{
  "schema_version": 1,
  "source_compilation_context": {
    "al": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/al.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "01097",
    "label": "Mobile County, Alabama"
  },
  "records": [
    {
      "id": "beacon-calvert-al",
      "state": "al",
      "kind": "facility",
      "name": "Calvert Infrastructure Hub",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mobile"
      ],
      "city": "Calvert",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact",
          "host": "utv44.com",
          "date": "2026-07-03",
          "published": "2026-07-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.79013,
        "lng": -88.20699,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "UTV44 reports Beacon Calvert proposal, first-building 2027 target and pending studies, design and permitting.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact",
              "host": "utv44.com",
              "date": "2026-07-03",
              "published": "2026-07-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Calvert · Mobile · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01097"
      }
    },
    {
      "id": "edged-gateway-prichard-al",
      "state": "al",
      "kind": "facility",
      "name": "Edged Prichard Data Center (Project Gateway)",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mobile"
      ],
      "city": "Prichard",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Edged Gateway Prichard proposed building and forecast. 93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Project website identifies an Edged US proposal and explicit approval conditions. The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://projectgatewayal.com/",
          "host": "projectgatewayal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.80728,
        "lng": -88.22571,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Edged Gateway Prichard proposed building and forecast",
          "fields": {
            "developer": "Edged US",
            "project": "Project Gateway",
            "locality": "Prichard, Alabama",
            "developer_described_stage": "proposed/evaluated campus",
            "proposed_building_power_mw": 8,
            "power_basis": "building capacity, not explicit critical IT",
            "proposed_building_sqft": 57000,
            "planned_investment_usd": 93000000,
            "expected_permanent_jobs_min_inclusive": 20
          },
          "notes": [
            "93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://projectgatewayal.com/",
              "host": "projectgatewayal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Project website identifies an Edged US proposal and explicit approval conditions",
          "fields": {
            "current_status": "proposed",
            "status_basis": "The project website calls Gateway a proposed Prichard development being evaluated by Edged US."
          },
          "notes": [
            "The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://projectgatewayal.com/",
              "host": "projectgatewayal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "329e73d0bd598b89c4bff6047e3e5919a39b768498596db88a484026a7a90271",
          "events": [],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Prichard · Mobile · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01097"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
