": "2026-10-12",
      "event_date_note": "The official docket cover records filing October 12, 2026 after submission October 11. This dates this separate resident filing, not the earliest earlier community concern or well association submission.",
      "published_on": null,
      "source_date_note": "The public docket date is established. The exact first online publication day is not separately certified.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The published resident filing requests review and protections. Current agency disposition, actual facility impacts and any operator response to this specific filing remain unverified.",
      "source_ids": [
        "source:2601eb17e3d3bf377217b25f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised noise, ambient heat, water supply, power reliability and generator concerns in a separate October public filing about RB Inyokern, requesting a full environmental impact report and enforceable protections. These are attributed resident concerns and requests, not verified measurements, agency findings or confirmed effects on wells or nearby institutions. The earlier well association submission remains a separate record.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:rb-inyokern-data-center-ca",
      "record_id": "rb-inyokern-data-center-ca",
      "subject_label": "RB Inyokern Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:2601eb17e3d3bf377217b25f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:2601eb17e3d3bf377217b25f",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273104&DocumentContentId=120831",
          "publisher": "California Energy Commission public docket",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:il-aurora-cyrusone-city-noise-update-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise"
      ],
      "event_on": "2026-04-23",
      "event_date_note": "The event date records the dated city update, not the unknown first complaint or a complaint filing day.",
      "published_on": "2026-04-23",
      "source_date_note": "The city page displays April 23, 2026. The later company statement is separately dated October 9.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the city-recorded noise concerns is unknown. The company reports mitigation progress, but no independently verified complaint resolution or measured compliance outcome was established in this bounded review.",
      "source_ids": [
        "source:d2975fe589ede348482ef64e"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Aurora acknowledged noise complaints concerning CyrusOne in an update about scheduled electrical maintenance and daytime generator use. The city described ongoing work toward a solution. This public update does not publish individual complaint files or a count, and it does not establish an adjudicated noise violation.",
      "quote": null,
      "operator_response": {
        "organization": "CyrusOne",
        "summary": "CyrusOne reported that previously scheduled sound-mitigation work at Buildings 2 and 3 was complete and that additional sound-attenuation measures at Building 3 were continuing. This is the company's dated progress statement, not an independent sound measurement or a verified complaint outcome.",
        "source_ids": [
          "source:fc77047d6aba3319460c646b"
        ],
        "published_on": "2026-10-09",
        "checked_on": "2026-10-18",
        "relationship": "The October 9 company update addresses mitigation at the same Aurora campus and provides later context for the recorded noise concerns. It is not presented as an express reply to the city's April 23 article or proof that every complaint is resolved.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:cyrusone-chi1-chi3-aurora-il",
      "record_id": "cyrusone-chi1-chi3-aurora-il",
      "subject_label": "CyrusOne CHI1-CHI3 (Aurora)",
      "actor": {
        "kind": "agency",
        "label": "City of Aurora",
        "source_ids": [
          "source:d2975fe589ede348482ef64e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:d2975fe589ede348482ef64e",
          "url": "https://www.aurora.il.us/News-articles/CyrusOne-Noise-Mitigation-Updates",
          "publisher": "City of Aurora",
          "source_type": "government_record",
          "published_on": "2026-04-23",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fc77047d6aba3319460c646b",
          "url": "https://www.cyrusone.com/data-centers/north-america/aurora-il-back-up-generator-schedule",
          "publisher": "CyrusOne",
          "source_type": "company_page",
          "published_on": "2026-10-09",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:warrenton-air-permit-102026-007-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "mo",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-10-08",
      "event_date_note": "October 8, 2026 is the effective date printed on the signed permit face. It is not inferred to be the first public posting,actual startup or a later compliance determination.",
      "published_on": null,
      "source_date_note": "The first online publication day is unknown. Permit-face effectiveness,application dates, PDF timestamps and URL folders do not supply that publication day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "Permit authorization is recorded. The current outcome of the ongoing permit conditions and current compliance is not established by this bounded review; unknown does not withdraw the effective permit or decide underlying public concerns.",
      "source_ids": [
        "source:66b3445d9c5a545d1161c65f",
        "source:0fbe527979e2869553a253e2"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Missouri Department of Natural Resources issued a construction air permit for emergency diesel generators, fire-pump engines and associated fuel storage at Warrenton Data Center, effective October 8, 2026, subject to nitrogen-oxide, testing, emergency-use and recordkeeping conditions. The authorization is not a violation finding or evidence of actual startup, measured emissions or delivered computing capacity.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:crusoe-warrenton-mo",
      "record_id": "crusoe-warrenton-mo",
      "subject_label": "Crusoe Warrenton Campus",
      "actor": {
        "kind": "agency",
        "label": "Missouri Department of Natural Resources",
        "source_ids": [
          "source:66b3445d9c5a545d1161c65f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:0fbe527979e2869553a253e2",
          "url": "https://ecode360.com/WA3466/document/753231245.pdf",
          "publisher": "City of Warrenton",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:66b3445d9c5a545d1161c65f",
          "url": "https://dnr.mo.gov/sites/dnr/files/vfc/2026/10/main/warrenton-data-center-102026-007.pdf",
          "publisher": "Missouri Department of Natural Resources",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ky-fayette-council-resource-regulation-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "ky",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "power_rates",
        "other"
      ],
      "event_on": "2026-10-08",
      "event_date_note": "The signed resolution and official legislative history establish October 8, 2026 passage. That dates the institutional record; the first day individual public comments were made is unknown.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:33aa2e9807f012acf72d2e61"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Lexington Fayette Urban County Council recorded public concern about environmental effects, nuisances and residential energy costs in its October extension resolution. It also recorded disagreement about regulation and uncertainty about data center needs of existing healthcare, banking and telecommunications industries. These are attributed reasons for further planning and public hearings, not measured harm, agreement by every resident or a finding that concerns were resolved.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:21067",
      "record_id": null,
      "subject_label": "Fayette County",
      "actor": {
        "kind": "agency",
        "label": "Lexington Fayette Urban County Council",
        "source_ids": [
          "source:33aa2e9807f012acf72d2e61"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:33aa2e9807f012acf72d2e61",
          "url": "https://lexington.legistar.com/View.ashx?M=F&ID=16055309&GUID=12C712EF-30F8-43EB-A046-AC1397EE9A18",
          "publisher": "Lexington Fayette Urban County Government",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ca-san-joaquin-board-resource-policy-account-20261007",
      "version": 1,
      "subject_kind": "county",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The publication date does not independently establish the exact Board vote or first concern day. No meeting day is inferred from the publication header.",
      "published_on": "2026-10-07",
      "source_date_note": "The original County news account is dated October 7, 2026. This records issuer publication rather than the exact first concern, Board vote, legal commencement or expiry.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:2d7ab10b08cce2111df040cd"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "San Joaquin County Board of Supervisors and Community Development Department identify questions about computing development water supply, electricity, agriculture, noise, public infrastructure and emergency response in the original October 7, 2026 County account. The account reports a pause and a separate study to examine potential effects and future standards. These are attributed policy concerns rather than measured shortages, a proven agricultural loss, a facility violation or a finding about incorporated cities. Reported pause approval does not establish resolution of these concerns, complete current law or an exact legal endpoint.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:06077",
      "record_id": null,
      "subject_label": "San Joaquin County",
      "actor": {
        "kind": "agency",
        "label": "San Joaquin County Board of Supervisors and Community Development Department",
        "source_ids": [
          "source:2d7ab10b08cce2111df040cd"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:2d7ab10b08cce2111df040cd",
          "url": "https://www.sjgov.org/department/bos/board-news/board-news-detail/2026/10/07/board-adopts-45-day-moratorium-on-land-approvals-for-new-data-centers",
          "publisher": "San Joaquin County Board of Supervisors",
          "source_type": "government_record",
          "published_on": "2026-10-07",
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:ak-cook-inlet-reported-fisheries-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "ak",
      "record_type": "news_report",
      "categories": [
        "noise",
        "heat",
        "water_quality_discharge",
        "wildlife_wetlands_stormwater",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The original source reports historical concerns or a developing procedure without one independently verified exact concern-event day; weekday or year-only references are not converted to guessed dates.",
      "published_on": "2026-10-07",
      "source_date_note": "The displayed original publication day is recorded separately from the event and source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.",
      "source_ids": [
        "source:ccb9e8043b7863608da09f35",
        "source:457fbc7349dc225d2c5440ef"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "National Fisherman reported fishing, conservation and borough concerns about salmon migration, marine habitat, vessel navigation, heat, noise and public participation in the DeepGreen Cook Inlet proposal. It also reported the company's position that studies would address those questions. The underlying intervention filings and original company interview were not independently reviewed; these are reported concerns and positions, not findings of actual harm.",
      "quote": null,
      "operator_response": {
        "organization": "DeepGreen",
        "summary": "DeepGreen stated, according to National Fisherman's account of an ADN interview, that a preliminary permit permits study rather than construction and that fisheries and marine-life questions would be studied. This is second-hand reporting of the company position, not a completed study or verified safety finding.",
        "source_ids": [
          "source:ccb9e8043b7863608da09f35"
        ],
        "published_on": "2026-10-07",
        "checked_on": "2026-10-18",
        "relationship": "Trade publication quotes and attributes company response to ADN; original ADN interview not independently inspected.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:deepgreen-cook-inlet-nikiski-ak",
      "record_id": "deepgreen-cook-inlet-nikiski-ak",
      "subject_label": "Cook Inlet Subsea-Compute & Infrastructure Hub",
      "actor": {
        "kind": "outlet",
        "label": "National Fisherman",
        "source_ids": [
          "source:ccb9e8043b7863608da09f35"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:457fbc7349dc225d2c5440ef",
          "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18147.pdf",
          "publisher": "Federal Energy Regulatory Commission",
          "source_type": "government_record",
          "published_on": "2026-09-04",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ccb9e8043b7863608da09f35",
          "url": "https://www.nationalfisherman.com/fishing-groups-concerned-over-proposed-cook-inlet-data-center",
          "publisher": "National Fisherman",
          "source_type": "news",
          "published_on": "2026-10-07",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-alameda-oakland-council-resource-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "noise",
        "heat",
        "land_use_zoning",
        "air_generators",
        "health"
      ],
      "event_on": "2026-10-06",
      "event_date_note": "The attested ordinance dates Council passage October 6, 2026. This dates the legislative record rather than the first earlier resident concern. The October 13 filing stamp is separate.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not established by the clerk filing stamp or source check date.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The adopted ordinance records City concerns and a temporary approval restriction. Current resolution of the concerns, actual facility effects, later legal amendments and individual property eligibility remain unverified. Legislative adoption does not resolve the underlying concerns.",
      "source_ids": [
        "source:5ba3f3fdabaf80f69b06f622"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Oakland City Council recorded potential electricity and water demand, generator emissions, noise, heat, vibration, infrastructure and land use compatibility concerns in Ordinance 13899. These are attributed legislative findings and reasons for a temporary approval pause within the City. Actual impacts at 415 20th Street or any other individual facility remain unverified. County aggregation does not extend City authority throughout Alameda County.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:06001",
      "record_id": null,
      "subject_label": "Alameda County",
      "actor": {
        "kind": "agency",
        "label": "Oakland City Council",
        "source_ids": [
          "source:5ba3f3fdabaf80f69b06f622"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:5ba3f3fdabaf80f69b06f622",
          "url": "https://oakland.legistar.com/View.ashx?M=F&ID=16061258&GUID=FE63DAEB-29A2-4617-A8B8-63F0D607ABC5",
          "publisher": "Oakland City Council",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:mi-saline-mprn-land-use-2026-10-02",
      "version": 1,
      "subject_kind": "project",
      "state": "mi",
      "record_type": "news_report",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": "2026-10-02",
      "event_date_note": "October 2 is the date of the event identified in the report and photo caption, not merely a source-check date.",
      "published_on": "2026-10-02",
      "source_date_note": "The article carries this explicit first publication date. The October 19 source check is separate.",
      "checked_on": "2026-10-19",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present disposition of these reported concerns has not been independently established. Approval, construction and company statements do not establish resolution or measured effects.",
      "source_ids": [
        "source:dceb856522c5ad6cfbda78b8"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Michigan Public Radio Network reported a discussion near the Saline Township data center on October 2 about local control and siting on farmland. The article described resident worries about loss of agricultural land. These are reported positions, not independently verified land loss, measured effects or new legal restrictions.",
      "quote": null,
      "operator_response": {
        "organization": "Related Digital and Blackstone",
        "summary": "Related Digital and Blackstone planned to preserve open space, farmland and wetlands, Michigan Public reported in April. This earlier reported plan is context for the same campus, not verified conservation or a direct reply to the October 2 discussion.",
        "source_ids": [
          "source:6778eaa059dfc2a1cc05789d"
        ],
        "published_on": "2026-04-25",
        "checked_on": "2026-10-19",
        "relationship": "The published company plan predates the October event and addresses the same land-use topic. It is linked with its April publication date and is not described as a later response.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:stargate-saline-township-mi",
      "record_id": "stargate-saline-township-mi",
      "subject_label": "Stargate The Barn Campus",
      "actor": {
        "kind": "outlet",
        "label": "Michigan Public Radio Network",
        "source_ids": [
          "source:dceb856522c5ad6cfbda78b8"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-16",
      "sources": [
        {
          "id": "source:6778eaa059dfc2a1cc05789d",
          "url": "https://www.michiganpublic.org/economy/2026-04-25/saline-township-data-center-major-construction-underway-financing-secured",
          "publisher": "Michigan Public",
          "source_type": "news",
          "published_on": "2026-04-25",
          "retrieved_on": "2026-10-19"
        },
        {
          "id": "source:dceb856522c5ad6cfbda78b8",
          "url": "https://www.michiganpublic.org/politics-government/2026-10-02/governors-race-hits-saline-township-site-of-massive-data-center-project",
          "publisher": "Michigan Public Radio Network",
          "source_type": "news",
          "published_on": "2026-10-02",
          "retrieved_on": "2026-10-19"
        }
      ]
    },
    {
      "id": "concern:mi-cannoli-mns-ratepayer-arguments-recorded-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "mi",
      "record_type": "public_concern_on_record",
      "categories": [
        "power_rates"
      ],
      "event_on": "2026-10-01",
      "event_date_note": "October 1, 2026 is when the order records the parties' positions. The individual underlying brief and testimony filing days have not been established in this bounded review.",
      "published_on": null,
      "source_date_note": "The original order and proof of service are dated October 1, 2026. A first public posting date is not independently established and stays unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The commission issued a conditional contract decision, but the later disposition of these documented cost concerns is unknown. Acceptance, revised contracts, subsequent compliance and actual costs were not verified. The order expressly excludes customers who do not pay power-supply costs, including choice customers, from its prohibition on shifting such costs to other customers.",
      "source_ids": [
        "source:20a54da396fde82cc80a63a1",
        "source:b2546c18d077931308791d2b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Michigan Environmental Council, Natural Resources Defense Council and Sierra Club raised questions about projected ratepayer benefits and proposed stronger cost protections for Google's Van Buren Township project, as summarized in the commission's October 1 order. That order also records DTE Electric's arguments for its contractual protections and conditionally approves the contracts. It does not establish actual future bill impacts.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:project-cannoli-van-buren-township-wayne-county-mi",
      "record_id": "project-cannoli-van-buren-township-wayne-county-mi",
      "subject_label": "Project Cannoli",
      "actor": {
        "kind": "public_group",
        "label": "Michigan Environmental Council, Natural Resources Defense Council and Sierra Club",
        "source_ids": [
          "source:20a54da396fde82cc80a63a1"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:20a54da396fde82cc80a63a1",
          "url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00002YBZ99AAH",
          "publisher": "Michigan Public Service Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b2546c18d077931308791d2b",
          "url": "https://vbtmi.gov/departments/municipal_services/data_center_faq.php",
          "publisher": "Van Buren Township",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:fl-tango-wlrn-environmental-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "fl",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The initial report describes the county hearing and vote in relative terms. This item does not substitute its publication day for an independently checked exact meeting or filing day.",
      "published_on": "2026-07-16",
      "source_date_note": "The original report displays July 16, 2026 publication; the distinct follow-up displays October 1, 2026. These outlet dates do not establish an original county-order or company-statement publication day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the documented environmental concerns is unknown in this bounded review. The outlet-reported expansion denial is distinct from earlier approvals and possible future applications, and does not establish measured harm, safety, present compliance or resolution of each concern.",
      "source_ids": [
        "source:82564b097fd4770dfa9202d1",
        "source:4243a50cad11fd9cb76d654f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "WLRN Public Media reported residents' concerns about water, noise, electric costs and land-use compatibility at Project Tango. Its July report describes denial of an expansion, and its October follow-up explains that earlier approvals and a possible future application remain distinct. This records the outlet's account, not verified technical effects, an independently inspected county order or the resolution of every concern.",
      "quote": null,
      "operator_response": {
        "organization": "PBA Holdings",
        "summary": "PBA Holdings stated, according to WLRN Public Media's October 1 report, that the project had followed transparency requirements and that it would continue working with the county and stakeholders to address concerns and pursue a path forward. This is an outlet-reported company position.",
        "source_ids": [
          "source:4243a50cad11fd9cb76d654f"
        ],
        "published_on": "2026-10-01",
        "checked_on": "2026-10-18",
        "relationship": "The later article explicitly attributes this same-project statement to PBA Holdings' project manager. October 1 is the outlet publication date, not an independently established original company-statement day; no separately inspected original company response is claimed.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:project-tango-loxahatchee-fl",
      "record_id": "project-tango-loxahatchee-fl",
      "subject_label": "Project Tango AI Data Center Campus",
      "actor": {
        "kind": "outlet",
        "label": "WLRN Public Media",
        "source_ids": [
          "source:82564b097fd4770dfa9202d1"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:4243a50cad11fd9cb76d654f",
          "url": "https://www.wlrn.org/wlrn-investigations/2026-10-01/ai-project-tango-florida",
          "publisher": "WLRN Public Media",
          "source_type": "news",
          "published_on": "2026-10-01",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:82564b097fd4770dfa9202d1",
          "url": "https://www.wlrn.org/government-politics/2026-07-16/project-tango-ai-data-center-palm-beach-rejected",
          "publisher": "WLRN Public Media",
          "source_type": "news",
          "published_on": "2026-07-16",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wv-monarch-r14-0042-air-comment-process-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "wv",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "power_rates"
      ],
      "event_on": "2026-04-17",
      "event_date_note": "The original notice expressly identifies April 17, 2026 as the air application date. October 20 and October 29 are scheduled future meetings; they have not been treated as completed events.",
      "published_on": "2026-09-29",
      "source_date_note": "The original agency notice displays September 29, 2026 publication. That is separate from the earlier application date, future comment deadlines and any later final permit decision.",
      "checked_on": "2026-10-18",
      "status": "pending",
      "status_on": null,
      "status_scope": "West Virginia Department of Environmental Protection published a preliminary review and future comment opportunities for R14-0042. Pending applies only to that named air application; no signed final permit, current generation, project operation or resolution of earlier enforcement was verified.",
      "source_ids": [
        "source:09db243263ae62f68fbd2964",
        "source:3b4aefffccf37a8dbb3cbb3e"
      ],
      "status_source_ids": [
        "source:09db243263ae62f68fbd2964"
      ],
      "event_ids": [],
      "summary": "West Virginia Department of Environmental Protection published a public-comment process for Monarch's proposed off-grid power facility under application R14-0042. The notice schedules October 20 and October 29, 2026 meetings, with written comments due October 30. This is a preliminary air-permit review, not an issued permit, completed hearing or measured-air finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:nscale-monarch-mason-county-wv",
      "record_id": "nscale-monarch-mason-county-wv",
      "subject_label": "Monarch Compute Campus",
      "actor": {
        "kind": "agency",
        "label": "West Virginia Department of Environmental Protection",
        "source_ids": [
          "source:09db243263ae62f68fbd2964"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:09db243263ae62f68fbd2964",
          "url": "https://dep.wv.gov/news/Pages/Public-Comment-Period-and-Public-Participation-Opportunities-for-Monarch-Cloud-Campus.aspx",
          "publisher": "West Virginia Department of Environmental Protection",
          "source_type": "government_record",
          "published_on": "2026-09-29",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:3b4aefffccf37a8dbb3cbb3e",
          "url": "https://wvpublic.org/story/energy-environment/data-center-development-faces-state-intervention-for-failing-to-prevent-flooding-of-neighbors/amp/",
          "publisher": "West Virginia Public Broadcasting",
          "source_type": "news",
          "published_on": "2026-07-15",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wv-monarch-paired-state-waters-comments-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "wv",
      "record_type": "permit_and_comment",
      "categories": [
        "water_quality_discharge",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": null,
      "event_date_note": "Exact filing dates for the two State Waters applications were not established in the read notice. October 26, 2026 is a scheduled future workshop, meeting and comment deadline, not an event already held.",
      "published_on": "2026-09-29",
      "source_date_note": "The original combined agency notice was published September 29, 2026. It distinguishes the State Waters process from separate air meetings and the October 30 air deadline; the publication date is not an application or issuance date.",
      "checked_on": "2026-10-18",
      "status": "pending",
      "status_on": null,
      "status_scope": "West Virginia Department of Environmental Protection published a comment opportunity for the paired State Waters applications through October 26, 2026. Pending applies to that process only; mitigation-credit plans do not establish final issuance, completed restoration, actual wetland effects or resolution of separate stormwater enforcement.",
      "source_ids": [
        "source:09db243263ae62f68fbd2964",
        "source:3b4aefffccf37a8dbb3cbb3e"
      ],
      "status_source_ids": [
        "source:09db243263ae62f68fbd2964"
      ],
      "event_ids": [],
      "summary": "West Virginia Department of Environmental Protection published a joint comment opportunity for Monarch State Waters applications SWP-26-0002 and SWP-26-0003, concerning proposed wetland impacts for two named campus projects. The notice schedules an October 26, 2026 meeting and comment deadline. This counts one paired public-notice process, not two verified buildings or a finding of actual environmental damage.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:nscale-monarch-mason-county-wv",
      "record_id": "nscale-monarch-mason-county-wv",
      "subject_label": "Monarch Compute Campus",
      "actor": {
        "kind": "agency",
        "label": "West Virginia Department of Environmental Protection",
        "source_ids": [
          "source:09db243263ae62f68fbd2964"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:09db243263ae62f68fbd2964",
          "url": "https://dep.wv.gov/news/Pages/Public-Comment-Period-and-Public-Participation-Opportunities-for-Monarch-Cloud-Campus.aspx",
          "publisher": "West Virginia Department of Environmental Protection",
          "source_type": "government_record",
          "published_on": "2026-09-29",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:3b4aefffccf37a8dbb3cbb3e",
          "url": "https://wvpublic.org/story/energy-environment/data-center-development-faces-state-intervention-for-failing-to-prevent-flooding-of-neighbors/amp/",
          "publisher": "West Virginia Public Broadcasting",
          "source_type": "news",
          "published_on": "2026-07-15",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ky-hawesville-psc-recorded-public-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "ky",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "air_generators",
        "power_rates",
        "wildlife_wetlands_stormwater",
        "health"
      ],
      "event_on": "2026-07-27",
      "event_date_note": "The original final order expressly records that the public comment meeting occurred July 27, 2026. This is separate from the August 21 order, earlier scheduled meeting locations and later company filing/preparation dates.",
      "published_on": "2026-08-21",
      "source_date_note": "The actual public docket posts the final order August 21, 2026; the original signed entry page independently gives that day. Later company noise publication August 27 and demolition-air-plan publication September 28 are separately bound to the post-case table.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the documented environmental and nuisance concerns is unknown in this bounded review. The PSC approved the electric-service agreement within its stated rates-and-terms scope. Later company modeling and a demolition monitoring plan are not independent measured compliance, agency adoption of technical conclusions or evidence that every public concern was resolved.",
      "source_ids": [
        "source:c1a6df74fb60b43e303c5ada",
        "source:d9c7469a4d31826be051702a",
        "source:de28ca26411ca8e9fdb1b4ae",
        "source:05787b18a35ba10702b3bed3",
        "source:ab8c0c25ed5ac86abd7c72f7"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about electricity costs, water, noise, pollution, health and wildlife at the July 27, 2026 Hawesville public-comment meeting, as recorded by the Kentucky Public Service Commission. Its later approval addresses the electric-service agreement and requires further filings. That tariff approval does not itself establish measured environmental conditions or resolve every concern.",
      "quote": null,
      "operator_response": {
        "organization": "Justified DataPower / TeraWulf",
        "summary": "Justified DataPower / TeraWulf filed a consultant noise assessment on August 27 and a demolition-air monitoring plan on September 28, 2026. The consultant predicts sound within its referenced guidelines and proposes dust monitoring during demolition. These are company-commissioned submissions, not measured operating results or an independent agency finding.",
        "source_ids": [
          "source:4755e5fb82d5983df8d366ca",
          "source:ab8c0c25ed5ac86abd7c72f7",
          "source:05787b18a35ba10702b3bed3"
        ],
        "published_on": "2026-09-28",
        "checked_on": "2026-10-18",
        "relationship": "Both actual originals are company-commissioned ERM submissions published in the same PSC post-case file, with the exact Justified/TeraWulf/Hawesville identity. September 28 is the latest selected company filing publication; the noise report was separately public August 27. The demolition-air plan addresses demolition dust and is not relabeled as the requested generator air-modeling analysis or an express answer to every water/power/health concern.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:terawulf-hawesville-ky",
      "record_id": "terawulf-hawesville-ky",
      "subject_label": "Justified Data Campus",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:c1a6df74fb60b43e303c5ada"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:05787b18a35ba10702b3bed3",
          "url": "https://psc.ky.gov/pscecf/2026-00115/mkurtz@bkllawfirm.com/08272026040605/Closed/KPSC_Ltr_-_2026-00115_Noise_Assessment.pdf",
          "publisher": "Kentucky Public Service Commission",
          "source_type": "government_record",
          "published_on": "2026-08-27",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:4755e5fb82d5983df8d366ca",
          "url": "https://psc.ky.gov/pscecf/2026-00115/mkurtz@bkllawfirm.com/09282026113102/Closed/Justified_Data_Power_LLC_-_Air_Monitoring_Plan.pdf",
          "publisher": "Kentucky Public Service Commission",
          "source_type": "government_record",
          "published_on": "2026-09-28",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ab8c0c25ed5ac86abd7c72f7",
          "url": "https://psc.ky.gov/pscecf/2026-00115/mkurtz@bkllawfirm.com/08272026040605/Closed/2026.08.25_Raylan_Data_Center_Noise_Summary_Report_.pdf",
          "publisher": "Kentucky Public Service Commission",
          "source_type": "government_record",
          "published_on": "2026-08-27",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:c1a6df74fb60b43e303c5ada",
          "url": "https://psc.ky.gov/pscscf/2026%20Cases/2026-00115//20260821_PSC_ORDER.pdf",
          "publisher": "Kentucky Public Service Commission",
          "source_type": "government_record",
          "published_on": "2026-08-21",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:d9c7469a4d31826be051702a",
          "url": "https://psc.ky.gov/Case/ViewCaseFilings/2026-00115/login",
          "publisher": "Kentucky Public Service Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:de28ca26411ca8e9fdb1b4ae",
          "url": "https://psc.ky.gov/Case/ViewCaseFilings/2026-00115/Post",
          "publisher": "Kentucky Public Service Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-wheatfield-draft-air-permit-comment-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "in",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-09-24",
      "event_date_note": "The original extension notice expressly identifies September 24, 2026 as the initial notice posting. November 10 is a scheduled future hearing, not an event already held.",
      "published_on": "2026-09-24",
      "source_date_note": "The initial notice was published September 24, 2026, as confirmed by the original extension and current agency row. Exact first posting days for the hearing and extension documents remain unknown; filenames are not publication dates.",
      "checked_on": "2026-10-18",
      "status": "pending",
      "status_on": null,
      "status_scope": "Indiana Department of Environmental Management published an extended comment period and scheduled a hearing for the named draft air permit. Pending applies only to that process. Comments are extended through November 16, 2026, with a hearing scheduled for November 10. No final decision, completed hearing, current operation or resolution of every concern was verified.",
      "source_ids": [
        "source:77c11af02338a734b0ab929c",
        "source:24acce18ee0b8c32da83f4a1",
        "source:27cb1e1c6a494c44818d0912",
        "source:ba7dae4d78dd4b053d98deb9"
      ],
      "status_source_ids": [
        "source:24acce18ee0b8c32da83f4a1"
      ],
      "event_ids": [],
      "summary": "Indiana Department of Environmental Management published a draft air-permit notice for Amazon Data Services in Wheatfield. Its later notices schedule a November 10, 2026 hearing following a hearing request and comments, and extend comments through November 16. This documents a pending permit procedure, not an issued permit, completed hearing or finding of measured impacts.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:aws-wheatfield-in",
      "record_id": "aws-wheatfield-in",
      "subject_label": "AWS Wheatfield Campus (Project Rise)",
      "actor": {
        "kind": "agency",
        "label": "Indiana Department of Environmental Management",
        "source_ids": [
          "source:77c11af02338a734b0ab929c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:24acce18ee0b8c32da83f4a1",
          "url": "https://www.in.gov/idem/public-notices/public-notices-northwest-indiana",
          "publisher": "Indiana Department of Environmental Management",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:27cb1e1c6a494c44818d0912",
          "url": "https://www.in.gov/idem/files/notice_20261116_air_50413ph-cm.pdf",
          "publisher": "Indiana Department of Environmental Management",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:77c11af02338a734b0ab929c",
          "url": "https://www.in.gov/idem/files/notice_20261024_air_50413pn-cm.pdf",
          "publisher": "Indiana Department of Environmental Management",
          "source_type": "government_record",
          "published_on": "2026-09-24",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ba7dae4d78dd4b053d98deb9",
          "url": "https://www.in.gov/idem/files/notice_20261116_air_50413phextension-CM.pdf",
          "publisher": "Indiana Department of Environmental Management",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-northtown-cbd-comment-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators",
        "power_rates",
        "water_use",
        "wildlife_wetlands_stormwater",
        "noise",
        "light"
      ],
      "event_on": "2026-08-20",
      "event_date_note": "The retained original filing or effective order provides this exact event date.",
      "published_on": "2026-08-20",
      "source_date_note": "The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The individual comment outcome has not been established by this bounded original-source review. A project-page process label is not its disposition.",
      "source_ids": [
        "source:7e166a077803ce7c3334e580",
        "source:6b168227a21615fb65e1c0a6"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Center for Biological Diversity filed comments requesting environmental analysis and mitigation for NorthTown, raising generator air emissions, energy demand, water, biological resources, noise and lighting. These are the group's concerns and requests in the exemption proceeding, not agency findings or verified measurements.",
      "quote": null,
      "operator_response": {
        "organization": "GIC San Jose LLC",
        "summary": "GIC San Jose LLC filed a response disputing the group's assumptions about generator operation and environmental effects, and described its own energy, water and biological-resource analysis. The applicant's filing is linked as its position; its cited technical studies are not independently verified Atlas findings.",
        "source_ids": [
          "source:e1e964690e2ba7161604d31b"
        ],
        "published_on": "2026-09-24",
        "checked_on": "2026-10-18",
        "relationship": "The applicant filing expressly answers the Center for Biological Diversity letter TN272073. It is not an agency ruling, evidence of a current operating role or a response to the separate Valley Water letter.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:goodman-innovation-centre-san-jose-ca",
      "record_id": "goodman-innovation-centre-san-jose-ca",
      "subject_label": "Goodman Innovation Centre San Jose (NorthTown Data Center)",
      "actor": {
        "kind": "public_group",
        "label": "Center for Biological Diversity",
        "source_ids": [
          "source:7e166a077803ce7c3334e580"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:6b168227a21615fb65e1c0a6",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:7e166a077803ce7c3334e580",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=272073&DocumentContentId=109748",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2026-08-20",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:e1e964690e2ba7161604d31b",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=272914&DocumentContentId=120657",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2026-09-24",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nm-jupiter-water-mandamus-order-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "nm",
      "record_type": "legal_action",
      "categories": [
        "water_use"
      ],
      "event_on": "2026-09-17",
      "event_date_note": "The original September 17, 2026 court filing stamp and signed order establish the decision day for S-1-SC-41580. The prior stay was dated August 23; no petition filing date is invented.",
      "published_on": null,
      "source_date_note": "The original court PDF first-publication day is unknown. Its signature and court filing dates are decision dates. KANW separately published its report September 23, 2026.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2026-09-17",
      "status_scope": "Supreme Court of New Mexico recorded denial of the named S-1-SC-41580 mandamus request and lifted its prior stay on September 17, 2026. Resolved applies only to that court procedure. No explanatory environmental merits findings, current permits, operational compliance or outcome of the distinct county cases were independently established.",
      "source_ids": [
        "source:45442ae60a331eccdbf7741e",
        "source:0c960dddd26d97ff85239a5a"
      ],
      "status_source_ids": [
        "source:45442ae60a331eccdbf7741e"
      ],
      "event_ids": [],
      "summary": "Supreme Court of New Mexico recorded denial of Center for Biological Diversity's emergency mandamus petition involving the State Engineer and lifted its August stay. KANW links the case to non-potable groundwater for Project Jupiter construction. This court outcome does not establish measured water impacts, operational cooling demand or resolution of every water concern.",
      "quote": null,
      "operator_response": {
        "organization": "Oracle",
        "summary": "Oracle stated, according to KANW, that construction uses non-potable water from an existing water-rights holder for activities such as dust control, with State Engineer oversight. It also described conservation efforts. These are outlet-reported company statements, not independent measurements or a response resolving every water concern.",
        "source_ids": [
          "source:0c960dddd26d97ff85239a5a"
        ],
        "published_on": "2026-09-23",
        "checked_on": "2026-10-18",
        "relationship": "KANW explicitly presents the Oracle spokesperson statement in its account of the same construction-water dispute. It addresses construction-water use, not every operational water or unrelated county-procedure issue. September 23 is the outlet publication; the original company statement day is unknown.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:stargate-project-jupiter-dona-ana-nm",
      "record_id": "stargate-project-jupiter-dona-ana-nm",
      "subject_label": "Stargate Project Jupiter",
      "actor": {
        "kind": "court",
        "label": "Supreme Court of New Mexico",
        "source_ids": [
          "source:45442ae60a331eccdbf7741e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:0c960dddd26d97ff85239a5a",
          "url": "https://www.kanw.org/new-mexico-news/2026-09-23/water-can-flow-again-for-construction-of-massive-project-jupiter-data-center?_amp=true",
          "publisher": "KANW",
          "source_type": "news",
          "published_on": "2026-09-23",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:45442ae60a331eccdbf7741e",
          "url": "https://nmcourts.gov/wp-content/uploads/2026/09/Orders-in-Project-Jupiter-air-quality-permit-and-water-cases.pdf",
          "publisher": "Supreme Court of New Mexico",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nj-vineland-dataone-reported-generator-enforcement-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "nj",
      "record_type": "news_report",
      "categories": [
        "air_generators",
        "noise",
        "water_use",
        "power_rates"
      ],
      "event_on": null,
      "event_date_note": "The article gives July 29 for a reported inspection, but an independently inspected exact order/penalty issuance date is not established. The item event date stays unknown; a relative Tuesday announcement, reported inspection and article publication remain distinct.",
      "published_on": "2026-09-23",
      "source_date_note": "The original report displays September 23, 2026 publication. The independently read company project page is undated; neither its capture nor the source-check day becomes a publication or agency action date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the reported penalty, permit applications and underlying community concerns is unknown in this bounded review. An outlet-reported company intention to apply, temporary generation or future fuel cells is not actual permit issuance, payment, agency withdrawal, current compliance or resolution of every concern.",
      "source_ids": [
        "source:ae2bb2fed23fd1c1592ff70a",
        "source:2c24c6dfc659183ebeedb7ff"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "NJ Spotlight News reported a state air-permitting penalty alleging unpermitted generators at DataOne's Vineland development, alongside residents' concerns about noise, water, electricity and air quality. The article includes DataOne's different account of temporary generation and planned fuel cells. The original agency record and later outcome were not independently read in this review, so this remains a news report.",
      "quote": null,
      "operator_response": {
        "organization": "DataOne",
        "summary": "DataOne stated, according to NJ Spotlight News, that the generators were temporary, that it would apply for air permits and that it was transitioning to fuel cells for permanent power. These are outlet-reported company statements, not independently inspected permits, completed changes or measured noise and emissions.",
        "source_ids": [
          "source:ae2bb2fed23fd1c1592ff70a"
        ],
        "published_on": "2026-09-23",
        "checked_on": "2026-10-18",
        "relationship": "The original article explicitly attributes the statement to DataOne in the same Vineland air-enforcement reporting. September 23 is the outlet publication, not an independently verified company-original statement date. Nebius's separate undated tenant FAQ supplies exact-site identity and general context, not a DataOne case reply or proof of agency endorsement.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:nebius-vineland-nj",
      "record_id": "nebius-vineland-nj",
      "subject_label": "Nebius Vineland Data Center",
      "actor": {
        "kind": "outlet",
        "label": "NJ Spotlight News",
        "source_ids": [
          "source:ae2bb2fed23fd1c1592ff70a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2c24c6dfc659183ebeedb7ff",
          "url": "https://nebius.com/vinelandnj",
          "publisher": "Nebius",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ae2bb2fed23fd1c1592ff70a",
          "url": "https://www.njspotlightnews.org/2026/09/nj-regulators-fine-data-center-for-gas-generators-that-lack-permits/",
          "publisher": "NJ Spotlight News",
          "source_type": "news",
          "published_on": "2026-09-23",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nh-bow-merrimack-reported-community-questions-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "nh",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "air_generators",
        "health",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The original source reports historical concerns or a developing procedure without one independently verified exact concern-event day; weekday or year-only references are not converted to guessed dates.",
      "published_on": "2026-09-23",
      "source_date_note": "The displayed original publication day is recorded separately from the event and source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.",
      "source_ids": [
        "source:f710cf493d436045cc4f520a"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "New Hampshire Public Radio reported residents' environmental, health and public-information concerns about a possible data center at the former Merrimack Station in Bow. The article also records public support and the town chair's statement that no application had been received at publication. These are reported public positions, not findings about a built facility or a current permit decision.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:granite-shore-merrimack-station-bow-nh",
      "record_id": "granite-shore-merrimack-station-bow-nh",
      "subject_label": "Merrimack Station Data Center (proposed, Bow)",
      "actor": {
        "kind": "outlet",
        "label": "New Hampshire Public Radio",
        "source_ids": [
          "source:f710cf493d436045cc4f520a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:f710cf493d436045cc4f520a",
          "url": "https://www.nhpr.org/nh-news/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers",
          "publisher": "New Hampshire Public Radio",
          "source_type": "news",
          "published_on": "2026-09-23",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wi-wisconsin-rapids-moratorium-written-comments-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "wi",
      "record_type": "public_concern_on_record",
      "categories": [
        "power_rates",
        "water_quality_discharge",
        "noise",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-09-22",
      "event_date_note": "The original written submission is dated September 22, 2026 and requests inclusion in the October 5 public hearing record. The letter date is not the hearing day.",
      "published_on": null,
      "source_date_note": "The City published the public comment compilation. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:9394002e31fb2898fcd8be44"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents submitted written comments for the Wisconsin Rapids data center moratorium hearing requesting electric ratepayer protections, cooling water discharge safeguards, noise review, application transparency and enforceable financial responsibility. The dated submission addresses City standards and future proposals generally. It does not establish measured harm from the proposed Wisconsin Rapids facility, independently verified medical or out of state claims, an adopted legal condition or an individual permit outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:pch-wi-holdings-wisconsin-rapids-wood-county-wi",
      "record_id": "pch-wi-holdings-wisconsin-rapids-wood-county-wi",
      "subject_label": "Wisconsin Rapids Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:9394002e31fb2898fcd8be44"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:9394002e31fb2898fcd8be44",
          "url": "https://www.wirapids.gov/DocumentCenter/View/3131/2026-10-05-Public-Hearing-Written-Comments-PDF",
          "publisher": "City of Wisconsin Rapids",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:nc-compass-stamey-farm-water-certification-notice-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "nc",
      "record_type": "permit_and_comment",
      "categories": [
        "water_quality_discharge",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": "2026-09-21",
      "event_date_note": "September 21, 2026 is the agency's dated reminder publication/notice event, not the later scheduled hearing. Whether the September 28 hearing actually occurred was not independently verified; future comment deadlines are not accomplished events.",
      "published_on": "2026-09-21",
      "source_date_note": "The original reminder displays September 21, 2026 publication. First publication of the changing event page is unknown; its August 29 start and October 27 end are scheduled range labels, not independently verified first-posting or disposition days.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current certification disposition and actual hearing outcome are unknown in this bounded review. The reminder gives October 28 for written comments while the event page gives October 27; the applicable deadline is unconfirmed. A prospective notice is not an issued certification, observed stream/wetland impact or resolution of public concerns.",
      "source_ids": [
        "source:2db2bca0fbfb5cd010acdcd1",
        "source:bc8d9d5d154b39cb781697ec"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "North Carolina Department of Environmental Quality published a notice seeking comments on the Stamey Farm Road / Compass water-quality certification application and proposed effects on streams and wetlands. Its pages list different October 2026 comment deadlines. The announced hearing is not independently verified as held, and the application's later outcome and applicable deadline remain unconfirmed.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:compass-statesville-nc",
      "record_id": "compass-statesville-nc",
      "subject_label": "Compass Statesville Campus",
      "actor": {
        "kind": "agency",
        "label": "North Carolina Department of Environmental Quality",
        "source_ids": [
          "source:2db2bca0fbfb5cd010acdcd1"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2db2bca0fbfb5cd010acdcd1",
          "url": "https://www.deq.nc.gov/news/press-releases/2026/09/21/reminder-ncdeq-division-water-resources-hold-public-hearing-401-water-quality-certification",
          "publisher": "North Carolina Department of Environmental Quality",
          "source_type": "government_record",
          "published_on": "2026-09-21",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:bc8d9d5d154b39cb781697ec",
          "url": "https://www.deq.nc.gov/news/events/individual-water-quality-certification-stamey-farm-road-data-centercompass-data-center",
          "publisher": "North Carolina Department of Environmental Quality",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:id-rhea-blacks-creek-reported-public-land-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "id",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "power_rates",
        "land_use_zoning",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": null,
      "event_date_note": "The article reports interviews and a newly reported proposal without one independently verified exact concern filing or hearing day. Monday/Friday references are not converted to guessed event dates; the event remains unknown.",
      "published_on": "2026-09-21",
      "source_date_note": "The original article displays September 21, 2026 at 3:43 p.m. MDT. Publication is separate from unverified application, interview and future scoping dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns and original federal review is unknown in this bounded report review. Anticipated future scoping and promised public input do not establish a completed review, permit approval, resource measurement or resolution of every concern.",
      "source_ids": [
        "source:fc97b2ab71d3066607ad962a"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Boise State Public Radio reported Sierra Club's concerns about water, electricity, wildlife habitat and use of public land for the Rhea Data proposal near Blacks Creek Reservoir. The article also records BLM's account of plans for public input. These are reported concerns and agency statements, not an independently inspected final environmental review, actual resource impacts or a granted project approval. All later permit and public-comment outcomes are unknown in this review.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:rhea-data-blacks-creek-campus-ada-county-id",
      "record_id": "rhea-data-blacks-creek-campus-ada-county-id",
      "subject_label": "Rhea Data Blacks Creek Campus",
      "actor": {
        "kind": "outlet",
        "label": "Boise State Public Radio",
        "source_ids": [
          "source:fc97b2ab71d3066607ad962a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:fc97b2ab71d3066607ad962a",
          "url": "https://www.boisestatepublicradio.org/politics-government/2026-09-21/idaho-data-center-blacks-creek-blm",
          "publisher": "Boise State Public Radio",
          "source_type": "news",
          "published_on": "2026-09-21",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ga-voltagrid-air-permit-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-09-18",
      "event_date_note": "The signed original permit cover and current agency registry identify September 18, 2026 as issuance. This is not an opening or all-permit completion date.",
      "published_on": null,
      "source_date_note": "The current registry labels an issuance date. A first public posting date for this permit or its evolving narrative is not established, so publication stays unknown.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2026-09-18",
      "status_scope": "Georgia Environmental Protection Division issued the named air permit. Resolved applies only to this permit action; the outcome of earlier construction allegations, actual operation and present compliance are not established.",
      "source_ids": [
        "source:2571b6d58f87a57d7cbc6931",
        "source:a46c21695f49a2d23307d09e",
        "source:00ee8e8c8db5fe96ad9fa21f"
      ],
      "status_source_ids": [
        "source:2571b6d58f87a57d7cbc6931"
      ],
      "event_ids": [],
      "summary": "Georgia Environmental Protection Division issued air permit 4911-217-0080-S-01-0 for the VoltaGrid prime-power generation component serving ATL2 at 10835 Hazelbrand Road. The signed permit and agency narrative document a conditional air authorization, not verified operation, all local approvals or disposition of earlier construction allegations. The final agency addendum treats the two facilities as one air-permitting source while retaining separate equipment permits; this does not merge Atlas identities.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:serverfarm-covington-hazelbrand-ga",
      "record_id": "serverfarm-covington-hazelbrand-ga",
      "subject_label": "Serverfarm Covington Data Center (Hazelbrand Road)",
      "actor": {
        "kind": "agency",
        "label": "Georgia Environmental Protection Division",
        "source_ids": [
          "source:2571b6d58f87a57d7cbc6931"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:00ee8e8c8db5fe96ad9fa21f",
          "url": "https://air.gaepd.org/Permits/Search?Name=VoltaGrid",
          "publisher": "Georgia Environmental Protection Division",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:2571b6d58f87a57d7cbc6931",
          "url": "https://air.gaepd.org/Permits/View/OP-29947",
          "publisher": "Georgia Environmental Protection Division",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:a46c21695f49a2d23307d09e",
          "url": "https://air.gaepd.org/Permits/View/ON-29947",
          "publisher": "Georgia Environmental Protection Division",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nm-jupiter-air-mandamus-order-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "nm",
      "record_type": "legal_action",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-09-17",
      "event_date_note": "The original September 17, 2026 court filing stamp and signed order establish the decision day for S-1-SC-41579. The prior stay was dated August 23; no petition filing date is invented.",
      "published_on": null,
      "source_date_note": "The original court PDF first-publication day is unknown. Its signature and court filing dates are decision dates. KANW separately published its report September 23, 2026.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2026-09-17",
      "status_scope": "Supreme Court of New Mexico recorded denial of the named S-1-SC-41579 mandamus request and lifted its prior stay on September 17, 2026. Resolved applies only to that court procedure. No explanatory environmental merits findings, current permits, operational compliance or outcome of the distinct county cases were independently established.",
      "source_ids": [
        "source:45442ae60a331eccdbf7741e",
        "source:0c960dddd26d97ff85239a5a"
      ],
      "status_source_ids": [
        "source:45442ae60a331eccdbf7741e"
      ],
      "event_ids": [],
      "summary": "Supreme Court of New Mexico recorded denial of New Energy Economy's mandamus request concerning the Project Jupiter air-permit proceeding and lifted its August stay. The order records that named court procedure without explanatory environmental findings. It does not establish an issued permit, actual emissions, present compliance or resolution of the separate county lawsuits.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:stargate-project-jupiter-dona-ana-nm",
      "record_id": "stargate-project-jupiter-dona-ana-nm",
      "subject_label": "Stargate Project Jupiter",
      "actor": {
        "kind": "court",
        "label": "Supreme Court of New Mexico",
        "source_ids": [
          "source:45442ae60a331eccdbf7741e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:0c960dddd26d97ff85239a5a",
          "url": "https://www.kanw.org/new-mexico-news/2026-09-23/water-can-flow-again-for-construction-of-massive-project-jupiter-data-center?_amp=true",
          "publisher": "KANW",
          "source_type": "news",
          "published_on": "2026-09-23",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:45442ae60a331eccdbf7741e",
          "url": "https://nmcourts.gov/wp-content/uploads/2026/09/Orders-in-Project-Jupiter-air-quality-permit-and-water-cases.pdf",
          "publisher": "Supreme Court of New Mexico",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:oh-hilliard-fuel-cell-permit-appeal-withdrawal-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "oh",
      "record_type": "legal_action",
      "categories": [
        "air_generators"
      ],
      "event_on": null,
      "event_date_note": "The city reports a November 2025 appeal filing and a later withdrawal, but the exact filing and disposition days are not established in the retained announcements.",
      "published_on": "2026-09-15",
      "source_date_note": "The city release displays September 15, 2026 and the retained original JSON-LD gives that publication day. The identity-context release is dated October 21, 2025. Neither is a substitute for an unverified ERAC filing day.",
      "checked_on": "2026-10-18",
      "status": "withdrawn",
      "status_on": null,
      "status_scope": "City of Hilliard reported withdrawing its own ERAC appeal. This is the city's published account, not a retained commission dismissal order, permit revocation, decision on alleged effects or proof of facility operation.",
      "source_ids": [
        "source:d4d17fe19857c9ac7d961b7a",
        "source:22227597b1ee4b07125faaa2"
      ],
      "status_source_ids": [
        "source:d4d17fe19857c9ac7d961b7a"
      ],
      "event_ids": [],
      "summary": "City of Hilliard reported withdrawing its ERAC appeal of the air permit for AEP Ohio's natural-gas fuel cells serving the AWS Scioto Darby campus. The city described a carbon-dioxide modeling review and planned later monitoring while criticizing limited local review. This records the city's account, not a court merits ruling, measured air quality, all-pollutant safety finding or AWS diesel-generator permit.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:aws-scioto-darby-hilliard-oh",
      "record_id": "aws-scioto-darby-hilliard-oh",
      "subject_label": "AWS Scioto Darby Campus",
      "actor": {
        "kind": "agency",
        "label": "City of Hilliard",
        "source_ids": [
          "source:d4d17fe19857c9ac7d961b7a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:22227597b1ee4b07125faaa2",
          "url": "https://hilliardohio.gov/state-law-overrides-local-review-for-aws-fuel-cell-system-in-hilliard/",
          "publisher": "City of Hilliard",
          "source_type": "government_record",
          "published_on": "2025-10-21",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:d4d17fe19857c9ac7d961b7a",
          "url": "https://hilliardohio.gov/city-of-hilliard-ends-fuel-cell-permit-appeal-calls-for-stronger-local-input/",
          "publisher": "City of Hilliard",
          "source_type": "government_record",
          "published_on": "2026-09-15",
          "retrieved_on": "2026-10-18"
        }
      ],
      "status_date_note": "The exact disposition date is not established in the retained city announcement. Its September 15 publication date is separate from an ERAC withdrawal filing day."
    },
    {
      "id": "concern:ma-westfield-servistar-reported-resource-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "ma",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "water_quality_discharge",
        "air_generators",
        "health"
      ],
      "event_on": null,
      "event_date_note": "The report describes a Tuesday-night meeting without an independently inspected original meeting record establishing its exact day. The event date remains unknown; a calendar date is not inferred from the article publication.",
      "published_on": "2026-09-15",
      "source_date_note": "The original article displays September 15, 2026 at 10:08 p.m. EDT. Its September 16 URL path does not replace the displayed local publication day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present outcome of the documented concerns and permit-extension request is unknown in this bounded review. A reported request does not establish an approved extension, final environmental permits, completed construction or resolution of every concern.",
      "source_ids": [
        "source:2b7984f0821dfa97e43c16f1"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Western Mass News reported residents' water, air-quality and health concerns, alongside public support, at a Westfield meeting about Servistar Realties' proposed data center. The report says the developer requested a permit extension. These are outlet accounts, not measured impacts or a verified approval of that request.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:servistar-westfield-ma",
      "record_id": "servistar-westfield-ma",
      "subject_label": "Servistar Realties Westfield Data Center Campus",
      "actor": {
        "kind": "outlet",
        "label": "Western Mass News",
        "source_ids": [
          "source:2b7984f0821dfa97e43c16f1"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2b7984f0821dfa97e43c16f1",
          "url": "https://www.westernmassnews.com/2026/09/16/westfield-residents-divided-data-centers/?outputType=amp",
          "publisher": "Western Mass News",
          "source_type": "news",
          "published_on": "2026-09-15",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ne-hallam-monolith-residents-growth-noise-water-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "ne",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "land_use_zoning"
      ],
      "event_on": "2026-09-14",
      "event_date_note": "September 14, 2026 is the original board meeting date. The request was tabled at that meeting. Later recommendations and reported approval remain distinct events; no exact original later signed decision day is inferred.",
      "published_on": null,
      "source_date_note": "The village PDFs have no independently established first public posting date. Their September meeting dates and October URL folders are not publication dates. Nebraska Public Media published its later approval report October 6, 2026.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current outcome of the residents' requested growth limits and underlying concerns is unknown in this bounded review. Tabling the proposed resolution, a planning recommendation, company commitments and later reported permit approval do not establish enacted limits, implemented mitigation, measured conditions or resolution of every concern.",
      "source_ids": [
        "source:7f9871dcfedaa66366e0fae0",
        "source:b3bfb7e910c571efa95cebdc"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents requested limits on data-center growth and further noise, water and setback rules during Hallam's September 14 board meeting, as recorded in the village minutes. The discussion specifically addressed Monolith and Crusoe's Olive Creek proposal. Later planning minutes record company commitments, while Nebraska Public Media reported a subsequent special-use approval. Those steps do not establish that every concern was resolved.",
      "quote": null,
      "operator_response": {
        "organization": "Crusoe",
        "summary": "Crusoe stated, as recorded in the planning minutes, that it would undertake follow-up sound studies and include water-use, lighting and decommissioning commitments in the proposed conditions. These are recorded company commitments, not independently verified operating results or completed mitigation.",
        "source_ids": [
          "source:b4501095541efed559d0786d"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original village minutes record Crusoe's representative discussing changes after community feedback for the same Olive Creek proposal. This is an agency-published account of the company statement, not an operator-authored page. First posting date is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:crusoe-monolith-hallam-lancaster-ne",
      "record_id": "crusoe-monolith-hallam-lancaster-ne",
      "subject_label": "Crusoe Hallam Data Center (Monolith Olive Creek campus)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:7f9871dcfedaa66366e0fae0"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:7f9871dcfedaa66366e0fae0",
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf",
          "publisher": "Village of Hallam",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b3bfb7e910c571efa95cebdc",
          "url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-village-board-unanimously-approves-monolith-data-center/",
          "publisher": "Nebraska Public Media",
          "source_type": "news",
          "published_on": "2026-10-06",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b4501095541efed559d0786d",
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf",
          "publisher": "Village of Hallam Planning Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ga-maysville-northern-data-epd-118359",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "regulator_record",
      "categories": [
        "water_quality_discharge",
        "wildlife_wetlands_stormwater",
        "land_use_zoning"
      ],
      "event_on": "2026-09-14",
      "event_date_note": "The complaint received date is explicit and is not the alleged activity date.",
      "published_on": null,
      "source_date_note": "Exact first online publication day is not established.",
      "checked_on": "2026-10-23",
      "status": "pending",
      "status_on": null,
      "status_scope": "Georgia Environmental Protection Division reported the complaint as under investigation in its current public copy. The exact date of that status entry and any final outcome are unknown.",
      "source_ids": [
        "source:f673e93dad98b675bb3e485a"
      ],
      "status_source_ids": [
        "source:f673e93dad98b675bb3e485a"
      ],
      "event_ids": [],
      "summary": "Georgia Environmental Protection Division recorded complaint 118359 concerning Northern Data in Maysville, Jackson County. The public complaint alleges land disturbance and almost a week of activity without a displayed land disturbance permit. This is a reported allegation, not a finding that no valid permit existed, a violation determination, measured water impacts or proof of computing operation.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:northern-data-maysville-jackson-ga",
      "record_id": "northern-data-maysville-jackson-ga",
      "subject_label": "Northern Data Maysville Data Center",
      "actor": {
        "kind": "agency",
        "label": "Georgia Environmental Protection Division",
        "source_ids": [
          "source:f673e93dad98b675bb3e485a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:f673e93dad98b675bb3e485a",
          "url": "https://cts.gaepd.org/Complaint/118359",
          "publisher": "Georgia Environmental Protection Division",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:wi-lighthouse-wpr-reported-resource-construction-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "wi",
      "record_type": "news_report",
      "categories": [
        "noise",
        "light",
        "water_use",
        "power_rates",
        "traffic_construction",
        "land_use_zoning"
      ],
      "event_on": "2026-09-10",
      "event_date_note": "The newer report's photo caption expressly identifies September 10, 2026 as the community conversation. This was a company informational event, not a formal agency hearing. The earlier reported hours amendment and its scheduled start are separate events.",
      "published_on": "2026-09-11",
      "source_date_note": "The original current report was published September 11, 2026 and updated that day; the construction-hours report was published March 20. The original company campus page has no independently established first publication day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current outcome of the documented resource and construction questions is unknown in this bounded review. A reported hours amendment and developer plans do not establish actual mitigation completion, measured noise or water conditions, current transmission approval or resolution of every concern.",
      "source_ids": [
        "source:2579bdb53c318ff413d11d34",
        "source:2cda8174d144cceea416e492"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Wisconsin Public Radio reported water, electricity, noise and transmission-route questions at a September 10, 2026 community event for Port Washington's Lighthouse campus. Earlier reporting described construction-noise, light and traffic complaints and a city-announced hours change. These are outlet accounts, not measured impacts, a formal complaint case or proof that every concern was resolved.",
      "quote": null,
      "operator_response": {
        "organization": "Vantage Data Centers",
        "summary": "Vantage Data Centers stated that Lighthouse would use closed-loop cooling and that it plans water restoration, wetland measures and a planted berm for sound mitigation. These are company plans and commitments, not independently verified water use, completed mitigation or permit outcomes.",
        "source_ids": [
          "source:6a0a94cce82c0a3a88cc53aa"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original campus page explicitly identifies Port Washington and Lighthouse. Its resource and design statements relate to the reported questions, but it is not an express reply to every construction complaint or an original transmission decision. First publication date is unknown.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:stargate-port-washington-wi",
      "record_id": "stargate-port-washington-wi",
      "subject_label": "Stargate Lighthouse Campus",
      "actor": {
        "kind": "outlet",
        "label": "Wisconsin Public Radio",
        "source_ids": [
          "source:2579bdb53c318ff413d11d34"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2579bdb53c318ff413d11d34",
          "url": "https://www.wpr.org/news/community-conversation-data-center-campus-port-washington",
          "publisher": "Wisconsin Public Radio",
          "source_type": "news",
          "published_on": "2026-09-11",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:2cda8174d144cceea416e492",
          "url": "https://www.wpr.org/news/port-washington-limits-construction-hours-data-center-project-after-complaints",
          "publisher": "Wisconsin Public Radio",
          "source_type": "news",
          "published_on": "2026-03-20",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:6a0a94cce82c0a3a88cc53aa",
          "url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
          "publisher": "Vantage Data Centers",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:tx-granbury-mandamus-order-2026",
      "version": 2,
      "subject_kind": "site",
      "state": "tx",
      "record_type": "legal_action",
      "categories": [
        "noise"
      ],
      "event_on": "2026-09-09",
      "event_date_note": "The orders page and official docket both date this procedural disposition September 9, 2026.",
      "published_on": "2026-09-09",
      "source_date_note": "The official Supreme Court orders page is dated September 9, 2026. First publication date of the dynamic docket is unknown.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2026-09-09",
      "status_scope": "Supreme Court of Texas issued a denial of this mandamus petition on September 9, 2026. Resolved describes this procedural item only; it does not mean the nuisance merits or alleged effects have been resolved.",
      "source_ids": [
        "source:8fd04143cc9442c19e641396",
        "source:dfcc39397781b8a3ee70f080"
      ],
      "status_source_ids": [
        "source:8fd04143cc9442c19e641396"
      ],
      "event_ids": [],
      "summary": "Supreme Court of Texas issued an order denying the petition by MARA Holdings for a writ of mandamus in the proceeding linked to the Granbury nuisance case. The court also dismissed the motion to stay as moot. This procedural order does not decide the truth of the noise allegations or establish that the underlying concern was resolved.",
      "quote": null,
      "operator_response": {
        "organization": "MARA Holdings",
        "summary": "MARA Holdings stated in its court-filed reply that the association lacked standing and that mandamus relief should be available. This is the company's legal argument, not a ruling on the nuisance allegations.",
        "source_ids": [
          "source:34cbf42a92bfbec51988227c"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The official case 26-0337 docket links this operator reply filed August 3, 2026 to lower-court cause C2024253. The statement precedes the September 9 procedural order and does not answer that later order or resolve the alleged noise impacts. First public-posting date is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "Spacing in public date and source notes corrected. Facts, machine dates, sources, attribution and record status are unchanged. The original source-check date is retained.",
      "subject_id": "site:mara-granbury-hood-tx",
      "record_id": "mara-granbury-hood-tx",
      "subject_label": "MARA Granbury Facility",
      "actor": {
        "kind": "court",
        "label": "Supreme Court of Texas",
        "source_ids": [
          "source:8fd04143cc9442c19e641396"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:34cbf42a92bfbec51988227c",
          "url": "https://dev-search.txcourts.gov/SearchMedia.aspx?MediaVersionID=28b2faaa-153f-41fd-b2c2-0a6ebdac7992&coa=cossup&DT=BRIEFS&MediaID=c33243d7-187f-4636-bd2b-942ff6530fb8",
          "publisher": "Supreme Court of Texas",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:8fd04143cc9442c19e641396",
          "url": "https://www.txcourts.gov/supreme/orders-opinions/2026/september/september-9-2026/",
          "publisher": "Supreme Court of Texas",
          "source_type": "government_record",
          "published_on": "2026-09-09",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:dfcc39397781b8a3ee70f080",
          "url": "https://dev-search.txcourts.gov/Case.aspx?cn=26-0337&coa=cossup",
          "publisher": "Supreme Court of Texas",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-st-joseph-wvpe-amazon-wastewater-questions-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "in",
      "record_type": "news_report",
      "categories": [
        "water_quality_discharge"
      ],
      "event_on": null,
      "event_date_note": "The outlet refers to an August 20 committee meeting and reported later conversations. The exact independently reviewed concern-event day remains unknown because original minutes and a filed utility inquiry were not inspected.",
      "published_on": "2026-09-08",
      "source_date_note": "The original report displays September 8, 2026 publication. That day is outlet publication, not an independently established discharge event, contamination finding or agency order.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The disposition of the reported water-composition questions is unknown in this bounded review. A proposed transparency bill and historical interview account do not establish a current water-quality result, permit decision, wrongdoing or resolution.",
      "source_ids": [
        "source:62868a24f5cdb81d33549240"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "WVPE reported South Bend council questions about the composition of wastewater from an Amazon data center sent to the city's treatment plant. This records an outlet account of public questions. It does not establish the exact originating campus, contaminant levels, a discharge violation or a current permit outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:18141",
      "record_id": null,
      "subject_label": "St. Joseph County",
      "actor": {
        "kind": "outlet",
        "label": "WVPE",
        "source_ids": [
          "source:62868a24f5cdb81d33549240"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:62868a24f5cdb81d33549240",
          "url": "https://www.wvpe.org/wvpe-news/2026-09-08/south-bend-official-cites-data-center-nda-in-declining-council-meeting-invite",
          "publisher": "WVPE",
          "source_type": "news",
          "published_on": "2026-09-08",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ak-cook-inlet-ferc-preliminary-notice-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "ak",
      "record_type": "permit_and_comment",
      "categories": [
        "water_quality_discharge",
        "noise",
        "heat",
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "other"
      ],
      "event_on": "2026-09-01",
      "event_date_note": "The event is the exact dated original public record.",
      "published_on": "2026-09-04",
      "source_date_note": "The displayed original publication day is recorded separately from the event and source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.",
      "source_ids": [
        "source:457fbc7349dc225d2c5440ef"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Federal Energy Regulatory Commission recorded acceptance for filing of the DeepGreen Cook Inlet preliminary-permit application and invited comments through November 2, 2026. The notice concerns study priority for the East Foreland subsea-compute proposal. It does not grant a construction license or authorize land disturbance or entry onto others' property.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:deepgreen-cook-inlet-nikiski-ak",
      "record_id": "deepgreen-cook-inlet-nikiski-ak",
      "subject_label": "Cook Inlet Subsea-Compute & Infrastructure Hub",
      "actor": {
        "kind": "agency",
        "label": "Federal Energy Regulatory Commission",
        "source_ids": [
          "source:457fbc7349dc225d2c5440ef"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:457fbc7349dc225d2c5440ef",
          "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18147.pdf",
          "publisher": "Federal Energy Regulatory Commission",
          "source_type": "government_record",
          "published_on": "2026-09-04",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:az-camelback-creek-county-public-comments",
      "version": 1,
      "subject_kind": "site",
      "state": "az",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "traffic_construction",
        "noise",
        "light",
        "wildlife_wetlands_stormwater",
        "land_use_zoning"
      ],
      "event_on": "2026-09-02",
      "event_date_note": "September 2 is the dated county memorandum recording the later correspondence. Individual letters have their own dates; this is not asserted as the first resident concern day.",
      "published_on": null,
      "source_date_note": "The selected government documents are dated, but their exact first online publication days were not independently established.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:6fba1583bd744d6a8d462e52",
        "source:8e1edc81960f1d94abbe7e72"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about water supply, traffic, noise, light, drainage and industrial land use in letters included in the county Camelback Creek handout. The September 2 memorandum records opposition received after the earlier staff report and also records additional support. These are attributed public comments, not agency findings of actual impacts, a violation or proof of the final Board decision.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:arizona-land-consulting-camelback-creek-tonopah-az",
      "record_id": "arizona-land-consulting-camelback-creek-tonopah-az",
      "subject_label": "Camelback Creek",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:6fba1583bd744d6a8d462e52",
          "source:8e1edc81960f1d94abbe7e72"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:6fba1583bd744d6a8d462e52",
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10497?fileID=102599",
          "publisher": "Maricopa County Planning and Development Department",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        },
        {
          "id": "source:8e1edc81960f1d94abbe7e72",
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10507?fileID=102687",
          "publisher": "Maricopa County Planning and Development Department",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:nv-townsite-federal-parcel-consolidated-appeal-stay-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "nv",
      "record_type": "legal_action",
      "categories": [
        "land_use_zoning",
        "water_use",
        "air_generators",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": "2026-09-01",
      "event_date_note": "The actual signed order is dated September 1, 2026. It separately identifies Boulder City's July 23 appeal and the June 26 federal decision. Earlier group filing and later briefing are separate events; no completed later filing is inferred.",
      "published_on": "2026-09-01",
      "source_date_note": "The original group stay announcement was published September 1, 2026; its earlier appeal announcement was published July 27. The exact first public posting day of the original order PDF and city page is unknown; the order date is not assumed to be first publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current merits disposition is unknown in this bounded review. The September 1 order grants a stay and expedited consolidated review. It denies Boulder City's separate stay motion as moot because the granted stay already provides relief; it does not dismiss the city appeal, finally resolve every concern or establish that the project was withdrawn.",
      "source_ids": [
        "source:257ca9f0e3483765e93909ad",
        "source:9adb40d78d029db459eb1be9",
        "source:fb306817dc2441a5a6a79d8f",
        "source:fc1bf1ed348148f1f5e00d7f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Interior Board of Land Appeals issued a September 1, 2026 stay of the federal Townsite data-center decision, consolidating Boulder City's and the environmental groups' appeals and expediting further review. The groups raised environmental-review, water, air and habitat concerns. The stay is an interim procedural ruling, not a final merits judgment or measured environmental finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:32003",
      "record_id": null,
      "subject_label": "Clark County",
      "actor": {
        "kind": "agency",
        "label": "Interior Board of Land Appeals",
        "source_ids": [
          "source:257ca9f0e3483765e93909ad"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:257ca9f0e3483765e93909ad",
          "url": "https://biologicaldiversity.org/programs/public_lands/pdfs/2026-0213-Boulder-City-Stay-Granted.pdf",
          "publisher": "U.S. Department of the Interior, Interior Board of Land Appeals",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:9adb40d78d029db459eb1be9",
          "url": "https://biologicaldiversity.org/w/news/press-releases/appeal-challenges-public-lands-data-center-in-nevada-2026-07-27/email_view/",
          "publisher": "Center for Biological Diversity",
          "source_type": "organization_page",
          "published_on": "2026-07-27",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fb306817dc2441a5a6a79d8f",
          "url": "https://www.biologicaldiversity.org/w/news/press-releases/appeal-halts-public-lands-data-center-in-nevada-before-construction-begins-2026-09-01/",
          "publisher": "Center for Biological Diversity",
          "source_type": "organization_page",
          "published_on": "2026-09-01",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fc1bf1ed348148f1f5e00d7f",
          "url": "https://www.bcnv.org/1170/Data-Centers",
          "publisher": "City of Boulder City",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wv-ridgeline-permit-ica-dismissal-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "wv",
      "record_type": "legal_action",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-08-26",
      "event_date_note": "The actual court order and electronic filing stamp both identify August 26, 2026. Earlier appeal-filing dates and any planned later refiling are separate; no accomplished higher-court filing is inferred.",
      "published_on": "2026-08-31",
      "source_date_note": "The exact original court PDF first posting day is unknown. The original linked WVPB follow-up was published August 31, 2026. A filename or filing stamp is not assumed to establish PDF publication.",
      "checked_on": "2026-10-18",
      "status": "dismissed",
      "status_on": "2026-08-26",
      "status_scope": "Intermediate Court of Appeals of West Virginia dismissed only appeal 26-ICA-92 for being improvidently docketed, stating that review belongs in the Supreme Court of Appeals. Dismissed applies to that dated Intermediate Court procedure. It does not resolve all air-permit or disclosure merits, prove current compliance, dismiss every possible challenge or establish the present higher-court outcome.",
      "source_ids": [
        "source:4d1a6913987f1935d9364010",
        "source:b97b64efbc31744a3d375156"
      ],
      "status_source_ids": [
        "source:4d1a6913987f1935d9364010"
      ],
      "event_ids": [],
      "summary": "Intermediate Court of Appeals of West Virginia dismissed Ridgeline-related appeal 26-ICA-92 on August 26, 2026 for being improvidently docketed, stating that review belongs in the Supreme Court of Appeals. This records the named court procedure, not a merits decision approving every environmental claim, current operation or the outcome of any later higher-court case.",
      "quote": null,
      "operator_response": {
        "organization": "Fundamental Data",
        "summary": "Fundamental Data stated, according to West Virginia Public Broadcasting, that it respects the rulings and would address issues in the proper forum while working with the state. This is an outlet-quoted company statement, not a verified merits determination or completed compliance finding.",
        "source_ids": [
          "source:b97b64efbc31744a3d375156"
        ],
        "published_on": "2026-08-31",
        "checked_on": "2026-10-18",
        "relationship": "The original report attributes this statement to Fundamental Data concerning both Ridgeline rulings. The company release itself was not independently inspected. August 31 is outlet publication, not an independently established company-original publication date.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:fundamental-data-ridgeline-datacenter-tucker-county-wv",
      "record_id": "fundamental-data-ridgeline-datacenter-tucker-county-wv",
      "subject_label": "Ridgeline Data Center",
      "actor": {
        "kind": "court",
        "label": "Intermediate Court of Appeals of West Virginia",
        "source_ids": [
          "source:4d1a6913987f1935d9364010"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:4d1a6913987f1935d9364010",
          "url": "https://wvpublic.org/wp-content/uploads/2026/08/082626-Tucker-United-Sierra-Club-and-West-Virginia-Highlands-Conservancy-v.-DEP-and-Fundamental-Data-Dismissal-Order.pdf",
          "publisher": "Intermediate Court of Appeals of West Virginia",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b97b64efbc31744a3d375156",
          "url": "https://wvpublic.org/story/energy-environment/community-conservation-groups-ask-courts-to-properly-review-challenges-to-data-center-permitting/amp/",
          "publisher": "West Virginia Public Broadcasting",
          "source_type": "news",
          "published_on": "2026-08-31",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wv-ridgeline-disclosure-ica-dismissal-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "wv",
      "record_type": "legal_action",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-08-26",
      "event_date_note": "The actual court order and electronic filing stamp both identify August 26, 2026. Earlier appeal-filing dates and any planned later refiling are separate; no accomplished higher-court filing is inferred.",
      "published_on": "2026-08-31",
      "source_date_note": "The exact original court PDF first posting day is unknown. The original linked WVPB follow-up was published August 31, 2026. A filename or filing stamp is not assumed to establish PDF publication.",
      "checked_on": "2026-10-18",
      "status": "dismissed",
      "status_on": "2026-08-26",
      "status_scope": "Intermediate Court of Appeals of West Virginia dismissed only appeal 25-ICA-391 for lack of jurisdiction, with a separate discussion of moot draft-permit questions. Dismissed applies to that dated Intermediate Court procedure. It does not resolve all air-permit or disclosure merits, prove current compliance, dismiss every possible challenge or establish the present higher-court outcome.",
      "source_ids": [
        "source:7896d3aa2e41b57dd0f1d849",
        "source:b97b64efbc31744a3d375156"
      ],
      "status_source_ids": [
        "source:7896d3aa2e41b57dd0f1d849"
      ],
      "event_ids": [],
      "summary": "Intermediate Court of Appeals of West Virginia dismissed Ridgeline-related appeal 25-ICA-391 on August 26, 2026 for lack of jurisdiction, with a separate discussion of moot draft-permit questions. This records the named court procedure, not a merits decision approving every environmental claim, current operation or the outcome of any later higher-court case.",
      "quote": null,
      "operator_response": {
        "organization": "Fundamental Data",
        "summary": "Fundamental Data stated, according to West Virginia Public Broadcasting, that it respects the rulings and would address issues in the proper forum while working with the state. This is an outlet-quoted company statement, not a verified merits determination or completed compliance finding.",
        "source_ids": [
          "source:b97b64efbc31744a3d375156"
        ],
        "published_on": "2026-08-31",
        "checked_on": "2026-10-18",
        "relationship": "The original report attributes this statement to Fundamental Data concerning both Ridgeline rulings. The company release itself was not independently inspected. August 31 is outlet publication, not an independently established company-original publication date.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:fundamental-data-ridgeline-datacenter-tucker-county-wv",
      "record_id": "fundamental-data-ridgeline-datacenter-tucker-county-wv",
      "subject_label": "Ridgeline Data Center",
      "actor": {
        "kind": "court",
        "label": "Intermediate Court of Appeals of West Virginia",
        "source_ids": [
          "source:7896d3aa2e41b57dd0f1d849"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:7896d3aa2e41b57dd0f1d849",
          "url": "https://wvpublic.org/wp-content/uploads/2026/08/082626-Tucker-United-Friends-of-Blackwater-and-West-Virginia-Highlands-Conservancy-v.-DEP-Dismissal-Order.pdf",
          "publisher": "Intermediate Court of Appeals of West Virginia",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b97b64efbc31744a3d375156",
          "url": "https://wvpublic.org/story/energy-environment/community-conservation-groups-ask-courts-to-properly-review-challenges-to-data-center-permitting/amp/",
          "publisher": "West Virginia Public Broadcasting",
          "source_type": "news",
          "published_on": "2026-08-31",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nc-amazon-hamlet-joint-air-permit-comment-record-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "nc",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "power_rates"
      ],
      "event_on": null,
      "event_date_note": "The agency announcement says the final permits had been issued, but exact signed issuance days were not independently established. Event date stays unknown; the announcement day and originally scheduled hearing are not substituted.",
      "published_on": "2026-08-28",
      "source_date_note": "The original final-permit announcement displays August 28, 2026 publication. The undated hearing-event page and current check are separate from an unverified exact permit issuance day.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": null,
      "status_scope": "North Carolina Department of Environmental Quality announced issuance of the two named air authorizations. Resolved applies only to that paired permitting action; actual operation, measured emissions, present compliance and the outcome of every community concern are not established.",
      "source_ids": [
        "source:d339e9e01314bd5bbf1a8f10",
        "source:4c456ded0936fc2c1581d3d2"
      ],
      "status_source_ids": [
        "source:d339e9e01314bd5bbf1a8f10"
      ],
      "event_ids": [],
      "summary": "North Carolina Department of Environmental Quality announced final air permits for Amazon's Hamlet backup engines and Duke Energy's temporary bridge-power engines, with additional testing, monitoring and reporting following public comments. The agency keeps the two permitted activities separate. Its announcement establishes a permit action, not measured emissions, actual campus operation or resolution of every community concern.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:aws-richmond-county-nc",
      "record_id": "aws-richmond-county-nc",
      "subject_label": "Amazon Web Services Richmond County Data Center Campus",
      "actor": {
        "kind": "agency",
        "label": "North Carolina Department of Environmental Quality",
        "source_ids": [
          "source:d339e9e01314bd5bbf1a8f10"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:4c456ded0936fc2c1581d3d2",
          "url": "https://www.deq.nc.gov/news/events/public-hearing-preliminary-determination-air-quality-permit-applications-amazon-data-services-and",
          "publisher": "North Carolina Department of Environmental Quality",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:d339e9e01314bd5bbf1a8f10",
          "url": "https://www.deq.nc.gov/news/press-releases/2026/08/28/ncdeqs-division-air-quality-requires-additional-monitoring-testing-final-air-quality-permits-amazon",
          "publisher": "North Carolina Department of Environmental Quality",
          "source_type": "government_record",
          "published_on": "2026-08-28",
          "retrieved_on": "2026-10-18"
        }
      ],
      "status_date_note": "Exact outcome date is not established for the signed permit issuances. August 28, 2026 is the verified agency announcement publication; the event and disposition dates remain unknown rather than substituting that publication or check day."
    },
    {
      "id": "concern:fl-martin-board-resource-review-account-20260825",
      "version": 1,
      "subject_kind": "county",
      "state": "fl",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "other"
      ],
      "event_on": "2026-08-25",
      "event_date_note": "The County Attorney account reports the August 25, 2026 Board direction and associated concerns. This dates the reported institutional episode rather than first public concern, original publication or an independently read complete minute record. The future October 27 draft date is not a completed vote.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:942c5d8ebe8f71675c12e11c"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Martin County Board of County Commissioners as reported by the County Attorney raised policy concerns about noise, water and electricity consumption, water disposal, land use compatibility and environmental effects during its August 25, 2026 direction to prepare a proposed computing moratorium. These are reported institutional policy concerns rather than measured impacts, a facility specific allegation or an accomplished future legislative finding. The associated unsigned October 27 draft remains a proposal, and its recitals do not establish that the Board adopted them or resolved the underlying questions.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:12085",
      "record_id": null,
      "subject_label": "Martin County",
      "actor": {
        "kind": "agency",
        "label": "Martin County Board of County Commissioners as reported by the County Attorney",
        "source_ids": [
          "source:942c5d8ebe8f71675c12e11c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:942c5d8ebe8f71675c12e11c",
          "url": "https://martin.legistar.com/LegislationDetail.aspx?FullText=1&GUID=58084918-819B-4913-9D1F-0FD6FC8CE974&ID=8288761&Options=&Search=",
          "publisher": "Martin County County Attorney",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:me-wiscasset-public-concerns-october-2025",
      "version": 1,
      "subject_kind": "campus",
      "state": "me",
      "record_type": "public_concern_on_record",
      "categories": [
        "light",
        "water_use",
        "power_rates",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2025-10-21",
      "event_date_note": "The event is the exact dated original public record.",
      "published_on": null,
      "source_date_note": "The original record supplies a document or meeting date, but its first public posting date is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.",
      "source_ids": [
        "source:bb4840d32cfa403bf45439ec",
        "source:0a007b566c95632de50ee570"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised light, water, utility-cost, land-use and public-information concerns about Wiscasset's prospective data center in preliminary October 21, 2025 minutes. In a later August 24, 2026 interview, Wiscasset Newspaper reported the inquirer's statement that he was no longer pursuing the Old Ferry Road project. That later position is not a finding about actual environmental effects or a permanent prohibition on future proposals.",
      "quote": null,
      "operator_response": {
        "organization": "Boundless Power",
        "summary": "Boundless Power stated through its representative, as reported by Wiscasset Newspaper, that he was no longer pursuing the Old Ferry Road inquiry and that discussions stopped before a formal proposal. The interview is a reported company position, not an independently reviewed municipal or court disposition.",
        "source_ids": [
          "source:0a007b566c95632de50ee570"
        ],
        "published_on": "2026-08-24",
        "checked_on": "2026-10-18",
        "relationship": "Later news interview about the same OldFerryRoad inquiry provides relevant company position; it is not a direct reply to each October21 speaker.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:wiscasset-proposed-me",
      "record_id": "wiscasset-proposed-me",
      "subject_label": "Wiscasset Data Center (Old Ferry Road Site)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:bb4840d32cfa403bf45439ec"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:0a007b566c95632de50ee570",
          "url": "https://www.wiscassetnewspaper.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584",
          "publisher": "Wiscasset Newspaper",
          "source_type": "news",
          "published_on": "2026-08-24",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:bb4840d32cfa403bf45439ec",
          "url": "https://www.wiscasset.gov/AgendaCenter/ViewFile/Item/1540?fileID=1360",
          "publisher": "Town of Wiscasset",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-buena-vista-ai-factory-resource-news-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "heat",
        "traffic_construction"
      ],
      "event_on": null,
      "event_date_note": "A single exact interview or concern-event day is not established. The two article publication days are not substituted for an event date.",
      "published_on": "2026-08-21",
      "source_date_note": "Part two displays August 21, 2026; the earlier project/position article displays August 19. These are separate publication dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of these reported concerns is not established by this bounded review.",
      "source_ids": [
        "source:627e8c9d895d47f7a9cd4947",
        "source:59890d5f9bdeb3ba7f2c075f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Central Sierra Broadcasting reported questions about cooling water, fan noise and heat management for the Buena Vista AI Factory proposal near Ione, and truck traffic for its associated biomass power plant. The reporting distinguishes proposed computing from the separate power-plant component; these are reported questions, not measured effects or agency findings.",
      "quote": null,
      "operator_response": {
        "organization": "NewYork GreenCloud",
        "summary": "NewYork GreenCloud described plans for biomass-powered, liquid-cooled computing, according to Central Sierra Broadcasting. These earlier company positions do not establish actual operating effects or measured carbon reductions.",
        "source_ids": [
          "source:59890d5f9bdeb3ba7f2c075f"
        ],
        "published_on": "2026-08-19",
        "checked_on": "2026-10-18",
        "relationship": "The outlet quoted earlier company promotional statements in its August 19 article, before the August 21 questions. August 19 is the news publication date; an exact statement day and a direct reply to the later questions are not established.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:nygc-buena-vista-ai-factory-ione-ca",
      "record_id": "nygc-buena-vista-ai-factory-ione-ca",
      "subject_label": "Buena Vista AI Factory",
      "actor": {
        "kind": "outlet",
        "label": "Central Sierra Broadcasting",
        "source_ids": [
          "source:627e8c9d895d47f7a9cd4947"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:59890d5f9bdeb3ba7f2c075f",
          "url": "https://mymotherlode.com/news/local/11078052/biomass-fueled-data-center-project-planned-in-amador-county.html",
          "publisher": "Central Sierra Broadcasting",
          "source_type": "news",
          "published_on": "2026-08-19",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:627e8c9d895d47f7a9cd4947",
          "url": "https://mymotherlode.com/news/local/11083246/part-2-biomass-fueled-data-center-project-questions.html",
          "publisher": "Central Sierra Broadcasting",
          "source_type": "news",
          "published_on": "2026-08-21",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:va-tuckahoe-county-completeness-20260820",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "traffic_construction",
        "land_use_zoning"
      ],
      "event_on": "2026-08-20",
      "event_date_note": "This dates the agency completeness letter, not the earliest concern, publication day or a measured physical effect.",
      "published_on": null,
      "source_date_note": "The letter supplies its August 20 date and the posted clarification supplies August 25. Exact first online publication days are unverified.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected letter establishes requested information during application review. The current index links later revised submissions, but this bounded pass does not verify a final response to each request or a current concern disposition. No final application denial, measured impact or operating site is established.",
      "source_ids": [
        "source:a67679d5a1df43c5d12b0c1f",
        "source:ce764ff4ab2600e47fee8870",
        "source:7aaf37879d0adf0c7cd0d902"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Goochland County Community Development Department identified outstanding application information and requested revised noise modeling, generator setback and viewshed information, traffic review and updated water and wastewater analysis for Tuckahoe Technology Park. Its August 25 clarification corrects a stated noise reference in the August 20 letter. These are attributed review requests and a correction, not measured harm, a violation finding, a final denial or a statement that the proposal is operating.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:tract-tuckahoe-technology-park-goochland-county-va",
      "record_id": "tract-tuckahoe-technology-park-goochland-county-va",
      "subject_label": "Tuckahoe Technology Park",
      "actor": {
        "kind": "agency",
        "label": "Goochland County Community Development Department",
        "source_ids": [
          "source:a67679d5a1df43c5d12b0c1f",
          "source:ce764ff4ab2600e47fee8870"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:7aaf37879d0adf0c7cd0d902",
          "url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park",
          "publisher": "Goochland County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:a67679d5a1df43c5d12b0c1f",
          "url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026",
          "publisher": "Goochland County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:ce764ff4ab2600e47fee8870",
          "url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits",
          "publisher": "Goochland County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:nv-manse-current-reported-water-land-use-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "nv",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The article describes a Tuesday commission vote, but an independently inspected exact vote date was not established. The event date remains unknown; the publication date is not substituted.",
      "published_on": "2026-08-20",
      "source_date_note": "The original report displays August 20, 2026 publication. The current developer page has no independently established first publication date; its source-check day is not a new company statement or project event.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current judicial and project outcome and the disposition of the reported water concerns are unknown in this bounded review. The historical basin-restriction report and current developer plans do not establish a final case disposition, site-specific approval or withdrawal, completed mitigation or measured water use.",
      "source_ids": [
        "source:6b2c4aa4ff2b054196c1a5d9"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Nevada Current reported public water concerns and a Nye County vote restricting data centers in Pahrump's Basin 162, linking the decision to the proposed Manse Technology Campus. This is an attributed report about that basin and proposal, not an independently checked present-day court outcome, a statewide ban or a measured water finding.",
      "quote": null,
      "operator_response": {
        "organization": "Manse Technology Campus",
        "summary": "Manse Technology Campus stated on its project page that the proposed campus would limit water use and avoid burdens on local infrastructure and services. These are developer plans and commitments, not independently verified water use, approval or completed mitigation.",
        "source_ids": [
          "source:0893fcfe6746adc4017c9995"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original project page expressly identifies the same Manse proposal in Pahrump. It has no verified publication date and does not expressly answer the later reported basin restriction or an inspected court case. The statements are linked as developer context, not evidence that the reported concerns were resolved.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:manse-technology-campus-pahrump-nv",
      "record_id": "manse-technology-campus-pahrump-nv",
      "subject_label": "Manse Technology Campus",
      "actor": {
        "kind": "outlet",
        "label": "Nevada Current",
        "source_ids": [
          "source:6b2c4aa4ff2b054196c1a5d9"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:0893fcfe6746adc4017c9995",
          "url": "https://mansetechcampus.com/",
          "publisher": "Manse Technology Campus",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:6b2c4aa4ff2b054196c1a5d9",
          "url": "https://nevadacurrent.com/2026/08/20/nye-county-totally-bans-data-centers-in-over-appropriated-water-basin/",
          "publisher": "Nevada Current",
          "source_type": "news",
          "published_on": "2026-08-20",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:mn-pine-island-mpr-reported-community-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "mn",
      "record_type": "news_report",
      "categories": [
        "noise",
        "light",
        "health",
        "water_use",
        "power_rates"
      ],
      "event_on": null,
      "event_date_note": "The newer report describes a Wednesday event but an independently checked exact event day was not established. Event date stays unknown; the earlier scheduled injunction hearing and later reported pause are not original verified court-event dates.",
      "published_on": "2026-08-20",
      "source_date_note": "The current original two-project report displays August 20, 2026 publication. The separate Pine Island background report is dated February 24. Publication, company-event timing and a court ruling are distinct.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current formal court and project disposition and the outcome of these documented concerns are unknown in this bounded review. MPR News reported a pause during judicial review in August; that is not an independently inspected current order, final project withdrawal, issued environmental approval or measured resource outcome.",
      "source_ids": [
        "source:5eaeb0ac11a5cd6767dc98eb",
        "source:f4b8dc9df638da473e19c897"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "MPR News reported continued environmental concerns about Google's Pine Island proposal, following earlier questions about noise, light, health, water and electricity. Its later report described opposition at a company event and a court-review-related pause. These are outlet accounts; the original court order, present project outcome and actual environmental conditions were not independently verified.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:google-skyway-pine-island-mn",
      "record_id": "google-skyway-pine-island-mn",
      "subject_label": "Google Project Skyway (Pine Island)",
      "actor": {
        "kind": "outlet",
        "label": "MPR News",
        "source_ids": [
          "source:5eaeb0ac11a5cd6767dc98eb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:5eaeb0ac11a5cd6767dc98eb",
          "url": "https://www.mprnews.org/story/2026/08/20/google-launches-a-charm-offensive-in-2-minnesota-towns-as-data-center-opposition-grows",
          "publisher": "MPR News",
          "source_type": "news",
          "published_on": "2026-08-20",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f4b8dc9df638da473e19c897",
          "url": "https://www.mprnews.org/story/2026/02/24/google-revealed-as-tenant-for-pine-island-data-center-amid-controversy",
          "publisher": "MPR News",
          "source_type": "news",
          "published_on": "2026-02-24",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:mn-hermantown-mpr-reported-community-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "mn",
      "record_type": "news_report",
      "categories": [
        "noise",
        "light",
        "water_use",
        "power_rates",
        "water_quality_discharge",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": null,
      "event_date_note": "The reports describe several open houses and relative weekday meetings without one independently verified exact concern-event day for this item. Event date remains unknown; report publication and scheduled later reviews are separate.",
      "published_on": "2026-08-20",
      "source_date_note": "The current original report displays August 20, 2026 publication,with separate June 25 background reporting. Those days are outlet publication dates,not independently verified company-original,permit or court-event dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of these documented concerns is unknown in this bounded original-report review. Presented design or cooling options and company mitigation plans do not establish completed work, measured noise or water outcomes, a final permit or resolution of every concern.",
      "source_ids": [
        "source:5eaeb0ac11a5cd6767dc98eb",
        "source:f0b79097060d3d4c0347b0f9"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "MPR News reported continuing questions about Google's Hermantown proposal, including noise, water and electricity use, a nearby trout stream and stormwater. It described company presentations and residents' differing reactions. These are reported concerns and plans, not an independently inspected complaint case, measured effects, completed mitigation or final agency approval.",
      "quote": null,
      "operator_response": {
        "organization": "Google",
        "summary": "Google stated, according to MPR News, that it was addressing noise, stream and runoff questions in its Hermantown design. The outlet also reported the company considering air cooling or recirculated-water cooling. These are reported company plans, not independently inspected final designs, completed mitigation or measured resource use.",
        "source_ids": [
          "source:5eaeb0ac11a5cd6767dc98eb",
          "source:f0b79097060d3d4c0347b0f9"
        ],
        "published_on": "2026-08-20",
        "checked_on": "2026-10-18",
        "relationship": "The August 20 report attributes these presentations to Google officials discussing Hermantown. The separate June 25 report supplies the cooling options; neither is a company-original publication or proof of implementation. Pine Island commitments, utility arrangements and events are not transferred to this proposal. August 20 is the later outlet publication day.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:google-hermantown-mn",
      "record_id": "google-hermantown-mn",
      "subject_label": "Google Hermantown Data Center",
      "actor": {
        "kind": "outlet",
        "label": "MPR News",
        "source_ids": [
          "source:5eaeb0ac11a5cd6767dc98eb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:5eaeb0ac11a5cd6767dc98eb",
          "url": "https://www.mprnews.org/story/2026/08/20/google-launches-a-charm-offensive-in-2-minnesota-towns-as-data-center-opposition-grows",
          "publisher": "MPR News",
          "source_type": "news",
          "published_on": "2026-08-20",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f0b79097060d3d4c0347b0f9",
          "url": "https://www.mprnews.org//story/2026/06/25/at-packed-hermantown-open-house-google-tries-to-ease-data-center-concerns",
          "publisher": "MPR News",
          "source_type": "news",
          "published_on": "2026-06-25",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-northtown-valley-water-comment-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "water_use",
        "water_quality_discharge",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": "2026-08-20",
      "event_date_note": "The retained original filing or effective order provides this exact event date.",
      "published_on": "2026-08-20",
      "source_date_note": "The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The individual comment outcome has not been established by this bounded original-source review. A project-page process label is not its disposition.",
      "source_ids": [
        "source:ac2c377990d5106c4316f49a",
        "source:6b168227a21615fb65e1c0a6"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Valley Water requested environmental-review analysis of water supply, flooding, shallow groundwater, stormwater and protection of the adjacent Guadalupe River for NorthTown. The agency recommended spill controls and protection of wells. Its comment requests assessment and safeguards; it does not establish a discharge, present contamination caused by the project or a permit violation.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:goodman-innovation-centre-san-jose-ca",
      "record_id": "goodman-innovation-centre-san-jose-ca",
      "subject_label": "Goodman Innovation Centre San Jose (NorthTown Data Center)",
      "actor": {
        "kind": "agency",
        "label": "Valley Water",
        "source_ids": [
          "source:ac2c377990d5106c4316f49a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:6b168227a21615fb65e1c0a6",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ac2c377990d5106c4316f49a",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=272075&DocumentContentId=109750",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2026-08-20",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ne-hallam-crusoe-village-residents-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "ne",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "water_use",
        "noise",
        "light"
      ],
      "event_on": "2026-08-19",
      "event_date_note": "The original Planning Commission minute body explicitly dates the meeting August 19, 2026. This is the discussion day, not the exact publication or final permit day.",
      "published_on": null,
      "source_date_note": "The original minute body does not independently establish the exact web publication day. Retrieval day is not publication day.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "Selected original Village minutes document concerns, a company response and a procedural pause. The complete concern disposition, final Board permission, actual measured harm and current legal force were not independently established.",
      "source_ids": [
        "source:d582a368626a588abec8c3ae"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents requested in the original Hallam Planning Commission minutes for a pause and enforceable limits because of potential noise, lighting, water demands, property effects and future expansion of the Monolith and Crusoe proposal. These are attributed concerns rather than measured findings. Individual resident names and home addresses are omitted. The selected passages do not establish the complete public comment history or final concern outcome.",
      "quote": null,
      "operator_response": {
        "organization": "Crusoe",
        "summary": "Crusoe responded in the same original minutes that it was willing to include a project limit, water limits, further sound studies and downward facing lighting conditions. Crusoe also said any later phase would return through the approval process. These are attributed responses and prospective commitments rather than independently verified executed conditions or measured performance.",
        "source_ids": [
          "source:d582a368626a588abec8c3ae"
        ],
        "published_on": null,
        "checked_on": "2026-10-24",
        "relationship": "The agency minutes attribute these responses to the Crusoe representative addressing the same named proposal and resident questions.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:crusoe-monolith-hallam-lancaster-ne",
      "record_id": "crusoe-monolith-hallam-lancaster-ne",
      "subject_label": "Crusoe Hallam Data Center (Monolith Olive Creek campus)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:d582a368626a588abec8c3ae"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:d582a368626a588abec8c3ae",
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf",
          "publisher": "Hallam original August 19 Planning Commission minutes",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:ca-santa-clara-city-water-grid-policy-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "other"
      ],
      "event_on": "2026-08-18",
      "event_date_note": "The original staff report identifies the August 18, 2026 Council request and motion to agendize future policy discussion. This dates the reported institutional action rather than first public concern, the later presentation, final policy adoption or source publication.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:8501cace8715f635d1cd410f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Santa Clara staff recorded a Council request for limits on the type and quantity of water used by computing facilities and questions about demand side grid support. Staff proposes further water efficiency, recycled water, siting and review standards. These are attributed municipal policy questions rather than measured harm, an enacted new water standard or a Countywide finding. The same report separately describes a Silicon Valley Power application limitation, which does not establish a general City land use ban or individual project violation.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:06085",
      "record_id": null,
      "subject_label": "Santa Clara County",
      "actor": {
        "kind": "agency",
        "label": "City of Santa Clara staff",
        "source_ids": [
          "source:8501cace8715f635d1cd410f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:8501cace8715f635d1cd410f",
          "url": "https://santaclara.legistar.com/LegislationDetail.aspx?FullText=1&GUID=2791DE9D-56B5-49B5-9998-BC1264149D06&ID=8260886",
          "publisher": "City of Santa Clara",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:ky-burgin-panattoni-reported-public-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "ky",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": "2026-07-30",
      "event_date_note": "The original caption and article expressly identify the July 30, 2026 planning hearing/commission action. Other relative Tuesday meetings and later annexation discussion are not converted to unverified exact event dates.",
      "published_on": "2026-08-17",
      "source_date_note": "The original report displays August 17, 2026 publication, distinct from the July 30 reported hearing and this source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later formal annexation, city/county applicability and proposal disposition are unknown in this bounded original-report review. A reported county moratorium or delayed city vote does not establish a permanent city ban, project withdrawal, permit denial or resolution of all resource concerns.",
      "source_ids": [
        "source:28915a40d5b6fb67941bdee4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Kentucky Public Radio reported opposition to Panattoni's Burgin-area proposal at a July 30, 2026 planning hearing and later annexation discussions, including questions about water, electricity and control over farmland development. The report distinguishes a county moratorium from city proceedings. It does not establish current annexation, a final city prohibition, measured impacts or a verified project withdrawal.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:panattoni-burgin-mercer-county-ky",
      "record_id": "panattoni-burgin-mercer-county-ky",
      "subject_label": "Panattoni Burgin Data Center Campus",
      "actor": {
        "kind": "outlet",
        "label": "Kentucky Public Radio",
        "source_ids": [
          "source:28915a40d5b6fb67941bdee4"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:28915a40d5b6fb67941bdee4",
          "url": "https://www.lpm.org/news/2026-08-17/hyperscale-data-centers-provoke-bipartisan-outrage-across-kentucky",
          "publisher": "Kentucky Public Radio",
          "source_type": "news",
          "published_on": "2026-08-17",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:la-hyperion-ucs-disclosure-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "la",
      "record_type": "public_concern_on_record",
      "categories": [
        "power_rates",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The July release refers to a Friday order without an independently inspected original order establishing its exact day. Later outlet-reported appeal filing and scheduled vote days are not guessed from publication.",
      "published_on": "2026-07-14",
      "source_date_note": "The original UCS release is dated July 14, 2026. Louisiana Illuminator separately published the appeal account August 11; neither is substituted for an unknown original order or filing date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current original commission disposition is unknown in this bounded review. The July disclosure order and later appeal are attributed source accounts; a scheduled vote is not a completed decision. No actual current disclosure compliance, final infrastructure approval or ratepayer impact was verified.",
      "source_ids": [
        "source:f774d4a49f0c1e648351160b",
        "source:90b092378b0a71f20e572f21"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Union of Concerned Scientists requested disclosure of evidence supporting Hyperion's projected power needs and economic claims, citing potential ratepayer consequences. Its July release described a disclosure order; Louisiana Illuminator later reported Meta's appeal. These are attributed accounts, not an independently inspected current order, actual bill result or final commission decision.",
      "quote": null,
      "operator_response": {
        "organization": "Meta",
        "summary": "Meta argued, according to Louisiana Illuminator, that the requested information was commercially sensitive and appealed the disclosure ruling. This is the outlet's account of the company's position, not a verified final commission outcome or independent finding about customer costs.",
        "source_ids": [
          "source:90b092378b0a71f20e572f21"
        ],
        "published_on": "2026-08-11",
        "checked_on": "2026-10-18",
        "relationship": "The original August11 article expressly presents Meta's confidentiality argument and appeal in the same Hyperion disclosure dispute. August11 is the outlet publication, not an independently verified original company statement or appeal filing day.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:meta-hyperion-richland-parish-la",
      "record_id": "meta-hyperion-richland-parish-la",
      "subject_label": "Meta Hyperion",
      "actor": {
        "kind": "public_group",
        "label": "Union of Concerned Scientists",
        "source_ids": [
          "source:f774d4a49f0c1e648351160b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:90b092378b0a71f20e572f21",
          "url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "publisher": "Louisiana Illuminator",
          "source_type": "news",
          "published_on": "2026-08-11",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f774d4a49f0c1e648351160b",
          "url": "https://www.ucs.org/about/news/judge-orders-meta-explain-new-gas-demand-hyperscale-louisiana-data-center",
          "publisher": "Union of Concerned Scientists",
          "source_type": "organization_page",
          "published_on": "2026-07-14",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:la-hyperion-reported-air-permit-comments-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "la",
      "record_type": "news_report",
      "categories": [
        "air_generators"
      ],
      "event_on": null,
      "event_date_note": "The report refers to comments submitted Thursday, but the original comments are blocked and the exact submission day is not independently verified. No calendar date is inferred from the August4 article.",
      "published_on": "2026-08-04",
      "source_date_note": "The original Louisiana Illuminator article displays August 4, 2026 publication. That is separate from the unknown original comment submission and later agency outcome dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the reported permit objections, monitoring and hearing requests is unknown in this bounded review. A reported earlier permit revision does not resolve every later objection or establish actual air measurements, current operation or all-permit compliance.",
      "source_ids": [
        "source:6e51817feb6bf3f4eb0f975d"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Louisiana Illuminator reported Sierra Club's objections to the emissions calculations and permit classification for Hyperion, with requests for monitoring and a hearing. The report also includes Meta's differing compliance position. These are outlet-reported concerns and company statements, not independently inspected agency findings or measured operating emissions.",
      "quote": null,
      "operator_response": {
        "organization": "Meta",
        "summary": "Meta stated, according to Louisiana Illuminator, that it works with regulators to comply with air-quality and permitting requirements. This is an outlet-reported company statement, not an independently verified finding that the permit objections were resolved or current emissions meet every requirement.",
        "source_ids": [
          "source:6e51817feb6bf3f4eb0f975d"
        ],
        "published_on": "2026-08-04",
        "checked_on": "2026-10-18",
        "relationship": "The original August4 article explicitly presents Meta's spokesperson response when asked about the same Sierra Club permit comments. August4 is outlet publication; the exact original email day is unknown.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:meta-hyperion-richland-parish-la",
      "record_id": "meta-hyperion-richland-parish-la",
      "subject_label": "Meta Hyperion",
      "actor": {
        "kind": "outlet",
        "label": "Louisiana Illuminator",
        "source_ids": [
          "source:6e51817feb6bf3f4eb0f975d"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:6e51817feb6bf3f4eb0f975d",
          "url": "https://lailluminator.com/2026/08/04/meta-data-center-pollution-permit-doesnt-account-for-all-its-emissions-sierra-club-says/",
          "publisher": "Louisiana Illuminator",
          "source_type": "news",
          "published_on": "2026-08-04",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-posey-boberg-public-moratorium-requests-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "in",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "noise",
        "water_use",
        "health",
        "other"
      ],
      "event_on": "2026-08-04",
      "event_date_note": "The signed August 4, 2026 minutes record the Boberg area discussion and public comments on PDF pages 3 and 4. Later August 18 minutes approve those earlier minutes.",
      "published_on": null,
      "source_date_note": "The original dated government record was captured and reviewed. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:87c265b63bd96a4c6e70000a",
        "source:34a921cf388d60aa390bdc8c",
        "source:43ceaa3cabe7028e144ff53b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents requested a moratorium and raised land use, noise, water and health concerns during the August 4, 2026 Posey Board discussion of possible data center development near Boberg Road. Some comments addressed data centers generally. The record establishes the public comment episode, not measured effects from an operating Boberg facility, an adopted moratorium or a formal project denial.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:posey-county-boberg-road-data-center-in",
      "record_id": "posey-county-boberg-road-data-center-in",
      "subject_label": "Posey County Boberg Road Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:87c265b63bd96a4c6e70000a",
          "source:34a921cf388d60aa390bdc8c",
          "source:43ceaa3cabe7028e144ff53b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:34a921cf388d60aa390bdc8c",
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-August-18-2026.pdf",
          "publisher": "Posey County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:43ceaa3cabe7028e144ff53b",
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-Special-Meeting-August-27-2026.pdf",
          "publisher": "Posey County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:87c265b63bd96a4c6e70000a",
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/08/Commissioners-August-4-2026.pdf",
          "publisher": "Posey County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:al-shelby-harpersville-town-resource-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "al",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "noise",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-08-03",
      "event_date_note": "The signed and attested ordinance adoption day is August 3, 2026, as verified in the restriction review. It dates this legislative record and not the first earlier statement of every concern.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:eb903690c00d1740b29443fb"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Harpersville Town Council recorded potential electrical demand, water consumption, emergency service and noise effects as reasons for studying data centers and reviewing Town regulations. The ordinance discusses compatibility with existing land uses and infrastructure capacity. These are institutional concerns in the Town corporate limits and legally permitted police jurisdiction, not a Shelby County wide rule, actual measured impacts or an individual project finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:01117",
      "record_id": null,
      "subject_label": "Shelby County",
      "actor": {
        "kind": "agency",
        "label": "Harpersville Town Council",
        "source_ids": [
          "source:eb903690c00d1740b29443fb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:eb903690c00d1740b29443fb",
          "url": "https://www.harpersvilleal.gov/DocumentCenter/View/861/ORD---2026-08-03-03---Data-Center-Moratoriumpdf",
          "publisher": "Town of Harpersville",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:va-spring-valley-lwc-opposition",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": null,
      "event_date_note": "The exact first opposition day is not established. July 30, 2026 is the group website publication day.",
      "published_on": "2026-07-30",
      "source_date_note": "The source publication day is explicit. The exact first concern or application filing day is not established unless separately stated.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:7e3af6f3c4172936dd92266f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Loudoun Wildlife Conservancy opposed the proposed Spring Valley Technology Park and raised concerns about forest loss and impervious cover near Goose Creek. Its website also reports a Planning Commission recommendation of denial. These are the group position and account, not an Atlas environmental finding or an independently reviewed final Board decision.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:active-infrastructure-spring-valley-tech-park-loudoun-va",
      "record_id": "active-infrastructure-spring-valley-tech-park-loudoun-va",
      "subject_label": "Spring Valley Technology Park",
      "actor": {
        "kind": "public_group",
        "label": "Loudoun Wildlife Conservancy",
        "source_ids": [
          "source:7e3af6f3c4172936dd92266f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:7e3af6f3c4172936dd92266f",
          "url": "https://loudounwildlife.org/2026/07/spring-valley-technology-park/",
          "publisher": "Loudoun Wildlife Conservancy",
          "source_type": "organization_page",
          "published_on": "2026-07-30",
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:pa-plymouth-council-safeguards-position-20260727",
      "version": 1,
      "subject_kind": "county",
      "state": "pa",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "other"
      ],
      "event_on": "2026-07-27",
      "event_date_note": "The original Council statement is dated July 27, 2026. This dates the institutional statement rather than its exact first online posting, first public concern, final application decision or subsequent hearing outcome.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:f15ce3261dc026ce6284eb43"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Plymouth Township Council describes concerns about neighborhood health and welfare, noise and vibration, residential buffers, lighting and site safeguards in its July 27, 2026 statement on the proposed 900 Conshohocken Road computing facility. The statement records Council opposition and its account of disputed proposed conditions. These are attributed government positions rather than measured harm, an independently verified applicant admission, adopted general Township standards or a completed project denial. The institutional concern episode remains separate from final legal disposition and its resolution is unknown.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:42091",
      "record_id": null,
      "subject_label": "Montgomery County",
      "actor": {
        "kind": "agency",
        "label": "Plymouth Township Council",
        "source_ids": [
          "source:f15ce3261dc026ce6284eb43"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:f15ce3261dc026ce6284eb43",
          "url": "https://www.plymouthtownship.org/download/Plymouth%20Council/2026/2026_0727_CouncilStatement_DataCenter.pdf",
          "publisher": "Plymouth Township Council",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:wa-grant-quincy-area-reported-concerns-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "wa",
      "record_type": "news_report",
      "categories": [
        "air_generators",
        "water_use",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The article combines several interviews and prior events without one independently verified exact filing or hearing day. The event date remains unknown; article publication is not substituted.",
      "published_on": "2026-07-26",
      "source_date_note": "The original article displays July 26, 2026 publication and July 27 update/editorial clarification. Publication is retained separately from all event and source-check dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of these area-level concerns is unknown in this bounded original-report review. Reported historic litigation, one changing air-monitor reading, company practices and agency process descriptions are not independently inspected current violations, procedural outcomes or evidence resolving all concerns.",
      "source_ids": [
        "source:78fdd2603ddb5f6308a31853"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "The Spokesman-Review reported residents' concerns about backup-generator emissions, water and land affected by transmission expansion associated with Quincy-area data-center growth. The article also describes claimed community benefits and company operating practices. This is area-level reporting, not an independently inspected violation, court disposition, measured exposure or an allegation assigned to every facility.",
      "quote": null,
      "operator_response": {
        "organization": "H5 Data Centers",
        "summary": "H5 Data Centers stated, according to The Spokesman-Review, that its Quincy facilities use outdoor air when conditions allow and generally run backup generators for testing or outages, coordinating testing locally. These are outlet-reported company practices, not independent measurements or a response for other operators.",
        "source_ids": [
          "source:78fdd2603ddb5f6308a31853"
        ],
        "published_on": "2026-07-26",
        "checked_on": "2026-10-18",
        "relationship": "The original report attributes these comments to H5 representatives discussing its Quincy facilities. They are linked as that bounded area-level company perspective, not an express answer to every resident concern, an exact-building statement or a county-wide operating role. July 26 is the outlet publication, not an independently verified company-original statement date.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "county:53025",
      "record_id": null,
      "subject_label": "Grant County",
      "actor": {
        "kind": "outlet",
        "label": "The Spokesman-Review",
        "source_ids": [
          "source:78fdd2603ddb5f6308a31853"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:78fdd2603ddb5f6308a31853",
          "url": "https://www.spokesman.com/stories/2026/jul/26/where-agriculture-meets-technology-inside-the-smal/",
          "publisher": "The Spokesman-Review",
          "source_type": "news",
          "published_on": "2026-07-26",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:tn-humboldt-joint-release-resident-questions-20260723",
      "version": 1,
      "subject_kind": "site",
      "state": "tn",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "power_rates",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The original release does not establish the exact day residents first raised these questions. July 23 dates publication of the joint account, not the first concern or a measured impact.",
      "published_on": "2026-07-23",
      "source_date_note": "The joint City, utility and Chamber release explicitly dates its publication July 23, 2026. The community questions have no separately verified exact first day.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original release records resident questions and institutional assurances but does not supply a completed regulatory or Court disposition resolving this episode or independent measured findings. The assurances do not establish that all concerns were resolved.",
      "source_ids": [
        "source:fa3246c9e63d982b2c8b1893"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised questions about electricity and water use, noise and infrastructure costs at the Humboldt cryptocurrency facility, according to the July 23, 2026 joint City, utility and Chamber release. The same release offers City and utility assurances about service priority, cooling, infrastructure funding and noise measures. Those are published institutional expectations and descriptions, without independently reviewed studies, executed contracts or measured impact findings.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:humboldt-gibson-county-bitcoin-mine-tn",
      "record_id": "humboldt-gibson-county-bitcoin-mine-tn",
      "subject_label": "Humboldt Bitcoin Mining Facility (near Gibson County Industrial Park)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:fa3246c9e63d982b2c8b1893"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:fa3246c9e63d982b2c8b1893",
          "url": "https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/",
          "publisher": "City of Humboldt, Humboldt Utilities and Humboldt Chamber of Commerce",
          "source_type": "government_record",
          "published_on": "2026-07-23",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:or-umatilla-opb-reported-generator-and-nuisance-concerns-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "or",
      "record_type": "news_report",
      "categories": [
        "noise",
        "light",
        "traffic_construction",
        "air_generators",
        "power_rates"
      ],
      "event_on": null,
      "event_date_note": "Interviews and nuisance episodes have no independently established exact event day. The October 9 date belongs to a separate original statewide policy letter, not a nuisance occurrence, outage or site enforcement action. The item event date remains unknown.",
      "published_on": "2026-07-22",
      "source_date_note": "The investigation and method display July 22, 2026 publication; the investigation was updated July 23. The separate current report is published October 13 and updated October 14. Original governor letter is dated October 9, but its first public PDF posting day is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the documented nuisance and regional air concerns is unknown in this bounded review. A modeled scenario, company statement or governor's new/expanded-permit pause request does not establish actual outage emissions, independent compliance, implementation for a particular permit or resolution of every existing-site concern.",
      "source_ids": [
        "source:a0d1d0b83ca96492731cb8ee",
        "source:ad344b8a926683325738d359",
        "source:9ddf5101ade46436d17be829",
        "source:b59343f7bca5f787e654c8dc"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "OPB reported residents' noise, light and traffic concerns near Umatilla-area data centers and modeled possible generator emissions during a regional blackout. Its methodology describes assumptions and revised calculations; Amazon disputed the scenario's likelihood. A later governor letter requests a permitting pause for new or expanded facilities. These records do not establish measured exposure, a violation or closure of existing sites.",
      "quote": null,
      "operator_response": {
        "organization": "Amazon Web Services",
        "summary": "Amazon Web Services stated, according to OPB, that a territory-wide outage would be extraordinarily rare and that its emergency generators protect service during interruptions. The outlet also reports company plans for pollution-controlled equipment at new sites. Those statements are not independent measurements, completed retrofits or a response for every facility.",
        "source_ids": [
          "source:a0d1d0b83ca96492731cb8ee"
        ],
        "published_on": "2026-07-22",
        "checked_on": "2026-10-18",
        "relationship": "The original article expressly presents Amazon statements in response to its regional generator investigation. July 22 is the outlet publication, not an independently verified company-original statement day. The same-day method describes revised math and company exchanges; lack of a later math challenge is not endorsement. October policy objections are not relabeled as a specific nuisance reply.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "county:41059",
      "record_id": null,
      "subject_label": "Umatilla County",
      "actor": {
        "kind": "outlet",
        "label": "OPB",
        "source_ids": [
          "source:a0d1d0b83ca96492731cb8ee"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:9ddf5101ade46436d17be829",
          "url": "https://www.opb.org/article/2026/10/13/oregon-data-centers-technology-amazon-tina-kotek/",
          "publisher": "OPB",
          "source_type": "news",
          "published_on": "2026-10-13",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:a0d1d0b83ca96492731cb8ee",
          "url": "https://www.opb.org/article/2026/07/22/data-center-eastern-oregon-air-quality-umatilla-basin/",
          "publisher": "OPB",
          "source_type": "news",
          "published_on": "2026-07-22",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ad344b8a926683325738d359",
          "url": "https://www.opb.org/article/2026/07/22/data-center-air-quality-how-we-reported/",
          "publisher": "OPB",
          "source_type": "news",
          "published_on": "2026-07-22",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b59343f7bca5f787e654c8dc",
          "url": "https://www.opb.org/pdf/100926_GovernorLettertoDEQDataCenterPermitting_1791931532928.pdf",
          "publisher": "Office of the Governor of Oregon",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wy-meta-cheyenne-public-official-reuse-water-questions-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "wy",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_quality_discharge",
        "water_use",
        "other"
      ],
      "event_on": "2026-07-09",
      "event_date_note": "The original signed letter is dated July 9, 2026 and the official release reports the request that day. Earlier incident and permit actions have separate dates; no exact appeal filing or later disposition day is inferred.",
      "published_on": "2026-07-09",
      "source_date_note": "The official release is published July 9, 2026. First public posting of the signed letter is unknown. WyoFile published the later company-position report July 20; that day is not the original appeal publication or filing day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current outcome of the information request and underlying discharge dispute is unknown in this bounded review. Company challenges, requested hearing or refund and scheduled reuse-irrigation resumption do not establish a final ruling, individual permit reinstatement, measured health impact or resolution of every concern.",
      "source_ids": [
        "source:646d99ad857d0813b541d347",
        "source:664c1a6574d891e94ac716a7",
        "source:c19d7e149218075181fd62c4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "U.S. Representative Harriet Hageman requested information from Meta about a reported Cheyenne reclaimed-water incident, contractor discharges and public communication. The utility's separate advisory described an unnamed industrial discharge source. These are documented questions and source accounts, not Atlas findings of causation, drinking-water contamination or a final case outcome.",
      "quote": null,
      "operator_response": {
        "organization": "Meta",
        "summary": "Meta disputed the causal and procedural basis of the utility action and requested a hearing and refund, according to WyoFile. These are reported company arguments, not a ruling, independently verified testing or resolution of the dispute.",
        "source_ids": [
          "source:e7a7092a4b01fd98340eb29d"
        ],
        "published_on": "2026-07-20",
        "checked_on": "2026-10-18",
        "relationship": "The original report concerns the same Cheyenne discharge incident. It presents Meta's appeal arguments and spokesperson statement, not an express response to every question in the congressional letter. July 20 is outlet publication; the original appeal was not inspected.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:meta-cheyenne-wy",
      "record_id": "meta-cheyenne-wy",
      "subject_label": "Meta Cheyenne Data Center",
      "actor": {
        "kind": "public_official",
        "label": "U.S. Representative Harriet Hageman",
        "source_ids": [
          "source:646d99ad857d0813b541d347"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:646d99ad857d0813b541d347",
          "url": "https://hageman.house.gov/sites/evo-subsites/hageman.house.gov/files/evo-media-document/hageman-letter-to-meta-cheyenne-date-center.pdf",
          "publisher": "Office of U.S. Representative Harriet Hageman",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:664c1a6574d891e94ac716a7",
          "url": "https://hageman.house.gov/media/press-releases/hageman-demands-answers-meta-over-data-center-water-contamination",
          "publisher": "Office of U.S. Representative Harriet Hageman",
          "source_type": "government_record",
          "published_on": "2026-07-09",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:c19d7e149218075181fd62c4",
          "url": "https://www.cheyennebopu.org/News-Articles/Discharge-to-the-Sanitary-Sewer-System",
          "publisher": "City of Cheyenne Board of Public Utilities",
          "source_type": "government_record",
          "published_on": "2026-06-26",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:e7a7092a4b01fd98340eb29d",
          "url": "https://wyofile.com/meta-wants-hearing-10k-fine-refunded-in-data-center-water-case/",
          "publisher": "WyoFile",
          "source_type": "news",
          "published_on": "2026-07-20",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wi-mount-pleasant-wpr-reported-noise-construction-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "wi",
      "record_type": "news_report",
      "categories": [
        "noise",
        "light",
        "air_generators",
        "traffic_construction",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The report describes a Wednesday lawsuit filing but no independently inspected original complaint or exact filing date was established in this bounded review. Event date remains unknown; a day was not inferred from the publication calendar.",
      "published_on": "2026-07-02",
      "source_date_note": "The original WPR report was published July 2, 2026. The selected company update is explicitly dated July 20; earlier June 18 and April updates are separate statements. The exact first creation date of the changing company page is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present lawsuit disposition and outcome of the documented concerns are unknown in this bounded review. Microsoft's statements about mitigation and ordinance compliance are company positions, not independently checked measurements, a final case decision or resolution of all campus construction concerns.",
      "source_ids": [
        "source:df7b7108569b8a6bad68cf78"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Wisconsin Public Radio reported a lawsuit alleging noise at Microsoft's Fairwater facility in Mount Pleasant, alongside separate construction-dust, light and traffic concerns elsewhere on the campus. This is an outlet report of allegations and community questions, not an independently inspected court filing, measured impacts or a current compliance finding.",
      "quote": null,
      "operator_response": {
        "organization": "Microsoft",
        "summary": "Microsoft stated in its July 20 update that sound evaluation, short-term mitigation and monitoring were continuing, with additional sound-reduction measures under evaluation. These are company reports, not an independently verified noise result, current compliance determination or final lawsuit outcome.",
        "source_ids": [
          "source:0d90fc81e346f715bdc6b394"
        ],
        "published_on": "2026-07-20",
        "checked_on": "2026-10-18",
        "relationship": "The original dated update concerns Mount Pleasant Fairwater 1 and the reported humming sound. It is later than the WPR report, but it does not expressly answer every lawsuit allegation or the separate construction-dust, light and traffic questions elsewhere on the campus.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:microsoft-mount-pleasant-wi",
      "record_id": "microsoft-mount-pleasant-wi",
      "subject_label": "Microsoft Mount Pleasant Data Center Campus",
      "actor": {
        "kind": "outlet",
        "label": "Wisconsin Public Radio",
        "source_ids": [
          "source:df7b7108569b8a6bad68cf78"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:0d90fc81e346f715bdc6b394",
          "url": "https://local.microsoft.com/blog/testing-underway-to-understand-noise-at-our-mount-pleasant-datacenter/",
          "publisher": "Microsoft",
          "source_type": "company_page",
          "published_on": "2026-07-20",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:df7b7108569b8a6bad68cf78",
          "url": "https://www.wpr.org/news/microsoft-sued-noise-complaints-at-new-mount-pleasant-data-center",
          "publisher": "Wisconsin Public Radio",
          "source_type": "news",
          "published_on": "2026-07-02",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-holger-way-ceqa-exemption",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning",
        "air_generators",
        "noise"
      ],
      "event_on": "2026-07-09",
      "event_date_note": "July 9, 2026 is the signed notice and county filing day. The older June 2 exemption statement and July 16 state index posting are separate dates.",
      "published_on": "2026-07-16",
      "source_date_note": "July 16, 2026 is the publication day of the state index. The original PDF first upload day is not established.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:b022be2f12e92d160f55af7c",
        "source:55d3a1fb3bd973c6700e40e5"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of San Jose issued a categorical CEQA exemption notice for the proposed data center reuse at 300 Holger Way. Its analysis describes interior reuse and no proposed new generators. These are the scope and conclusions of the environmental record, not a measured noise or air quality finding, confirmation of all permits or an operating milestone.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:menlo-equities-300-holger-way-san-jose-ca",
      "record_id": "menlo-equities-300-holger-way-san-jose-ca",
      "subject_label": "300 Holger Way Data Center (Menlo Equities conversion)",
      "actor": {
        "kind": "agency",
        "label": "City of San Jose",
        "source_ids": [
          "source:b022be2f12e92d160f55af7c",
          "source:55d3a1fb3bd973c6700e40e5"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:55d3a1fb3bd973c6700e40e5",
          "url": "https://files.ceqanet.lci.ca.gov/336867-1/attachment/vA_1jJIqvW9fLOZtHXIqFpDPTX4aqQxB-al9TUgH270N4ahzuusAZlaJskGTdoDJu21I1wdo2hIDs5Lp0",
          "publisher": "City of San Jose",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        },
        {
          "id": "source:b022be2f12e92d160f55af7c",
          "url": "https://ceqanet.lci.ca.gov/2026070652",
          "publisher": "California Office of Land Use and Climate Innovation",
          "source_type": "government_record",
          "published_on": "2026-07-16",
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:sc-newberry-council-resource-study-recitals-20260715",
      "version": 1,
      "subject_kind": "county",
      "state": "sc",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "other"
      ],
      "event_on": "2026-07-15",
      "event_date_note": "The signed original records third reading and public hearing July 15, 2026. The Court filing stamp is July 16. The reading day dates the institutional instrument rather than first concern or exact legal commencement, and the two source days are not harmonized.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:62a03305d4dfb6ecb8ff1451"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Newberry County Council recorded concern that large computing campuses could strain electricity, finite water supply and local infrastructure and requests a study of energy, environmental, health, housing and community effects in its signed moratorium. These are attributed legislative concerns and requested analysis rather than proof of a measured shortage, injury, reduced housing value or an effect caused by Project Altair. Adoption of a pause does not establish resolution of the underlying concerns or cancellation of an individual proposal.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:45071",
      "record_id": null,
      "subject_label": "Newberry County",
      "actor": {
        "kind": "agency",
        "label": "Newberry County Council",
        "source_ids": [
          "source:62a03305d4dfb6ecb8ff1451"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:62a03305d4dfb6ecb8ff1451",
          "url": "https://www.newberrycounty.gov/sites/default/files/uploads/documents/ordinance-06-01-2026.pdf",
          "publisher": "Newberry County South Carolina",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:wv-monarch-agency-stormwater-enforcement-record-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "wv",
      "record_type": "regulator_record",
      "categories": [
        "water_quality_discharge",
        "wildlife_wetlands_stormwater",
        "traffic_construction"
      ],
      "event_on": null,
      "event_date_note": "The July 14, 2026 agency announcement says an order had been issued but does not provide its exact issuance day. July 11 is the reported rainfall event, not an assumed order date. The event date therefore remains unknown.",
      "published_on": "2026-07-14",
      "source_date_note": "The original agency release displays July 14, 2026 publication. Independent original reporting was published July 15. Those days are separate from the unknown exact order issuance date and any later corrective-action verification.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current enforcement disposition is unknown in this bounded review. The agency announced required corrective work and a restriction limited to a separate drainage area. Its release does not verify that all corrections were completed, that work resumed, that the whole campus closed or that later air and wetland applications resolved this enforcement matter.",
      "source_ids": [
        "source:12b625bf6bdf220c4a54babd",
        "source:3b4aefffccf37a8dbb3cbb3e"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "West Virginia Department of Environmental Protection announced a unilateral enforcement order after stormwater inspections at Monarch Cloud Campus. The agency recorded sediment-control deficiencies, required corrective work and restricted land disturbance in a separate drainage area. These are the agency's published findings and directions; current corrective completion and the later enforcement outcome were not verified.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:nscale-monarch-mason-county-wv",
      "record_id": "nscale-monarch-mason-county-wv",
      "subject_label": "Monarch Compute Campus",
      "actor": {
        "kind": "agency",
        "label": "West Virginia Department of Environmental Protection",
        "source_ids": [
          "source:12b625bf6bdf220c4a54babd"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:12b625bf6bdf220c4a54babd",
          "url": "https://dep.wv.gov/news/Pages/WVDEP-Issues-Enforcement-Order-Following-Stormwater-Violations-at-Monarch-Cloud-Campus-Construction-Site.aspx",
          "publisher": "West Virginia Department of Environmental Protection",
          "source_type": "government_record",
          "published_on": "2026-07-14",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:3b4aefffccf37a8dbb3cbb3e",
          "url": "https://wvpublic.org/story/energy-environment/data-center-development-faces-state-intervention-for-failing-to-prevent-flooding-of-neighbors/amp/",
          "publisher": "West Virginia Public Broadcasting",
          "source_type": "news",
          "published_on": "2026-07-15",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-inyokern-well-association-comment-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "heat",
        "noise",
        "light",
        "other"
      ],
      "event_on": "2026-07-13",
      "event_date_note": "The agency wrapper records submission and docket filing on July 13, 2026. The attached association letter is dated July 11; that letter date is not substituted for the recorded filing day.",
      "published_on": "2026-07-13",
      "source_date_note": "The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The individual comment outcome has not been established by this bounded original-source review. A project-page process label is not its disposition.",
      "source_ids": [
        "source:c1549b6dc7e679347221865d",
        "source:2681304cb0519409032b4930"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Indian Wells Valley Domestic Well Owner's Association filed an objection to the RB Inyokern exemption application, raising water-supply, waste-heat, noise, night-lighting and electromagnetic-interference concerns and requesting a comprehensive environmental review. These are the association's concerns, not verified measurements, agency findings or independently confirmed statements from the Navy.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:rb-inyokern-data-center-ca",
      "record_id": "rb-inyokern-data-center-ca",
      "subject_label": "RB Inyokern Data Center",
      "actor": {
        "kind": "public_group",
        "label": "Indian Wells Valley Domestic Well Owner's Association",
        "source_ids": [
          "source:c1549b6dc7e679347221865d"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2681304cb0519409032b4930",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:c1549b6dc7e679347221865d",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=271405&DocumentContentId=108943",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2026-07-13",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:al-marvel-selc-public-records-resource-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "al",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "air_generators",
        "noise",
        "power_rates",
        "wildlife_wetlands_stormwater",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The release does not establish an exact document-production or litigation filing day. The date remains unknown; a threat to sue is not treated as an accomplished court filing.",
      "published_on": "2026-07-13",
      "source_date_note": "The original group release is dated July 13, 2026. It is publication of the group's position, not a verified original agreement execution or production day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current public-records and underlying environmental-concern outcomes are unknown in this bounded review. The group's account of receiving an agreement does not establish a court finding, complete disclosure, permit outcome or resolution of every concern.",
      "source_ids": [
        "source:386f14b7c9505527bd78aefa"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Southern Environmental Law Center questioned Project Marvel's public-records transparency and potential water, power, air, noise and wildlife impacts. The group reported obtaining a non-disclosure agreement after threatening litigation. These are the group's account and concerns, not a court ruling, an independently inspected filed lawsuit or measured harm.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:qts-marvel-bessemer-al",
      "record_id": "qts-marvel-bessemer-al",
      "subject_label": "QTS Bessemer (Project Marvel)",
      "actor": {
        "kind": "public_group",
        "label": "Southern Environmental Law Center",
        "source_ids": [
          "source:386f14b7c9505527bd78aefa"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:386f14b7c9505527bd78aefa",
          "url": "https://www.selc.org/press-release/bessemers-data-center-non-disclosure-agreement-raises-deeply-concerning-public-records-questions/",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": "2026-07-13",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ga-covington-gpb-reported-warning-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "news_report",
      "categories": [
        "air_generators"
      ],
      "event_on": null,
      "event_date_note": "The article describes a later agency letter but does not give its exact day in the body. The event date remains unknown; a linked filename is not an independently reviewed letter date.",
      "published_on": "2026-07-07",
      "source_date_note": "The original article displays July 7, 2026 publication and July 8 update. Publication stays July 7, separate from the unknown agency event day and October source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of this documented concern has not been established by the bounded source review. A related permit issuance does not by itself resolve an earlier allegation.",
      "source_ids": [
        "source:dfbd36adbc6d0f2b96568ed3"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Georgia Public Broadcasting reported that Georgia EPD warned VoltaGrid about likely air-rule violations and a construction pause at the generation project serving Serverfarm in Covington. This is the outlet's account of the warning and a historical response deadline. The original agency letter and later enforcement outcome were not independently verified in this review.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:serverfarm-covington-hazelbrand-ga",
      "record_id": "serverfarm-covington-hazelbrand-ga",
      "subject_label": "Serverfarm Covington Data Center (Hazelbrand Road)",
      "actor": {
        "kind": "outlet",
        "label": "Georgia Public Broadcasting",
        "source_ids": [
          "source:dfbd36adbc6d0f2b96568ed3"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:dfbd36adbc6d0f2b96568ed3",
          "url": "https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law",
          "publisher": "Georgia Public Broadcasting",
          "source_type": "news",
          "published_on": "2026-07-07",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nc-davie-council-infrastructure-study-recitals-20260706",
      "version": 1,
      "subject_kind": "county",
      "state": "nc",
      "record_type": "public_concern_on_record",
      "categories": [
        "other"
      ],
      "event_on": "2026-07-06",
      "event_date_note": "The signed original identifies July 6, 2026 adoption and commencement. This dates the institutional instrument rather than first concern or exact public posting.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:653c78be343fc6b2e4629b42"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Davie County Board of Commissioners recorded citizen concerns about potential effects of computing development on nearby quality of life, County infrastructure and utilities in its signed moratorium instrument. The same text recognizes possible economic benefits and calls for further study and public input. These are institutional reasons for policy review rather than measured local injury, a finding against an individual facility or resolution of the underlying concerns.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:37059",
      "record_id": null,
      "subject_label": "Davie County",
      "actor": {
        "kind": "agency",
        "label": "Davie County Board of Commissioners",
        "source_ids": [
          "source:653c78be343fc6b2e4629b42"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:653c78be343fc6b2e4629b42",
          "url": "https://www.daviecountync.gov/DocumentCenter/View/19793/Data-Center-Moratorium-July-6-2026-PDF",
          "publisher": "Davie County North Carolina",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:va-digital-gateway-qts-appeal-withdrawal",
      "version": 2,
      "subject_kind": "project",
      "state": "va",
      "record_type": "legal_action",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": "2026-07-02",
      "event_date_note": "The party release reports the withdrawal on July 2, 2026; the earlier court opinion is dated March 31, 2026.",
      "published_on": "2026-07-02",
      "source_date_note": "The original party release is dated July 2, 2026. The linked outlet response account is dated July 3.",
      "checked_on": "2026-10-18",
      "status": "withdrawn",
      "status_on": "2026-07-02",
      "status_scope": "American Battlefield Trust reported QTS's withdrawal of its remaining Supreme Court appeal on July 2, 2026. This disposition describes that appeal, not every possible future proposal or an Atlas finding about environmental effects.",
      "source_ids": [
        "source:9f8767f785100b95356e89cb",
        "source:8dfa250d21805d88f4e85aee"
      ],
      "status_source_ids": [
        "source:9f8767f785100b95356e89cb"
      ],
      "event_ids": [],
      "summary": "American Battlefield Trust reported that QTS withdrew its remaining Supreme Court appeal in the Digital Gateway rezoning dispute. The earlier Court of Appeals opinion affirmed invalidation of the Compass, Digital Gateway North and Digital Gateway South rezonings for public-notice defects. This entry records the appeal and its reported withdrawal, not an environmental finding.",
      "quote": null,
      "operator_response": {
        "organization": "QTS",
        "summary": "QTS stated, in a statement reported by Potomac Local News, that it would terminate the Digital Gateway project and wind down its work after withdrawing its appeal. The outlet also reported the company citing its expected investment, jobs and tax benefits.",
        "source_ids": [
          "source:3167f816a85c89f0d30b9488"
        ],
        "published_on": "2026-07-03",
        "checked_on": "2026-10-18",
        "relationship": "The outlet reports the QTS statement on the same July 2 appeal withdrawal. This is reported company speech, not a company-hosted original or a statement for Compass.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "Spacing in public date and source notes corrected. Facts, machine dates, sources, attribution and record status are unchanged. The original source-check date is retained.",
      "subject_id": "site:prince-william-digital-gateway-va",
      "record_id": "prince-william-digital-gateway-va",
      "subject_label": "Prince William Digital Gateway",
      "actor": {
        "kind": "public_group",
        "label": "American Battlefield Trust",
        "source_ids": [
          "source:9f8767f785100b95356e89cb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:3167f816a85c89f0d30b9488",
          "url": "https://www.potomaclocal.com/2026/07/03/qts-withdraws-supreme-court-appeal-ending-proposed-digital-gateway-data-center-project/",
          "publisher": "Potomac Local News",
          "source_type": "news",
          "published_on": "2026-07-03",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:8dfa250d21805d88f4e85aee",
          "url": "https://www.vacourts.gov/static/opinions/opncavwp/1584254.pdf",
          "publisher": "Court of Appeals of Virginia",
          "source_type": "government_record",
          "published_on": "2026-03-31",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:9f8767f785100b95356e89cb",
          "url": "https://www.battlefields.org/news/victory-manassas-prince-william-digital-gateway-project-dead-after-developer-drops-appeal",
          "publisher": "American Battlefield Trust",
          "source_type": "organization_page",
          "published_on": "2026-07-02",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ga-covington-selc-enforcement-request-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-06-25",
      "event_date_note": "The published letter is dated June 25, 2026. The actual delivery or agency receipt day is not independently established.",
      "published_on": "2026-07-01",
      "source_date_note": "The organization release is dated July 1, 2026 and links the letter. A first public posting day for the PDF itself is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of this documented concern has not been established by the bounded source review. A related permit issuance does not by itself resolve an earlier allegation.",
      "source_ids": [
        "source:97ce446442ad2c509fdda8fb",
        "source:b0cae349e513aa3662c8c205"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Southern Environmental Law Center requested an investigation and enforcement action concerning alleged construction before air permits at VoltaGrid and the adjacent Serverfarm ATL2 development, on behalf of itself, Sustainable Newton and Altamaha Riverkeeper. This records the groups' allegations and request, not an agency finding, filed lawsuit or verified present compliance outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:serverfarm-covington-hazelbrand-ga",
      "record_id": "serverfarm-covington-hazelbrand-ga",
      "subject_label": "Serverfarm Covington Data Center (Hazelbrand Road)",
      "actor": {
        "kind": "public_group",
        "label": "Southern Environmental Law Center",
        "source_ids": [
          "source:97ce446442ad2c509fdda8fb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:97ce446442ad2c509fdda8fb",
          "url": "https://www.selc.org/wp-content/uploads/2026/06/VoltaGrid-and-Serverfarm-Enforcement-Request.pdf",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b0cae349e513aa3662c8c205",
          "url": "https://www.selc.org/press-release/groups-alert-georgia-regulators-to-unpermitted-construction-of-pop-up-power-plant-data-center/",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": "2026-07-01",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:az-5c-phoenix-special-permit-waiver",
      "version": 1,
      "subject_kind": "site",
      "state": "az",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning",
        "noise",
        "water_use",
        "power_rates",
        "health"
      ],
      "event_on": "2026-07-01",
      "event_date_note": "July 1, 2026 is the action date in the city matter history. It is not an opening, permit compliance determination or the day of an underlying complaint.",
      "published_on": null,
      "source_date_note": "The first publication date is not established. The city API modification timestamp is not used as a publication day.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:1b5a843f577e0202e831529a",
        "source:c8a12362219c91924c782bc7"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Phoenix adopted a revised special permit waiver item for the proposed 5C facility after staff described review of potential public health, safety, water, energy and noise issues. The received staff text predates the final revision. The record does not establish actual impacts, final revised requirements, current compliance or operation.",
      "quote": null,
      "operator_response": {
        "organization": "5C Data Centers",
        "summary": "5C Data Centers stated mitigation commitments in information described by the City of Phoenix staff report. The final revised waiver terms were not independently reviewed.",
        "source_ids": [
          "source:1b5a843f577e0202e831529a"
        ],
        "published_on": null,
        "checked_on": "2026-10-22",
        "relationship": "Agency published statement relates to the same named proposal and its future land use or mitigation approach.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:5c-data-centers-phx01-phoenix-az",
      "record_id": "5c-data-centers-phx01-phoenix-az",
      "subject_label": "5C Data Centers PHX01",
      "actor": {
        "kind": "agency",
        "label": "City of Phoenix",
        "source_ids": [
          "source:1b5a843f577e0202e831529a",
          "source:c8a12362219c91924c782bc7"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:1b5a843f577e0202e831529a",
          "url": "https://webapi.legistar.com/v1/phoenix/matters/35495/texts/35595",
          "publisher": "City of Phoenix",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        },
        {
          "id": "source:c8a12362219c91924c782bc7",
          "url": "https://webapi.legistar.com/v1/phoenix/matters/35495/histories",
          "publisher": "City of Phoenix",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:wi-menomonie-city-public-input-ordinance-review-20260630",
      "version": 1,
      "subject_kind": "site",
      "state": "wi",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "light",
        "water_use",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The June 30 statement describes earlier public feedback without an exact first concern day. Its publication date is not substituted for that event.",
      "published_on": "2026-06-30",
      "source_date_note": "The original City statement expressly dates itself June 30, 2026 and is marked for immediate release. This is the official publication day, separate from earlier community feedback and later ordinance steps.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original City statement records public input and ongoing ordinance work. The present final ordinance, individual property eligibility, measured facility effects and resolution of the concerns remain unverified. Pausing incentive negotiations does not establish project closure or concern resolution.",
      "source_ids": [
        "source:5fb98fc83cdd7b4feb34aba2"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Menomonie reported community feedback about the proposed data center and described ordinance work addressing light, noise, water, equipment setbacks, landscaping and reclamation in its June 30, 2026 statement. The City distinguished an earlier pause in tax incentive negotiations from stopping the project. These are attributed community input and planning concerns, not measured injury, a verified final ordinance or proof that concerns were resolved.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:menomonie-data-center-wi",
      "record_id": "menomonie-data-center-wi",
      "subject_label": "Menomonie Data Center Campus",
      "actor": {
        "kind": "agency",
        "label": "City of Menomonie",
        "source_ids": [
          "source:5fb98fc83cdd7b4feb34aba2"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:5fb98fc83cdd7b4feb34aba2",
          "url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF",
          "publisher": "City of Menomonie Wisconsin",
          "source_type": "government_record",
          "published_on": "2026-06-30",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:il-plum-farms-rezoning-withdrawal",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": "2026-06-30",
      "event_date_note": "June 30, 2026 is the written withdrawal notification date stated by the village.",
      "published_on": null,
      "source_date_note": "The village notice first publication date is not established. No image timestamp is used as publication evidence.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:b6b5e0fa7ed1c3c294961481"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Village of Hoffman Estates states that the Plum Farms property owner notified it in writing on June 30, 2026 that its rezoning application was withdrawn. The village says existing zoning remains and a future zoning change requires a new application. The canceled July 6 hearing is separate from an accomplished hearing. This is a scoped municipal application record, not a physical shutdown or a measured harm finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:karis-critical-hoffman-estates-plum-farms-il",
      "record_id": "karis-critical-hoffman-estates-plum-farms-il",
      "subject_label": "Karis Critical Hoffman Estates Data Center (Plum Farms)",
      "actor": {
        "kind": "agency",
        "label": "Village of Hoffman Estates",
        "source_ids": [
          "source:b6b5e0fa7ed1c3c294961481"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:b6b5e0fa7ed1c3c294961481",
          "url": "https://www.hoffmanestates.org/news_detail_T3_R194.php",
          "publisher": "Village of Hoffman Estates",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:mn-faribault-environmental-review-appeal-record-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "mn",
      "record_type": "legal_action",
      "categories": [
        "noise",
        "air_generators",
        "power_rates",
        "water_use"
      ],
      "event_on": "2026-06-08",
      "event_date_note": "The original city chronology and litigant update both identify June 8, 2026 as the appellate ruling date. The exact earlier appeal-filing day was not independently established; the outcome event is separate from the later update publication.",
      "published_on": "2026-06-29",
      "source_date_note": "The original litigant case update displays June 29, 2026 publication. The changing city project page has no independently established first publication day; its dated actions are not page-publication dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present disposition of the full challenge and underlying concerns is unknown in this bounded review. The city records the June 8 procedural return and a July 14 extension through March 31, 2027 for supplemental review. That account does not establish a final supplemental determination, an ordered full impact statement, current project approval or resolution of every concern.",
      "source_ids": [
        "source:55e18ff16e9a802c677a49e7",
        "source:402aa04dc44253b084a9490b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Minnesota Center for Environmental Advocacy reported its challenge to Faribault's environmental review of the Archer proposal, raising questions about noise, generator emissions, electricity and water. The city records a June 8, 2026 appellate return for more information or an environmental impact statement and a later supplemental-review extension. These source accounts do not establish measured impacts or a final project approval.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:archer-datacenter-faribault-mn",
      "record_id": "archer-datacenter-faribault-mn",
      "subject_label": "Archer Datacenter Faribault",
      "actor": {
        "kind": "public_group",
        "label": "Minnesota Center for Environmental Advocacy",
        "source_ids": [
          "source:55e18ff16e9a802c677a49e7"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:402aa04dc44253b084a9490b",
          "url": "https://www.faribaultmn.gov/815/Archer-Datacenters",
          "publisher": "City of Faribault",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:55e18ff16e9a802c677a49e7",
          "url": "https://www.mncenter.org/minnesota-court-rules-faribault-data-center-review-violated-law-heres-what-means",
          "publisher": "Minnesota Center for Environmental Advocacy",
          "source_type": "organization_page",
          "published_on": "2026-06-29",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ga-atl2-air-permit-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "power_rates"
      ],
      "event_on": "2026-06-29",
      "event_date_note": "The signed original permit cover and current agency registry identify June 29, 2026 as issuance. This is not an opening or all-permit completion date.",
      "published_on": null,
      "source_date_note": "The current registry labels an issuance date. A first public posting date for this permit or its evolving narrative is not established, so publication stays unknown.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2026-06-29",
      "status_scope": "Georgia Environmental Protection Division issued the named air permit. Resolved applies only to this permit action; the outcome of earlier construction allegations, actual operation and present compliance are not established.",
      "source_ids": [
        "source:df0692edea6c5e650384b0d2",
        "source:fdd8d36a83dadeb7f35dd00a",
        "source:97a2bcddc9a826219f134818"
      ],
      "status_source_ids": [
        "source:df0692edea6c5e650384b0d2"
      ],
      "event_ids": [],
      "summary": "Georgia Environmental Protection Division issued air permit 7374-217-0079-S-01-0 for the ATL2 data center emergency generators at 10835 Hazelbrand Road. The signed permit and agency narrative document a conditional air authorization, not verified operation, all local approvals or disposition of earlier construction allegations. The narrative records Sierra Club comments about generator controls and grid planning, alongside the agency's responses.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:serverfarm-covington-hazelbrand-ga",
      "record_id": "serverfarm-covington-hazelbrand-ga",
      "subject_label": "Serverfarm Covington Data Center (Hazelbrand Road)",
      "actor": {
        "kind": "agency",
        "label": "Georgia Environmental Protection Division",
        "source_ids": [
          "source:df0692edea6c5e650384b0d2"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:97a2bcddc9a826219f134818",
          "url": "https://air.gaepd.org/Permits/Search?Name=ATL2",
          "publisher": "Georgia Environmental Protection Division",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:df0692edea6c5e650384b0d2",
          "url": "https://air.gaepd.org/Permits/View/OP-29898",
          "publisher": "Georgia Environmental Protection Division",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fdd8d36a83dadeb7f35dd00a",
          "url": "https://air.gaepd.org/Permits/View/ON-29898",
          "publisher": "Georgia Environmental Protection Division",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nv-keystone-third-act-woda-public-concerns-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "nv",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "air_generators",
        "power_rates",
        "traffic_construction",
        "land_use_zoning",
        "heat"
      ],
      "event_on": "2026-06-25",
      "event_date_note": "The original group article expressly identifies June 25, 2026 as its joint action with Water Over Data Alliance. This is separate from earlier permit approval and later city FAQ updates.",
      "published_on": "2026-06-26",
      "source_date_note": "The original group article displays June 26, 2026 publication. The city PDF is updated July 28 with earlier dated additions, but its exact first publication date is unknown; update labels and URL timestamps are not first posting dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present disposition of the documented concerns is unknown in this bounded review. The city published answers and described planned noise controls and review procedures; those accounts do not establish that all questions were resolved, actual operating measurements or a final determination on every allegation.",
      "source_ids": [
        "source:1e02fb5d92020443576937be",
        "source:c9f9f7770b09a86768f42bfb"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Third Act Nevada reported that it joined Water Over Data Alliance in raising questions about the Keystone project's cooling design, electricity, generator air, noise, construction hours and heat. Reno later published answers to project questions. These are documented group concerns and city responses, not independently established violations or measured impacts.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:centra-rno2-keystone-reno-nv",
      "record_id": "centra-rno2-keystone-reno-nv",
      "subject_label": "CENTRA RNO2 (Keystone Data Center)",
      "actor": {
        "kind": "public_group",
        "label": "Third Act Nevada",
        "source_ids": [
          "source:1e02fb5d92020443576937be"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:1e02fb5d92020443576937be",
          "url": "https://thirdact.org/nevada/2026/06/26/action-to-hold-the-reno-city-staff-and-council-accountable-to-the-public-on-data-centers/",
          "publisher": "Third Act Nevada",
          "source_type": "organization_page",
          "published_on": "2026-06-26",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:c9f9f7770b09a86768f42bfb",
          "url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300",
          "publisher": "City of Reno",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:sc-valara-air-water-hearing-comment-record-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "sc",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "noise"
      ],
      "event_on": "2026-06-25",
      "event_date_note": "The agency explicitly schedules June 25, 2026 and the June 26 original report describes the hearing as having occurred. The hearing date is separate from an application, final permit or later utility proceeding.",
      "published_on": null,
      "source_date_note": "The event page has no independently established first publication day. June 25 is the hearing date; June 26 is publication of the separate outlet report, not an issued permit day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present original permit and appeal outcomes are unknown in this bounded review. Southern Environmental Law Center reported subsequent permit approval and an October 16 appeal. The original signed permit and court docket were not inspected; that party account is not a final judicial ruling or resolution of every concern.",
      "source_ids": [
        "source:c928b04f90dc2c0764940805",
        "source:7852750fb8207d9996d2f4f5",
        "source:7da3a4eb88d864032d2eab88"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "South Carolina Department of Environmental Services announced a June 25 public hearing and availability session for Valara's compute-center proposal. SC Daily Gazette subsequently reported residents' air and generator-noise questions about the NorthMark/Valara development. These records document a comment process, not measured emissions, present compliance or a verified final permit outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:northmark-valara-spartanburg-sc",
      "record_id": "northmark-valara-spartanburg-sc",
      "subject_label": "NorthMark Strategies Spartanburg High-Performance Computing Center",
      "actor": {
        "kind": "agency",
        "label": "South Carolina Department of Environmental Services",
        "source_ids": [
          "source:c928b04f90dc2c0764940805"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:7852750fb8207d9996d2f4f5",
          "url": "https://scdailygazette.com/2026/06/26/sc-counties-enacting-data-center-moratoriums/",
          "publisher": "SC Daily Gazette",
          "source_type": "news",
          "published_on": "2026-06-26",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:7da3a4eb88d864032d2eab88",
          "url": "https://www.selc.org/press-release/selc-appeals-valara-air-permit-approval/",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": "2026-10-16",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:c928b04f90dc2c0764940805",
          "url": "https://www.des.sc.gov/events/valara-holdings-high-performance-compute-center-availability-session-public-hearing",
          "publisher": "South Carolina Department of Environmental Services",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ny-wf-industrial-xii-agency-review-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ny",
      "record_type": "regulator_record",
      "categories": [
        "power_rates",
        "other"
      ],
      "event_on": "2026-06-17",
      "event_date_note": "The exact action day is printed in the original record. Draft minutes retain their draft status and do not certify a later adopted version.",
      "published_on": null,
      "source_date_note": "The court document issue day is explicit where supplied. The first online publication day of the Agency packet is not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The dated court order or attributed draft board discussion is documented. Later appeals, compliance, final financial assistance disposition and present facility effects remain unknown in this bounded review.",
      "source_ids": [
        "source:6343c8b4632f8dead3a9e7d0"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Town of Brookhaven Industrial Development Agency published draft June 17 minutes reporting its earlier position against supporting data centers and its consideration of WF Industrial XII conversion and financial assistance issues. The draft says pending studies would be reviewed before a decision. This records the attributed draft discussion, not final minutes, a binding data center ban, a permit denial or measured environmental and employment effects.",
      "quote": null,
      "operator_response": {
        "organization": "WF Industrial XII, LLC",
        "summary": "WF Industrial XII, LLC requested in the Agency draft account that its project not be terminated and described a proposed conversion of its buildings and anticipated employment. This is the Agency published applicant explanation. It does not establish actual jobs, no environmental impact, a final assistance outcome or a current operator role.",
        "source_ids": [
          "source:6343c8b4632f8dead3a9e7d0"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The named applicant is quoted in the Agency draft record. A current operating company role is not inferred from that representation.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:wf-industrial-yaphank-ny",
      "record_id": "wf-industrial-yaphank-ny",
      "subject_label": "Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)",
      "actor": {
        "kind": "agency",
        "label": "Town of Brookhaven Industrial Development Agency",
        "source_ids": [
          "source:6343c8b4632f8dead3a9e7d0"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:6343c8b4632f8dead3a9e7d0",
          "url": "https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf",
          "publisher": "Town of Brookhaven Industrial Development Agency",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:nc-cumberland-board-resource-review-20260615",
      "version": 1,
      "subject_kind": "county",
      "state": "nc",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "power_rates",
        "air_generators",
        "other"
      ],
      "event_on": "2026-06-15",
      "event_date_note": "The signed order adoption day is June 15, 2026. It dates this institutional record rather than the first concern. The order expressly refers to an earlier March 23 community forum; no individual first complaint day is invented.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:fdd576f51173c598ec7ff8b4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Cumberland County Board of Commissioners recorded resident questions about electricity, water, noise and environmental effects in its signed data center moratorium, referring to the March 23, 2026 community forum. The order also discusses existing groundwater contamination and the need for a permanent water source. Those are attributed legislative and community concerns rather than evidence that data centers caused the existing contamination, a representative survey or measured injury at a named proposal. County rule development does not approve a particular facility.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:37051",
      "record_id": null,
      "subject_label": "Cumberland County",
      "actor": {
        "kind": "agency",
        "label": "Cumberland County Board of Commissioners",
        "source_ids": [
          "source:fdd576f51173c598ec7ff8b4"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:fdd576f51173c598ec7ff8b4",
          "url": "https://www.cumberlandcountync.gov/docs/default-source/planning-documents/data-center-moratorium-6-15-2026.pdf",
          "publisher": "Cumberland County North Carolina",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:va-tac-wythe-resident-land-use-questions-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-06-09",
      "event_date_note": "The original June 9, 2026 Board minutes record public comments expressly discussing the TAC proposal on pages 6 and 7.",
      "published_on": null,
      "source_date_note": "The original dated agency record was reviewed. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:3cd87ed7270a076002e34d47"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised questions about the scale, agricultural land use and planning controls for the reported TAC Wythe County proposal at the June 9, 2026 Board meeting. The minutes attribute those concerns to residents. They do not independently verify quoted news claims, developer promises, a final project approval, actual construction or measured harm.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:tac-data-centers-wythe-county-va",
      "record_id": "tac-data-centers-wythe-county-va",
      "subject_label": "TAC Data Centers Wythe County Campus",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:3cd87ed7270a076002e34d47"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:3cd87ed7270a076002e34d47",
          "url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147",
          "publisher": "Wythe County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:va-solis-arx-board-communication-review-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "regulator_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-06-09",
      "event_date_note": "The original June 9, 2026 minutes identify a Solis Arx project discussion in the joint board portion on page 31.",
      "published_on": null,
      "source_date_note": "The original dated agency record was reviewed. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:3cd87ed7270a076002e34d47"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Wythe County recorded board concerns about communication and public transparency around the Solis Arx project during the June 9, 2026 joint board discussion. The minutes document those concerns and a call for improved communication, not a measured environmental effect, a final legal finding or a verified resolution. The separate acquisition account does not change the record operator role.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:solis-arx-progress-park-wythe-va",
      "record_id": "solis-arx-progress-park-wythe-va",
      "subject_label": "Solis Arx Progress Park Data Center Campus",
      "actor": {
        "kind": "agency",
        "label": "Wythe County",
        "source_ids": [
          "source:3cd87ed7270a076002e34d47"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:3cd87ed7270a076002e34d47",
          "url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147",
          "publisher": "Wythe County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ms-desoto-southaven-plant-resident-noise-complaint-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "ms",
      "record_type": "legal_action",
      "categories": [
        "noise",
        "health"
      ],
      "event_on": "2026-06-08",
      "event_date_note": "The original document 1 court stamp and dated signature both identify June 8, 2026. That is the complaint filing date, separate from the unknown later disposition.",
      "published_on": null,
      "source_date_note": "First public posting of the filed complaint and undated company letter is unknown. Mississippi Free Press published the later article September 25, 2026; that day is not substituted for company-letter publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current court disposition is unknown in this bounded review. The proposed class is not independently verified as certified; requested damages and injunction are not awarded relief. Company accounts of partial motions or dismissal of one party do not establish dismissal of the whole case.",
      "source_ids": [
        "source:ac10ba6c1ca18a80152c9d99",
        "source:483196e1c1f5d81304f80f35"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents filed a federal complaint alleging noise, vibration and nuisance impacts from the Southaven power plant serving xAI facilities. They requested damages and injunctive relief. The complaint concerns the generating plant, separate from nearby data-center buildings; these are allegations and requests, not court findings or awarded relief.",
      "quote": null,
      "operator_response": {
        "organization": "MZX Tech",
        "summary": "MZX Tech denied the allegations in its published notice about the lawsuit. This is the company's position, not a court ruling, verified noise measurement or resolution of the residents' claims.",
        "source_ids": [
          "source:7c07ce0e2438529736c19535"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original company notice explicitly describes the same numbered Southaven noise case and alleged plant impacts. It is undated; later outlet publication does not establish its original publication day.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "county:28033",
      "record_id": null,
      "subject_label": "DeSoto County",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:ac10ba6c1ca18a80152c9d99"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:483196e1c1f5d81304f80f35",
          "url": "https://www.mississippifreepress.org/xai-moves-to-buy-out-southaven-residents-who-agree-not-to-sue-it-over-power-plant-noise-letter-shows/",
          "publisher": "Mississippi Free Press",
          "source_type": "news",
          "published_on": "2026-09-25",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:7c07ce0e2438529736c19535",
          "url": "https://www.mississippifreepress.org/wp-content/uploads/2026/09/MZX-Tech-buyout-offer-letter.pdf",
          "publisher": "MZX Tech",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ac10ba6c1ca18a80152c9d99",
          "url": "https://www.mississippifreepress.org/wp-content/uploads/2026/06/Southaven-residents-complaint-against-xAI.pdf",
          "publisher": "Filed federal complaint (Northern District of Mississippi)",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-granger-wvpe-construction-resource-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "in",
      "record_type": "news_report",
      "categories": [
        "air_generators",
        "traffic_construction",
        "power_rates"
      ],
      "event_on": null,
      "event_date_note": "The reports describe several panel and county meetings. A single independently checked exact concern-event day is not established for this combined report item. The company separately identifies a May 19, 2026 open house, not a formal agency hearing.",
      "published_on": "2026-05-30",
      "source_date_note": "The later original WVPE report was published May 30, 2026; background reporting was published February 19. The company recap was first published May 20, separate from its May 19 meeting. The exact first publication day of the linked company PDF remains unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later outcome of the documented concerns is unknown in this bounded review. County monitoring accounts and company plans do not establish measured air conditions, completed mitigation, the outcome of individual complaints or current compliance.",
      "source_ids": [
        "source:4aabd6512cb745a5fc28dda5",
        "source:fb80039cc9844ebe5d7b1ca9",
        "source:cbec90fb391214a6edd4a97a"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "WVPE reported dust, construction-truck and backup-generator questions about Microsoft's Granger project, following earlier reporting on electricity rates and reliability. It described county officials' monitoring and dust-control accounts. These are attributed reports and plans, not independently measured conditions, a published formal complaint case or a resolved compliance finding.",
      "quote": null,
      "operator_response": {
        "organization": "Microsoft",
        "summary": "Microsoft stated in its community materials that it plans to cover infrastructure costs, coordinate water supply and obtain applicable generator permits. The materials describe planned cooling and design measures. These are company commitments and plans, not independently verified permits, achieved mitigation or measured resource use.",
        "source_ids": [
          "source:a71d0009d0035e120cb8cfac"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original company recap links these materials from its May 19, 2026 St. Joseph County meeting, and their site context matches Granger. They precede the May 30 construction report and are not an express answer to its dust or truck-route accounts. The exact first PDF posting date is unknown.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:microsoft-granger-in",
      "record_id": "microsoft-granger-in",
      "subject_label": "Microsoft Granger Data Center",
      "actor": {
        "kind": "outlet",
        "label": "WVPE",
        "source_ids": [
          "source:4aabd6512cb745a5fc28dda5"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:4aabd6512cb745a5fc28dda5",
          "url": "https://www.wvpe.org/wvpe-news/2026-05-30/st-joseph-county-officials-respond-to-data-center-construction-concerns",
          "publisher": "WVPE",
          "source_type": "news",
          "published_on": "2026-05-30",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:a71d0009d0035e120cb8cfac",
          "url": "https://local.microsoft.com/wp-content/uploads/2026/05/St-Joseph-Boards-May2026.pdf",
          "publisher": "Microsoft",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:cbec90fb391214a6edd4a97a",
          "url": "https://local.microsoft.com/blog/st-joseph-county-public-meeting-recap/",
          "publisher": "Microsoft",
          "source_type": "company_page",
          "published_on": "2026-05-20",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fb80039cc9844ebe5d7b1ca9",
          "url": "https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting",
          "publisher": "WVPE",
          "source_type": "news",
          "published_on": "2026-02-19",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ny-fortistar-transaction-climate-review-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "ny",
      "record_type": "legal_action",
      "categories": [
        "air_generators",
        "other"
      ],
      "event_on": "2026-05-28",
      "event_date_note": "The exact action day is printed in the original record. Draft minutes retain their draft status and do not certify a later adopted version.",
      "published_on": "2026-05-28",
      "source_date_note": "The court document issue day is explicit where supplied. The first online publication day of the Agency packet is not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The dated court order or attributed draft board discussion is documented. Later appeals, compliance, final financial assistance disposition and present facility effects remain unknown in this bounded review.",
      "source_ids": [
        "source:80f7d6cbe9507e82cc876889"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "New York Supreme Court Appellate Division Third Judicial Department issued its May 28, 2026 order affirming the judgment requiring CLCPA consideration of the PSC acquisition approval. The May 28 order rejects reliance on a conclusory consistency statement or separate DEC permitting as a substitute for that review. It does not order an individual data center closure or decide every disadvantaged community issue. Later proceedings and current compliance remain unknown.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:digihost-north-tonawanda-ny",
      "record_id": "digihost-north-tonawanda-ny",
      "subject_label": "Digihost / Digi Power X  -  Fortistar North Tonawanda",
      "actor": {
        "kind": "court",
        "label": "New York Supreme Court Appellate Division Third Judicial Department",
        "source_ids": [
          "source:80f7d6cbe9507e82cc876889"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:80f7d6cbe9507e82cc876889",
          "url": "https://earthjustice.org/wp-content/uploads/2026/05/cv_24_2101_clean_air_coalition_of_v_clean_air_coalition_of_memorandum_and_order_27.pdf",
          "publisher": "New York Supreme Court Appellate Division Third Judicial Department via Earthjustice",
          "source_type": "organization_page",
          "published_on": "2026-05-28",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:il-lockport-resident-cost-and-framework-concerns-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "public_concern_on_record",
      "categories": [
        "power_rates",
        "water_use",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The May 28, 2026 City release describes an earlier workshop but does not establish its exact day in this bounded review. The release date is not substituted for the workshop event day.",
      "published_on": "2026-05-28",
      "source_date_note": "The original City news release is dated May 28, 2026 for immediate release. Its first website posting day was not independently established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:156508df029e6b8f78c4cc40"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns, as recorded by the City of Lockport, that utility, infrastructure and environmental costs of potential Star Innovation District data center development could fall on the community and that local protections might be insufficient without broader oversight. The City release attributes these concerns to residents. It does not establish actual cost shifting, measured harm or resolution of the concerns.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:vme-lockport-star-innovation-district-il",
      "record_id": "vme-lockport-star-innovation-district-il",
      "subject_label": "Star Innovation District Data Center (Lockport)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:156508df029e6b8f78c4cc40"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:156508df029e6b8f78c4cc40",
          "url": "https://www.cityoflockport.net/DocumentCenter/View/7669/CITY-OF-LOCKPORT-SUSPENDS-DATA-CENTER-DISCUSSIONS-PENDING-BROADER-REGULATORY-FRAMEWORKS?bidId=",
          "publisher": "City of Lockport",
          "source_type": "government_record",
          "published_on": "2026-05-28",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:or-deschutes-boxminer-city-staff-review",
      "version": 1,
      "subject_kind": "site",
      "state": "or",
      "record_type": "regulator_record",
      "categories": [
        "power_rates",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-05-27",
      "event_date_note": "The packet labels this as the May 27, 2026 meeting account. Its minutes signature fields are blank, and the first day the questions were raised is not established.",
      "published_on": null,
      "source_date_note": "The June 10 agenda date does not establish the exact first online publication day.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The official packet documents the staff questions and a land transaction motion. Adoption of the unsigned minutes, later project or permit disposition, actual utility conditions and resolution of the concerns remain unverified.",
      "source_ids": [
        "source:606f4dd66636bef8d557d070"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "La Pine City Council recorded staff concerns about the basis for Boxminer power revenues, franchise fees and employment forecasts, the lack of an established utility rate for the proposed load, and missing supporting utility information. The unsigned meeting account also reports a motion to conclude the land sale matter. These are attributed staff assessments and a recorded procedural account, not Atlas findings of fraud, measured grid impacts, delivered jobs, approved tariffs or present physical shutdown.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:boxminer-la-pine-or",
      "record_id": "boxminer-la-pine-or",
      "subject_label": "Boxminer La Pine Bitcoin Mining Facility",
      "actor": {
        "kind": "agency",
        "label": "La Pine City Council",
        "source_ids": [
          "source:606f4dd66636bef8d557d070"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:606f4dd66636bef8d557d070",
          "url": "https://www.lapineoregon.gov/DocumentCenter/View/3374/061026-City-Council-Packet",
          "publisher": "City of La Pine",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ri-smithfield-hanton-reported-community-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "ri",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "health",
        "other"
      ],
      "event_on": "2026-05-05",
      "event_date_note": "The event is the exact dated original public record.",
      "published_on": "2026-05-13",
      "source_date_note": "The displayed original publication day is recorded separately from the event and source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.",
      "source_ids": [
        "source:2c3dcf1450db4d5236a9a7d9"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Ocean State Media reported residents' noise, water, conservation-land and quality-of-life concerns about the Hanton City proposal at Smithfield's May 5, 2026 meeting. It reported different developer and town views on how zoning would apply after the local ordinance change. The underlying application, ordinance and later court outcome were not independently reviewed; the article does not establish a denied or permanently cancelled project.",
      "quote": null,
      "operator_response": {
        "organization": "Hanton City Investments",
        "summary": "Hanton City Investments stated through counsel, as reported by Ocean State Media, that the filing preceded the ordinance's effective date and that the proposal was allowed under the earlier zoning. This is the reported legal position, not a court ruling or an environmental mitigation response.",
        "source_ids": [
          "source:2c3dcf1450db4d5236a9a7d9"
        ],
        "published_on": "2026-05-13",
        "checked_on": "2026-10-18",
        "relationship": "Company counsel zoning position in the same original article; not a response addressing every environmental concern.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:hanton-city-smithfield-ri",
      "record_id": "hanton-city-smithfield-ri",
      "subject_label": "Hanton City Business Park (data center anchor)",
      "actor": {
        "kind": "outlet",
        "label": "Ocean State Media",
        "source_ids": [
          "source:2c3dcf1450db4d5236a9a7d9"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2c3dcf1450db4d5236a9a7d9",
          "url": "https://www.oceanstatemedia.org/technology/2026-05-13/proposed-data-center-still-looms-over-smithfield-even-after-town-council-enacts-ban",
          "publisher": "Ocean State Media",
          "source_type": "news",
          "published_on": "2026-05-13",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:az-project-blue-dust-notice-pc2605-064",
      "version": 1,
      "subject_kind": "site",
      "state": "az",
      "record_type": "regulator_record",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-05-12",
      "event_date_note": "The original notice is dated May 12, 2026. The inspections occurred on May 8 and May 11, and the contractor response is dated May 15, 2026.",
      "published_on": null,
      "source_date_note": "The dated original documents were reviewed; their first online publication dates were not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:3b30440adf8050f5b67fc162",
        "source:a9b691096fb60748f7a5bf7c"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Pima County Department of Environmental Quality issued a May 12, 2026 notice alleging fugitive dust crossed Project Blue property boundaries during May 8 and May 11 inspections. The County May 22 memorandum records a contractor response and continuing monitoring. This is a documented agency allegation and response, not an Atlas finding, final penalty, closed notice or measured health effect.",
      "quote": null,
      "operator_response": {
        "organization": "AMES Construction",
        "summary": "AMES Construction stated in its May 15 response that loss of the project water source halted major earthwork while plant harvesting continued. It described corrective dust controls and a temporary stand down. These are contractor statements published by Pima County, not independent proof of continuing compliance, agency closure or permanent project cancellation.",
        "source_ids": [
          "source:a9b691096fb60748f7a5bf7c"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The County memorandum attaches the May 15 contractor response to this exact May 12 dust notice. AMES is identified as the construction contractor, without certifying a data center operator role.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:beale-project-blue-pima-county-az",
      "record_id": "beale-project-blue-pima-county-az",
      "subject_label": "Project Blue",
      "actor": {
        "kind": "agency",
        "label": "Pima County Department of Environmental Quality",
        "source_ids": [
          "source:3b30440adf8050f5b67fc162",
          "source:a9b691096fb60748f7a5bf7c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:3b30440adf8050f5b67fc162",
          "url": "https://content.civicplus.com/api/assets/640632e2-0b76-4257-bb62-8b751f22aa64",
          "publisher": "Pima County Department of Environmental Quality",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:a9b691096fb60748f7a5bf7c",
          "url": "https://content.civicplus.com/api/assets/6063ed1f-cc11-4876-bbc8-d64025507660",
          "publisher": "Pima County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ks-beale-gardner-news-2026",
      "version": 2,
      "subject_kind": "site",
      "state": "ks",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "noise",
        "air_generators",
        "land_use_zoning"
      ],
      "event_on": "2026-05-04",
      "event_date_note": "The article explicitly identifies the council meeting date; it is not the source-check date.",
      "published_on": "2026-05-07",
      "source_date_note": "The original news article displays May 7, 2026 as publication. The separate city statement displays May 6, 2026. These are publication dates, not an inferred withdrawal-action day.",
      "checked_on": "2026-10-18",
      "status": "withdrawn",
      "status_on": null,
      "status_scope": "Johnson County Post via KCUR reported withdrawal of this Gardner application. The City of Gardner separately reported the withdrawal in a statement published May 6, 2026. These sources do not establish that every concern was resolved or that future proposals are barred.",
      "source_ids": [
        "source:90ab8c4fb35ce1db52764370",
        "source:da27c349f10451bbdcd12d7d"
      ],
      "status_source_ids": [
        "source:90ab8c4fb35ce1db52764370",
        "source:da27c349f10451bbdcd12d7d"
      ],
      "event_ids": [],
      "summary": "Johnson County Post via KCUR reported residents raised water, noise, air and property-value concerns about Beale Infrastructure's Gardner proposal. The outlet reported that the company withdrew the application after the city said it would provide no incentives. The nearby De Soto and Spring Hill projects are separate.",
      "quote": null,
      "operator_response": {
        "organization": "Beale Infrastructure",
        "summary": "Beale Infrastructure stated, as reported by Johnson County Post via KCUR, that it would not proceed with the Gardner project at that time and appreciated community and city input.",
        "source_ids": [
          "source:90ab8c4fb35ce1db52764370"
        ],
        "published_on": "2026-05-07",
        "checked_on": "2026-10-18",
        "relationship": "Company statement quoted by the reporting outlet about the same Gardner application; no original withdrawal letter is independently verified.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "Adds an individually reviewed primary city statement about the same application. Retains the prior news attribution and unknown exact withdrawal day; no facility status, location or quantity change.",
      "subject_id": "site:beale-gardner-johnson-county-ks",
      "record_id": "beale-gardner-johnson-county-ks",
      "subject_label": "Beale Infrastructure Gardner Campus",
      "actor": {
        "kind": "outlet",
        "label": "Johnson County Post via KCUR",
        "source_ids": [
          "source:90ab8c4fb35ce1db52764370"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:90ab8c4fb35ce1db52764370",
          "url": "https://www.kcur.org/housing-development-section/2026-05-07/gardner-data-center-plan-withdrawn-by-company-after-resident-opposition",
          "publisher": "Johnson County Post via KCUR",
          "source_type": "news",
          "published_on": "2026-05-07",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:da27c349f10451bbdcd12d7d",
          "url": "https://www.gardnerkansas.gov/news_detail_T17_R72.php",
          "publisher": "City of Gardner",
          "source_type": "government_record",
          "published_on": "2026-05-06",
          "retrieved_on": "2026-10-18"
        }
      ],
      "status_date_note": "Exact disposition date is not established by either source. The city statement was published May 6, 2026 and the news report May 7; these publication dates are not substituted for the withdrawal-action day."
    },
    {
      "id": "concern:az-project-blue-reported-construction-water-dispute-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "az",
      "record_type": "news_report",
      "categories": [
        "water_use"
      ],
      "event_on": null,
      "event_date_note": "The first outlet report describes a May 4 city letter, but the exact day the construction meter was actually revoked is not independently established. The event date stays unknown; a reported letter, article date and check date are separate.",
      "published_on": "2026-05-06",
      "source_date_note": "The original reports display May 6 and May 28, 2026 publication with same-day modifications. The item retains the initial May 6 reporting day; later context and this source check are not a filing, revocation or current compliance date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the reported construction-water dispute is unknown in this bounded review. Separate groundwater authorizations, company procedural statements and continued project activity do not establish that every water concern was resolved, a violation was adjudicated, credits were transferred or actual water use was measured.",
      "source_ids": [
        "source:bf70983ee015d0f9232b09ed",
        "source:f94a2546bca8ded185a67ed3"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Arizona Public Media reported that Tucson revoked a contractor's temporary construction-water meter used for Project Blue dust control, while Beale Infrastructure described the permit as following normal procedures and said it was seeking another source. The outlet later reported separate groundwater-well authorizations. These accounts concern different water arrangements, not an independently inspected violation, final project closure or measured water use.",
      "quote": null,
      "operator_response": {
        "organization": "Beale Infrastructure",
        "summary": "Beale Infrastructure stated, according to Arizona Public Media, that its contractor followed normal temporary-water permit procedures and that it was procuring alternative construction water. This is the outlet's account of a company statement, not an independently inspected permit, completed alternative supply or agency endorsement.",
        "source_ids": [
          "source:bf70983ee015d0f9232b09ed"
        ],
        "published_on": "2026-05-06",
        "checked_on": "2026-10-18",
        "relationship": "The original article expressly presents Beale's emailed statement in the same Project Blue temporary-construction-water dispute. May 6 is the article publication, not an independently verified company-original statement date. The May 28 reported groundwater arrangements are a separate source context, not proof that this specific dispute ended.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:beale-project-blue-pima-county-az",
      "record_id": "beale-project-blue-pima-county-az",
      "subject_label": "Project Blue",
      "actor": {
        "kind": "outlet",
        "label": "Arizona Public Media",
        "source_ids": [
          "source:bf70983ee015d0f9232b09ed"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:bf70983ee015d0f9232b09ed",
          "url": "https://news.azpm.org/p/news-topical-nature/2026/5/6/229644-project-blue-developers-improperly-used-tucson-water-city-has-shut-it-off/",
          "publisher": "Arizona Public Media",
          "source_type": "news",
          "published_on": "2026-05-06",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f94a2546bca8ded185a67ed3",
          "url": "https://www.azpm.org/p/earthday/2026/5/28/229919-arizona-water-officials-approve-wells-tied-to-project-blue-data-center/",
          "publisher": "Arizona Public Media",
          "source_type": "news",
          "published_on": "2026-05-28",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:wa-westrichland-lewisclark-residents-city-minute-account-20260505",
      "version": 1,
      "subject_kind": "site",
      "state": "wa",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-05-05",
      "event_date_note": "The City minute account bears May 5, 2026 and is published within the May 19 agenda packet. This is the documented public comment meeting day rather than an independently verified first objection, certified approval of those minutes or first publication day.",
      "published_on": null,
      "source_date_note": "The later agenda packet date and raw retrieval timestamp do not become the original publication or physical event date. The selected minute signature lines are blank.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The City minute account explicitly links public comments to potential data center development associated with the Lewis and Clark Ranch area. Current concern resolution and an exact later computing application are unverified. General planning approval does not establish approval of a computing facility.",
      "source_ids": [
        "source:0d1c84bb3a934d286f820252"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about possible future Lewis and Clark Ranch data center development in the City published May 5, 2026 minute account. Comments addressed possible health, school, neighborhood and environmental impacts, community character, transparency and future public involvement. These are attributed public concerns rather than measured effects, findings of violations, an approved computing application or verified current resolution.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:trammell-crow-lewis-clark-ranch-west-richland-wa",
      "record_id": "trammell-crow-lewis-clark-ranch-west-richland-wa",
      "subject_label": "Trammell Crow Lewis & Clark Ranch Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:0d1c84bb3a934d286f820252"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:0d1c84bb3a934d286f820252",
          "url": "https://www.westrichland.org/AgendaCenter/ViewFile/Agenda/_05192026-403?packet=true",
          "publisher": "City of West Richland original May 19 agenda packet",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:nc-rowan-board-zoning-quality-of-life-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "nc",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-05-04",
      "event_date_note": "The signed instrument adoption day is May 4, 2026, as separately verified in the restriction review. It dates this legislative record and is not the exact first day residents raised concerns. The April 20 hearing remains a distinct earlier event.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:6e135ec158fcfb8a8be82f66"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Rowan County Board of Commissioners recorded citizen concern about nearby quality of life and gaps in data center zoning definitions in its moratorium ordinance. It also recognized possible economic benefits and the need to weigh development and citizen welfare. These are stated legislative reasons for further review, not measured nuisance, a finding against an individual project or proof that concerns were resolved.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:37159",
      "record_id": null,
      "subject_label": "Rowan County",
      "actor": {
        "kind": "agency",
        "label": "Rowan County Board of Commissioners",
        "source_ids": [
          "source:6e135ec158fcfb8a8be82f66"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:6e135ec158fcfb8a8be82f66",
          "url": "https://www.rowancountync.gov/DocumentCenter/View/57271/Ordinance-Imposing-One-Year-Moratorium-on-the-Development-of-Data-Centers-in-Rowan-County-PDF?bidId=",
          "publisher": "Rowan County Board of Commissioners",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:in-metrobloks-martindale-brightwood-news-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "in",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "power_rates"
      ],
      "event_on": "2026-05-04",
      "event_date_note": "The article explicitly identifies the council meeting date; it is not the source-check date.",
      "published_on": "2026-05-04",
      "source_date_note": "The original article displays this publication date and local time.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The outcome of the reported concerns is not established by this bounded source review.",
      "source_ids": [
        "source:a405671f098545776ce13874"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "WFYI Public Media reported that residents questioned noise, water use and power demand associated with the Metrobloks proposal in Martindale-Brightwood as the city council approved its rezoning request on May 4, 2026. This news report does not establish construction or the outcome of those concerns.",
      "quote": null,
      "operator_response": {
        "organization": "Metrobloks",
        "summary": "Metrobloks stated in its undated project FAQ that closed-loop cooling, utility arrangements and noise controls would limit effects. These are company positions about the proposed development, not verified operating measurements.",
        "source_ids": [
          "source:137ffcac91e8f8bef5ad4eef"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "Same-project FAQ addressing the reported topics; no publication date or dated direct reply to the WFYI article is established.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:metrobloks-martindale-brightwood-indianapolis-in",
      "record_id": "metrobloks-martindale-brightwood-indianapolis-in",
      "subject_label": "Metrobloks Martindale-Brightwood Data Center",
      "actor": {
        "kind": "outlet",
        "label": "WFYI Public Media",
        "source_ids": [
          "source:a405671f098545776ce13874"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:137ffcac91e8f8bef5ad4eef",
          "url": "https://www.metrobloks.com/community/indianapolis",
          "publisher": "Metrobloks",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:a405671f098545776ce13874",
          "url": "https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood",
          "publisher": "WFYI Public Media",
          "source_type": "news",
          "published_on": "2026-05-04",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:mi-saline-michiganpublic-concerns-2026-04-25",
      "version": 1,
      "subject_kind": "project",
      "state": "mi",
      "record_type": "news_report",
      "categories": [
        "power_rates",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The exact date on which the described opponents raised each concern is not established. Article publication is not substituted for that event date.",
      "published_on": "2026-04-25",
      "source_date_note": "The article carries this explicit first publication date. The October 19 source check is separate.",
      "checked_on": "2026-10-19",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present disposition of these reported concerns has not been independently established. Approval, construction and company statements do not establish resolution or measured effects.",
      "source_ids": [
        "source:6778eaa059dfc2a1cc05789d"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Michigan Public reported concerns about energy demand, environmental impacts and transparency at the Saline Township campus being developed for Oracle. The report described the legal challenge brought by the state attorney general to the electricity contracts and included differing company assurances. It does not establish a later court outcome, actual customer bill changes or measured environmental effects.",
      "quote": null,
      "operator_response": {
        "organization": "Related Digital and Blackstone",
        "summary": "Related Digital and Blackstone said the project would benefit existing electricity customers and that Oracle would fund its battery storage, according to Michigan Public. These reported assurances are not verified customer savings or an answer establishing the outcome of the legal challenge.",
        "source_ids": [
          "source:6778eaa059dfc2a1cc05789d"
        ],
        "published_on": "2026-04-25",
        "checked_on": "2026-10-19",
        "relationship": "The article includes the companies cost-protection position beside the reported power and transparency concerns. This is the outlet-reported statement as published in April, not an October company update.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:stargate-saline-township-mi",
      "record_id": "stargate-saline-township-mi",
      "subject_label": "Stargate The Barn Campus",
      "actor": {
        "kind": "outlet",
        "label": "Michigan Public",
        "source_ids": [
          "source:6778eaa059dfc2a1cc05789d"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-16",
      "sources": [
        {
          "id": "source:6778eaa059dfc2a1cc05789d",
          "url": "https://www.michiganpublic.org/economy/2026-04-25/saline-township-data-center-major-construction-underway-financing-secured",
          "publisher": "Michigan Public",
          "source_type": "news",
          "published_on": "2026-04-25",
          "retrieved_on": "2026-10-19"
        }
      ]
    },
    {
      "id": "concern:mo-ferguson-emerson-resident-comments-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "mo",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "air_generators",
        "power_rates"
      ],
      "event_on": "2026-04-21",
      "event_date_note": "The original Council minutes explicitly date the public discussion April 21, 2026. That discussion does not date the later tax decision or exact first computing service.",
      "published_on": null,
      "source_date_note": "The selected original body does not independently establish the exact web publication day of the complete concern record. Retrieval is not publication.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected original record documents an attributed concern or resource review, without independently establishing the complete disposition, measured harm or present compliance.",
      "source_ids": [
        "source:daf482c593c67aa59fdddcea",
        "source:f4baaaa68f089865d8355196"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents stated in the original Ferguson Council minutes that the redevelopment discussion lacked sufficient plans and public transparency and raised questions about school finances, emissions and community benefits. These are attributed public concerns rather than verified losses or measured pollution. The agency hosted developer questions are a separate project account, without an independently established exact Next Revolution computing operator response.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:next-revolution-emerson-campus-ferguson-mo",
      "record_id": "next-revolution-emerson-campus-ferguson-mo",
      "subject_label": "Former Emerson Campus Data Center (Next Revolution Technologies)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:daf482c593c67aa59fdddcea",
          "source:f4baaaa68f089865d8355196"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:daf482c593c67aa59fdddcea",
          "url": "https://www.fergusoncity.com/DocumentCenter/View/8742/Council-Meeting-Minutes-4212026-outgoing",
          "publisher": "Ferguson City original April 21 outgoing Council minutes",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        },
        {
          "id": "source:f4baaaa68f089865d8355196",
          "url": "https://www.fergusoncity.com/DocumentCenter/View/8645/Project-Butterfly---Complete-Q-and-A-Responses?bidId=",
          "publisher": "Ferguson City original Project Butterfly resident questions and responses",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:de-project-washington-coastal-zone-appeal-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "de",
      "record_type": "legal_action",
      "categories": [
        "air_generators",
        "land_use_zoning"
      ],
      "event_on": "2026-02-17",
      "event_date_note": "The original order states that CZICB2026-01 was filed February 17, 2026. The March24-26 hearing and April17 signed final order are separate later events; the disposition date remains separately recorded.",
      "published_on": null,
      "source_date_note": "The first public posting of the signed order is unknown. April 17, 2026 is its dated disposition, not an invented first-publication day.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2026-04-17",
      "status_scope": "Delaware Coastal Zone Industrial Control Board issued its April 17, 2026 final order affirming the Secretary's status decision. Resolved applies only to this administrative appeal. Later judicial appeals, revised proposals, present permit conditions and all underlying environmental concerns were not independently established.",
      "source_ids": [
        "source:0a4d4dc9addc15fc1fa1acde"
      ],
      "status_source_ids": [
        "source:0a4d4dc9addc15fc1fa1acde"
      ],
      "event_ids": [],
      "summary": "Delaware Coastal Zone Industrial Control Board issued a final order affirming DNREC's coastal-zone status decision for Starwood's Project Washington after an administrative appeal. The decision addresses the project's heavy-industry classification, including its generator context. It does not establish measured emissions, a current operating violation or the result of any later court case. All later judicial and revised-proposal outcomes are unknown in this review. A source check does not advance the project's physical status.",
      "quote": null,
      "operator_response": {
        "organization": "Starwood Digital Ventures",
        "summary": "Starwood Digital Ventures argued in the agency-published order that its project was not prohibited heavy industry and should be exempt from coastal-zone regulation. These are the appellant's stated positions; the Board affirmed the status decision. This does not supply the result of any later court review.",
        "source_ids": [
          "source:0a4d4dc9addc15fc1fa1acde"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The same original CZICB2026-01 order explicitly describes Starwood's grounds for reversal on page2. This is an agency-published company argument in the named appeal, not an operator-original press release. First public posting is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:starwood-digital-project-washington-de",
      "record_id": "starwood-digital-project-washington-de",
      "subject_label": "Project Washington (Starwood Digital Ventures)",
      "actor": {
        "kind": "agency",
        "label": "Delaware Coastal Zone Industrial Control Board",
        "source_ids": [
          "source:0a4d4dc9addc15fc1fa1acde"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:0a4d4dc9addc15fc1fa1acde",
          "url": "https://documents.dnrec.delaware.gov/Admin/CZICB/Decisions/CZ-2026-01-Starwood-Digital-Ventures.pdf",
          "publisher": "Delaware Coastal Zone Industrial Control Board",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:mi-gaines-township-april-rezoning-public-comments",
      "version": 1,
      "subject_kind": "site",
      "state": "mi",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "noise",
        "light",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": "2026-04-15",
      "event_date_note": "This is the documented public meeting day, not a verified first concern or legal effective day.",
      "published_on": null,
      "source_date_note": "The minutes identify the meeting day. Their exact first online publication day was not independently established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:55a6337d20f877b64bbd93e7"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about water resources, noise, potential lighting, electricity demand, land use and the amount of project information available at the April 15, 2026 Gaines Charter Township Microsoft rezoning hearing. The minutes also record public support and company answers. These are attributed concerns and statements, not findings of measured environmental effects, health harm, a violation or an approved final site plan.",
      "quote": null,
      "operator_response": {
        "organization": "Microsoft",
        "summary": "Microsoft representatives told the Planning Commission that the project was in an early phase, outlined proposed conditions for sound, light, water and decommissioning, and described planned utility infrastructure payments. They said final audible effects would depend on the site layout and further information could be supplied. These are agency published company statements and proposed measures, not independently verified performance or completed mitigation.",
        "source_ids": [
          "source:55a6337d20f877b64bbd93e7"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The certified township minutes record these company answers during the same April 15, 2026 Microsoft rezoning hearing and discussion as the public concerns.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:microsoft-gaines-township-mi",
      "record_id": "microsoft-gaines-township-mi",
      "subject_label": "Microsoft Gaines Township Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:55a6337d20f877b64bbd93e7"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:55a6337d20f877b64bbd93e7",
          "url": "https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070",
          "publisher": "Gaines Charter Township",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ut-stadion-eagle-mountain-air-application-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "ut",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2026-04-10",
      "event_date_note": "The agency table labels April 10, 2026 as NOI received. This is an application-receipt event, not a hearing, public comment, issuance, startup or violation date.",
      "published_on": null,
      "source_date_note": "No first public posting day for the changing agency table or application is established. Its most-recent-update field is not substituted for a publication date.",
      "checked_on": "2026-10-18",
      "status": "pending",
      "status_on": null,
      "status_scope": "Utah Division of Air Quality currently lists draft permitting documents under review for the named application. Pending applies only to that listed review step; an issued permit, later original determination, actual operation and present air compliance have not been established in this bounded review. The exact day this draft-review step began is unknown; the August 7 update field is not substituted for a transition day.",
      "source_ids": [
        "source:52be94bd70070797e131cf3a",
        "source:b96ec651c1bc90923e96b01a",
        "source:fde369459a9ad8c11eec6040"
      ],
      "status_source_ids": [
        "source:52be94bd70070797e131cf3a"
      ],
      "event_ids": [],
      "summary": "Utah Division of Air Quality lists air-permit application N159410011 for Stadion LLC at the Eagle Mountain data-center campus, received April 10, 2026. Its public row shows draft permitting documents under review, with a separate August 7 update field. This is an application-review record, not an issued permit, an inspection finding or verification of operation or compliance.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:meta-eagle-mountain-ut",
      "record_id": "meta-eagle-mountain-ut",
      "subject_label": "Meta Eagle Mountain Data Center Campus",
      "actor": {
        "kind": "agency",
        "label": "Utah Division of Air Quality",
        "source_ids": [
          "source:52be94bd70070797e131cf3a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:52be94bd70070797e131cf3a",
          "url": "https://noistatus.deq.utah.gov/status",
          "publisher": "Utah Division of Air Quality",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b96ec651c1bc90923e96b01a",
          "url": "https://pscdocs.utah.gov/electric/20docs/2003504/314615PetitionInterveneStadion7-14-2020.pdf",
          "publisher": "Public Service Commission of Utah",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fde369459a9ad8c11eec6040",
          "url": "https://eaglemountain.gov/data-centers-in-eagle-mountain/",
          "publisher": "Eagle Mountain City",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ut-iron-antelope-planning-resource-review",
      "version": 1,
      "subject_kind": "site",
      "state": "ut",
      "record_type": "regulator_record",
      "categories": [
        "water_use",
        "air_generators",
        "noise",
        "land_use_zoning"
      ],
      "event_on": "2026-04-02",
      "event_date_note": "The original minutes identify the April 2, 2026 meeting. This is the documented planning discussion day, not the first day residents raised concerns.",
      "published_on": null,
      "source_date_note": "Exact first online publication day is not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The planning concern is documented in an original County record. Final individual application disposition, later resolution and measured conditions are unknown in this bounded review.",
      "source_ids": [
        "source:87e5b8aab9eec1046f51a5d8"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Iron County Planning Commission recorded staff discussion of public concerns about Antelope water use and gas leakage, together with noise and possible mitigation conditions. Its minutes explicitly describe this as a discussion item with no action and no public hearing for that item. This documents the planning concerns and draft conditions, not acquired water rights, adopted project conditions, measured impacts or a violation finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:pronghorn-antelope-cedar-city-ut",
      "record_id": "pronghorn-antelope-cedar-city-ut",
      "subject_label": "Antelope Data Center (Project Antelope)",
      "actor": {
        "kind": "agency",
        "label": "Iron County Planning Commission",
        "source_ids": [
          "source:87e5b8aab9eec1046f51a5d8"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:87e5b8aab9eec1046f51a5d8",
          "url": "https://secure.utah.gov/pmn-admin/files/1431597.pdf",
          "publisher": "Iron County Planning Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:oh-trenton-mila-saveohioparks-20260402",
      "version": 1,
      "subject_kind": "site",
      "state": "oh",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators",
        "health",
        "other"
      ],
      "event_on": "2026-04-02",
      "event_date_note": "The exact April 2, 2026 Council meeting dates the recorded public group concern. It is not independently the first day any person raised a concern.",
      "published_on": null,
      "source_date_note": "The original Council minutes establish the meeting day without independently establishing first publication. The archive path and later retrieval day are not publication dates.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected original record attributes questions and a request for further review to the public group representative. It does not independently verify the alleged impacts, current resolution or an accomplished project pause.",
      "source_ids": [
        "source:35a77d6e32b7ee326992040f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Save Ohio Parks raised potential air quality, public health and climate concerns associated with energy production for the proposed Prologis Mila data center, as recorded in the April 2, 2026 Trenton Council minutes. The representative requested a pause for further environmental and infrastructure review and consideration of renewable alternatives. These are attributed potential impacts and requests, without verified fuel sourcing, measured emissions, established health harm, enacted pause or proof of resolution.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:prologis-mila-trenton-oh",
      "record_id": "prologis-mila-trenton-oh",
      "subject_label": "Prologis Project Mila",
      "actor": {
        "kind": "public_group",
        "label": "Save Ohio Parks",
        "source_ids": [
          "source:35a77d6e32b7ee326992040f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:35a77d6e32b7ee326992040f",
          "url": "https://ci.trenton.oh.us/AgendaCenter/ViewFile/Minutes/_04022026-551",
          "publisher": "City of Trenton Ohio Council minutes",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:or-morrow-reported-amazon-groundwater-settlement-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "or",
      "record_type": "news_report",
      "categories": [
        "water_quality_discharge"
      ],
      "event_on": null,
      "event_date_note": "The article reports a settlement announcement but the original signed execution, filing or actual approval date was not independently established. The event date stays unknown; publication and a relative Tuesday reference are not substituted for a verified court event.",
      "published_on": "2026-03-31",
      "source_date_note": "The original Oregon Capital Chronicle report displays March 31, 2026 publication with later same-day company/group updates. The independently read OPB follow-up is published August 12, not its August 13 syndication. Source checks are separate from all execution, court and payment dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present final approval, payment and remedial outcome are unknown in this bounded review. OPB reported approval pending in August; an announced settlement or reported preliminary-approval lead does not establish final court approval, actual disbursement, admitted liability or resolution of all regional groundwater concerns.",
      "source_ids": [
        "source:6b0b95630c8fb886fed70d23",
        "source:121701707b3510e4b81b2e1f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Oregon Capital Chronicle reported an Amazon settlement announcement over regional groundwater allegations, alongside the company's denial and no admission of liability. Later OPB reporting described court approval as pending at that time. This county-level news context does not establish present final approval, payment, causation, completed remediation or responsibility at an individual data-center campus.",
      "quote": null,
      "operator_response": {
        "organization": "Amazon Data Services",
        "summary": "Amazon Data Services stated, according to Oregon Capital Chronicle, that it denied contributing to the groundwater problem and chose to settle to avoid extended litigation and focus on community support. The report describes no admission of liability. This is an outlet-reported statement, not a court finding or verified completed remedy.",
        "source_ids": [
          "source:6b0b95630c8fb886fed70d23"
        ],
        "published_on": "2026-03-31",
        "checked_on": "2026-10-18",
        "relationship": "The original March 31 report explicitly attributes the statement to an Amazon spokesperson in the same reported settlement discussion; its update note records the company reply later that same day. March 31 is outlet publication, not an independently reviewed company-original statement/execution day. Other defendants and separate farm settlements are not attributed to Amazon.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "county:41049",
      "record_id": null,
      "subject_label": "Morrow County",
      "actor": {
        "kind": "outlet",
        "label": "Oregon Capital Chronicle",
        "source_ids": [
          "source:6b0b95630c8fb886fed70d23"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:121701707b3510e4b81b2e1f",
          "url": "https://www.opb.org/article/2026/08/12/oregon-farm-madison-ranches-settlement-lower-umatilla-basin-nitrate-pollution/",
          "publisher": "OPB",
          "source_type": "news",
          "published_on": "2026-08-12",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:6b0b95630c8fb886fed70d23",
          "url": "https://oregoncapitalchronicle.com/2026/03/31/amazon-to-pay-20-5-million-settlement-over-northeast-oregon-nitrate-pollution/",
          "publisher": "Oregon Capital Chronicle",
          "source_type": "news",
          "published_on": "2026-03-31",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:mi-ypsilanti-board-opposition-20260331",
      "version": 1,
      "subject_kind": "site",
      "state": "mi",
      "record_type": "public_concern_on_record",
      "categories": [
        "health",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-03-31",
      "event_date_note": "This dates the Special Meeting approval certified in Resolution 2026 05, not the earliest community concern, actual publication day or any measured impact.",
      "published_on": null,
      "source_date_note": "The certified resolution supplies March 31 approval. The URL contains an upload timestamp which is not an independently verified first publication day. Current project page publication day is unknown.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original resolution and current Township page establish formal Board opposition and attributed concern. They do not supply a final court or regulator disposition of those allegations, a final project decision or a verified current response resolving the episode.",
      "source_ids": [
        "source:53f3b33f7a6179b5a70e0673",
        "source:c125f9fce3a95b9d87b10441"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Ypsilanti Township Board of Trustees adopted formal opposition to siting the proposed University of Michigan and Los Alamos research computing facility and raised concerns about community security, emergency preparedness, public participation and environmental justice. These are attributed Board positions in Resolution 2026 05, not an independently verified threat designation, a court finding, a measured injury or a final project denial.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:umich-lanl-research-computing-ypsilanti-township-mi",
      "record_id": "umich-lanl-research-computing-ypsilanti-township-mi",
      "subject_label": "U-M / Los Alamos Research Computing Center",
      "actor": {
        "kind": "agency",
        "label": "Ypsilanti Township Board of Trustees",
        "source_ids": [
          "source:53f3b33f7a6179b5a70e0673",
          "source:c125f9fce3a95b9d87b10441"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:53f3b33f7a6179b5a70e0673",
          "url": "https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-05-Data-Center-High-Value-Target-Risk.pdf?t=202606301548230",
          "publisher": "Charter Township of Ypsilanti",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:c125f9fce3a95b9d87b10441",
          "url": "https://files.ypsitownship.org/government/boards___commissions/board_of_trustees/data_center_information.php",
          "publisher": "Charter Township of Ypsilanti",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:mi-hyperscale-dowagiac-noise-news-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "mi",
      "record_type": "news_report",
      "categories": [
        "noise",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "A single dated concern event is not established by the article. Its publication date is not substituted for an event day.",
      "published_on": "2026-03-31",
      "source_date_note": "The original WWMT article identifies March 31, 2026 as publication and April 1 as an update; the update is not a new event or first publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the reported concerns is not established by this bounded source review.",
      "source_ids": [
        "source:6949f485f16934de3f6657bf"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "WWMT reported that residents raised noise and property-value concerns near Hyperscale Data's Dowagiac campus as the company discussed expansion. The article also described city noise-rule and development-proposal discussions; this report does not establish a violation or current case outcome.",
      "quote": null,
      "operator_response": {
        "organization": "Hyperscale Data",
        "summary": "Hyperscale Data stated in its letter dated October 6, 2026 that it had ended cryptocurrency mining in early September and expected a temporary restart on October 7 for sound testing it described as court-ordered. These are company statements; actual testing results and present operation are not independently verified.",
        "source_ids": [
          "source:bd4ed6a0ed2e195288a9453b"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The City of Dowagiac published this original same-facility company letter, dated months after the WWMT article. Its first online publication date and a direct reply to the article are not established. The letter date is distinct from a publication date; the court order was not inspected.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:hyperscale-data-dowagiac-mi",
      "record_id": "hyperscale-data-dowagiac-mi",
      "subject_label": "Hyperscale Data Dowagiac Campus",
      "actor": {
        "kind": "outlet",
        "label": "WWMT",
        "source_ids": [
          "source:6949f485f16934de3f6657bf"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:6949f485f16934de3f6657bf",
          "url": "https://wwmt.com/news/local/ai-data-center-expansion-dowagiac-loud-noise-complaints-residents-southwest-michigan-hyperscale-megawatt-bitcoin-wwmt",
          "publisher": "WWMT",
          "source_type": "news",
          "published_on": "2026-03-31",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:bd4ed6a0ed2e195288a9453b",
          "url": "https://us1-photo.nextdoor.com/post_photos/36/eb/36eb51397f368c53089fde9058197b2c.png?output_type=jpeg&quality=80&request_version=v2&sizing=linear",
          "publisher": "City of Dowagiac",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ok-coweta-flyer-reported-resource-concerns-withdrawal-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "ok",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": "2026-03-30",
      "event_date_note": "The March 30, 2026 original report records the company withdrawal announcement and the city's same-day account of notification. This is a reported announcement date, not an independently inspected signed zoning-withdrawal instrument.",
      "published_on": "2026-03-30",
      "source_date_note": "The original Tulsa Flyer report displays March 30, 2026 publication and same-day update. That is outlet publication, not a separately verified company-original statement publication day.",
      "checked_on": "2026-10-18",
      "status": "withdrawn",
      "status_on": "2026-03-30",
      "status_scope": "Tulsa Flyer reported that Beale announced withdrawal of the Coweta proposal on March 30, 2026, with the city separately acknowledging notification that day. Withdrawn applies only to that reported proposal; it is not a water-quality finding, resolution of every concern or a permanent ban on future projects.",
      "source_ids": [
        "source:c620313c5b20c50477555720"
      ],
      "status_source_ids": [
        "source:c620313c5b20c50477555720"
      ],
      "event_ids": [],
      "summary": "Tulsa Flyer reported water and electricity concerns about Coweta's Project Atlas and Beale Infrastructure's March 30, 2026 announcement that it was withdrawing the proposal. The report attributes the withdrawal to company statements and a city account. It does not establish measured environmental conditions or that every underlying concern was resolved.",
      "quote": null,
      "operator_response": {
        "organization": "Beale Infrastructure",
        "summary": "Beale Infrastructure stated, according to Tulsa Flyer, that it was withdrawing its Coweta proposal while continuing other Oklahoma investments. The statement does not give a specific reason or establish an environmental outcome.",
        "source_ids": [
          "source:c620313c5b20c50477555720"
        ],
        "published_on": "2026-03-30",
        "checked_on": "2026-10-18",
        "relationship": "The original report quotes Beale about this same Coweta proposal. This is a news-quoted statement, not an independently inspected company-original release or signed withdrawal instrument. March 30 is the outlet publication date.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:beale-project-atlas-coweta-ok",
      "record_id": "beale-project-atlas-coweta-ok",
      "subject_label": "Project Atlas at Coweta",
      "actor": {
        "kind": "outlet",
        "label": "Tulsa Flyer",
        "source_ids": [
          "source:c620313c5b20c50477555720"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:c620313c5b20c50477555720",
          "url": "https://tulsaflyer.org/2026/03/30/news/post/developer-pulls-out-of-project-atlas-data-center/",
          "publisher": "Tulsa Flyer",
          "source_type": "news",
          "published_on": "2026-03-30",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:la-hyperion-aae-energy-financing-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "la",
      "record_type": "public_concern_on_record",
      "categories": [
        "power_rates",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The report discusses several past decisions and future possibilities without one independently verified exact concern event day. The event remains unknown.",
      "published_on": null,
      "source_date_note": "The report cover states 2026 but supplies no exact publication day. The May 18 URL path and source-check date are not substituted for first publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the documented ratepayer and transparency concerns is unknown in this bounded review. Report forecasts and company commitments do not establish actual savings, cost transfers, a final current regulatory outcome or resolution of every concern.",
      "source_ids": [
        "source:42c2c3608488a3b541c52d6f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Alliance for Affordable Energy published a report raising questions about Hyperion's energy financing, potential ratepayer cost exposure and access to project agreements. The report discusses possible future outcomes. It does not establish actual customer bill changes, a regulatory violation or measured environmental effects.",
      "quote": null,
      "operator_response": {
        "organization": "Meta",
        "summary": "Meta stated in Entergy Louisiana's published announcement that it was working with the utility so other customers would not pay its costs. The release describes expected benefits and planned infrastructure. This is a published company position, not independently measured bill savings or proof that every cost concern was resolved.",
        "source_ids": [
          "source:2a4b9b681d7f10dba22047c7"
        ],
        "published_on": "2026-03-27",
        "checked_on": "2026-10-18",
        "relationship": "Entergy's official March 27 partner announcement explicitly quotes Meta on the same Richland Parish campus and ratepayer cost allocation. It predates the report and is linked as a relevant published position, not an express reply to that report, a Meta-hosted page, final regulatory approval or a new utility operating role in Atlas.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:meta-hyperion-richland-parish-la",
      "record_id": "meta-hyperion-richland-parish-la",
      "subject_label": "Meta Hyperion",
      "actor": {
        "kind": "public_group",
        "label": "Alliance for Affordable Energy",
        "source_ids": [
          "source:42c2c3608488a3b541c52d6f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2a4b9b681d7f10dba22047c7",
          "url": "https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings",
          "publisher": "Entergy Louisiana",
          "source_type": "company_page",
          "published_on": "2026-03-27",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:42c2c3608488a3b541c52d6f",
          "url": "https://www.all4energy.org/wp-content/uploads/2026/05/2026-05-18-Data-Centers-Financing-Energy-Overview-Report.pdf",
          "publisher": "Alliance for Affordable Energy",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ia-cedar-falls-ipr-mining-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "ia",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "power_rates",
        "land_use_zoning",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": null,
      "event_date_note": "The article reports an earlier rezoning discussion but does not establish its exact day in the bounded source. The event date stays unknown; planned April dates are not accomplished events.",
      "published_on": "2026-03-26",
      "source_date_note": "The original report displays March 26, 2026 publication, separate from the unknown exact discussion date and this source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the documented concerns and proposed rezoning is unknown in this bounded original-article review. An inherited title or a scheduled later discussion does not establish a final vote, current operation, measured noise or resolution of each concern.",
      "source_ids": [
        "source:23f0338568d66381be17dfe3"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Iowa Public Radio reported residents' concerns about noise, water and electricity use, nearby habitat and property values around Simple Mining's proposed Cedar Falls location. The article distinguishes that proposal from the utility's Viking power plant. Its announced later discussion is not proof of a final rezoning outcome, measured effects or present mine operation.",
      "quote": null,
      "operator_response": {
        "organization": "Simple Mining",
        "summary": "Simple Mining stated, according to Iowa Public Radio, that it had worked with the city on larger, slower fans intended to reduce noise and offered tours. This is the outlet's account of the company position, not an independently inspected design, measured sound level or verified mitigation outcome.",
        "source_ids": [
          "source:23f0338568d66381be17dfe3"
        ],
        "published_on": "2026-03-26",
        "checked_on": "2026-10-18",
        "relationship": "The original article explicitly attributes this noise-design statement to Simple Mining in the same proposed-site discussion. March 26 is the outlet publication day, not an independently verified company-original date. Utility statements about closed-loop water and no wells belong to the separate power plant and are not assigned to this mine.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:simple-mining-cedar-falls-ia",
      "record_id": "simple-mining-cedar-falls-ia",
      "subject_label": "Simple Mining Cedar Falls (rezoning defeated)",
      "actor": {
        "kind": "outlet",
        "label": "Iowa Public Radio",
        "source_ids": [
          "source:23f0338568d66381be17dfe3"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:23f0338568d66381be17dfe3",
          "url": "https://www.iowapublicradio.org/ipr-news/2026-03-26/cedar-falls-rezoning-proposal-cryptocurrency-mining-site",
          "publisher": "Iowa Public Radio",
          "source_type": "news",
          "published_on": "2026-03-26",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:md-frederick-amazon-air-comment-determination-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "md",
      "record_type": "permit_and_comment",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "air_generators",
        "power_rates",
        "light",
        "traffic_construction",
        "wildlife_wetlands_stormwater",
        "health"
      ],
      "event_on": "2025-12-08",
      "event_date_note": "December 8, 2025 is the original documented public meeting date. March 25, 2026 is the separately stated effective final determination, not a source-check or invented hearing day.",
      "published_on": null,
      "source_date_note": "The first public posting of the packet is unknown. Meeting, application and effective determination dates are separate from publication; the current agency index does not supply a first posting day.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2026-03-25",
      "status_scope": "Maryland Department of the Environment recorded a final determination effective March 25, 2026. Resolved applies only to that named air-permit determination. It does not establish actual operation, measured emissions, current compliance, all local approvals or resolution of every comment.",
      "source_ids": [
        "source:ca43eddecbae618e9b5ff58b",
        "source:eba21fb3b312bc2b316e28ce"
      ],
      "status_source_ids": [
        "source:ca43eddecbae618e9b5ff58b"
      ],
      "event_ids": [],
      "summary": "Maryland Department of the Environment recorded public questions about Amazon's proposed generators, health, water, noise, construction and electricity in Frederick County. It made a final determination to issue the air permit effective March 25, 2026. That determination addresses the named air-permit procedure, not measured operating conditions or resolution of every concern.",
      "quote": null,
      "operator_response": {
        "organization": "Amazon",
        "summary": "Amazon stated in the agency-published response that it would use county water service, follow local requirements and use acoustic design measures. These are company positions and design expectations, not independently verified operating results or a response resolving every concern.",
        "source_ids": [
          "source:ca43eddecbae618e9b5ff58b"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The agency packet explicitly presents additional Amazon responses for this application, including water and noise. This is an agency-published company statement; original first posting is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "county:24021",
      "record_id": null,
      "subject_label": "Frederick County",
      "actor": {
        "kind": "agency",
        "label": "Maryland Department of the Environment",
        "source_ids": [
          "source:ca43eddecbae618e9b5ff58b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:ca43eddecbae618e9b5ff58b",
          "url": "https://mde.maryland.gov/datacenters/Documents/2026_FinalDeterminationandResponsetoComments.pdf",
          "publisher": "Maryland Department of the Environment",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:eba21fb3b312bc2b316e28ce",
          "url": "https://mde.maryland.gov/datacenters/Pages/FrederickDataCenter.aspx",
          "publisher": "Maryland Department of the Environment",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ia-google-palo-ipr-community-questions-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "ia",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "power_rates",
        "light",
        "traffic_construction",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The March report describes a Tuesday town hall without an independently checked exact meeting day. The event date remains unknown; the publication day is not substituted.",
      "published_on": "2026-03-25",
      "source_date_note": "The original town-hall report displays March 25, 2026, with separate March 4 background reporting. Article updates and source checks do not establish a meeting or permit date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later outcome of these documented questions is unknown in this bounded review. Mayor or county statements and requests for further detail do not resolve actual resource impacts, legal jurisdiction, permit conditions or current project status.",
      "source_ids": [
        "source:b90ec66eae6946e0a338aaad",
        "source:bacd79f5cebed359a1378ea4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Iowa Public Radio reported residents' questions about water, electricity, traffic, lighting and noise at a town hall concerning Google's Palo proposal. The report describes differing county and mayor positions on local review and annexation. Those positions do not establish corporate motives, the applicable final rules, completed annexation, a permit outcome or measured impacts.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:google-palo-ia",
      "record_id": "google-palo-ia",
      "subject_label": "Google Palo Data Center Campus",
      "actor": {
        "kind": "outlet",
        "label": "Iowa Public Radio",
        "source_ids": [
          "source:b90ec66eae6946e0a338aaad"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:b90ec66eae6946e0a338aaad",
          "url": "https://www.iowapublicradio.org/ipr-news/2026-03-25/palo-google-data-center-mayor-townhall-linn-county",
          "publisher": "Iowa Public Radio",
          "source_type": "news",
          "published_on": "2026-03-25",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:bacd79f5cebed359a1378ea4",
          "url": "https://www.iowapublicradio.org/ipr-news/2026-03-04/google-data-center-palo-linn-county",
          "publisher": "Iowa Public Radio",
          "source_type": "news",
          "published_on": "2026-03-04",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-menlo-ross-utility-agreement",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "power_rates"
      ],
      "event_on": "2026-03-19",
      "event_date_note": "March 19, 2026 is the adoption date. March 20 is issuance. The proposed operating month remains a forecast.",
      "published_on": "2026-03-20",
      "source_date_note": "The notice or final document publication day is explicit when given. A docketing day remains a filing date. A source check does not replace either date.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:d369575d81ccb334ab370953"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "California Public Utilities Commission approved modified PG&E agreement terms for the proposed Menlo Equities data center and computing lab at 888 Ross Drive. The final resolution describes cost advance and refund protections. This is a utility approval and its terms, not measured rate impacts, actual refunds, completed energization or an operating facility.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:menlo-digital-md-sv1-ross-drive-sunnyvale-ca",
      "record_id": "menlo-digital-md-sv1-ross-drive-sunnyvale-ca",
      "subject_label": "Menlo Digital MD-SV1 (888-894 Ross Drive)",
      "actor": {
        "kind": "agency",
        "label": "California Public Utilities Commission",
        "source_ids": [
          "source:d369575d81ccb334ab370953"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:d369575d81ccb334ab370953",
          "url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K988/602988978.PDF",
          "publisher": "California Public Utilities Commission",
          "source_type": "government_record",
          "published_on": "2026-03-20",
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:in-hobart-resident-noise-well-and-land-use-comments-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "in",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_quality_discharge",
        "land_use_zoning",
        "health"
      ],
      "event_on": "2026-03-18",
      "event_date_note": "The signed original Council minutes date the meeting March 18, 2026 and place the relevant public discussion on PDF pages 3 and 4.",
      "published_on": null,
      "source_date_note": "The original dated government record was captured and reviewed. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:f24ed1555ed2fcc219cd1ece"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about wells, noise, air emissions, health and loss of farmland around the Amazon Hobart proposal at the March 18, 2026 Council meeting. The signed minutes record those statements and municipal replies. A resident account of a medical conversation and reports about another campus are not independently verified medical evidence or measured site effects. No merits or concern resolution is inferred.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:aws-hobart-in",
      "record_id": "aws-hobart-in",
      "subject_label": "AWS Hobart Campus",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:f24ed1555ed2fcc219cd1ece"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:f24ed1555ed2fcc219cd1ece",
          "url": "https://www.cityofhobart.org/AgendaCenter/ViewFile/Minutes/_03182026-2545",
          "publisher": "City of Hobart",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:pa-pax1-county-subdivision-review-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "pa",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "other"
      ],
      "event_on": "2026-03-16",
      "event_date_note": "The report records March 16, 2026 as the review day and March 5 as the receipt day. Final is the submitted plan status, not proof of an approval.",
      "published_on": null,
      "source_date_note": "The original dated agency record was reviewed. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:4c836120136b49b007d42e02"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Cumberland County Planning Department recorded recommendations on the PAX 1 subdivision plan, including plan clarity, drainage easements, survey markers and addressing information. The March 16, 2026 review is a technical plan comment record, not an allegation of measured harm, a final municipal permit decision or a finding that an operating facility violated a rule.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:powerhouse-pax-carlisle-pa",
      "record_id": "powerhouse-pax-carlisle-pa",
      "subject_label": "PAX  -  Pennsylvania Digital I",
      "actor": {
        "kind": "agency",
        "label": "Cumberland County Planning Department",
        "source_ids": [
          "source:4c836120136b49b007d42e02"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:4c836120136b49b007d42e02",
          "url": "https://www.cumberlandcountypa.gov/DocumentCenter/View/54948/Pennsylvania-Digital-PAX-1-Final-SD-Review-Report-2026-03-05",
          "publisher": "Cumberland County Planning Department",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:nd-atlas-williston-news-settlement-progress-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "nd",
      "record_type": "news_report",
      "categories": [
        "noise",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The original source reports historical concerns or a developing procedure without one independently verified exact concern-event day; weekday or year-only references are not converted to guessed dates.",
      "published_on": "2026-03-13",
      "source_date_note": "The displayed original publication day is recorded separately from the event and source check.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.",
      "source_ids": [
        "source:8f187df78bab25c9d6ad5535"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "KFYR reported progress on individual settlement agreements following residents' noise and property-value allegations concerning Atlas Power near Williston. The outlet recorded company counsel's account of finalized and still-negotiated agreements. The original settlement and current court disposition were not independently reviewed, and the report does not establish measured noise abatement or resolution of every concern.",
      "quote": null,
      "operator_response": {
        "organization": "Atlas Power",
        "summary": "Atlas Power counsel stated, as reported by KFYR, that some individual agreements were finalized and others were still being negotiated. The confidential settlement itself and later completion are unverified.",
        "source_ids": [
          "source:8f187df78bab25c9d6ad5535"
        ],
        "published_on": "2026-03-13",
        "checked_on": "2026-10-18",
        "relationship": "Company counsel statement quoted in the same original KFYR settlement-progress article.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:atlas-power-williston-nd",
      "record_id": "atlas-power-williston-nd",
      "subject_label": "Atlas Power Data Center (Williston)",
      "actor": {
        "kind": "outlet",
        "label": "KFYR",
        "source_ids": [
          "source:8f187df78bab25c9d6ad5535"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:8f187df78bab25c9d6ad5535",
          "url": "https://www.kfyrtv.com/2026/03/13/settlement-agreements-going-out-residents-by-data-center-next-williston/",
          "publisher": "KFYR",
          "source_type": "news",
          "published_on": "2026-03-13",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:me-loring-residents-legislative-testimony-20260311",
      "version": 1,
      "subject_kind": "site",
      "state": "me",
      "record_type": "public_concern_on_record",
      "categories": [
        "power_rates",
        "other"
      ],
      "event_on": "2026-03-11",
      "event_date_note": "The document bears March 11, 2026 and a resubmission heading for LD713 with earlier LD307 wording. This is the printed testimony date; the exact original submission and actual hearing day are not independently established.",
      "published_on": null,
      "source_date_note": "The original dated document establishes its printed review or testimony day without independently establishing first publication. Archive paths, wrapper timestamps and retrieval dates do not become publication or opening dates.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original testimony explicitly names Loring LiquidCool and discusses potential local utility and environmental effects. The general policy proposal, third party engineering descriptions and suggested exception are not independently established legal outcomes or measured project impacts. No current concern disposition is verified.",
      "source_ids": [
        "source:c327b0fedfbe76c8f0ddd91e"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised potential utility rate and environmental concerns about the Loring computing proposal in testimony hosted by the Maine Legislature. The same writer suggested using Loring as a policy case study. These are attributed public comments rather than State engineering findings, measured effects, an enacted exception or commissioned computing.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:liquidcool-loring-afb-me",
      "record_id": "liquidcool-loring-afb-me",
      "subject_label": "Loring LiquidCool Data Center (Green 4 Maine Campus)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:c327b0fedfbe76c8f0ddd91e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:c327b0fedfbe76c8f0ddd91e",
          "url": "https://legislature.maine.gov/legis/bills/getTestimonyDoc.asp?id=10061699",
          "publisher": "Maine Legislature hosted original residents testimony",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:sc-colleton-boulder-scelp-resource-land-use-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "sc",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "air_generators",
        "power_rates",
        "light",
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "health"
      ],
      "event_on": null,
      "event_date_note": "The changing group page discusses an application and concerns without an exact filing or testimony day established in this bounded review. Event date remains unknown; publication is not substituted.",
      "published_on": "2026-03-06",
      "source_date_note": "The group page displays March 6, 2026. The earlier SC Daily Gazette report was published February 5; its account of a December company statement has no independently established original statement day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later original zoning, permit and concern outcomes are unknown in this bounded review. Group criticism, related policy debates and company water forecasts do not establish a legal violation, measured conditions, current project approval or resolution of every concern.",
      "source_ids": [
        "source:bd2965d0930c10a1ec205f7b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "South Carolina Environmental Law Project raised land-use, water, air, noise, light, energy and health concerns about Eagle Rock's proposed Cooks Hill Road campus in Colleton County. The group questioned compatibility with the rural ACE Basin setting. These are attributed concerns and legal positions, not Atlas findings of measured harm or an issued permit outcome.",
      "quote": null,
      "operator_response": {
        "organization": "Eagle Rock Partners",
        "summary": "Eagle Rock Partners stated, according to SC Daily Gazette, that the proposed Colleton campus would have limited daily water requirements. This is a company forecast reported by an outlet, not independently verified water use or an approved withdrawal.",
        "source_ids": [
          "source:b000d3f1585c7a6da58a5f0e"
        ],
        "published_on": "2026-02-05",
        "checked_on": "2026-10-18",
        "relationship": "The earlier report identifies the same Eagle Rock Colleton proposal. Its account of a December company statement predates the March group page and addresses water only. February 5 is outlet publication, not a newly verified operator-original reply date.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:project-boulder-colleton-county-sc",
      "record_id": "project-boulder-colleton-county-sc",
      "subject_label": "Project Boulder",
      "actor": {
        "kind": "public_group",
        "label": "South Carolina Environmental Law Project",
        "source_ids": [
          "source:bd2965d0930c10a1ec205f7b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:b000d3f1585c7a6da58a5f0e",
          "url": "https://scdailygazette.com/2026/02/05/sc-legislators-denounce-lowcountry-data-center-while-mulling-regulations-for-the-industry/",
          "publisher": "SC Daily Gazette",
          "source_type": "news",
          "published_on": "2026-02-05",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:bd2965d0930c10a1ec205f7b",
          "url": "https://www.scelp.org/news/colleton-data-center",
          "publisher": "South Carolina Environmental Law Project",
          "source_type": "organization_page",
          "published_on": "2026-03-06",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ky-campground-lpm-hearing-2026-03-05",
      "version": 1,
      "subject_kind": "project",
      "state": "ky",
      "record_type": "news_report",
      "categories": [
        "air_generators",
        "water_use",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": "2026-03-05",
      "event_date_note": "March 5 is the hearing date identified in the article and its dated photo caption, separate from this source check.",
      "published_on": "2026-03-05",
      "source_date_note": "The article carries this explicit first publication date. The October 19 source check is separate.",
      "checked_on": "2026-10-19",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present disposition of these reported concerns has not been independently established. Approval, construction and company statements do not establish resolution or measured effects.",
      "source_ids": [
        "source:60f52ec573ee3089c79fa478"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Louisville Public Media reported that residents at a March 5 hearing raised questions about pollution, water supplies, electricity demand and local development rules for the Camp Ground Road project proposed by Poe Companies and PowerHouse. The outlet reported approval of revised plans; that vote does not establish that the concerns were resolved or that environmental effects occurred.",
      "quote": null,
      "operator_response": {
        "organization": "Poe Companies and PowerHouse",
        "summary": "Poe Companies and PowerHouse were represented by a lawyer whom Louisville Public Media quoted as saying that the electricity and water utilities had assured the developers they could meet demand. This is a reported developer statement, not verified available capacity.",
        "source_ids": [
          "source:60f52ec573ee3089c79fa478"
        ],
        "published_on": "2026-03-05",
        "checked_on": "2026-10-19",
        "relationship": "The same hearing report directly includes the representative for the developers answering the water and electricity questions. The publication basis is the outlet report, not a newly located company statement.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:powerhouse-louisville-ky",
      "record_id": "powerhouse-louisville-ky",
      "subject_label": "PowerHouse Data Centers - Louisville (Camp Ground Road)",
      "actor": {
        "kind": "outlet",
        "label": "Louisville Public Media",
        "source_ids": [
          "source:60f52ec573ee3089c79fa478"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-16",
      "sources": [
        {
          "id": "source:60f52ec573ee3089c79fa478",
          "url": "https://www.lpm.org/news/2026-03-05/west-louisville-data-center-approved-despite-opposition",
          "publisher": "Louisville Public Media",
          "source_type": "news",
          "published_on": "2026-03-05",
          "retrieved_on": "2026-10-19"
        }
      ]
    },
    {
      "id": "concern:pa-kline-amazon-public-records-appeal-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "pa",
      "record_type": "legal_action",
      "categories": [
        "other"
      ],
      "event_on": "2026-03-02",
      "event_date_note": "The original final determination records March 2, 2026 as its issued and mailed day.",
      "published_on": "2026-03-02",
      "source_date_note": "The original determination date is retained where explicit. The first online publication day of the undated public comment is unknown.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:5d9f268c75506045b4ed2320"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Pennsylvania Office of Open Records granted part of a records appeal and dismissed another part as moot concerning Kline Township Amazon and NorthPoint communications and data center water correspondence. The determination says the Township did not meet its disclosure burden and directs records production or a detailed nonexistence attestation. Actual later compliance or appeal was not verified. This records decision is not a project permit denial, a finding of intentional concealment or an environmental harm finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:aws-kline-township-schuylkill-pa",
      "record_id": "aws-kline-township-schuylkill-pa",
      "subject_label": "AWS Kline Township Data Center Campus",
      "actor": {
        "kind": "agency",
        "label": "Pennsylvania Office of Open Records",
        "source_ids": [
          "source:5d9f268c75506045b4ed2320"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:5d9f268c75506045b4ed2320",
          "url": "https://www.openrecords.pa.gov/Appeals/DocketGetFile.cfm?id=257197",
          "publisher": "Pennsylvania Office of Open Records",
          "source_type": "government_record",
          "published_on": "2026-03-02",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:mi-dorr-township-february-public-comments",
      "version": 1,
      "subject_kind": "site",
      "state": "mi",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": "2026-02-26",
      "event_date_note": "This is the documented public meeting day, not a verified first concern or legal effective day.",
      "published_on": null,
      "source_date_note": "The minutes identify the meeting day. Their exact first online publication day was not independently established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:320ba0a9dd5b3b36aa8c91a4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents expressed concerns about the Microsoft data center, as recorded in Dorr Township minutes for the February 26, 2026 meeting. The minutes do not specify the individual concern topics in that entry. The Board separately authorized a temporary data center moratorium. The comments and action do not establish a measured impact, an operating violation, project cancellation or final resolution of the residents concerns.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:microsoft-dorr-township-mi",
      "record_id": "microsoft-dorr-township-mi",
      "subject_label": "Microsoft Dorr Township Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:320ba0a9dd5b3b36aa8c91a4"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:320ba0a9dd5b3b36aa8c91a4",
          "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
          "publisher": "Dorr Township",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:sc-oconee-subcommittee-computing-standards-review-20260213",
      "version": 1,
      "subject_kind": "county",
      "state": "sc",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "power_rates",
        "other"
      ],
      "event_on": "2026-02-13",
      "event_date_note": "The original subcommittee minute header identifies February 13, 2026. That dates the minuted institutional discussion rather than the first concern, final legislative action or an exact first posting day.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:944bccae90f1c4c5197e9581"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Oconee County Planning Commission subcommittee recorded a need to distinguish computing facilities from general industrial uses and propose performance standards for noise, water, power, siting, fire safety and decommissioning. The committee also discusses power supply options and asks for legal guidance. These are attributed policy questions and recommendations rather than measured impacts, final County regulations, a prohibition in every zoning district or proof that a later scheduled meeting occurred.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:45073",
      "record_id": null,
      "subject_label": "Oconee County",
      "actor": {
        "kind": "agency",
        "label": "Oconee County Planning Commission subcommittee",
        "source_ids": [
          "source:944bccae90f1c4c5197e9581"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:944bccae90f1c4c5197e9581",
          "url": "https://oconeesc.com/documents/council/committees/planning-commission/2026/minutes/2026-02-13-special-minutes.pdf",
          "publisher": "Oconee County South Carolina",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:mo-nebius-independence-kcur-resource-concerns-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "mo",
      "record_type": "news_report",
      "categories": [
        "water_use",
        "power_rates",
        "wildlife_wetlands_stormwater",
        "health"
      ],
      "event_on": "2026-02-10",
      "event_date_note": "The article explicitly identifies February 10, 2026 as the community meeting. This was not an independently inspected agency hearing or complaint filing.",
      "published_on": "2026-02-13",
      "source_date_note": "KCUR published the report February 13, 2026. The changing original Nebius project page has no independently established first publication day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The outcome of these reported concerns is unknown in this bounded review. Company resource and ratepayer commitments do not establish measured performance or resolution of every question.",
      "source_ids": [
        "source:f6d2a22cbdd48377f2406df1"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "KCUR reported water, power, wildlife and health concerns raised at a February 10 community meeting about Nebius's Independence proposal. The article also describes differing company and city positions. These are reported questions, not measured impacts or an independently verified permit or ratepayer outcome.",
      "quote": null,
      "operator_response": {
        "organization": "Nebius",
        "summary": "Nebius stated that it would use closed-loop cooling, sound controls and construction measures, and bear its power costs. These are company commitments, not independently verified resource use, operating noise or future household rates.",
        "source_ids": [
          "source:3d234addcd0a2ba0662bd607"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original Independence project page addresses the same resource and neighborhood questions. It is not an express answer to every meeting statement; first publication date is unknown.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:nebius-independence-mo",
      "record_id": "nebius-independence-mo",
      "subject_label": "Nebius AI Factory (Independence)",
      "actor": {
        "kind": "outlet",
        "label": "KCUR",
        "source_ids": [
          "source:f6d2a22cbdd48377f2406df1"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:3d234addcd0a2ba0662bd607",
          "url": "https://nebius.com/independencemo",
          "publisher": "Nebius",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f6d2a22cbdd48377f2406df1",
          "url": "https://www.kcur.org/housing-development-section/2026-02-13/independence-data-center-tax-breaks-opposition",
          "publisher": "KCUR",
          "source_type": "news",
          "published_on": "2026-02-13",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:pa-hazelnut-water-permit-comment-notice-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "pa",
      "record_type": "permit_and_comment",
      "categories": [
        "water_quality_discharge",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": "2026-02-12",
      "event_date_note": "February 12, 2026 is the dated announcement, not proof that the planned February 17 hearing or reserved February 19 snow date occurred.",
      "published_on": "2026-02-12",
      "source_date_note": "The original agency release displays February 12, 2026 publication. The developer page is undated; its source check date and copyright year do not establish publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later permit and comment-process outcome is unknown in this bounded review. A hearing notice does not establish actual testimony, a final decision, measured discharge, resolution of concerns or present compliance.",
      "source_ids": [
        "source:a5033d124f92432e593d1a58"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Pennsylvania Department of Environmental Protection announced a comment hearing on Project Hazelnut's water-obstruction and stormwater permit applications, including discharges to Black Creek, Stony Creek and nearby wetlands. The notice scheduled a February 17 hearing with a snow date. It does not establish that the hearing occurred, what residents said, permit issuance or a violation.",
      "quote": null,
      "operator_response": {
        "organization": "NorthPoint Development",
        "summary": "NorthPoint Development described plans to use reclaimed water for cooling and privately fund sewer improvements, and states that it will avoid local potable water and wells for cooling. These are developer commitments, not independent water measurements, a permit decision or verification of completed work.",
        "source_ids": [
          "source:a1271056039bc486ad552723"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The undated original project page gives the developer's water-handling position for the same Hazelnut proposal. It is linked as general same-project context, not as an express reply to the February notice, specific stormwater comments or an agency finding.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:project-hazelnut-hazle-township-pa",
      "record_id": "project-hazelnut-hazle-township-pa",
      "subject_label": "Project Hazelnut",
      "actor": {
        "kind": "agency",
        "label": "Pennsylvania Department of Environmental Protection",
        "source_ids": [
          "source:a5033d124f92432e593d1a58"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:a1271056039bc486ad552723",
          "url": "https://projecthazelnut.com/",
          "publisher": "NorthPoint Development",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:a5033d124f92432e593d1a58",
          "url": "https://www.pa.gov/agencies/dep/newsroom/2026-02-12-dep-to-host-public-meeting-and-hearing-for-project-hazlenut-data-center-luzerne-county",
          "publisher": "Pennsylvania Department of Environmental Protection",
          "source_type": "government_record",
          "published_on": "2026-02-12",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:mi-cannoli-february-planning-resident-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "mi",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "power_rates",
        "traffic_construction",
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "health"
      ],
      "event_on": "2026-02-11",
      "event_date_note": "The original minutes record the February 11, 2026 meeting and testimony. This is not an inferred first complaint date.",
      "published_on": null,
      "source_date_note": "A first public posting date for these municipal minutes has not been established. The URL folder year and PDF creation metadata are not used as publication dates.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of the residents' concerns is unknown in this bounded review. The recorded preliminary approval and developer commitments do not establish final approval, actual operation, measured compliance or that each concern was resolved.",
      "source_ids": [
        "source:c42f8a3d859ec704ee851a67",
        "source:b2546c18d077931308791d2b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about noise, water, electric rates, construction dust, health, land use and wildlife during Van Buren Township's Project Cannoli planning review. The minutes record differing views and conditional preliminary approval requiring further steps, including recurring sound monitoring and construction controls. They do not establish measured harm, a violation or resolution of every concern.",
      "quote": null,
      "operator_response": {
        "organization": "Panattoni",
        "summary": "Panattoni describes planned sound limits, municipal water supply, generator standards, landscaping and traffic controls, and states that the project is intended to fund its required power infrastructure. These are the developer's published commitments, not independent measurements or proof of their completion.",
        "source_ids": [
          "source:15198fa84262f0a29f097d9d"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The company's Project Cannoli page addresses the same project and issues raised in the municipal record. Its publication date is unknown, so it is not presented as a dated express reply to the February meeting.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:project-cannoli-van-buren-township-wayne-county-mi",
      "record_id": "project-cannoli-van-buren-township-wayne-county-mi",
      "subject_label": "Project Cannoli",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:c42f8a3d859ec704ee851a67"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:15198fa84262f0a29f097d9d",
          "url": "https://www.panattoni.com/vanburen/",
          "publisher": "Panattoni",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b2546c18d077931308791d2b",
          "url": "https://vbtmi.gov/departments/municipal_services/data_center_faq.php",
          "publisher": "Van Buren Township",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:c42f8a3d859ec704ee851a67",
          "url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Minutes/2-11-26%20PC%20Min.pdf",
          "publisher": "Van Buren Township",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:nm-jupiter-open-meetings-complaint-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "nm",
      "record_type": "legal_action",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-02-06",
      "event_date_note": "The original court stamp and signature identify February 6, 2026 as the filing day. This is separate from the September 19, 2025 county meeting and the earlier bond-application lawsuit.",
      "published_on": "2026-02-10",
      "source_date_note": "Source New Mexico published February 10, 2026. First public posting of the filed complaint and evolving counsel case page is unknown; publication is not substituted for the February 6 filing.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current independent court disposition is unknown in this bounded review. Counsel describes the litigation as ongoing, but no present docket or final ruling was inspected. The complaint does not establish that its requested ordinance invalidation or other relief was granted.",
      "source_ids": [
        "source:934682c1835818e5fbce668d",
        "source:fe2d41adf61a0fe9611f47ed",
        "source:7c07b210cb1fafe762516600"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "New Mexico Environmental Law Center filed a complaint alleging that Doña Ana County violated open-meetings requirements when adopting Project Jupiter ordinances. It requested that the ordinances and related commitments be voided. These are the filed allegations and requested relief, not a court finding or a verified cancellation of the project.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:stargate-project-jupiter-dona-ana-nm",
      "record_id": "stargate-project-jupiter-dona-ana-nm",
      "subject_label": "Stargate Project Jupiter",
      "actor": {
        "kind": "public_group",
        "label": "New Mexico Environmental Law Center",
        "source_ids": [
          "source:934682c1835818e5fbce668d"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:7c07b210cb1fafe762516600",
          "url": "https://sourcenm.com/2026/02/10/lawsuit-alleges-nm-countys-project-jupiter-data-center-vote-violated-open-meetings-act/",
          "publisher": "Source New Mexico",
          "source_type": "news",
          "published_on": "2026-02-10",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:934682c1835818e5fbce668d",
          "url": "https://nmelc.org/wp-content/uploads/2026/02/Final-Complaint-Open-Meetings-Act-Lawsuit-Exs.-1-3-endorsed_-02-06-26.pdf",
          "publisher": "New Mexico Environmental Law Center",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fe2d41adf61a0fe9611f47ed",
          "url": "https://nmelc.org/our-work/projectjupiter/",
          "publisher": "New Mexico Environmental Law Center",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-fulton-decennial-residents-20260210",
      "version": 1,
      "subject_kind": "site",
      "state": "in",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "water_quality_discharge",
        "noise",
        "power_rates",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2026-02-10",
      "event_date_note": "The exact February 10, 2026 public meeting dates the recorded residents concerns. This is not independently the first day concerns were raised.",
      "published_on": null,
      "source_date_note": "The original scanned minutes establish the meeting day without independently establishing first publication. No archive, recorder or retrieval day becomes a publication date.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected original record attributes residents questions to the County computing discussion in which Decennial representatives outlined an exploratory proposal. Potential impacts are not independently measured or resolved. Later general pause adoption does not prove resolution of water, noise, land or power concerns.",
      "source_ids": [
        "source:180e38750b1748c5d3b42edb"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about water demand, wells, electricity use, noise, agricultural land, taxes, fire protection and public notice during the February 10, 2026 Fulton County planning discussion. The same original minutes record Decennial representatives describing an exploratory computing proposal without a selected site or signed agreement. These are attributed concerns within that proposal discussion, without verified contamination, measured noise, established rate impacts, a selected physical property or proof of resolution.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:decennial-akron-fulton-county-in",
      "record_id": "decennial-akron-fulton-county-in",
      "subject_label": "Decennial Group Akron Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:180e38750b1748c5d3b42edb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:180e38750b1748c5d3b42edb",
          "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349",
          "publisher": "Fulton County Indiana Area Plan Commission original minutes",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:wi-deforest-qts-annexation-decision",
      "version": 1,
      "subject_kind": "site",
      "state": "wi",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": "2026-02-03",
      "event_date_note": "February 3, 2026 is the vote date recorded in the official project timeline. It differs from the earlier consolidation decision.",
      "published_on": null,
      "source_date_note": "January 27, 2026 is the staff release date. The project timeline first publication or update date for its later vote entry is not established.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:f9851db4b811cb141783be4b",
        "source:a4cc4e391d1839471a903693"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Village of DeForest project timeline records a unanimous vote rejecting the QTS direct annexation petition on February 3, 2026. An earlier village statement described the proposal as infeasible in DeForest and recommended rejection. These are attributed municipal process records. They do not establish measured environmental harm, final withdrawal of every application or the outcome of a different proposal.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:qts-dane-county-deforest-wi",
      "record_id": "qts-dane-county-deforest-wi",
      "subject_label": "QTS Dane County Hyperscale Campus (DeForest)",
      "actor": {
        "kind": "agency",
        "label": "Village of DeForest",
        "source_ids": [
          "source:f9851db4b811cb141783be4b",
          "source:a4cc4e391d1839471a903693"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:a4cc4e391d1839471a903693",
          "url": "https://www.deforestwi.gov/m/NewsFlash/Home/Detail/75",
          "publisher": "Village of DeForest",
          "source_type": "government_record",
          "published_on": "2026-01-27",
          "retrieved_on": "2026-10-22"
        },
        {
          "id": "source:f9851db4b811cb141783be4b",
          "url": "https://www.engagedeforest.com/QTS",
          "publisher": "Village of DeForest",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:mo-nebius-dnr-information-request-64672-2026",
      "version": 1,
      "subject_kind": "campus",
      "state": "mo",
      "record_type": "public_concern_on_record",
      "categories": [
        "wildlife_wetlands_stormwater",
        "other"
      ],
      "event_on": "2026-01-24",
      "event_date_note": "The original agency entry explicitly records webform submission on January 24, 2026 and received/investigation dates on January 26. The exact later information-response day is not independently established.",
      "published_on": null,
      "source_date_note": "The report footer is dated March 6, 2026, but its first public posting day is unknown. The report-generation date and April URL folder are not substituted as publication.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": null,
      "status_scope": "Residents requested information that the agency recorded providing. Resolved applies only to the agency's recorded information-assistance response and no-further-action entry. It does not establish absence of violations, resolved wildlife effects, permit approval or resolution of other concerns.",
      "source_ids": [
        "source:075c25b74fac2f3792cf96cb"
      ],
      "status_source_ids": [
        "source:075c25b74fac2f3792cf96cb"
      ],
      "event_ids": [],
      "summary": "Residents requested eagle-habitat and permit-record information for the Nebius proposal, as recorded by Missouri Department of Natural Resources in concern 64672. The department recorded providing information with no further action. This documents an assistance request, not a formal violation complaint, inspection finding or permit decision.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:nebius-independence-mo",
      "record_id": "nebius-independence-mo",
      "subject_label": "Nebius AI Factory (Independence)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:075c25b74fac2f3792cf96cb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:075c25b74fac2f3792cf96cb",
          "url": "https://dnr.mo.gov/sites/dnr/files/vfc/2026/04/main/Concern%20Report%20January%202026.pdf",
          "publisher": "Missouri Department of Natural Resources",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ],
      "status_date_note": "Exact disposition date is unknown for the information-response or closure. January 26 is labeled as receipt and investigation, so it is not substituted for a separately dated disposition."
    },
    {
      "id": "concern:warrenton-city-hearing-2026-01-20",
      "version": 1,
      "subject_kind": "site",
      "state": "mo",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "power_rates"
      ],
      "event_on": "2026-01-20",
      "event_date_note": "January 20, 2026 is the Board meeting date recorded in the adopted minutes,not the earlier Planning Commission meeting or agenda posting.",
      "published_on": null,
      "source_date_note": "The first online publication day of the combined adopted minutes is unknown. Agenda posting January 16 and PDF metadata are not substituted for publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of these individual public concerns is not established. The separate city approval vote does not resolve every concern.",
      "source_ids": [
        "source:0fbe527979e2869553a253e2"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised questions about approval conditions, the natural waterway and tree line, electricity and whether project commitments would be fulfilled, according to City of Warrenton minutes for the data-center hearing. The minutes also record support and a statement that most earlier questions had been addressed; this does not establish resolution of every concern.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:crusoe-warrenton-mo",
      "record_id": "crusoe-warrenton-mo",
      "subject_label": "Crusoe Warrenton Campus",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:0fbe527979e2869553a253e2"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:0fbe527979e2869553a253e2",
          "url": "https://ecode360.com/WA3466/document/753231245.pdf",
          "publisher": "City of Warrenton",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:il-naperville-karis-council-air-review-20260120",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators",
        "land_use_zoning"
      ],
      "event_on": "2026-01-20",
      "event_date_note": "The exact January 20, 2026 Council meeting dates this institutional discussion and record. The first day that an individual raised a concern is not established.",
      "published_on": null,
      "source_date_note": "The final minutes carry a February 4, 2026 print date, which does not independently establish their exact first publication day.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The final Council minutes document the air review discussion and a separate conditional use denial. That legal decision does not independently establish measured environmental conditions, resolution of the concerns, permanent project abandonment or present computing stage.",
      "source_ids": [
        "source:40c79dde1498ae935b09866e"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Naperville City Council discussed air dispersion modeling for the proposed Karis Critical data center during its January 20, 2026 meeting. The minutes also record the petitioner representative describing revisions in response to resident concerns and an intended future study. The Council denied the requested conditional use ordinance in a separate motion. These are attributed planning and air review accounts, without independently verified measured harm, a completed study or a finding that concerns were resolved.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:karis-critical-naperville-il",
      "record_id": "karis-critical-naperville-il",
      "subject_label": "Karis Critical Naperville Data Center",
      "actor": {
        "kind": "agency",
        "label": "Naperville City Council",
        "source_ids": [
          "source:40c79dde1498ae935b09866e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:40c79dde1498ae935b09866e",
          "url": "https://naperville.legistar.com/View.ashx?M=M&ID=1355597&GUID=3323A6F2-7A6B-4ACA-84C4-FF5AC63F6632",
          "publisher": "City of Naperville Illinois",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ga-rockdale-board-resource-land-use-review-20260113",
      "version": 1,
      "subject_kind": "county",
      "state": "ga",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "power_rates",
        "air_generators",
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "other"
      ],
      "event_on": "2026-01-13",
      "event_date_note": "The signed original records January 13, 2026 adoption. That dates the institutional record rather than the first time any resident or agency raised each issue.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:e31c0efcc02797bb08965858"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Rockdale County Board of Commissioners recorded potential data center demands on land, electricity, water supply, wastewater, stormwater and emergency services in its signed resolution. It identified possible generator emissions, noise, heat discharge and effects on surrounding residential, agricultural and sensitive areas as matters needing analysis. These are attributed legislative findings about possible effects, not measured injury or violations at every facility. The resolution separately discusses battery storage fire and explosion risks, which are not assigned to all data centers.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:13247",
      "record_id": null,
      "subject_label": "Rockdale County",
      "actor": {
        "kind": "agency",
        "label": "Rockdale County Board of Commissioners",
        "source_ids": [
          "source:e31c0efcc02797bb08965858"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:e31c0efcc02797bb08965858",
          "url": "https://www.rockdalecountyga.gov/wp-content/uploads/2026/01/R-2026-01.pdf",
          "publisher": "Rockdale County Georgia",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ca-rue-ferrari-research-use-permit",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning",
        "air_generators"
      ],
      "event_on": "2025-12-10",
      "event_date_note": "December 10, 2025 is the recorded approval date. December 18 is the state notice posting date.",
      "published_on": "2025-12-18",
      "source_date_note": "The notice or final document publication day is explicit when given. A docketing day remains a filing date. A source check does not replace either date.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:c4abce6a5d23bb3fd1c0c7be"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of San Jose recorded a site development permit amendment for the Rue Ferrari property, describing research and laboratory use with backup generators and utility equipment. The state notice reports the city approval and environmental determinations. It does not independently establish an operating data center, measured emissions or completion of the equipment.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:prologis-rue-ferrari-san-jose-ca",
      "record_id": "prologis-rue-ferrari-san-jose-ca",
      "subject_label": "Prologis 5853 Rue Ferrari",
      "actor": {
        "kind": "agency",
        "label": "City of San Jose",
        "source_ids": [
          "source:c4abce6a5d23bb3fd1c0c7be"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:c4abce6a5d23bb3fd1c0c7be",
          "url": "https://ceqanet.lci.ca.gov/2022010266/2",
          "publisher": "City of San Jose",
          "source_type": "government_record",
          "published_on": "2025-12-18",
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:tn-colossus-2025-air-permit-appeal",
      "version": 2,
      "subject_kind": "site",
      "state": "tn",
      "record_type": "legal_action",
      "categories": [
        "air_generators"
      ],
      "event_on": "2025-07-16",
      "event_date_note": "The original release reports the filing on July 16, 2025. The outcome account separately dates dismissal to December 15, 2025.",
      "published_on": "2025-07-16",
      "source_date_note": "The filing release is dated July 16, 2025; the retrospective timeline is published May 8, 2026.",
      "checked_on": "2026-10-18",
      "status": "dismissed",
      "status_on": "2025-12-15",
      "status_scope": "Southern Environmental Law Center reported that the air board dismissed these appeals as moot on December 15, 2025. This is the group account of this administrative proceeding; no board order or finding on the allegations is certified here.",
      "source_ids": [
        "source:8354693612a858d1635ee455",
        "source:f32dc2ee5347dcd3f685ca8d"
      ],
      "status_source_ids": [
        "source:f32dc2ee5347dcd3f685ca8d"
      ],
      "event_ids": [],
      "summary": "Southern Environmental Law Center reported filing an administrative appeal on behalf of the NAACP and Young, Gifted & Green challenging the initial South Memphis turbine permit and related department decisions. Its later timeline reports that the air board dismissed the appeals as moot in December 2025. The group account is not an agency violation finding or a court merits ruling.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "Spacing in public date and source notes corrected. Facts, machine dates, sources, attribution and record status are unchanged. The original source-check date is retained.",
      "subject_id": "site:xai-colossus-memphis-tn",
      "record_id": "xai-colossus-memphis-tn",
      "subject_label": "Colossus",
      "actor": {
        "kind": "public_group",
        "label": "Southern Environmental Law Center",
        "source_ids": [
          "source:8354693612a858d1635ee455"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:8354693612a858d1635ee455",
          "url": "https://www.selc.org/press-release/groups-appeal-permit-for-xais-south-memphis-data-center-decisions-around-unpermitted-methane-gas-turbines/",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": "2025-07-16",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f32dc2ee5347dcd3f685ca8d",
          "url": "https://www.selc.org/news/inside-memphis-fight-against-xai/",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": "2026-05-08",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:mt-butte-silver-bow-community-resource-questions",
      "version": 1,
      "subject_kind": "county",
      "state": "mt",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "wildlife_wetlands_stormwater",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The group report refers to an October16 community event without an independently verified explicit event year. The exact event date remains unknown, rather than inferred from publication.",
      "published_on": "2025-12-15",
      "source_date_note": "The original group article is dated December 15, 2025 and identifies its December2025 issue. January16,2026 is modification, not a new event. The evolving resource page first-publication day is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present disposition of these area-level resource and transparency concerns is unknown in this bounded group-source review. Submitted questions, forecast demand and general regulatory proposals do not establish actual water or electricity effects, an agency finding or resolution of every concern.",
      "source_ids": [
        "source:1a23f68303364b8b7e975c40",
        "source:ba223c97b60b441c30fa35be"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Montana Environmental Information Center reported Butte community questions about data-center water demand, drought, wildlife, electricity costs and access to project information. Its account discusses existing and proposed facilities without a verified assignment of each question to a particular campus. This is an area-level public-group record, not measured harm, an agency violation or an allegation assigned to every Silver Bow County site.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:30093",
      "record_id": null,
      "subject_label": "Silver Bow County",
      "actor": {
        "kind": "public_group",
        "label": "Montana Environmental Information Center",
        "source_ids": [
          "source:1a23f68303364b8b7e975c40"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:1a23f68303364b8b7e975c40",
          "url": "https://meic.org/buttians-question-the-impacts-of-big-techs-data-centers/",
          "publisher": "Montana Environmental Information Center",
          "source_type": "organization_page",
          "published_on": "2025-12-15",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ba223c97b60b441c30fa35be",
          "url": "https://meic.org/data-centers/",
          "publisher": "Montana Environmental Information Center",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ut-nephi-council-water-resource-recitals-20251202",
      "version": 1,
      "subject_kind": "county",
      "state": "ut",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use"
      ],
      "event_on": "2025-12-02",
      "event_date_note": "The signed original records December 2, 2025 passage and recording. Its certificate states December 3 publication or posting, while the State notice was posted December 4. Those distinct source dates are not harmonized and do not establish the first concern day.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:3f777f719d9e6fae9ee3bfe9"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Nephi City Council recorded a desire to limit excessive water use by computing development and require projects to provide their own water resources during development in the Industrial 4 ordinance recitals. These are institutional resource policy concerns rather than measured water depletion, a violation, an allegation against an individual facility or a Countywide prohibition. A separate Industrial 1 modular computing pathway remains distinct, and adopting zoning text does not establish resolution of the underlying resource question.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:49023",
      "record_id": null,
      "subject_label": "Juab County",
      "actor": {
        "kind": "agency",
        "label": "Nephi City Council",
        "source_ids": [
          "source:3f777f719d9e6fae9ee3bfe9"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:3f777f719d9e6fae9ee3bfe9",
          "url": "https://www.utah.gov/pmn/files/1360629.pdf",
          "publisher": "Nephi City Utah",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:al-marvel-reflector-reported-hearing-resource-concerns-2025",
      "version": 1,
      "subject_kind": "campus",
      "state": "al",
      "record_type": "news_report",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "air_generators",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": "2025-11-18",
      "event_date_note": "The original meeting photo caption explicitly identifies November 18, 2025. That hearing is separate from an original signed rezoning instrument, later public-records dispute or current permit outcome.",
      "published_on": "2025-11-19",
      "source_date_note": "The original meeting report was published November 19, 2025. The later resource/transparency article was published August 3, 2026; its relative month wording is not used to invent a separate event day.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present outcome of these documented concerns is unknown in this bounded review. Reported rezoning and developer study claims do not establish measured impacts, current compliance, final environmental permits or resolution of every concern.",
      "source_ids": [
        "source:94034070ca752170aeb07c3c",
        "source:7b1ca2c9c53fb58811ff1603"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Alabama Reflector reported residents' and environmental groups' water, air, noise and electric-rate concerns at a November 18, 2025 Bessemer meeting about Project Marvel. Later reporting described continuing transparency and resource questions. The outlet-reported rezoning is not measured environmental performance or resolution of every concern.",
      "quote": null,
      "operator_response": {
        "organization": "Logistics Land Investment",
        "summary": "Logistics Land Investment stated, according to Alabama Reflector, that its studies supported the project and that it would not affect streams or waterways. These are developer positions, not independently verified environmental conditions or a permit finding.",
        "source_ids": [
          "source:94034070ca752170aeb07c3c"
        ],
        "published_on": "2025-11-19",
        "checked_on": "2026-10-18",
        "relationship": "The original article directly attributes these project-specific statements to the developer's representative at the Bessemer meeting. November 19 is outlet publication; the statement does not answer every later public-records question.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:qts-marvel-bessemer-al",
      "record_id": "qts-marvel-bessemer-al",
      "subject_label": "QTS Bessemer (Project Marvel)",
      "actor": {
        "kind": "outlet",
        "label": "Alabama Reflector",
        "source_ids": [
          "source:94034070ca752170aeb07c3c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:7b1ca2c9c53fb58811ff1603",
          "url": "https://alabamareflector.com/2026/08/03/data-centers-emerge-as-top-alabama-election-issue-as-community-concerns-grow/",
          "publisher": "Alabama Reflector",
          "source_type": "news",
          "published_on": "2026-08-03",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:94034070ca752170aeb07c3c",
          "url": "https://alabamareflector.com/2025/11/19/bessemer-officials-approve-data-center-construction-despite-environmental-concerns/",
          "publisher": "Alabama Reflector",
          "source_type": "news",
          "published_on": "2025-11-19",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:pa-homer-city-generation-and-adjacent-data-center-comments-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "pa",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "health",
        "power_rates",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The exact days of individual public comments are not established by this bounded agency response review.",
      "published_on": "2025-11-18",
      "source_date_note": "This is the date printed on the original agency document. The first online posting day was not independently established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:8b6ffc6bb8ac06180c8cdf66"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Pennsylvania DEP recorded public concerns about air pollution, health and energy costs and requests for more participation and information about possible adjacent data centers. Its November 18, 2025 response explains that the reviewed authorization is for a generating station and does not authorize data center construction or operation. The record documents public comments and agency responses, not measured harm from an operating data center or an independent Atlas environmental finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:homer-city-energy-campus-pa",
      "record_id": "homer-city-energy-campus-pa",
      "subject_label": "Homer City Energy Campus",
      "actor": {
        "kind": "agency",
        "label": "Pennsylvania DEP",
        "source_ids": [
          "source:8b6ffc6bb8ac06180c8cdf66"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:8b6ffc6bb8ac06180c8cdf66",
          "url": "https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/Final-AQ-Plan-Approval/Final%20Comment%20Response%20Document%2020251118.pdf",
          "publisher": "Pennsylvania Department of Environmental Protection",
          "source_type": "government_record",
          "published_on": "2025-11-18",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ny-greenidge-title-v-denial-withdrawn-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "ny",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2022-06-30",
      "event_date_note": "June 30, 2022 is the original denial letter date. The separate November 18, 2025 ALJ disposition is the date used for withdrawal, confirmed by the regional decision dated November 19.",
      "published_on": null,
      "source_date_note": "The source documents have dated actions and signatures, but exact first public posting days are not established. They stay separate from this source check date.",
      "checked_on": "2026-10-18",
      "status": "withdrawn",
      "status_on": "2025-11-18",
      "status_scope": "New York State Department of Environmental Conservation recorded withdrawal of the historical denial and administrative hearing request in the November 18, 2025 disposition, confirmed November 19. It does not establish completion of later public/EPA review, actual final permit issuance, achieved emissions reductions, all-party agreement or present compliance. The order records that the public-group petitioners did not concur.",
      "source_ids": [
        "source:394c6bf122fd092673707a66",
        "source:1032bac6de6a86952f0a2f89",
        "source:23084bd5afc6fd0f9ce73c14",
        "source:ca4102e02500c454b63d5810"
      ],
      "status_source_ids": [
        "source:1032bac6de6a86952f0a2f89"
      ],
      "event_ids": [],
      "summary": "New York State Department of Environmental Conservation issued a Title V renewal denial for Greenidge Station, citing greenhouse-gas limits under state climate law. The later November 2025 disposition describes withdrawal of that denial under a signed settlement and remands the application for final processing. This historical permitting record does not establish a current violation, closure or a subsequently issued final permit.",
      "quote": null,
      "operator_response": {
        "organization": "Greenidge Generation LLC",
        "summary": "Greenidge Generation LLC signed a settlement agreeing to seek modified permit conditions, emissions limits and reporting through the agency's public process. The agency-published agreement contains no admission of fact or liability. Signing is not proof that later conditions were completed or a final permit issued.",
        "source_ids": [
          "source:23084bd5afc6fd0f9ce73c14"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The signed November 7, 2025 stipulation directly addresses this same denial and hearing dispute. It is a company-executed document published by the agency, not an independently accessible company press release; its exact first public posting date is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:greenidge-generation-dresden-ny",
      "record_id": "greenidge-generation-dresden-ny",
      "subject_label": "Greenidge Generation",
      "actor": {
        "kind": "agency",
        "label": "New York State Department of Environmental Conservation",
        "source_ids": [
          "source:394c6bf122fd092673707a66"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:1032bac6de6a86952f0a2f89",
          "url": "https://dec.ny.gov/sites/default/files/2025-11/greenidged.pdf",
          "publisher": "New York State Department of Environmental Conservation",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:23084bd5afc6fd0f9ce73c14",
          "url": "https://dec.ny.gov/sites/default/files/2025-11/finalsignedstipulation11.7.25.pdf",
          "publisher": "New York State Department of Environmental Conservation",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:394c6bf122fd092673707a66",
          "url": "https://dec.ny.gov/docs/administration_pdf/greenidgefinal630.pdf",
          "publisher": "New York State Department of Environmental Conservation",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:ca4102e02500c454b63d5810",
          "url": "https://dec.ny.gov/regulatory/permits-licenses/notable-projects-documentation/greenridge-generation-station",
          "publisher": "New York State Department of Environmental Conservation",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ga-project-turbo-public-hearing-opposition-20250915",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": "2025-09-15",
      "event_date_note": "The original County staff memo dates five opposition speakers to the September 15, 2025 Planning Commission public hearing. This is the recorded episode date rather than the first concern or any measured effect.",
      "published_on": null,
      "source_date_note": "The original memo header dates October 7, 2025 while its footer identifies December 11, 2025 Board consideration. Neither supplies an independently verified original publication day.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original staff memo records public hearing opposition and a later Commission recommendation. It does not establish the final Board outcome, a Court or regulator disposition, independently verified injury or resolution of community concerns.",
      "source_ids": [
        "source:9e080366f23b784fca0487e4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Public hearing speakers stated opposition to the proposed Project Turbo data center special use at the September 15, 2025 Hall County Planning Commission hearing, according to the original County staff memo. The memo records five speakers in opposition without supplying their specific allegations in the selected account. A later Commission recommendation with proposed conditions does not establish final Board approval, measured harm or resolution of this episode.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:project-turbo-okelly-road-gainesville-ga",
      "record_id": "project-turbo-okelly-road-gainesville-ga",
      "subject_label": "Project Turbo (Gainesville Data Center)",
      "actor": {
        "kind": "public_group",
        "label": "Public hearing speakers",
        "source_ids": [
          "source:9e080366f23b784fca0487e4"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:9e080366f23b784fca0487e4",
          "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
          "publisher": "Hall County Planning and Zoning",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:va-cabin-field-resident-hearing-20250902",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "traffic_construction",
        "land_use_zoning"
      ],
      "event_on": "2025-09-02",
      "event_date_note": "This dates the selected public record episode, not the earliest concern or a present physical effect.",
      "published_on": null,
      "source_date_note": "The selected public record supplies the action day; exact first online publication day remains unverified.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected historical public record establishes the attributed episode. A current concern disposition and later published response remain unverified. A land use recommendation or proffer decision does not itself resolve the concern or establish physical harm.",
      "source_ids": [
        "source:d6cf4d935e867c6e5008b6d2"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about construction traffic, noise including backup generators, water and electricity demand, project notice and possible effects on nearby property during the Cabin Field Road hearing recorded in the September 2, 2025 minutes. These are attributed public comments about a proposal, not measured impacts, a notice violation finding or proof that a facility is operating.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:mesh-capital-cabin-field-road-data-center-campbell-va",
      "record_id": "mesh-capital-cabin-field-road-data-center-campbell-va",
      "subject_label": "Cabin Field Road Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:d6cf4d935e867c6e5008b6d2"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:d6cf4d935e867c6e5008b6d2",
          "url": "https://www.campbellcountyva.gov/AgendaCenter/ViewFile/ArchivedMinutes/_09022025-600",
          "publisher": "Campbell County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:mo-cumulus-council-transparency-record-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "mo",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": "2025-08-19",
      "event_date_note": "The original City Council minutes date the statement August 19, 2025. This does not independently establish the unread applicant letter day or exact first opposition.",
      "published_on": null,
      "source_date_note": "The selected original body does not independently establish the exact web publication day of the complete concern record. Retrieval is not publication.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected original record documents an attributed concern or resource review, without independently establishing the complete disposition, measured harm or present compliance.",
      "source_ids": [
        "source:04a93c635c44d9255276677f"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City Council member stated in the original Saint Charles minutes that the Cumulus applicant withdrawal prevented a public vote and criticized the project communication and limited detail. These are attributed public official concerns rather than a Council denial, a general ban or a finding of measured harm. The source separately records applicant withdrawal without Council action.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:crg-project-cumulus-st-charles-mo",
      "record_id": "crg-project-cumulus-st-charles-mo",
      "subject_label": "Project Cumulus (St. Charles)",
      "actor": {
        "kind": "public_official",
        "label": "City Council member",
        "source_ids": [
          "source:04a93c635c44d9255276677f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:04a93c635c44d9255276677f",
          "url": "https://www.stcharlescitymo.gov/AgendaCenter/ViewFile/Minutes/_08192025-1737",
          "publisher": "Saint Charles City original August 19 Council minutes",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:mo-cumulus-stlpr-reported-resource-concerns-withdrawal-2025",
      "version": 1,
      "subject_kind": "project",
      "state": "mo",
      "record_type": "news_report",
      "categories": [
        "water_quality_discharge",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "No independently inspected original filing or exact withdrawal day was established in this bounded review. The outlet announcement day is not substituted for a filing date.",
      "published_on": "2025-08-18",
      "source_date_note": "St. Louis Public Radio published its withdrawal report August 18, 2025 and updated it that day. The related moratorium report, distributed by KCUR, was published August 23.",
      "checked_on": "2026-10-18",
      "status": "withdrawn",
      "status_on": null,
      "status_scope": "St. Louis Public Radio reported withdrawal of the 2025 permit application. Withdrawn applies only to that application. It does not establish permanent cancellation, a current ban, later replacement status or resolution of every concern.",
      "source_ids": [
        "source:0e75d0572aa5cc9d03eab4d1",
        "source:1644552ce880528a0f406b29"
      ],
      "status_source_ids": [
        "source:0e75d0572aa5cc9d03eab4d1"
      ],
      "event_ids": [],
      "summary": "St. Louis Public Radio reported residents' water-quality and energy concerns about Project Cumulus and CRG's withdrawal of its permit application. Later reporting described a temporary application moratorium. These accounts do not establish measured impacts, permanent cancellation or the outcome of every concern.",
      "quote": null,
      "operator_response": {
        "organization": "CRG",
        "summary": "CRG stated, according to St. Louis Public Radio, that it was withdrawing the application to incorporate community feedback and intended to work on a revised proposal. That intention is not proof a replacement was filed.",
        "source_ids": [
          "source:0e75d0572aa5cc9d03eab4d1"
        ],
        "published_on": "2025-08-18",
        "checked_on": "2026-10-18",
        "relationship": "The original report quotes CRG's withdrawal email. This is outlet-reported company text; the linked original email could not be freshly inspected. August 18 is the outlet publication day.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:crg-project-cumulus-st-charles-mo",
      "record_id": "crg-project-cumulus-st-charles-mo",
      "subject_label": "Project Cumulus (St. Charles)",
      "actor": {
        "kind": "outlet",
        "label": "St. Louis Public Radio",
        "source_ids": [
          "source:0e75d0572aa5cc9d03eab4d1"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:0e75d0572aa5cc9d03eab4d1",
          "url": "https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles",
          "publisher": "St. Louis Public Radio",
          "source_type": "news",
          "published_on": "2025-08-18",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:1644552ce880528a0f406b29",
          "url": "https://www.kcur.org/housing-development-section/2025-08-23/st-charles-data-center-year-ban",
          "publisher": "St. Louis Public Radio",
          "source_type": "news",
          "published_on": "2025-08-23",
          "retrieved_on": "2026-10-18"
        }
      ],
      "status_date_note": "Exact filing date is not established for the withdrawal. August 18 is the report publication date and is not substituted for a separate original filing date."
    },
    {
      "id": "concern:il-prime-ord-air-permit-2025",
      "version": 1,
      "subject_kind": "campus",
      "state": "il",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2025-07-15",
      "event_date_note": "The original permit cover gives July 15, 2025 as its issue date. This is the permit action date, not a verified startup day.",
      "published_on": "2025-07-15",
      "source_date_note": "The official agency index gives July 15, 2025 as the posting date. The separately recorded issue date and the source-check date retain their own meanings.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2025-07-15",
      "status_scope": "Illinois Environmental Protection Agency issued this specific construction permit. Resolved describes that dated permit action only; current compliance, subsequent amendments, other permits and physical operating status remain outside this record.",
      "source_ids": [
        "source:f323112ac89227f2acfd8c22",
        "source:7a5cc24b7daa9afbc17ebe48"
      ],
      "status_source_ids": [
        "source:f323112ac89227f2acfd8c22"
      ],
      "event_ids": [],
      "summary": "Illinois Environmental Protection Agency issued construction permit 24090003 for generator equipment at 1600 East Higgins Road. It is associated here with the existing Prime ORD campus research record through its retained address context. The exact individual building or phase and present operating status are not established by this binding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:prime-ord-elk-grove-village-il",
      "record_id": "prime-ord-elk-grove-village-il",
      "subject_label": "Prime ORD Chicago Campus",
      "actor": {
        "kind": "agency",
        "label": "Illinois Environmental Protection Agency",
        "source_ids": [
          "source:f323112ac89227f2acfd8c22"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:7a5cc24b7daa9afbc17ebe48",
          "url": "https://epa.illinois.gov/topics/environmental-justice/informal-resolution-agreement-analyses.html",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f323112ac89227f2acfd8c22",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/24090003.pdf",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": "2025-07-15",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ky-oldham-reported-data-center-land-use-opposition-2025",
      "version": 1,
      "subject_kind": "county",
      "state": "ky",
      "record_type": "news_report",
      "categories": [
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The original article describes a Tuesday vote but an exact independently verified vote/filing date was not established in this bounded review. Event date stays unknown; publication is not substituted.",
      "published_on": "2025-07-02",
      "source_date_note": "The original county report displays July 2, 2025 publication. Separate August 17, 2026 reporting recalls Oldham context while focusing on other Kentucky proposals; that is not a new original ordinance publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current legal duration of the reported moratorium and later disposition of all land-use objections are unknown in this bounded review. A reported temporary pause or replacement proposal is not a verified permanent ban, final project withdrawal or court merits decision.",
      "source_ids": [
        "source:bacaae2cfe5e392fd17ba75f",
        "source:28915a40d5b6fb67941bdee4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Louisville Public Media reported residents' opposition to Western Hospitality Partners' Oldham County proposals and a temporary county moratorium covering data-center applications. The report distinguishes an original farmland proposal from a smaller replacement proposal. This is county-level reporting, not an independently inspected ordinance, current ban, final court outcome or an allegation assigned to every county facility.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:21185",
      "record_id": null,
      "subject_label": "Oldham County",
      "actor": {
        "kind": "outlet",
        "label": "Louisville Public Media",
        "source_ids": [
          "source:bacaae2cfe5e392fd17ba75f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:28915a40d5b6fb67941bdee4",
          "url": "https://www.lpm.org/news/2026-08-17/hyperscale-data-centers-provoke-bipartisan-outrage-across-kentucky",
          "publisher": "Kentucky Public Radio",
          "source_type": "news",
          "published_on": "2026-08-17",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:bacaae2cfe5e392fd17ba75f",
          "url": "https://www.lpm.org/news/2025-07-02/oldham-county-passes-sweeping-data-center-moratorium-executive-fired-over-recording",
          "publisher": "Louisville Public Media",
          "source_type": "news",
          "published_on": "2025-07-02",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:tn-colossus-2025-notice-of-intent",
      "version": 2,
      "subject_kind": "site",
      "state": "tn",
      "record_type": "legal_action",
      "categories": [
        "air_generators"
      ],
      "event_on": "2025-06-17",
      "event_date_note": "The original release reports sending the notice on June 17, 2025.",
      "published_on": "2025-06-17",
      "source_date_note": "The original SELC release is dated June 17, 2025.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The eventual disposition of this initial-site notice has not been established by this bounded review. It is separate from the later administrative appeal and the Southaven power-plant case.",
      "source_ids": [
        "source:f653d7210ac21c574e35a16d"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Southern Environmental Law Center reported sending a notice of intent to sue on behalf of the NAACP over alleged unpermitted gas-turbine operation at the initial South Memphis Colossus site. A notice of intent is a preliminary legal notice, not a filed lawsuit or an agency violation finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "Spacing in public date and source notes corrected. Facts, machine dates, sources, attribution and record status are unchanged. The original source-check date is retained.",
      "subject_id": "site:xai-colossus-memphis-tn",
      "record_id": "xai-colossus-memphis-tn",
      "subject_label": "Colossus",
      "actor": {
        "kind": "public_group",
        "label": "Southern Environmental Law Center",
        "source_ids": [
          "source:f653d7210ac21c574e35a16d"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:f653d7210ac21c574e35a16d",
          "url": "https://www.selc.org/press-release/elon-musks-xai-threatened-with-lawsuit-over-air-pollution-from-memphis-data-center/",
          "publisher": "Southern Environmental Law Center",
          "source_type": "organization_page",
          "published_on": "2025-06-17",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:sd-deuel-applied-digital-public-questions-2025",
      "version": 1,
      "subject_kind": "campus",
      "state": "sd",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "air_generators",
        "power_rates",
        "traffic_construction",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2025-06-17",
      "event_date_note": "The event is the exact dated original public record.",
      "published_on": null,
      "source_date_note": "The original record supplies a document or meeting date, but its first public posting date is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current disposition of the documented concerns is unknown in this bounded review. Reported progress, future commitments, permit notices or historical project statements do not establish actual impacts, current compliance or resolution of all concerns.",
      "source_ids": [
        "source:7dc6bf15c96bbd77b797d053"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised water, backup-generation, power-cost, road, land-use and emergency-response questions during Deuel County's June 17, 2025 Applied Digital discussion. The minutes record company replies about cooling, road work and cost allocation. Those replies describe plans and positions, not independently verified performance, rate protection or completed mitigation.",
      "quote": null,
      "operator_response": {
        "organization": "Applied Digital",
        "summary": "Applied Digital stated that it planned a closed-loop cooling system and road improvements at its expense, and said it would bear applicable power costs. These are company statements recorded by the county, not verified commitments implemented at the proposed site.",
        "source_ids": [
          "source:7dc6bf15c96bbd77b797d053"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "Company representative replies recorded alongside public questions in the same June17 meeting.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:applied-digital-deuel-county-sd",
      "record_id": "applied-digital-deuel-county-sd",
      "subject_label": "Applied Digital Deuel County AI Campus",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:7dc6bf15c96bbd77b797d053"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:7dc6bf15c96bbd77b797d053",
          "url": "https://www.deuelcountysd.com/_files/ugd/1bce45_424f12f13573425d950ea8db8ed76895.pdf",
          "publisher": "Deuel County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:il-iron-mountain-air-permit-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2025-06-05",
      "event_date_note": "The original permit cover gives June 5, 2025 as its issue date. This is the permit action date, not a verified startup day.",
      "published_on": "2025-06-06",
      "source_date_note": "The official agency index gives June 6, 2025 as the posting date. The separately recorded issue date and the source-check date retain their own meanings.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2025-06-05",
      "status_scope": "Illinois Environmental Protection Agency issued this specific construction permit. Resolved describes that dated permit action only; current compliance, subsequent amendments, other permits and physical operating status remain outside this record.",
      "source_ids": [
        "source:baed70565b1f9f77af1d8d96",
        "source:7a5cc24b7daa9afbc17ebe48"
      ],
      "status_source_ids": [
        "source:baed70565b1f9f77af1d8d96"
      ],
      "event_ids": [],
      "summary": "Illinois Environmental Protection Agency issued construction permit 23050030 for emergency-generator equipment at 1680 East Touhy Avenue, associated with Iron Mountain CHI1 in Des Plaines. This is a dated air-permitting action subject to conditions, not verification of first operation, present compliance or every local approval.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:iron-mountain-chi1-des-plaines-il",
      "record_id": "iron-mountain-chi1-des-plaines-il",
      "subject_label": "Iron Mountain CHI-1",
      "actor": {
        "kind": "agency",
        "label": "Illinois Environmental Protection Agency",
        "source_ids": [
          "source:baed70565b1f9f77af1d8d96"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:7a5cc24b7daa9afbc17ebe48",
          "url": "https://epa.illinois.gov/topics/environmental-justice/informal-resolution-agreement-analyses.html",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:baed70565b1f9f77af1d8d96",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/031063AUJ%2023050030.pdf",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": "2025-06-06",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:il-cyrusone-chi6-air-permit-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2025-05-16",
      "event_date_note": "The original permit cover gives May 16, 2025 as its issue date. This is the permit action date, not a verified startup day.",
      "published_on": "2025-05-19",
      "source_date_note": "The official agency index gives May 19, 2025 as the posting date. The separately recorded issue date and the source-check date retain their own meanings.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2025-05-16",
      "status_scope": "Illinois Environmental Protection Agency issued this specific construction permit. Resolved describes that dated permit action only; current compliance, subsequent amendments, other permits and physical operating status remain outside this record.",
      "source_ids": [
        "source:bcebbf5250a66583dc658ad6",
        "source:7a5cc24b7daa9afbc17ebe48",
        "source:e78bd69c81c72ac693c9d83e"
      ],
      "status_source_ids": [
        "source:bcebbf5250a66583dc658ad6"
      ],
      "event_ids": [],
      "summary": "Illinois Environmental Protection Agency issued construction permit 24060010 for emergency-generator equipment at 460 and 480 Bryn Mawr Avenue, associated with CyrusOne CHI6 in Wood Dale. This is a dated air-permitting action subject to conditions, not verification of first operation, present compliance or every local approval.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:cyrusone-chi6-wood-dale-il",
      "record_id": "cyrusone-chi6-wood-dale-il",
      "subject_label": "CyrusOne Wood Dale Campus",
      "actor": {
        "kind": "agency",
        "label": "Illinois Environmental Protection Agency",
        "source_ids": [
          "source:bcebbf5250a66583dc658ad6"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:7a5cc24b7daa9afbc17ebe48",
          "url": "https://epa.illinois.gov/topics/environmental-justice/informal-resolution-agreement-analyses.html",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:bcebbf5250a66583dc658ad6",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/24060010.pdf",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": "2025-05-19",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:e78bd69c81c72ac693c9d83e",
          "url": "https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony",
          "publisher": "CyrusOne",
          "source_type": "company_page",
          "published_on": "2025-05-13",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-hancock-surge-technical-plan-comments-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "in",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning",
        "traffic_construction",
        "wildlife_wetlands_stormwater",
        "water_use"
      ],
      "event_on": "2025-04-10",
      "event_date_note": "The original Technical Committee minutes date the review April 10, 2025 and identify Surge PUD 25 2592 on PDF pages 2 and 3.",
      "published_on": null,
      "source_date_note": "The original dated government record was captured and reviewed. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:43eb75373b2f8d90300af1a3"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Hancock County Area Plan Commission recorded technical comments on Surge PUD 25 2592 about plan completeness, lot coverage, setbacks, tree preservation, road access, drainage and water capacity for operations and fire protection. The petition was forwarded with neither support nor objection. These are planning comments and questions, not a final approval, a finding of actual harm or verification of the developers utility claims.",
      "quote": null,
      "operator_response": {
        "organization": "Surge Development",
        "summary": "Surge Development stated that it was working with the County Surveyor on drainage and that Duke Energy had confirmed power availability. Its representative confirmed the identified parcel was a cooling park. These are developer statements recorded by the agency, not independent utility delivery verification or a comprehensive response resolving every technical comment.",
        "source_ids": [
          "source:43eb75373b2f8d90300af1a3"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The agency identifies the company as the project developer. This response attribution does not establish a data center operator role or change any existing provider relationship.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:surge-hancock-county-megasite-buck-creek-township-in",
      "record_id": "surge-hancock-county-megasite-buck-creek-township-in",
      "subject_label": "Hancock County MegaSite",
      "actor": {
        "kind": "agency",
        "label": "Hancock County Area Plan Commission",
        "source_ids": [
          "source:43eb75373b2f8d90300af1a3"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:43eb75373b2f8d90300af1a3",
          "url": "https://www.hancockin.gov/AgendaCenter/ViewFile/Minutes/_04102025-440",
          "publisher": "Hancock County Area Plan Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:md-quantum-dust-inspection-information-request-2025",
      "version": 1,
      "subject_kind": "campus",
      "state": "md",
      "record_type": "regulator_record",
      "categories": [
        "air_generators",
        "traffic_construction"
      ],
      "event_on": "2025-03-28",
      "event_date_note": "March 28, 2025 is the inspection date explicitly recorded in the agency letter. April 7 is the information-request letter date; the later reply is dated April 29.",
      "published_on": null,
      "source_date_note": "First public posting of the agency letter and response is unknown. Their document dates are not substituted as publication days.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later agency compliance determination and present outcome are unknown in this bounded review. An information request, company description of controls and future monitoring commitments do not establish agency closure, measured exposure or current compliance.",
      "source_ids": [
        "source:67a376dfb4f69e7f137dd56b",
        "source:eba21fb3b312bc2b316e28ce"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Maryland Department of the Environment recorded an inspection finding that required dust controls were not being implemented at Quantum Maryland and requested supporting compliance information. The company's consultant later described its controls and proposed further measures. This is an agency inspection record and a separate company response, not measured public exposure or a verified later closure.",
      "quote": null,
      "operator_response": {
        "organization": "Quantum Maryland",
        "summary": "Quantum Maryland stated through GEI Consultants that a water truck and monitoring program were present and described further dust-control measures. These are the company consultant's submitted account and commitments, not an independently verified agency clearance or measured public exposure.",
        "source_ids": [
          "source:05f9acb66ef708d0df95ae19"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "GEI explicitly submitted the response on Quantum Maryland's behalf to answer the April 7 information request. The agency hosts the signed letter, dated April 29, 2025; first posting is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:quantum-frederick-campus-md",
      "record_id": "quantum-frederick-campus-md",
      "subject_label": "Quantum Frederick",
      "actor": {
        "kind": "agency",
        "label": "Maryland Department of the Environment",
        "source_ids": [
          "source:67a376dfb4f69e7f137dd56b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:05f9acb66ef708d0df95ae19",
          "url": "https://mde.maryland.gov/programs/land/MarylandBrownfieldVCP/SiteAssets/Pages/SPVoluntaryCleanupProgram/L-LUC%20RFI%20Response%20Letter%20with%20Attachments%204.29.2025.pdf",
          "publisher": "GEI Consultants for Quantum Maryland",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:67a376dfb4f69e7f137dd56b",
          "url": "https://mde.maryland.gov/programs/land/MarylandBrownfieldVCP/SiteAssets/Pages/remediationsites/L-%20LUC%20Dust%20Control%20Compliance%20RFI%20Letter%2004072025.pdf",
          "publisher": "Maryland Department of the Environment",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:eba21fb3b312bc2b316e28ce",
          "url": "https://mde.maryland.gov/datacenters/Pages/FrederickDataCenter.aspx",
          "publisher": "Maryland Department of the Environment",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-valparaiso-draft-public-engagement-concerns-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "in",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "noise",
        "other"
      ],
      "event_on": "2025-03-13",
      "event_date_note": "The April 10, 2025 agenda packet includes draft March 13 meeting minutes expressly marked subject to approval. This records the draft account and its stated meeting day, not independent certification of final minutes.",
      "published_on": null,
      "source_date_note": "The original dated government record was captured and reviewed. Its first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:295b3907fbba79a1c9ba34d7"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised concerns about transparency, public participation, environmental effects and land use around the Agincourt exploration, as recorded in draft March 13, 2025 Redevelopment Commission minutes. The draft records the comments and a separate proposed option termination action. It is not a finding of City or developer wrongdoing, measured harm or a verified resolution of public trust concerns.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:agincourt-valparaiso-porter-county-in",
      "record_id": "agincourt-valparaiso-porter-county-in",
      "subject_label": "Agincourt Valparaiso Data Center Campus",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:295b3907fbba79a1c9ba34d7"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:295b3907fbba79a1c9ba34d7",
          "url": "https://www.ci.valparaiso.in.us/DocumentCenter/View/11025/04102025-RDC-Agenda-Packet",
          "publisher": "City of Valparaiso",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:il-t5-iii-air-permit-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2025-02-11",
      "event_date_note": "The original permit cover gives February 11, 2025 as its issue date. This is the permit action date, not a verified startup day.",
      "published_on": "2025-02-26",
      "source_date_note": "The official agency index gives February 26, 2025 as the posting date. The separately recorded issue date and the source-check date retain their own meanings.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2025-02-11",
      "status_scope": "Illinois Environmental Protection Agency issued this specific construction permit. Resolved describes that dated permit action only; current compliance, subsequent amendments, other permits and physical operating status remain outside this record.",
      "source_ids": [
        "source:2dff135f67f5860fef2d5e2f",
        "source:7a5cc24b7daa9afbc17ebe48",
        "source:aeacdac626c3985b225124b0"
      ],
      "status_source_ids": [
        "source:2dff135f67f5860fef2d5e2f"
      ],
      "event_ids": [],
      "summary": "Illinois Environmental Protection Agency issued construction permit 24020017 for emergency-generator equipment at 11650 West Grand Avenue, associated with T5 at Chicago III. This is a dated air-permitting action subject to conditions, not verification of first operation, present compliance or every local approval.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:t5-chicago-iii-northlake-il",
      "record_id": "t5-chicago-iii-northlake-il",
      "subject_label": "T5 @ Chicago III (Northlake)",
      "actor": {
        "kind": "agency",
        "label": "Illinois Environmental Protection Agency",
        "source_ids": [
          "source:2dff135f67f5860fef2d5e2f"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:2dff135f67f5860fef2d5e2f",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/24020017.pdf",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": "2025-02-26",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:7a5cc24b7daa9afbc17ebe48",
          "url": "https://epa.illinois.gov/topics/environmental-justice/informal-resolution-agreement-analyses.html",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:aeacdac626c3985b225124b0",
          "url": "https://t5datacenters.com/resources/t5-data-centers-acquires-third-location-in-tier-one-chicago-market/",
          "publisher": "T5 Data Centers",
          "source_type": "company_page",
          "published_on": "2023-10-03",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ny-massena-zeroc-substation-use-review-20250220",
      "version": 1,
      "subject_kind": "site",
      "state": "ny",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": "2025-02-20",
      "event_date_note": "The exact February 20, 2025 Town Planning Board meeting dates this institutional discussion. It is not independently the first day that any person raised a concern.",
      "published_on": null,
      "source_date_note": "The original minutes identify the meeting day without independently establishing their exact first publication day. The archive filename is not substituted for publication.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original minutes record questions about the ultimate use and a separate substation approval. That limited infrastructure approval does not independently resolve the planning concerns, establish a binding prohibition of cryptocurrency, or verify current computing stage.",
      "source_ids": [
        "source:f1a7272a3408ad1c8142c3be"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Town of Massena Planning Board discussed the intended ultimate use of the ZeroC and Petawatt site while reviewing its proposed substation on February 20, 2025. The minutes record questions about use classification and potentially wasteful cryptocurrency activity, alongside the proponent account of intended computing use and willingness to make a conditional commitment concerning cryptocurrency. The Board approved the substation site plan. These are attributed planning questions and proponent accounts, without a verified executed use restriction, measured harm or proof that concerns were resolved.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:petawatt-zeroc-massena-ny",
      "record_id": "petawatt-zeroc-massena-ny",
      "subject_label": "ZeroC / Petawatt Holdings Data Center Site (417 County Route 42)",
      "actor": {
        "kind": "agency",
        "label": "Town of Massena Planning Board",
        "source_ids": [
          "source:f1a7272a3408ad1c8142c3be"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:f1a7272a3408ad1c8142c3be",
          "url": "https://massena.us/AgendaCenter/ViewFile/Minutes/_02202025-1061",
          "publisher": "Town of Massena Planning Board New York",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:il-equinix-ch5-air-permit-2025",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2025-01-15",
      "event_date_note": "The original permit cover gives January 15, 2025 as its issue date. This is the permit action date, not a verified startup day.",
      "published_on": "2025-01-29",
      "source_date_note": "The official agency index gives January 29, 2025 as the posting date. The separately recorded issue date and the source-check date retain their own meanings.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2025-01-15",
      "status_scope": "Illinois Environmental Protection Agency issued this specific construction permit. Resolved describes that dated permit action only; current compliance, subsequent amendments, other permits and physical operating status remain outside this record.",
      "source_ids": [
        "source:062cca663479707604d5b679",
        "source:7a5cc24b7daa9afbc17ebe48"
      ],
      "status_source_ids": [
        "source:062cca663479707604d5b679"
      ],
      "event_ids": [],
      "summary": "Illinois Environmental Protection Agency issued construction permit 23080013 for emergency-generator equipment at 2001 Lunt Avenue, associated with Equinix CH5. This is a dated air-permitting action subject to conditions, not verification of first operation, present compliance or every local approval. The cover also describes a shared air-permitting source with CH3; the Atlas keeps its two existing research records separate.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:equinix-ch5-elk-grove-village-il",
      "record_id": "equinix-ch5-elk-grove-village-il",
      "subject_label": "Equinix CH5 (Elk Grove Village)",
      "actor": {
        "kind": "agency",
        "label": "Illinois Environmental Protection Agency",
        "source_ids": [
          "source:062cca663479707604d5b679"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:062cca663479707604d5b679",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/23080013.pdf",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": "2025-01-29",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:7a5cc24b7daa9afbc17ebe48",
          "url": "https://epa.illinois.gov/topics/environmental-justice/informal-resolution-agreement-analyses.html",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:il-hoffman-air-permit-2024",
      "version": 1,
      "subject_kind": "site",
      "state": "il",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2024-12-19",
      "event_date_note": "The original permit cover gives December 19, 2024 as its issue date. This is the permit action date, not a verified startup day.",
      "published_on": "2024-12-20",
      "source_date_note": "The official agency index gives December 20, 2024 as the posting date. The separately recorded issue date and the source-check date retain their own meanings.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2024-12-19",
      "status_scope": "Illinois Environmental Protection Agency issued this specific construction permit. Resolved describes that dated permit action only; current compliance, subsequent amendments, other permits and physical operating status remain outside this record.",
      "source_ids": [
        "source:82aea854b0e52de8c550d949",
        "source:7a5cc24b7daa9afbc17ebe48",
        "source:04aec9c697b0ebde1779a44e"
      ],
      "status_source_ids": [
        "source:82aea854b0e52de8c550d949"
      ],
      "event_ids": [],
      "summary": "Illinois Environmental Protection Agency issued construction permit 23110003 for emergency-generator equipment at 2045 Lakewood Boulevard, associated with Microsoft Hoffman Estates. This is a dated air-permitting action subject to conditions, not verification of first operation, present compliance or every local approval.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:microsoft-hoffman-estates-il",
      "record_id": "microsoft-hoffman-estates-il",
      "subject_label": "Microsoft Hoffman Estates Data Center",
      "actor": {
        "kind": "agency",
        "label": "Illinois Environmental Protection Agency",
        "source_ids": [
          "source:82aea854b0e52de8c550d949"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:04aec9c697b0ebde1779a44e",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/23110003-ejttitlevi-review.pdf",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": "2024-12-20",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:7a5cc24b7daa9afbc17ebe48",
          "url": "https://epa.illinois.gov/topics/environmental-justice/informal-resolution-agreement-analyses.html",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:82aea854b0e52de8c550d949",
          "url": "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/23110003.pdf",
          "publisher": "Illinois Environmental Protection Agency",
          "source_type": "government_record",
          "published_on": "2024-12-20",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-prime-comstock-commission-land-use-findings",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "regulator_record",
      "categories": [
        "power_rates",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2024-10-23",
      "event_date_note": "The Council report identifies the October 23, 2024 Planning Commission hearing and denial motions. The later appeal and environmental actions have separate dates and scopes.",
      "published_on": null,
      "source_date_note": "The Council record identifies the December 3, 2024 agenda action, but its exact first online publication day was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:f8f3fe65c531ed78331e0203"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Santa Clara recorded Planning Commission questions about power use, environmental concerns and alternative land uses for the proposed 1231 Comstock data center. The report says the Commission denied the use permit and variances on October 23, 2024 and made findings about orderly growth, job intensity, surrounding uses and variance justification. Staff recommended approval and the applicant appealed. Those attributed agency findings are separate from the later Council environmental action and do not establish measured environmental harm, an operating violation or final resolution of underlying concerns.",
      "quote": null,
      "operator_response": {
        "organization": "Prime Data Centers",
        "summary": "Prime Data Centers stated in its appeal, as reported by City of Santa Clara, that the project met or exceeded city zoning and design requirements and asked the Council to overturn the Commission decision. This is the applicant position, not an independent compliance certification or proof of construction and operation.",
        "source_ids": [
          "source:f8f3fe65c531ed78331e0203"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The same Council report recounts the applicant appeal of the October 23, 2024 Commission denials for this project. The response is an applicant statement, without certifying a current operating role.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:prime-1231-comstock-santa-clara-ca",
      "record_id": "prime-1231-comstock-santa-clara-ca",
      "subject_label": "Prime Data Centers 1231 Comstock Street",
      "actor": {
        "kind": "agency",
        "label": "City of Santa Clara",
        "source_ids": [
          "source:f8f3fe65c531ed78331e0203"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:f8f3fe65c531ed78331e0203",
          "url": "https://santaclara.legistar.com/LegislationDetail.aspx?From=RSS&FullText=1&GUID=0B254487-45AC-47F9-9963-F92C81AB0252&ID=7036667",
          "publisher": "City of Santa Clara",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:tx-granbury-noise-petition-2024",
      "version": 2,
      "subject_kind": "site",
      "state": "tx",
      "record_type": "legal_action",
      "categories": [
        "noise"
      ],
      "event_on": "2024-10-04",
      "event_date_note": "The original court-filed stamp is October 4, 2024. It is distinct from the October 7 press release.",
      "published_on": "2024-10-07",
      "source_date_note": "Earthjustice published its release on October 7, 2024. First posting date of the retained petition copy is unknown.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current merits disposition of the nuisance claims is not established by this bounded review. A procedural mandamus denial does not resolve those claims.",
      "source_ids": [
        "source:e8505fcec3445ce68fb9f781",
        "source:f24d60006d4416ab29bcd207",
        "source:dfcc39397781b8a3ee70f080"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Citizens Concerned About Wolf Hollow filed a petition alleging that noise and vibrations from the Granbury bitcoin mine created a private nuisance and requesting a permanent injunction. The petition is an allegation, not a merits decision. The separately recorded denial of a later mandamus petition does not decide those nuisance claims.",
      "quote": null,
      "operator_response": {
        "organization": "MARA Holdings",
        "summary": "MARA Holdings stated in its court-filed reply that the association lacked standing and that mandamus relief should be available. This is the company's legal argument, not a ruling on the nuisance allegations.",
        "source_ids": [
          "source:34cbf42a92bfbec51988227c"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The official case 26-0337 docket links this operator reply filed August 3, 2026 to lower-court cause C2024253. The statement precedes the September 9 procedural order and does not answer that later order or resolve the alleged noise impacts. First public-posting date is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "Spacing in public date and source notes corrected. Facts, machine dates, sources, attribution and record status are unchanged. The original source-check date is retained.",
      "subject_id": "site:mara-granbury-hood-tx",
      "record_id": "mara-granbury-hood-tx",
      "subject_label": "MARA Granbury Facility",
      "actor": {
        "kind": "public_group",
        "label": "Citizens Concerned About Wolf Hollow",
        "source_ids": [
          "source:e8505fcec3445ce68fb9f781"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:34cbf42a92bfbec51988227c",
          "url": "https://dev-search.txcourts.gov/SearchMedia.aspx?MediaVersionID=28b2faaa-153f-41fd-b2c2-0a6ebdac7992&coa=cossup&DT=BRIEFS&MediaID=c33243d7-187f-4636-bd2b-942ff6530fb8",
          "publisher": "Supreme Court of Texas",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:dfcc39397781b8a3ee70f080",
          "url": "https://dev-search.txcourts.gov/Case.aspx?cn=26-0337&coa=cossup",
          "publisher": "Supreme Court of Texas",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:e8505fcec3445ce68fb9f781",
          "url": "https://earthjustice.org/wp-content/uploads/2024/10/2024-10-04-first-verified-petition_redacted.pdf",
          "publisher": "Earthjustice",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:f24d60006d4416ab29bcd207",
          "url": "https://earthjustice.org/press/2024/granbury-residents-sue-local-bitcoin-mine-over-health-threatening-noise-pollution",
          "publisher": "Earthjustice",
          "source_type": "organization_page",
          "published_on": "2024-10-07",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:in-st-joseph-larrison-air-permit-comments-2024",
      "version": 1,
      "subject_kind": "county",
      "state": "in",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "health",
        "water_use",
        "water_quality_discharge",
        "power_rates",
        "traffic_construction"
      ],
      "event_on": "2024-10-01",
      "event_date_note": "The agency addendum expressly confirms October 1, 2024 as the initial notice posting and records meetings held December 5, 2024 and January 9, 2025. It does not establish one exact filing day for every public comment.",
      "published_on": "2024-10-01",
      "source_date_note": "The original initial notice was posted October 1, 2024, as confirmed in the later agency addendum. The current addendum packet has no independently established first posting day, and a blank cover issue-date cell is not a publication or final decision date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present formal permit disposition and outcome of the documented concerns are unknown in this bounded review. The packet records completed meetings and agency responses, but its blank issue-date cells and statement that a permit will issue do not establish a signed final issuance, current compliance or resolution of every concern.",
      "source_ids": [
        "source:9e6953a78e4edceba2916d43",
        "source:8f63bb8c4722434d49f791a2"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Indiana Department of Environmental Management recorded public questions about generator air, health, water, electricity and traffic in its New Carlisle air-permit review for Amazon at 55001 Larrison Boulevard. The agency documented two meetings and its responses. This is a permit/comment record; the reviewed cover has no completed issue date and does not verify a final present-day outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:18141",
      "record_id": null,
      "subject_label": "St. Joseph County",
      "actor": {
        "kind": "agency",
        "label": "Indiana Department of Environmental Management",
        "source_ids": [
          "source:9e6953a78e4edceba2916d43"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:8f63bb8c4722434d49f791a2",
          "url": "https://ecm.idem.in.gov/cs/idcplg?IdcService=GET_FILE&Rendition=web&dDocName=83752296&dID=83748253&noSaveAs=1",
          "publisher": "Indiana Department of Environmental Management",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:9e6953a78e4edceba2916d43",
          "url": "https://ecm.idem.in.gov/cs/idcplg?IdcService=GET_FILE&dDocName=83736344&dID=83732301",
          "publisher": "Indiana Department of Environmental Management",
          "source_type": "government_record",
          "published_on": "2024-10-01",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ma-lowell-markley-city-plan-comments-20240916",
      "version": 1,
      "subject_kind": "site",
      "state": "ma",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "water_quality_discharge",
        "land_use_zoning"
      ],
      "event_on": "2024-09-16",
      "event_date_note": "The original staff memorandum bears September 16, 2024. This dates the documented staff review rather than a first complaint, final Board vote or later permit appeal.",
      "published_on": null,
      "source_date_note": "The original dated document establishes its printed review or testimony day without independently establishing first publication. Archive paths, wrapper timestamps and retrieval dates do not become publication or opening dates.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original City memorandum explicitly identifies Markley Lowell and its site plan. Existing provider service does not independently resolve the earlier screening, equipment clarification or substance handling review. The separate later State appeal was not read and is not merged into this staff review.",
      "source_ids": [
        "source:1839ae372a11c84211e3cd3b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Lowell planning staff requested clarification of generator counts, screening progress and hazardous substance practices in the September 16, 2024 Markley site plan memorandum. Staff described screening as a significant issue for abutters and also recorded applicant emissions and stormwater accounts. These are permit review comments rather than findings of measured harm, a violation, final approval or completed mitigation.",
      "quote": null,
      "operator_response": {
        "organization": "Markley Group",
        "summary": "Markley Group is described in the City memorandum as providing an emissions account below permit limits and saying generators ordinarily serve emergencies and testing. These are the agency published applicant statements, without independent performance verification or proof that all screening and substance handling questions were resolved.",
        "relationship": "The original City staff memorandum publishes applicant statements within the same site plan review. These statements are not a later independently verified final case disposition.",
        "publication_basis": "agency_published_operator_statement",
        "source_ids": [
          "source:1839ae372a11c84211e3cd3b"
        ],
        "checked_on": "2026-10-24",
        "published_on": null
      },
      "correction_reason": "",
      "subject_id": "site:markley-lowell-ma",
      "record_id": "markley-lowell-ma",
      "subject_label": "Markley Group One Lowell Data Center",
      "actor": {
        "kind": "agency",
        "label": "City of Lowell planning staff",
        "source_ids": [
          "source:1839ae372a11c84211e3cd3b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:1839ae372a11c84211e3cd3b",
          "url": "https://lowellma.gov/DocumentCenter/View/27797/Prince-Ave_2-and-1-Markley-Way-Comments",
          "publisher": "City of Lowell original September 16, 2024 site plan memorandum",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:tx-public-citizen-granbury-power-comment",
      "version": 2,
      "subject_kind": "site",
      "state": "tx",
      "record_type": "public_concern_on_record",
      "categories": [
        "power_rates"
      ],
      "event_on": "2024-09-09",
      "event_date_note": "The letter and agency received stamp both show September 9, 2024; actual pages 92 and 94 were visually verified.",
      "published_on": null,
      "source_date_note": "The letter is dated September 9, 2024, but first public publication date of the aggregate packet is not established.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "No disposition of this specific group concern about possible electricity supply to the mine is established by this bounded letter review.",
      "source_ids": [
        "source:2ea7164ca98b559cb7fbaa1c"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Public Citizen filed comments on the separate Wolf Hollow power-plant expansion expressing concern that additional electricity could support the neighboring Marathon Digital mine. Its letter speculates about possible mine expansion; it does not establish that an expansion occurred. These are group comments in a public permit packet, not a mine air permit or an agency finding.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "Spacing in public date and source notes corrected. Facts, machine dates, sources, attribution and record status are unchanged. The original source-check date is retained.",
      "subject_id": "site:mara-granbury-hood-tx",
      "record_id": "mara-granbury-hood-tx",
      "subject_label": "MARA Granbury Facility",
      "actor": {
        "kind": "public_group",
        "label": "Public Citizen",
        "source_ids": [
          "source:2ea7164ca98b559cb7fbaa1c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:2ea7164ca98b559cb7fbaa1c",
          "url": "https://www.tceq.texas.gov/downloads/agency/decisions/agendas/backup/2024/2024-1918-air-ltr2.pdf",
          "publisher": "Texas Commission on Environmental Quality",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ca-martin-sppe-order-2024",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2024-06-12",
      "event_date_note": "The retained original filing or effective order provides this exact event date.",
      "published_on": "2024-06-13",
      "source_date_note": "The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2024-06-12",
      "status_scope": "California Energy Commission issued the order granting this specific Small Power Plant Exemption. Resolved applies only to that exemption proceeding, not every local approval, present compliance, individual comment outcome or physical facility stage.",
      "source_ids": [
        "source:53e1507187abf070cff36fb9",
        "source:768d665a263905f2a1f67663"
      ],
      "status_source_ids": [
        "source:53e1507187abf070cff36fb9"
      ],
      "event_ids": [],
      "summary": "California Energy Commission adopted Order 24-0612-03h certifying the final environmental impact report, adopting mitigation monitoring and granting a Small Power Plant Exemption for the Martin backup generating facility. The order describes the exemption and mitigation procedure; it does not establish facility operation, all local permits or present compliance.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:martin-data-center-santa-clara-ca",
      "record_id": "martin-data-center-santa-clara-ca",
      "subject_label": "Martin Data Center",
      "actor": {
        "kind": "agency",
        "label": "California Energy Commission",
        "source_ids": [
          "source:53e1507187abf070cff36fb9"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:53e1507187abf070cff36fb9",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=256855&DocumentContentId=92668",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2024-06-13",
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:768d665a263905f2a1f67663",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/martin-backup-generating-facility-mbgf",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ne-stanton-jigowatt-ketv-reported-noise-2024",
      "version": 1,
      "subject_kind": "site",
      "state": "ne",
      "record_type": "news_report",
      "categories": [
        "noise"
      ],
      "event_on": null,
      "event_date_note": "The report does not establish an exact interview day or complaint filing date. Event date remains unknown; the outlet publication day is not substituted.",
      "published_on": "2024-06-11",
      "source_date_note": "The visible publication day is June 11, 2024 in CDT; the original datePublished timestamp is June 12 at 03:28 UTC, the same instant. Later metadata modification is not a newly verified concern or outcome.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later outcome of the reported noise concerns is unknown in this bounded original-report review. No current complaint disposition, independently checked mitigation, measured noise or present compliance determination was established.",
      "source_ids": [
        "source:c5952ee15a3bc708c351f215"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "KETV reported residents' concerns about fan noise from Jigowatt's Stanton mining site and requests for noise mitigation. The outlet also reported the company's differing perspective. This is a news account, not an independently inspected agency complaint, measured noise result or present compliance finding.",
      "quote": null,
      "operator_response": {
        "organization": "Jigowatt",
        "summary": "Jigowatt stated, according to KETV, that views on noise differed and that it intended to continue its Nebraska business. This is an outlet-reported company position, not a verified noise result or completed mitigation.",
        "source_ids": [
          "source:c5952ee15a3bc708c351f215"
        ],
        "published_on": "2024-06-11",
        "checked_on": "2026-10-18",
        "relationship": "The original KETV article directly interviews the company about its Stanton site. June 11 is the outlet publication day, not an independently verified operator-original statement date.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:jigowatt-stanton-ne",
      "record_id": "jigowatt-stanton-ne",
      "subject_label": "Jigowatt Stanton Bitcoin Mine",
      "actor": {
        "kind": "outlet",
        "label": "KETV",
        "source_ids": [
          "source:c5952ee15a3bc708c351f215"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:c5952ee15a3bc708c351f215",
          "url": "https://www.ketv.com/article/stanton-residents-say-bitcoin-mining-site-at-odds-on-noise-concern/61077379",
          "publisher": "KETV",
          "source_type": "news",
          "published_on": "2024-06-11",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ia-adair-applied-digital-county-review-2024",
      "version": 1,
      "subject_kind": "site",
      "state": "ia",
      "record_type": "regulator_record",
      "categories": [
        "power_rates",
        "water_use",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2024-04-24",
      "event_date_note": "The April 24, 2024 date is printed in the original County minutes. The earlier April 2 discussion remains separate context.",
      "published_on": null,
      "source_date_note": "Meeting days are explicit, but exact first online publication days are not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The historic public discussion and recorded concerns are documented. Current project phase, final ordinance, later resolution of individual concerns and measured impacts remain unknown in this bounded review.",
      "source_ids": [
        "source:6dc574bb0bac214e45901320",
        "source:750af43216b9aa69117fb497"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Adair County Board of Supervisors recorded concerns about water and electricity during the April 2 Applied Digital discussion and residential setbacks and project information during the April 24 ordinance hearing. The minutes contain differing Board views and a failed motion to abandon the ordinance. This is an attributed historic planning discussion, not an Atlas finding of actual utility impacts, a final project denial or proof that a proposed setback became current law.",
      "quote": null,
      "operator_response": {
        "organization": "Applied Digital",
        "summary": "Applied Digital stated in the County published minutes that its plans were at an early stage, that it did not intend to displace residents and that it was willing to work with setbacks and the Board. These are recorded company representations, not independently verified current commitments, delivered benefits or a present operator role.",
        "source_ids": [
          "source:6dc574bb0bac214e45901320"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The original minutes identify the speakers as Applied Digital representatives discussing their proposal. No current operating company relationship is inferred.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:applied-digital-adair-ia",
      "record_id": "applied-digital-adair-ia",
      "subject_label": "Applied Digital Adair County Data Center",
      "actor": {
        "kind": "agency",
        "label": "Adair County Board of Supervisors",
        "source_ids": [
          "source:6dc574bb0bac214e45901320",
          "source:750af43216b9aa69117fb497"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:6dc574bb0bac214e45901320",
          "url": "https://adaircounty.iowa.gov/files/meetings/2024-04-24_minutes_5812.pdf",
          "publisher": "Adair County Board of Supervisors",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        },
        {
          "id": "source:750af43216b9aa69117fb497",
          "url": "https://adaircounty.iowa.gov/files/meetings/2024-04-02_minutes_4647.pdf",
          "publisher": "Adair County Board of Supervisors",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ar-bono-newrays-kuar-reported-noise-case-2024",
      "version": 1,
      "subject_kind": "site",
      "state": "ar",
      "record_type": "news_report",
      "categories": [
        "noise"
      ],
      "event_on": null,
      "event_date_note": "The report does not independently establish the original complaint filing day. Its scheduled January 5 court date is not treated as a completed hearing or outcome; event date remains unknown.",
      "published_on": "2024-01-03",
      "source_date_note": "The original KUAR article was published January 3, 2024. A later source check does not make that reporting a current court disposition.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present case disposition and outcome of the reported noise concerns are unknown in this bounded original-report review. A company procedural argument and a scheduled hearing do not establish dismissal, measured noise, completed mitigation or current compliance.",
      "source_ids": [
        "source:97123f3d99c422d9e549e2c6"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Little Rock Public Radio (KUAR) reported residents' allegations of persistent noise from NewRays One's Bono mining site and their lawsuit seeking relief. The report also described the company's procedural arguments. This is an outlet account, not an independently inspected current court record, measured noise or compliance finding.",
      "quote": null,
      "operator_response": {
        "organization": "NewRays One",
        "summary": "NewRays One argued, according to Little Rock Public Radio (KUAR), that the claims did not meet procedural requirements. This is an outlet-reported legal position, not a ruling on the noise allegations or a verified current outcome.",
        "source_ids": [
          "source:97123f3d99c422d9e549e2c6"
        ],
        "published_on": "2024-01-03",
        "checked_on": "2026-10-18",
        "relationship": "The article attributes the procedural statement to the company's lawyer. It does not present it as a noise assessment or response to every allegation; January 3 is outlet publication, not an independently verified original statement day.",
        "publication_basis": "news_quoted_statement"
      },
      "correction_reason": "",
      "subject_id": "site:newrays-one-bono-ar",
      "record_id": "newrays-one-bono-ar",
      "subject_label": "NewRays One Bitcoin Mine",
      "actor": {
        "kind": "outlet",
        "label": "Little Rock Public Radio (KUAR)",
        "source_ids": [
          "source:97123f3d99c422d9e549e2c6"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:97123f3d99c422d9e549e2c6",
          "url": "https://www.ualrpublicradio.org/local-regional-news/2024-01-03/sound-complaint-lawsuit-against-arkansas-crypto-mine-company-continues?_amp=true",
          "publisher": "Little Rock Public Radio (KUAR)",
          "source_type": "news",
          "published_on": "2024-01-03",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:va-sharpless-wellington-water-reauthorization",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "permit_and_comment",
      "categories": [
        "wildlife_wetlands_stormwater",
        "water_quality_discharge"
      ],
      "event_on": "2023-11-10",
      "event_date_note": "November 10, 2023 is the dated public notice. The initial application filing day and later decision day are not established.",
      "published_on": "2023-11-10",
      "source_date_note": "The source publication day is explicit. The exact first concern or application filing day is not established unless separately stated.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:f984f10ec64a63a77f68dca9"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "U.S. Army Corps of Engineers published a permit reauthorization notice for the Sharpless restricted data center campus north of Wellington Road. It describes changed jurisdiction over aquatic resources, earlier permits and applicant mitigation. This is a regulatory application and comment record, not a finding of a new violation, measured present impacts or facility operation.",
      "quote": null,
      "operator_response": {
        "organization": "Sharpless Enterprises LLC",
        "summary": "Sharpless Enterprises LLC describes alternatives, avoidance and mitigation in the application information published by the Corps notice. The notice reports completed credit purchases under earlier permits. This does not independently establish current field compliance or measured impacts.",
        "source_ids": [
          "source:f984f10ec64a63a77f68dca9"
        ],
        "published_on": "2023-11-10",
        "checked_on": "2026-10-22",
        "relationship": "Agency published applicant information concerns the same restricted campus and regulated water impacts.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:sharpless-wellington-road-bristow-va",
      "record_id": "sharpless-wellington-road-bristow-va",
      "subject_label": "Wellington Road Data Center Campus (Sharpless)",
      "actor": {
        "kind": "agency",
        "label": "U.S. Army Corps of Engineers",
        "source_ids": [
          "source:f984f10ec64a63a77f68dca9"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:f984f10ec64a63a77f68dca9",
          "url": "https://usace.contentdm.oclc.org/digital/api/collection/p16021coll15/id/3616/download",
          "publisher": "U.S. Army Corps of Engineers",
          "source_type": "government_record",
          "published_on": "2023-11-10",
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:ca-bowers-sppe-order-2023",
      "version": 1,
      "subject_kind": "project",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators"
      ],
      "event_on": "2023-11-08",
      "event_date_note": "The retained original filing or effective order provides this exact event date.",
      "published_on": "2023-11-09",
      "source_date_note": "The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.",
      "checked_on": "2026-10-18",
      "status": "resolved",
      "status_on": "2023-11-08",
      "status_scope": "California Energy Commission issued the order granting this specific Small Power Plant Exemption. Resolved applies only to that exemption proceeding, not every local approval, present compliance, individual comment outcome or physical facility stage.",
      "source_ids": [
        "source:f850f57ba6dbeeb817da22d0"
      ],
      "status_source_ids": [
        "source:f850f57ba6dbeeb817da22d0"
      ],
      "event_ids": [],
      "summary": "California Energy Commission adopted Order 23-1108-07 certifying the final environmental impact report, adopting mitigation monitoring and granting a Small Power Plant Exemption for the Bowers backup generating facility. The order describes the exemption and mitigation procedure; it does not establish facility operation, all local permits or present compliance.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:coresite-bowers-santa-clara-ca",
      "record_id": "coresite-bowers-santa-clara-ca",
      "subject_label": "Bowers Data Center",
      "actor": {
        "kind": "agency",
        "label": "California Energy Commission",
        "source_ids": [
          "source:f850f57ba6dbeeb817da22d0"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": null,
      "sources": [
        {
          "id": "source:f850f57ba6dbeeb817da22d0",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=253064&DocumentContentId=88267",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2023-11-09",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ct-millstone-public-information-concerns-2023",
      "version": 1,
      "subject_kind": "campus",
      "state": "ct",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_quality_discharge",
        "power_rates",
        "land_use_zoning",
        "wildlife_wetlands_stormwater",
        "health",
        "other"
      ],
      "event_on": "2023-10-02",
      "event_date_note": "October 2, 2023 is the actual town meeting and attached-letter date, distinct from the October4 record stamp. The separate resident request is dated September7 and acknowledged September8; no later hearing outcome or agenda completion is inferred.",
      "published_on": null,
      "source_date_note": "First public posting of the town minutes and Siting Council packet is unknown. Meeting, letter, acknowledgment and record-stamp dates do not substitute for source publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later disposition of these historical public concerns, hearing requests and separate boundary procedure is unknown in this bounded review. Acknowledgment, an agenda item or a company update does not establish a granted hearing, current permit, operating impacts or resolution of every concern.",
      "source_ids": [
        "source:6aad71ad4d6215e800ee0d8b",
        "source:0e4666ecceb6047cb3e50133"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents raised noise, power-allocation, watercourse, wildlife, health and public-information concerns about the NE Edge Millstone proposal in Waterford's October 2, 2023 meeting record and attached letters. Earlier Siting Council correspondence records a hearing request. The town minutes also record public support. These are historical public concerns, not agency findings of harm or proof of a current project or permit outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:ne-edge-millstone-ct",
      "record_id": "ne-edge-millstone-ct",
      "subject_label": "NE Edge Millstone Nuclear Data Center",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:6aad71ad4d6215e800ee0d8b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:0e4666ecceb6047cb3e50133",
          "url": "https://portal.ct.gov/-/media/csc/3_petitions-medialibrary/petitions_medialibrary/mediapetitionnos1501-1600/pe1586/proceduralcorrespondence/pe1586maythada.pdf?hash=95F69F8AA36DA42E9D2DD0E723275463&rev=29d30963fb4448a8892199ef07a0f57b",
          "publisher": "Connecticut Siting Council",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:6aad71ad4d6215e800ee0d8b",
          "url": "https://waterforddocs.org/document/10157/download",
          "publisher": "Town of Waterford",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:md-quantum-emp-withdrawal-enforcement-referral-2023",
      "version": 1,
      "subject_kind": "campus",
      "state": "md",
      "record_type": "regulator_record",
      "categories": [
        "water_quality_discharge",
        "wildlife_wetlands_stormwater",
        "traffic_construction",
        "land_use_zoning"
      ],
      "event_on": "2023-09-07",
      "event_date_note": "September 7, 2023 is stamped on the original referral notice. The earlier plan-withdrawal letter is dated May 25, and the company response is dated June 28. No later court filing or disposition day is inferred.",
      "published_on": null,
      "source_date_note": "First public posting of these documents is unknown. The company response is dated June 28, 2023 despite its May-looking filename; neither document date nor filename is substituted for publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current enforcement disposition and status of the specific historical plan action are unknown in this bounded review. Referral does not establish a filed court case, awarded penalty, current shutdown or final compliance outcome. Later separately listed plan approvals do not by themselves resolve this record.",
      "source_ids": [
        "source:b144168503b8295a1364a00c",
        "source:038b960f47fd412690091b3d",
        "source:eba21fb3b312bc2b316e28ce"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Maryland Department of the Environment notified Quantum Maryland that it was referring reported site violations for Attorney General enforcement. An earlier letter withdrew conditional approval of a utility-work environmental plan and cited unapproved work and groundwater discharge. These are historical agency actions, not a verified filed lawsuit, current campus shutdown or measured environmental harm.",
      "quote": null,
      "operator_response": {
        "organization": "Quantum Maryland",
        "summary": "Quantum Maryland disputed the agency's factual and legal allegations and reported stopping dewatering and utility work while supplying further information. These are company statements, not independently adopted findings about water safety, compliance or the later enforcement referral.",
        "source_ids": [
          "source:961757ced7452f3eb04cca1a"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The original company letter responds to the May 25 plan-withdrawal notice and is hosted by the agency. It is dated June 28, 2023 and predates the September referral; it is not an express answer to that later notice. First posting is unknown.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:quantum-frederick-campus-md",
      "record_id": "quantum-frederick-campus-md",
      "subject_label": "Quantum Frederick",
      "actor": {
        "kind": "agency",
        "label": "Maryland Department of the Environment",
        "source_ids": [
          "source:b144168503b8295a1364a00c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:038b960f47fd412690091b3d",
          "url": "https://mde.maryland.gov/programs/land/MarylandBrownfieldVCP/SiteAssets/Pages/remediationsites/EMPresend.pdf",
          "publisher": "Maryland Department of the Environment",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:961757ced7452f3eb04cca1a",
          "url": "https://mde.maryland.gov/programs/land/MarylandBrownfieldVCP/SiteAssets/Pages/remediationsites/QL%20letter%205-28-23.pdf",
          "publisher": "Quantum Maryland",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:b144168503b8295a1364a00c",
          "url": "https://mde.maryland.gov/programs/land/MarylandBrownfieldVCP/Documents/2023.09.07_Quantum_Maryland__OAG_Referral_Notice.pdf",
          "publisher": "Maryland Department of the Environment",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:eba21fb3b312bc2b316e28ce",
          "url": "https://mde.maryland.gov/datacenters/Pages/FrederickDataCenter.aspx",
          "publisher": "Maryland Department of the Environment",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:or-cascadelocks-roundhouse-joint-community-support-account-20230720",
      "version": 1,
      "subject_kind": "site",
      "state": "or",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The joint public announcement is dated July 20, 2023. The exact first community comment, underlying discontinuation decision and complete public input chronology are not independently dated in this bounded source.",
      "published_on": "2023-07-20",
      "source_date_note": "The release date is printed in the original Port announcement. Its date does not become an exact first community objection or physical facility closure day.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original Port joint statement explicitly identifies the Roundhouse proposal and describes insufficient community support. It does not independently establish current concern disposition, a complete public comment record or the present outcome of every possible project at the Port.",
      "source_ids": [
        "source:847d5545e29927761ae946be"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Port of Cascade Locks and Roundhouse said in their joint July 20, 2023 announcement that the community support needed for their proposed computing project was not achieved. They attributed the decision to discontinue the project to community feedback and incompatibility with current community sentiments. This is the joint participants account rather than direct resident testimony, a petition total, measured harm, a general ban or physical closure.",
      "quote": null,
      "operator_response": {
        "organization": "Roundhouse Inc.",
        "summary": "Roundhouse Inc. stated in the joint Port announcement that the proposed project would be discontinued and that no future computing partnerships were planned between those two organizations at that point. This is a direct joint statement without independently dated earlier deliberations or a verified current concern resolution.",
        "source_ids": [
          "source:847d5545e29927761ae946be"
        ],
        "published_on": "2023-07-20",
        "checked_on": "2026-10-24",
        "relationship": "The original Port announcement expressly identifies Roundhouse as a joint participant in this same project discontinuation and community support account.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:roundhouse-cascade-locks-or",
      "record_id": "roundhouse-cascade-locks-or",
      "subject_label": "Roundhouse Cascade Locks Data Center",
      "actor": {
        "kind": "agency",
        "label": "Port of Cascade Locks",
        "source_ids": [
          "source:847d5545e29927761ae946be"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:847d5545e29927761ae946be",
          "url": "https://www.portofcascadelocks.gov/july-20-2023-cascade-locks-port-and-roundhouse-inc-jointly-announce-decision-to-discontinue-datacenter-project",
          "publisher": "Port of Cascade Locks original joint Roundhouse announcement",
          "source_type": "government_record",
          "published_on": "2023-07-20",
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:ca-lafayette-draft-environmental-review",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "land_use_zoning",
        "air_generators"
      ],
      "event_on": "2023-04-06",
      "event_date_note": "April 6, 2023 is the docketed filing day. The cover reports April 2023; an exact first publication day is not independently established.",
      "published_on": null,
      "source_date_note": "The notice or final document publication day is explicit when given. A docketing day remains a filing date. A source check does not replace either date.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:2d89aac2e44762af21e53353"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "California Energy Commission recorded the filing of a Draft Environmental Impact Report for the Lafayette Data Center and backup generating proposal. The cover and filing record identify it as a draft environmental review. This item records that regulatory document, not a final impact determination, permit completion, current compliance or an operating milestone.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:digital-realty-sjc36-lafayette-santa-clara-ca",
      "record_id": "digital-realty-sjc36-lafayette-santa-clara-ca",
      "subject_label": "Digital Realty SJC36 (Lafayette Data Center, 2825 Lafayette Street)",
      "actor": {
        "kind": "agency",
        "label": "California Energy Commission",
        "source_ids": [
          "source:2d89aac2e44762af21e53353"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:2d89aac2e44762af21e53353",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=249557",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:ca-martin-valley-water-comment-2023",
      "version": 1,
      "subject_kind": "site",
      "state": "ca",
      "record_type": "permit_and_comment",
      "categories": [
        "water_use"
      ],
      "event_on": "2023-03-15",
      "event_date_note": "The retained original filing or effective order provides this exact event date.",
      "published_on": "2023-03-15",
      "source_date_note": "The retained original CEC docket wrapper gives the publication date, distinct from the source-check date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The individual comment outcome has not been established by this bounded original-source review. A project-page process label is not its disposition.",
      "source_ids": [
        "source:fc732b5808f952fd55d8d667",
        "source:768d665a263905f2a1f67663"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Valley Water requested analysis of water demand, supply and recycled-water options in its environmental-review comment for the Martin Data Center at 651 Martin Avenue. The agency also requested protection of existing wells. This is an agency comment requesting analysis, not a finding of excess use, pollution or a permit violation.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:martin-data-center-santa-clara-ca",
      "record_id": "martin-data-center-santa-clara-ca",
      "subject_label": "Martin Data Center",
      "actor": {
        "kind": "agency",
        "label": "Valley Water",
        "source_ids": [
          "source:fc732b5808f952fd55d8d667"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:768d665a263905f2a1f67663",
          "url": "https://www.energy.ca.gov/powerplant/backup-generating-system/martin-backup-generating-facility-mbgf",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:fc732b5808f952fd55d8d667",
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=249155&DocumentContentId=83700",
          "publisher": "California Energy Commission",
          "source_type": "government_record",
          "published_on": "2023-03-15",
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:va-blackwell-planning-recommendation-20221220",
      "version": 1,
      "subject_kind": "site",
      "state": "va",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "land_use_zoning",
        "other"
      ],
      "event_on": "2022-12-20",
      "event_date_note": "This dates the selected public record episode, not the earliest concern or a present physical effect.",
      "published_on": null,
      "source_date_note": "The selected public record supplies the action day; exact first online publication day remains unverified.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected historical public record establishes the attributed episode. A current concern disposition and later published response remain unverified. A land use recommendation or proffer decision does not itself resolve the concern or establish physical harm.",
      "source_ids": [
        "source:5c4923b39424432f1ca00e3d"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Warrenton Planning Commission recorded a recommendation of denial, as summarized in the Town FAQ, citing missing noise and power information, tax justification, scenic gateway and viewshed effects, Comprehensive Plan compliance and decommissioning information. The FAQ dates the recommendation to December 20, 2022. This is an attributed historical advisory assessment, not the final Council action, a current permit violation or measured harm.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:amazon-blackwell-road-warrenton-va",
      "record_id": "amazon-blackwell-road-warrenton-va",
      "subject_label": "Blackwell Road Data Center (Warrenton)",
      "actor": {
        "kind": "agency",
        "label": "Warrenton Planning Commission",
        "source_ids": [
          "source:5c4923b39424432f1ca00e3d"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:5c4923b39424432f1ca00e3d",
          "url": "https://www.warrentonva.gov/500/Frequently-Asked-Questions-FAQs",
          "publisher": "Town of Warrenton",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:hi-hawaiki-cwb-review-comments-2017",
      "version": 1,
      "subject_kind": "site",
      "state": "hi",
      "record_type": "permit_and_comment",
      "categories": [
        "water_quality_discharge",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": "2017-01-04",
      "event_date_note": "The actual agency letter is dated January 4, 2017; the January9 received stamp is a separate receipt. April11 is the later applicant response date, not the agency comment or source publication.",
      "published_on": null,
      "source_date_note": "The first public posting date of the original EA packet is unknown. A May23 filename and cover stamps are not substituted for its publication or the January4 comment date.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The current outcome of the specific water-quality requirements and later permit/compliance processes is unknown in this bounded historical review. Applicant commitments and the EA review do not establish implemented controls, measured discharges or present compliance.",
      "source_ids": [
        "source:6b6b892e132ecc913486051e"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Hawaii Department of Health, Clean Water Branch issued standard review comments identifying water-quality, discharge-permit and stormwater-planning requirements for the Hawaiki Kapolei cable landing project. Its letter appears in the final environmental assessment with the applicant's response. This is historical review correspondence, not a notice of violation or measured pollution finding. All later permit and compliance outcomes are unknown in this review. A new source check does not establish present site conditions.",
      "quote": null,
      "operator_response": {
        "organization": "Hawaiki Submarine Cable USA",
        "summary": "Hawaiki Submarine Cable USA stated through its consultant that it would comply with water-quality requirements, obtain applicable permits and use protective planning practices. The consultant also described consultation with the Army Corps. These are applicant commitments in the agency-published response, not verified implementation or current compliance findings.",
        "source_ids": [
          "source:6b6b892e132ecc913486051e"
        ],
        "published_on": null,
        "checked_on": "2026-10-18",
        "relationship": "The April 11, 2017 Tetra Tech letter expressly answers the same January4 Clean Water Branch comments on behalf of Hawaiki Submarine Cable USA and TE SubCom. The letter date is known; its first public posting is not. No new company operating role or extension to the later expansion is inferred.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:hawaiki-cable-kapolei-hi",
      "record_id": "hawaiki-cable-kapolei-hi",
      "subject_label": "Kapolei Cable Landing Station",
      "actor": {
        "kind": "agency",
        "label": "Hawaii Department of Health, Clean Water Branch",
        "source_ids": [
          "source:6b6b892e132ecc913486051e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:6b6b892e132ecc913486051e",
          "url": "https://files.hawaii.gov/dbedt/erp/EA_EIS_Library/2017-05-23-OA-FEA-Hawaiki-Submarine-Cable-Kapolei-Landing.pdf",
          "publisher": "Hawaii Department of Land and Natural Resources",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:de-cirrus-delcog-financing-comment-20160504",
      "version": 1,
      "subject_kind": "site",
      "state": "de",
      "record_type": "public_concern_on_record",
      "categories": [
        "other"
      ],
      "event_on": "2016-05-04",
      "event_date_note": "This dates the selected historical public record episode, not the earliest public concern, a current physical impact or the source check.",
      "published_on": null,
      "source_date_note": "The posted draft minutes supply the meeting day, while the exact first online publication day remains unverified.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected historical public record establishes an institutional concern episode. A current concern disposition, later response and present physical effects are not separately verified. Historical funding or lease actions do not establish that the concern itself was resolved.",
      "source_ids": [
        "source:c6ddbe088e7420b542106a5e"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Delaware Coalition for Open Government requested disclosure of project ownership and financing, rigorous review of the business plan and caution before public infrastructure funding. The posted draft minutes record these transparency requests; they do not establish financial misconduct, insolvency, misuse of funds or a current project impact.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:cirrus-delaware-middletown-technology-center-de",
      "record_id": "cirrus-delaware-middletown-technology-center-de",
      "subject_label": "Middletown Technology Center (Cirrus Delaware LLC)",
      "actor": {
        "kind": "public_group",
        "label": "Delaware Coalition for Open Government",
        "source_ids": [
          "source:c6ddbe088e7420b542106a5e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:c6ddbe088e7420b542106a5e",
          "url": "https://publicmeetings.delaware.gov/Document/35863_Minutes-Draft.pdf",
          "publisher": "Delaware Infrastructure Investment Committee",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:de-star-campus-university-assessment-20140710",
      "version": 1,
      "subject_kind": "site",
      "state": "de",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators",
        "land_use_zoning"
      ],
      "event_on": "2014-07-10",
      "event_date_note": "This dates the selected historical public record episode, not the earliest public concern, a current physical impact or the source check.",
      "published_on": "2014-07-10",
      "source_date_note": "The University account expressly supplies July 10, 2014 as its publication day.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected historical public record establishes an institutional concern episode. A current concern disposition, later response and present physical effects are not separately verified. Historical funding or lease actions do not establish that the concern itself was resolved.",
      "source_ids": [
        "source:23aac0d944a885f8f47d5bdc"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "University of Delaware published its working group concerns about the proposed power plant scale, emissions and fit with the STAR Campus science mission, and its recommendation against supporting the project. The University published that assessment with its lease termination announcement. These are attributed institutional conclusions about a proposal, not Atlas measurements, a regulator violation finding or proof of physical facility closure.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:the-data-centers-star-campus-newark-de",
      "record_id": "the-data-centers-star-campus-newark-de",
      "subject_label": "STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC)",
      "actor": {
        "kind": "public_group",
        "label": "University of Delaware",
        "source_ids": [
          "source:23aac0d944a885f8f47d5bdc"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:23aac0d944a885f8f47d5bdc",
          "url": "https://www1.udel.edu/udaily/2015/jul/decision071014.html",
          "publisher": "University of Delaware",
          "source_type": "organization_page",
          "published_on": "2014-07-10",
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:wa-columbia-2025-air-permit-public-comments",
      "version": 1,
      "subject_kind": "site",
      "state": "wa",
      "record_type": "permit_and_comment",
      "categories": [
        "air_generators",
        "noise",
        "health",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The appendix compiles comments across December 30, 2024 through February 27, 2025. A single first concern filing day for this combined episode is not established. The February 20 hearing had no public attendance according to Ecology.",
      "published_on": null,
      "source_date_note": "The order is dated March 28, 2025. The exact first online publication day of the combined order and appendices was not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:8f9a5500b16d1d7b476daa1c"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Washington Department of Ecology recorded public comments about generator changes, noise, potential health effects and access to understandable Spanish language permit information in the Microsoft Columbia air permit review. Appendix B records the comments and agency answers, including an extended comment period and a hearing with no public attendance. Ecology explains that noise regulation is local and that the requested change concerned bypass use rather than a new maintenance time window. These comments and agency explanations do not establish measured harm, a violation or final resolution of the underlying concerns.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:microsoft-columbia-quincy-wa",
      "record_id": "microsoft-columbia-quincy-wa",
      "subject_label": "Microsoft Columbia Data Center (Quincy)",
      "actor": {
        "kind": "agency",
        "label": "Washington Department of Ecology",
        "source_ids": [
          "source:8f9a5500b16d1d7b476daa1c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:8f9a5500b16d1d7b476daa1c",
          "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
          "publisher": "Washington Department of Ecology",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:va-loudoun-county-noise-air-context",
      "version": 1,
      "subject_kind": "county",
      "state": "va",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "air_generators"
      ],
      "event_on": null,
      "event_date_note": "No exact event date is supplied for this countywide informational account.",
      "published_on": null,
      "source_date_note": "The captured county page supplies no reliable exact publication date for this account.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "No individual complaint case or adjudicated outcome is established by this countywide informational page.",
      "source_ids": [
        "source:587d50e3d5969851a2872f8d"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Loudoun County reported persistent data center noise complaints and described residents raising air-quality concerns on its countywide information page. The page describes complaint review and enforcement processes. It does not identify an individual complaint case, publish a complaint count or establish a violation at any Atlas site.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:51107",
      "record_id": null,
      "subject_label": "Loudoun County",
      "actor": {
        "kind": "agency",
        "label": "Loudoun County",
        "source_ids": [
          "source:587d50e3d5969851a2872f8d"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:587d50e3d5969851a2872f8d",
          "url": "https://www.loudoun.gov/6405/Noise-Air-Quality-Concerns",
          "publisher": "Loudoun County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ut-stratos-boxelder-county-feedback-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "ut",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "water_use",
        "noise",
        "power_rates",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The original current County fact sheet does not independently date the first public submission or individual recurring concern. Exact event dates remain unknown.",
      "published_on": null,
      "source_date_note": "No exact fact sheet publication day is independently printed in the read body. The retrieval day is not a public concern event or publication day.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The County reports mixed supportive and critical feedback and publishes its own responses. This bounded account does not independently establish the complete comment history, current concern resolution, representative community opinion or measured harm.",
      "source_ids": [
        "source:8379cb4ed1aea62a8698a05a"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Box Elder County said in its original Stratos fact sheet that it received supportive and critical submissions and that recurring topics included water, noise, community effects, electricity prices and public finances. The County published assurances about the proposed project in response. These are attributed County accounts rather than direct resident testimony, independently measured impacts, verified unique resident totals or an operator response.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:stratos-box-elder-ut",
      "record_id": "stratos-box-elder-ut",
      "subject_label": "Stratos AI Data Center Campus",
      "actor": {
        "kind": "agency",
        "label": "Box Elder County",
        "source_ids": [
          "source:8379cb4ed1aea62a8698a05a"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:8379cb4ed1aea62a8698a05a",
          "url": "https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet",
          "publisher": "Box Elder County original Stratos feedback fact sheet",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:ut-juab-dog-valley-planning-water-review",
      "version": 1,
      "subject_kind": "site",
      "state": "ut",
      "record_type": "regulator_record",
      "categories": [
        "water_use",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The cover and opening give November 19, 2025 while the printed page 4 header gives September 17, 2025. The conflicting source dates remain unresolved, so no exact concern event day is adopted.",
      "published_on": null,
      "source_date_note": "Exact first online publication day is not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The planning concern is documented in an original County record. Final individual application disposition, later resolution and measured conditions are unknown in this bounded review.",
      "source_ids": [
        "source:e649569f00b2e76592585262"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Juab County Planning Commission recorded concerns about water resources, effects on agricultural users, future tenant demand and the proposed industrial use in Dog Valley. The body documents differing views and a recommendation to County Commissioners. This is an attributed planning discussion, not a final rezoning decision, a finding of actual groundwater effects or independent confirmation of project benefits.",
      "quote": null,
      "operator_response": {
        "organization": "Summit Group Holdings",
        "summary": "Summit Group Holdings stated in the County published minutes that planned closed loop cooling and potentially delivered water would limit local consumptive use. These are recorded applicant representations, not verified water demand, a legal water entitlement or measured protection of neighboring supplies.",
        "source_ids": [
          "source:e649569f00b2e76592585262"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The original minutes identify the company representative as speaking for this rezoning proposal. No current operating role is inferred.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:summit-group-holdings-dog-valley-juab-county-ut",
      "record_id": "summit-group-holdings-dog-valley-juab-county-ut",
      "subject_label": "Dog Valley Data Center (McWilliams/Sperry rezone)",
      "actor": {
        "kind": "agency",
        "label": "Juab County Planning Commission",
        "source_ids": [
          "source:e649569f00b2e76592585262"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:e649569f00b2e76592585262",
          "url": "https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf",
          "publisher": "Juab County Planning Commission",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:tx-temple-rowan-local-development-controls",
      "version": 1,
      "subject_kind": "site",
      "state": "tx",
      "record_type": "permit_and_comment",
      "categories": [
        "water_use",
        "noise",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The exact agreement execution or first condition adoption date is not established from this undated FAQ.",
      "published_on": null,
      "source_date_note": "An exact first publication or revision date for the city FAQ is not established.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:e1e7fe7915cf8ebd531677d5"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Temple described domestic water limits and noise safeguards for the Rowan Project Temple development. The FAQ describes a contractual domestic water cap and requires acoustic review before occupancy. These are agency described development controls, not measured water withdrawal, a noise violation, completed compliance or an operating milestone.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:rowan-temple-tx",
      "record_id": "rowan-temple-tx",
      "subject_label": "Rowan Project Temple",
      "actor": {
        "kind": "agency",
        "label": "City of Temple",
        "source_ids": [
          "source:e1e7fe7915cf8ebd531677d5"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:e1e7fe7915cf8ebd531677d5",
          "url": "https://www.templetx.gov/community/faq__data_center_development_.php",
          "publisher": "City of Temple",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:tn-washington-published-proposed-resource-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "tn",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "power_rates",
        "health",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The selected government record does not independently establish an exact first concern day or original publication day. A meeting date, folder month and source check day do not substitute for that event.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:078c3f72e620771813771d45"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Washington County Tennessee published proposed moratorium text describing concerns about electricity demand, possible household cost effects, continuous cooling noise, health, property values and rural land use compatibility. The text also questions the balance between infrastructure demands and community benefits. These are the stated reasons in a prepared legislative text, without independent proof of measured effects, a verified executed version of every recital or a finding against an individual computing facility.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:47179",
      "record_id": null,
      "subject_label": "Washington County",
      "actor": {
        "kind": "agency",
        "label": "Washington County Tennessee",
        "source_ids": [
          "source:078c3f72e620771813771d45"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:078c3f72e620771813771d45",
          "url": "https://www.washingtoncountytn.org/AgendaCenter/ViewFile/Agenda/_03232026-988",
          "publisher": "Washington County Tennessee",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:tn-sullivan-published-sponsor-resource-review-2025",
      "version": 1,
      "subject_kind": "county",
      "state": "tn",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "power_rates",
        "health",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The selected government record does not independently establish an exact first concern day or original publication day. A meeting date, folder month and source check day do not substitute for that event.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:4c61f2807b82897ca4a1ccc3"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Sullivan County Tennessee published sponsor versions of a proposed data and cryptocurrency mining moratorium describing concerns about electricity demand, household costs, cooling noise, health, property values and rural community character. The proposed recitals also question community benefits compared with infrastructure demands. These are attributed sponsor text in an official packet, without measured injury, a verified completed Board vote, an executed current rule or proof that all facilities have those effects.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:47163",
      "record_id": null,
      "subject_label": "Sullivan County",
      "actor": {
        "kind": "agency",
        "label": "Sullivan County Tennessee",
        "source_ids": [
          "source:4c61f2807b82897ca4a1ccc3"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:4c61f2807b82897ca4a1ccc3",
          "url": "https://sullivancountytn.gov/wp-content/uploads/December-2025-Monthly-Meeting.pdf",
          "publisher": "Sullivan County Tennessee",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:tn-davidson-metropolitan-council-land-use-recitals-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "tn",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "power_rates",
        "noise",
        "air_generators",
        "light",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": null,
      "event_date_note": "The selected official document does not establish the exact first day these institutional concerns were raised. No publication or source check day substitutes for that event.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:ef4c7b3565779fd886ba394b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Metropolitan Council of Nashville and Davidson County recorded possible land use incompatibility, electrical demand, generators, noise, vibration, lighting and stormwater issues in the BL2026 1448 legislative text. These are the institutional reasons stated for defining and reviewing data center uses, not documented violations, measured effects or a determination about every site. The displayed older term is not used to replace the separate reviewed amendment or certify current legal effect.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:47037",
      "record_id": null,
      "subject_label": "Davidson County",
      "actor": {
        "kind": "agency",
        "label": "Metropolitan Council of Nashville and Davidson County",
        "source_ids": [
          "source:ef4c7b3565779fd886ba394b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:ef4c7b3565779fd886ba394b",
          "url": "https://nashville.legistar.com/ViewReport.ashx?M=R&N=Text&GID=787&ID=6857083&GUID=2B2D3C04-FAE6-43C3-BBB6-FCC098A948FC&Title=Legislation+Text",
          "publisher": "Metro Nashville Legislative Information Center",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:pa-hummingbird-cumulative-impact-public-comment",
      "version": 1,
      "subject_kind": "site",
      "state": "pa",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators",
        "water_use",
        "water_quality_discharge",
        "health",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The original comment has no exact day. Its November 2025 folder name is not converted into an event date.",
      "published_on": null,
      "source_date_note": "The original determination date is retained where explicit. The first online publication day of the undated public comment is unknown.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:b95ebebe9acdc41d61c18055"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Clean Air Council submitted public comments asking DEP to consider cumulative environmental and health impacts around the proposed Hummingbird development, including the associated gas infrastructure and water demand. The government published comment records the group position. Its health, water, well and employment estimates are not independently verified, and the letter does not establish measured impacts from an operating Hummingbird facility or a final permit outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:iep-hummingbird-data-center-campus-greene-county-pa",
      "record_id": "iep-hummingbird-data-center-campus-greene-county-pa",
      "subject_label": "Project Hummingbird Data Center Campus (former Robena Mine)",
      "actor": {
        "kind": "public_group",
        "label": "Clean Air Council",
        "source_ids": [
          "source:b95ebebe9acdc41d61c18055"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:b95ebebe9acdc41d61c18055",
          "url": "https://files.dep.state.pa.us/PublicParticipation/Citizens%20Advisory%20Council/CACPortalFiles/Meetings/2025_11/Public%20Comment%20-%20Lois%20Bower-Bjornson.pdf",
          "publisher": "Pennsylvania Department of Environmental Protection",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ok-coweta-atlas-city-environment-energy-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "ok",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates"
      ],
      "event_on": null,
      "event_date_note": "The original newsletter is labeled December 2025, without an independently established exact publication day or first concern day. No day within that month is invented.",
      "published_on": null,
      "source_date_note": "The selected original body does not independently establish the exact web publication day of the complete concern record. Retrieval is not publication.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected original record documents an attributed concern or resource review, without independently establishing the complete disposition, measured harm or present compliance.",
      "source_ids": [
        "source:ae253c752cc2337ea799b581"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Coweta reported in its original December 2025 City Manager newsletter that environmental impact and energy use concerns about Project Atlas were being considered. This is an attributed City account of concerns rather than measured environmental harm, a quantified resource finding or an adopted project decision. Forecast benefits in the same account remain prospective.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:beale-project-atlas-coweta-ok",
      "record_id": "beale-project-atlas-coweta-ok",
      "subject_label": "Project Atlas at Coweta",
      "actor": {
        "kind": "agency",
        "label": "City of Coweta",
        "source_ids": [
          "source:ae253c752cc2337ea799b581"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:ae253c752cc2337ea799b581",
          "url": "https://www.cityofcoweta-ok.gov/ArchiveCenter/ViewFile/Item/1158",
          "publisher": "Coweta City original December 2025 City Manager newsletter",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:oh-springfield-5c-public-questions",
      "version": 1,
      "subject_kind": "site",
      "state": "oh",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "air_generators"
      ],
      "event_on": null,
      "event_date_note": "The exact first date of residents questions is not established from the undated FAQ.",
      "published_on": null,
      "source_date_note": "An exact first publication or update day is not established.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:5096fd3010f55d2fb617c806"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Springfield published residents questions about 5C power, water, generators and oversight with answers supplied by the company. This records the public questions and attributed response, not an independent finding of grid readiness, permit compliance, actual water demand, emissions or harm.",
      "quote": null,
      "operator_response": {
        "organization": "5C Data Center",
        "summary": "5C Data Center described planned phased infrastructure, cooling, backup generation and oversight in answers hosted by the city. Design maxima, company assurances and future jobs are not independently verified operating outcomes.",
        "source_ids": [
          "source:5096fd3010f55d2fb617c806"
        ],
        "published_on": null,
        "checked_on": "2026-10-22",
        "relationship": "The city explicitly identifies these as company answers to residents questions about the same 5C project.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:5c-group-vultr-prime-ohio-springfield-oh",
      "record_id": "5c-group-vultr-prime-ohio-springfield-oh",
      "subject_label": "5C Group / Vultr Data Center (Prime Ohio)",
      "actor": {
        "kind": "agency",
        "label": "City of Springfield",
        "source_ids": [
          "source:5096fd3010f55d2fb617c806"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:5096fd3010f55d2fb617c806",
          "url": "https://springfieldohio.gov/5c-data-center-faqs/",
          "publisher": "City of Springfield",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:nj-millville-planning-policy-review-2026",
      "version": 1,
      "subject_kind": "site",
      "state": "nj",
      "record_type": "regulator_record",
      "categories": [
        "power_rates",
        "water_use",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The included minutes print an April 13, 2025 meeting header inside a May 2026 packet discussing Ordinance 48 of 2026. That conflicting year is not silently corrected into an exact event day.",
      "published_on": null,
      "source_date_note": "The original packet is for the May 2026 meeting, but its first web publication day is not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The documented municipal policy discussion is verified only within the reviewed packet. Final ordinance passage, individual project disposition, current compliance and measured environmental effects remain separate and unresolved here.",
      "source_ids": [
        "source:faca1826c31e7a9f68a7eaea"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of Millville Planning Board recorded the planner discussion of energy and water demand, limited permanent employment and land use compatibility during review of a proposed data center prohibition. The minutes also record public and property owner support and objections. This is municipal policy context for the Millville development record, not an Atlas finding of measured site harm, a final application denial or a court ruling on the ordinance legality.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:a1-data-center-millville-nj",
      "record_id": "a1-data-center-millville-nj",
      "subject_label": "A1 Data Center Campus",
      "actor": {
        "kind": "agency",
        "label": "City of Millville Planning Board",
        "source_ids": [
          "source:faca1826c31e7a9f68a7eaea"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:faca1826c31e7a9f68a7eaea",
          "url": "https://www.millvillenj.gov/AgendaCenter/ViewFile/Agenda/_05112026-1232?packet=true",
          "publisher": "City of Millville",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:nc-lee-deep-river-cwfnc-review",
      "version": 1,
      "subject_kind": "site",
      "state": "nc",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_quality_discharge",
        "air_generators",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The campaign source does not establish an exact first concern event date. Its month and day meeting references do not become accomplished events or an inferred year.",
      "published_on": null,
      "source_date_note": "Exact first online publication day is unknown.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The group concern and requested local planning pause are documented. Actual environmental conditions, current permit disposition and resolution of the concern remain unknown.",
      "source_ids": [
        "source:f3f9eca112067e0c37d7d603"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Clean Water for North Carolina raised concerns about groundwater, the Deep River, air emissions and the public review process for the named Deep River Data gas powered AI proposal near Cumnock. The group requested local moratoriums and additional community input. This records its stated concerns and requests, not an Atlas finding of contamination, actual drilling, measured emissions, a completed public vote or an enacted moratorium.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:deep-river-data-cumnock-lee-county-nc",
      "record_id": "deep-river-data-cumnock-lee-county-nc",
      "subject_label": "Deep River Data AI Data Center (Cumnock, Lee County)",
      "actor": {
        "kind": "public_group",
        "label": "Clean Water for North Carolina",
        "source_ids": [
          "source:f3f9eca112067e0c37d7d603"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:f3f9eca112067e0c37d7d603",
          "url": "https://cwfnc.org/nofracklee/",
          "publisher": "Clean Water for North Carolina",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:nc-davidson-staff-proposed-resource-review-20261024",
      "version": 1,
      "subject_kind": "county",
      "state": "nc",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "noise",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The selected government record does not independently establish an exact first concern day or original publication day. A meeting date, folder month and source check day do not substitute for that event.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:906cefc36c1eb607f6ae5526"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Davidson County Planning and Zoning staff published proposed ordinance text describing questions about grid capacity, residential and small business electricity rates, water and sewer capacity, heat, noise and industrial or agricultural land use. The accompanying agenda memorandum presents the ordinance for Board consideration. These are concerns stated in a staff proposal rather than an accomplished Board finding, enacted moratorium, measured County impact or allegation against an individual project.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:37057",
      "record_id": null,
      "subject_label": "Davidson County",
      "actor": {
        "kind": "agency",
        "label": "Davidson County Planning and Zoning staff",
        "source_ids": [
          "source:906cefc36c1eb607f6ae5526"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:906cefc36c1eb607f6ae5526",
          "url": "https://www.agendasuite.org/iip/davidson/file/getfile/82660",
          "publisher": "Davidson County North Carolina",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:mt-bonner-krambu-residents-county-feedback-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "mt",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "water_use",
        "noise",
        "power_rates",
        "health"
      ],
      "event_on": null,
      "event_date_note": "The original page displays relative public feedback timestamps. Exact comment days and the later property owner withdrawal day are not independently established in the selected body.",
      "published_on": null,
      "source_date_note": "No exact publication day for the current County project update and selected public comments is independently printed in the read body. Retrieval day is not an event or publication day.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The original County page records public concern and an undated property owner withdrawal update. This does not independently establish the complete concern disposition, removal of every future proposal or measured harm.",
      "source_ids": [
        "source:1aca98a0c8f2dbfc0af2dedb"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Residents said in selected public comments on the original Missoula County Bonner project page that they opposed the proposed Krambu facility because of potential noise, water effects, utility costs, nearby schools and community compatibility. These are attributed public concerns rather than County findings of measured harm. The complete comment history and exact comment dates were not independently reviewed.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:krambu-bonner-mill-data-center-bonner-mt",
      "record_id": "krambu-bonner-mill-data-center-bonner-mt",
      "subject_label": "Krambu Bonner Data Center (former UFP Edge building, Bonner Mill Industrial Park)",
      "actor": {
        "kind": "residents",
        "label": "Residents",
        "source_ids": [
          "source:1aca98a0c8f2dbfc0af2dedb"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:1aca98a0c8f2dbfc0af2dedb",
          "url": "https://missoulacountyvoice.com/bonner-data-center",
          "publisher": "Missoula County original Bonner project and public feedback account",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:mo-lumon-conservation-resource-review-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "mo",
      "record_type": "regulator_record",
      "categories": [
        "wildlife_wetlands_stormwater",
        "water_use"
      ],
      "event_on": null,
      "event_date_note": "The original report was created May 14, 2026. Exact first days of the described resident concerns are not independently established.",
      "published_on": null,
      "source_date_note": "The selected original body does not independently establish the exact web publication day of the complete concern record. Retrieval is not publication.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected original record documents an attributed concern or resource review, without independently establishing the complete disposition, measured harm or present compliance.",
      "source_ids": [
        "source:4af94605ec1c5af5709833bf"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Missouri Department of Conservation recorded a Lumon Solutions Marshfield project description reporting area residents concerned about natural resources, conservation and wildlife. The report explicitly says it is not site clearance and that a lack of known occurrence records does not establish species absence. This is an attributed resource review and reported public concern rather than measured ecological harm or completed consultation.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:lumon-solutions-marshfield-mo",
      "record_id": "lumon-solutions-marshfield-mo",
      "subject_label": "Marshfield Data Center (Lumon Solutions)",
      "actor": {
        "kind": "agency",
        "label": "Missouri Department of Conservation",
        "source_ids": [
          "source:4af94605ec1c5af5709833bf"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:4af94605ec1c5af5709833bf",
          "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf",
          "publisher": "Missouri Conservation original Lumon project review hosted by Webster County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:mo-armory-city-community-conditions-20261024",
      "version": 1,
      "subject_kind": "site",
      "state": "mo",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "land_use_zoning",
        "power_rates",
        "water_use"
      ],
      "event_on": null,
      "event_date_note": "The City release is dated April 21, 2026, but exact first days of the underlying community concerns are not independently established.",
      "published_on": null,
      "source_date_note": "The selected original body does not independently establish the exact web publication day of the complete concern record. Retrieval is not publication.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected original record documents an attributed concern or resource review, without independently establishing the complete disposition, measured harm or present compliance.",
      "source_ids": [
        "source:cf98c3a2e0ed1e64ac542872"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "City of St Louis reported that community concerns about noise, walkability, sustainability, power and water led to required conditions for the Armory computing proposal. The City also described prospective community benefits. These are attributed concerns and conditions rather than measured harm, an executed benefit agreement or proof of current compliance.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:armory-innovation-district-st-louis-mo",
      "record_id": "armory-innovation-district-st-louis-mo",
      "subject_label": "Armory Innovation District Data Center",
      "actor": {
        "kind": "agency",
        "label": "City of St Louis",
        "source_ids": [
          "source:cf98c3a2e0ed1e64ac542872"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:cf98c3a2e0ed1e64ac542872",
          "url": "https://www.stlouis-mo.gov/government/departments/mayor/news/data-center-permit-approved.cfm",
          "publisher": "St Louis City original conditional approval announcement",
          "source_type": "government_record",
          "published_on": "2026-04-21",
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:md-frederick-county-policy-resource-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "md",
      "record_type": "public_concern_on_record",
      "categories": [
        "air_generators",
        "water_use",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The selected official document does not establish the exact first day these institutional concerns were raised. No publication or source check day substitutes for that event.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:4dde60c489222f19fa4a3d89"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Frederick County described public questions about diesel generators, air quality, water supply, power and transparency on its data center policy page, alongside its County application pause and large load registration requirement. This is a County policy and public information record, separate from the Maryland environment agency Amazon permit comment determination. It does not establish measured harm, a completed impact study, permission for every property or a stop to existing construction.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:24021",
      "record_id": null,
      "subject_label": "Frederick County",
      "actor": {
        "kind": "agency",
        "label": "Frederick County",
        "source_ids": [
          "source:4dde60c489222f19fa4a3d89"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:4dde60c489222f19fa4a3d89",
          "url": "https://www.frederickcountymd.gov/9310/Data-Centers",
          "publisher": "Frederick County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ks-desoto-community-resource-questions",
      "version": 1,
      "subject_kind": "county",
      "state": "ks",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "water_quality_discharge",
        "power_rates"
      ],
      "event_on": null,
      "event_date_note": "The undated resource page refers to a June luncheon without an independently verified exact day or year. The event date remains unknown; the website copyright year and source-check day do not supply one.",
      "published_on": null,
      "source_date_note": "The Chamber resource and evolving city page supply no independently established exact first-publication day. Retrieval is a source check, not a new public event.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The later outcome of these area-level resource and nuisance questions is unknown in this bounded review. A panel, city FAQ or general design assurance does not establish a formal complaint disposition, measured conditions, implemented mitigation or resolution of every question.",
      "source_ids": [
        "source:5a77b60855c97986c94b473c",
        "source:e19c2c10a211c4e0d1fb63ab"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "De Soto Chamber of Commerce reported that its community panel addressed frequently raised questions about electricity and rates, water, wastewater and noise. The page names Beale Infrastructure and Digital Realty as separate local developments. This is an area-level record of questions, not verified opposition, a formal complaint, measured impacts or an allegation assigned to either individual project.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:20091",
      "record_id": null,
      "subject_label": "Johnson County",
      "actor": {
        "kind": "public_group",
        "label": "De Soto Chamber of Commerce",
        "source_ids": [
          "source:5a77b60855c97986c94b473c"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:5a77b60855c97986c94b473c",
          "url": "https://www.desotoks.org/data-center-resources",
          "publisher": "De Soto Chamber of Commerce",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        },
        {
          "id": "source:e19c2c10a211c4e0d1fb63ab",
          "url": "https://www.desotoks.us/465/Data-Center-Campus-Project",
          "publisher": "City of De Soto",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:ga-tyrone-microsoft-town-public-questions",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "noise",
        "land_use_zoning",
        "wildlife_wetlands_stormwater"
      ],
      "event_on": null,
      "event_date_note": "The town page describes public questions without an exact first concern day. Conflicting operator session date descriptions are not used as an accomplished event.",
      "published_on": null,
      "source_date_note": "The exact first publication day of the town FAQ and operator boards was not established.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:590ec05023c38c420648792e"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Town of Tyrone recorded residents questions about the Microsoft proposal, including water, power, noise, environmental impacts and zoning oversight. The town explains its review and future permit processes. Those explanations and Microsoft design commitments are not findings of measured site impacts, verified compliance or an operating facility.",
      "quote": null,
      "operator_response": {
        "organization": "Microsoft",
        "summary": "Microsoft published Tyrone community boards describing a proposed design, anticipated cooling approaches and water infrastructure commitments. The concept is marked as subject to change during design and permitting. These are company statements, not an approved site plan, measured operating demand or independently verified environmental performance.",
        "source_ids": [
          "source:275ebf710d41d3c43a783004"
        ],
        "published_on": null,
        "checked_on": "2026-10-22",
        "relationship": "The boards are linked from Microsoft own Tyrone project update and name this proposed Tyrone data center. They address design and water topics in the same public discussion. Conflicting May session date labels are retained without asserting an exact meeting day.",
        "publication_basis": "operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:microsoft-tyrone-ga",
      "record_id": "microsoft-tyrone-ga",
      "subject_label": "Microsoft Tyrone Campus (Project Rita)",
      "actor": {
        "kind": "agency",
        "label": "Town of Tyrone",
        "source_ids": [
          "source:590ec05023c38c420648792e"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:275ebf710d41d3c43a783004",
          "url": "https://local.microsoft.com/wp-content/uploads/2026/07/Tyrone-May-26-Boards.pdf",
          "publisher": "Microsoft",
          "source_type": "company_page",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        },
        {
          "id": "source:590ec05023c38c420648792e",
          "url": "https://www.tyronega.gov/datacenter",
          "publisher": "Town of Tyrone",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:ga-effingham-camellia-noise-review",
      "version": 1,
      "subject_kind": "site",
      "state": "ga",
      "record_type": "regulator_record",
      "categories": [
        "noise",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The source account gives no verified exact concern event date.",
      "published_on": null,
      "source_date_note": "Exact first online publication day is not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The concern is documented in the County project account. An exact concern meeting date, later resolution and measured conditions remain unknown.",
      "source_ids": [
        "source:1d19f0a090f4afa01554a240"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Effingham County reported resident concerns about noise near the proposed Project Camellia campus. Its account describes planned offsite power generation, separation, a future noise study and monitoring commitments. This documents the concern and proposed response, not measured noise impacts, completed controls or a finding of noncompliance.",
      "quote": null,
      "operator_response": {
        "organization": "OpenAI",
        "summary": "OpenAI stated in the County published project account that perimeter noise monitoring and regular data updates are planned. This is an attributed commitment, not evidence of installed monitoring, compliance or current operation.",
        "source_ids": [
          "source:1d19f0a090f4afa01554a240"
        ],
        "published_on": null,
        "checked_on": "2026-10-23",
        "relationship": "The County account expressly attributes the planned monitoring commitment to OpenAI for Project Camellia. No current operating role is inferred.",
        "publication_basis": "agency_published_operator_statement"
      },
      "correction_reason": "",
      "subject_id": "site:openai-project-camellia-effingham-ga",
      "record_id": "openai-project-camellia-effingham-ga",
      "subject_label": "Project Camellia (OpenAI Effingham County Campus)",
      "actor": {
        "kind": "agency",
        "label": "Effingham County",
        "source_ids": [
          "source:1d19f0a090f4afa01554a240"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:1d19f0a090f4afa01554a240",
          "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
          "publisher": "Effingham County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:ga-augusta-government-computing-policy-safeguards-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "ga",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The selected government record does not independently establish an exact first concern day or original publication day. A meeting date, folder month and source check day do not substitute for that event.",
      "published_on": null,
      "source_date_note": "The exact first public posting day of this original government document is not independently established. Signed instrument dates and printed meeting dates remain separate.",
      "checked_on": "2026-10-24",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected institutional account records concern or a proposed legislative reason for review. Current concern resolution, measured facility effects, final current legal disposition and individual project eligibility remain unverified. A pause, draft text, extension or vote does not establish resolution of the underlying concern.",
      "source_ids": [
        "source:0ba5b5921a713f45e6b98752"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Augusta Georgia Government identifies noise, lighting, visual effects, buffers from residential neighborhoods and sensitive land uses, utility coordination, emergency access, environmental performance and stormwater as subjects of its proposed computing ordinance. The original account frames these as safeguards for residents and community character. These are attributed institutional policy concerns rather than measured noise, a proven service shortage, a violation or a facility specific allegation. Different proposed, approved and considering labels remain explicit, without certifying complete enactment, an effective day or resolution of these policy concerns.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:13245",
      "record_id": null,
      "subject_label": "Richmond County",
      "actor": {
        "kind": "agency",
        "label": "Augusta Georgia Government",
        "source_ids": [
          "source:0ba5b5921a713f45e6b98752"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-21",
      "sources": [
        {
          "id": "source:0ba5b5921a713f45e6b98752",
          "url": "https://www.augustaga.gov/3460/Draft-Data-Center-Ordinance",
          "publisher": "Augusta Georgia Government",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-24"
        }
      ]
    },
    {
      "id": "concern:fl-manatee-county-infrastructure-zoning-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "fl",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "power_rates",
        "noise",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The selected official document does not establish the exact first day these institutional concerns were raised. No publication or source check day substitutes for that event.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:41723be229bc0dac39d9d855"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Manatee County reported staff concerns about potential electricity and water demand, facility scale, land use compatibility, noise and buffering when announcing its data center application pause. The account concerns unincorporated County review and missing use definitions. It does not establish measured impacts, a permanent ban, the signed final law or an individual project outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:12081",
      "record_id": null,
      "subject_label": "Manatee County",
      "actor": {
        "kind": "agency",
        "label": "Manatee County",
        "source_ids": [
          "source:41723be229bc0dac39d9d855"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:41723be229bc0dac39d9d855",
          "url": "https://www.mymanatee.org/connect/news-and-information/news-and-information/article-detail/board-of-county-commissioners/2026/10/09/manatee-county-commissioners-approve-12-month-data-center-moratorium",
          "publisher": "Manatee County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:co-taurus-integrity-matters-resource-noise-concerns-2026",
      "version": 1,
      "subject_kind": "project",
      "state": "co",
      "record_type": "public_concern_on_record",
      "categories": [
        "noise",
        "water_use",
        "air_generators",
        "power_rates",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The changing group page discusses several past and scheduled proceedings. No single exact filing, testimony or current official disposition day was independently established for this bounded concern item; the event date remains unknown.",
      "published_on": null,
      "source_date_note": "No independently established first publication date is displayed for the selected changing group page. Dates of quoted records and scheduled meetings are not substituted for page publication.",
      "checked_on": "2026-10-18",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The present official appeal disposition and outcome of these concerns are unknown in this bounded group-source review. Criticism of models or city standards is not an independent noise measurement, violation finding or proof that the project was finally approved, denied or withdrawn.",
      "source_ids": [
        "source:20f33b4b6e516b315492506b"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Integrity Matters raised questions about Project Taurus's noise analysis, generator emissions, water and electricity needs, and neighborhood protections in Colorado Springs. These are the group's stated concerns and criticisms, not Atlas findings about measured impacts, legal compliance or the current appeal outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:raeden-taurus-colorado-springs-co",
      "record_id": "raeden-taurus-colorado-springs-co",
      "subject_label": "Raeden Project Taurus",
      "actor": {
        "kind": "public_group",
        "label": "Integrity Matters",
        "source_ids": [
          "source:20f33b4b6e516b315492506b"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-15",
      "sources": [
        {
          "id": "source:20f33b4b6e516b315492506b",
          "url": "https://www.integritymatterscos.org/project-taurus-data-center",
          "publisher": "Integrity Matters",
          "source_type": "organization_page",
          "published_on": null,
          "retrieved_on": "2026-10-18"
        }
      ]
    },
    {
      "id": "concern:co-boulder-county-scale-zoning-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "co",
      "record_type": "public_concern_on_record",
      "categories": [
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The selected official document does not establish the exact first day these institutional concerns were raised. No publication or source check day substitutes for that event.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:2f0f94e4d4bda68770b8fcdf"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Boulder County reported that its commissioners expressed concern about resource intensive development, missing data center use definitions and the appropriate scale and zoning locations for the unincorporated County. The page presents proposed code options. These institutional planning concerns do not establish adopted final standards, measured resource use, a City of Boulder ban or an individual site violation.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:08013",
      "record_id": null,
      "subject_label": "Boulder County",
      "actor": {
        "kind": "agency",
        "label": "Boulder County",
        "source_ids": [
          "source:2f0f94e4d4bda68770b8fcdf"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:2f0f94e4d4bda68770b8fcdf",
          "url": "https://bouldercounty.gov/property-and-land/land-use/planning/land-use-code-update/dc-26-0003/",
          "publisher": "Boulder County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:az-pima-staff-health-zoning-review-2026",
      "version": 1,
      "subject_kind": "county",
      "state": "az",
      "record_type": "public_concern_on_record",
      "categories": [
        "health",
        "air_generators",
        "water_use",
        "power_rates",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The selected official document does not establish the exact first day these institutional concerns were raised. No publication or source check day substitutes for that event.",
      "published_on": null,
      "source_date_note": "The exact first online publication day is not supplied in the selected official source.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The selected official record documents institutional concerns and a regulatory review context. Their current resolution, actual environmental or utility effects, individual project eligibility and later legal changes remain unverified. A policy pause does not establish that a concern was resolved.",
      "source_ids": [
        "source:c56f5ed33343307dbb97ef79"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Pima County Development Services described potential public health, environmental, energy and water considerations as reasons for recommending a temporary pause and updating data center zoning requirements. The staff packet includes a public health review framework and a prepared resolution. The selected Board signature lines are blank. This is an attributed staff and legislative preparation record, not proof of actual health effects, an executed final instrument or permission for a particular project.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "county:04019",
      "record_id": null,
      "subject_label": "Pima County",
      "actor": {
        "kind": "agency",
        "label": "Pima County Development Services",
        "source_ids": [
          "source:c56f5ed33343307dbb97ef79"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:c56f5ed33343307dbb97ef79",
          "url": "https://pima.legistar.com/View.ashx?M=F&ID=15860968&GUID=FCCDB6FB-FD3D-4B34-BE73-9A3AB907023A",
          "publisher": "Pima County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:az-la-osa-advisory-drainage-water-concerns",
      "version": 1,
      "subject_kind": "site",
      "state": "az",
      "record_type": "regulator_record",
      "categories": [
        "water_use",
        "land_use_zoning",
        "other"
      ],
      "event_on": null,
      "event_date_note": "The staff report is dated for the October 16, 2025 meeting. The exact day each earlier committee concern was raised is not adopted.",
      "published_on": null,
      "source_date_note": "The dated original documents were reviewed; their first online publication dates were not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:95fc3e98d4f7591c585b6228"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Pinal County October 16, 2025 staff summary recorded Citizen Advisory Committee concerns about La Osa drainage and fire safety, water use and trails or open space. The reported eleven to four recommendation favored the plan amendment. The concerns and advisory recommendation do not establish measured harm, final Board approval or resolution of later legal and permitting questions.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:vermaland-la-osa-eloy-az",
      "record_id": "vermaland-la-osa-eloy-az",
      "subject_label": "La Osa Data Center Park",
      "actor": {
        "kind": "agency",
        "label": "Pinal County",
        "source_ids": [
          "source:95fc3e98d4f7591c585b6228"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:95fc3e98d4f7591c585b6228",
          "url": "https://public.destinyhosted.com/pinaldocs/2025/PZ/20251016_135/784_PZPA01125-_La_Osa_PKT-P%26Z.pdf",
          "publisher": "Pinal County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    },
    {
      "id": "concern:az-hassayampa-ranch-county-public-comments",
      "version": 1,
      "subject_kind": "site",
      "state": "az",
      "record_type": "public_concern_on_record",
      "categories": [
        "water_use",
        "wildlife_wetlands_stormwater",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The April 8 report records correspondence from more than one date. A single first filing or hearing testimony day for this concern episode was not established.",
      "published_on": null,
      "source_date_note": "The selected government documents are dated, but their exact first online publication days were not independently established.",
      "checked_on": "2026-10-22",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:7dad0cd4f2606c7072e6b0d4"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Maricopa County Planning and Development Department recorded public opposition and support for Hassayampa Ranch Z250047. The appended staff analysis attributes concerns about local water resources, habitat and economic effects to opposition letters, while staff supports the rezoning with proposed conditions. The recorded comments are not findings of actual environmental harm, an operating violation or a verified final Board outcome.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:arizona-land-consulting-hassayampa-ranch-tonopah-az",
      "record_id": "arizona-land-consulting-hassayampa-ranch-tonopah-az",
      "subject_label": "Hassayampa Ranch Data Center",
      "actor": {
        "kind": "agency",
        "label": "Maricopa County Planning and Development Department",
        "source_ids": [
          "source:7dad0cd4f2606c7072e6b0d4"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-19",
      "sources": [
        {
          "id": "source:7dad0cd4f2606c7072e6b0d4",
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10211?fileID=99867",
          "publisher": "Maricopa County Planning and Development Department",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-22"
        }
      ]
    },
    {
      "id": "concern:az-energy-generation-campus-advisory-traffic-water",
      "version": 1,
      "subject_kind": "site",
      "state": "az",
      "record_type": "regulator_record",
      "categories": [
        "water_use",
        "traffic_construction",
        "land_use_zoning"
      ],
      "event_on": null,
      "event_date_note": "The staff report is dated for the October 16, 2025 meeting. The exact day each earlier committee concern was raised is not adopted.",
      "published_on": null,
      "source_date_note": "The dated original documents were reviewed; their first online publication dates were not established.",
      "checked_on": "2026-10-23",
      "status": "unknown",
      "status_on": null,
      "status_scope": "The bounded review establishes the documented action and attributed statements only. It does not establish final resolution of underlying public concerns, present compliance or measured site effects.",
      "source_ids": [
        "source:83cee52c007f3683e33f3320"
      ],
      "status_source_ids": [],
      "event_ids": [],
      "summary": "Pinal County October 16, 2025 staff summary recorded Citizen Advisory Committee concerns about traffic and water use for the Energy Generation and Technology Campus. It reports a nine to five advisory recommendation against the plan amendment and separate opposition from the City of Maricopa. That recommendation is not a final Board denial, an operating violation or proof of measured resource effects.",
      "quote": null,
      "operator_response": null,
      "correction_reason": "",
      "subject_id": "site:w-holdings-energy-generation-technology-campus-maricopa-az",
      "record_id": "w-holdings-energy-generation-technology-campus-maricopa-az",
      "subject_label": "Energy Generation and Technology Campus",
      "actor": {
        "kind": "agency",
        "label": "Pinal County",
        "source_ids": [
          "source:83cee52c007f3683e33f3320"
        ]
      },
      "correction_url": "https://shaunwilsondesigns.com/contact/",
      "recheck_due_on": "2027-02-20",
      "sources": [
        {
          "id": "source:83cee52c007f3683e33f3320",
          "url": "https://public.destinyhosted.com/pinaldocs/2025/PZ/20251016_135/788_PZPA01525-P%26Z_PKT-r_%281%29.pdf",
          "publisher": "Pinal County",
          "source_type": "government_record",
          "published_on": null,
          "retrieved_on": "2026-10-23"
        }
      ]
    }
  ]
}
