{
  "schema_version": 1,
  "source_compilation_context": {
    "al": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/al.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "01125",
    "label": "Tuscaloosa County, Alabama"
  },
  "records": [
    {
      "id": "applied-digital-delta-forge-2-brookwood-al",
      "state": "al",
      "kind": "facility",
      "name": "Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tuscaloosa"
      ],
      "city": "Brookwood",
      "address": "",
      "who": "Applied Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer announcement republished by telecom newswire, with planned quantities.. Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed. Company report of lease, not original confidential instrument.. Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Reporter account of operator presentation, not observed water use or signed permit.. Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified. Public index and short banner used for discovery, not independent site verification.. Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/",
          "host": "tuscaloosathread.com",
          "date": "2026-09-24",
          "published": "2026-09-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/",
          "host": "newswire.telecomramblings.com",
          "date": "2026-09-24",
          "published": "2026-09-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2",
          "host": "ir.applieddigital.com",
          "date": "2026-06-08",
          "published": "2026-06-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://tuscaloosathread.com/applied-digital-brookwood-town-hall/",
          "host": "tuscaloosathread.com",
          "date": "2026-10-02",
          "published": "2026-10-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.applieddigital.com/insights/july-site-update",
          "host": "applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "host": "ir.applieddigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Applied Digital reviewed source"
        }
      ],
      "loc": {
        "lat": 33.28943,
        "lng": -87.52539,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Reported TCEDA incentive vote for Brookwood Delta Forge 2, including projected abatements and community benefit commitments.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/",
              "host": "tuscaloosathread.com",
              "date": "2026-09-24",
              "published": "2026-09-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer announcement republished by telecom newswire, with planned quantities.",
          "fields": {
            "announcement_date": "2026-09-24",
            "location": "Brookwood, Tuscaloosa County, Alabama",
            "planned_combined_developer_tenant_investment_usd_more_than": 3200000000,
            "leased_critical_it_load_mw": 210,
            "anticipated_operations_year": 2028,
            "community_benefit_commitment_usd": 270000000,
            "community_benefit_term_years": 20
          },
          "notes": [
            "Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/",
              "host": "newswire.telecomramblings.com",
              "date": "2026-09-24",
              "published": "2026-09-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Company report of lease, not original confidential instrument.",
          "fields": {
            "announcement_date": "2026-06-08",
            "company_reported_signed_critical_it_load_mw": 210,
            "base_lease_years": 15,
            "expected_base_lease_revenue_usd_approx": 5200000000,
            "all_options_total_lease_years": 30,
            "all_options_lease_revenue_usd_approx": 12700000000,
            "initial_operations_forecast": "2028-Q1"
          },
          "notes": [
            "Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2",
              "host": "ir.applieddigital.com",
              "date": "2026-06-08",
              "published": "2026-06-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer reports; readiness is not metered grid demand.",
          "fields": {
            "announcement_date": "2026-10-07",
            "fiscal_quarter_ended": "2026-08-31",
            "polaris_forge_1_reported_ready_for_service_date": "2026-10-01",
            "polaris_forge_1_reported_operational_critical_it_mw": 250,
            "other_named_ai_campuses_reported_stage": "Various construction stages",
            "jamestown_crypto_facility_mw_as_of_quarter_end": 106,
            "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180,
            "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300,
            "potential_base_electron_generation_mw": 1200
          },
          "notes": [
            "Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Reporter account of operator presentation, not observed water use or signed permit.",
          "fields": {
            "report_date": "2026-10-02",
            "developer_initial_water_fill_gallons_approx": 1400000,
            "fill_components_gallons": {
              "fire_tank": 500000,
              "cooling_loop": 900000
            },
            "developer_ongoing_annual_water_gallons_approx": 750000,
            "reported_permit_stage": "Packages submitted to city, under review."
          },
          "notes": [
            "Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://tuscaloosathread.com/applied-digital-brookwood-town-hall/",
              "host": "tuscaloosathread.com",
              "date": "2026-10-02",
              "published": "2026-10-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Public index and short banner used for discovery, not independent site verification.",
          "fields": {},
          "notes": [
            "Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.applieddigital.com/insights/july-site-update",
              "host": "applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement",
          "fields": {
            "current_status": "under construction",
            "status_basis": "Delta Forge 2 is explicitly described as under construction.",
            "status_as_of": "2026-10-07",
            "report_period_ended": "2026-08-31"
          },
          "notes": [
            "Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "Applied Digital",
              "reporting_period": "2026-05-31",
              "source_name": "Delta Forge 2",
              "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Applied Digital reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 30, October 23, 2026",
          "scope": "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.",
          "fields": {
            "company_association": {
              "name": "Applied Digital",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Brookwood · Tuscaloosa · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01125"
      }
    },
    {
      "id": "university-of-alabama-hpc-tuscaloosa-al",
      "state": "al",
      "kind": "facility",
      "name": "University of Alabama High Performance Computing and Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tuscaloosa"
      ],
      "city": "Tuscaloosa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alabama future facility with unresolved capacity units/boundary. Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. University future facility page; revised opening forecast and named project address. The current university page forecasts early2027, superseding the older August 2026 completion target. Existing campus computing services do not prove this new building is operating. Historical Stage1approval alone does not establish present construction or final permits; current status remains unresolved.",
      "date": "",
      "events": [
        [
          "2023-09-05",
          "The September 5, 2023 publication date of the University account announces the planned computing center and reports earlier Stage 1 approval. It does not establish the exact approval day, a construction start or an August 2026 actual completion."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hpc.ua.edu/about/",
          "host": "hpc.ua.edu",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
          "host": "news.ua.edu",
          "date": "2023-09-05",
          "published": "2023-09-05",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.30991,
        "lng": -87.54775,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Alabama future facility with unresolved capacity units/boundary",
          "fields": {
            "institution": "University of Alabama",
            "facility": "High Performance Computing and Data Center",
            "address": "709 Johnny Stallings Drive, Tuscaloosa, Alabama",
            "planned_gross_sqft": 40000,
            "included_data_hall_sqft": 10000,
            "planned_project_investment_usd": 96000000,
            "opening_target": "early2027",
            "published_masterplanned_computing_mw": 14.6,
            "other_published_capacity_text": "5 mW+ available, scalable to16 mW+"
          },
          "notes": [
            "Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hpc.ua.edu/about/",
              "host": "hpc.ua.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "University future facility page; revised opening forecast and named project address",
          "fields": {
            "operator_published_project_address": "709 Johnny Stallings Drive, Tuscaloosa, Alabama",
            "opening_forecast": "early 2027",
            "historical_stage_1_approval_publication_date": "2023-09-05"
          },
          "notes": [
            "The current university page forecasts early2027, superseding the older August 2026 completion target. Existing campus computing services do not prove this new building is operating. Historical Stage1approval alone does not establish present construction or final permits; current status remains unresolved."
          ],
          "sources": [
            {
              "url": "https://hpc.ua.edu/about/",
              "host": "hpc.ua.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
              "host": "news.ua.edu",
              "date": "2023-09-05",
              "published": "2023-09-05",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "9fe9ef21b70ac3babecf11800d3aee21823459d9ad6a9c2bf2b46969eecb84ba",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The current original University project page forecasts opening in early 2027. Its September 5, 2023 account had forecast completion in August 2026 and reported earlier Stage 1 approval without an exact approval day. Neither a passed completion forecast nor the newer future opening forecast establishes actual construction progress, commissioning or an operating new facility. Other existing University computing resources are not merged into this planned center, and the forecast is not completed to an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_future_opening_forecast_not_completed_physical_stage",
              "scope": "The current original University project page forecasts opening in early 2027. Its September 5, 2023 account had forecast completion in August 2026 and reported earlier Stage 1 approval without an exact approval day. Neither a passed completion forecast nor the newer future opening forecast establishes actual construction progress, commissioning or an operating new facility. Other existing University computing resources are not merged into this planned center, and the forecast is not completed to an exact opening day."
            }
          },
          "notes": [
            "The current original University project page forecasts opening in early 2027. Its September 5, 2023 account had forecast completion in August 2026 and reported earlier Stage 1 approval without an exact approval day. Neither a passed completion forecast nor the newer future opening forecast establishes actual construction progress, commissioning or an operating new facility. Other existing University computing resources are not merged into this planned center, and the forecast is not completed to an exact opening day.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://hpc.ua.edu/about/",
              "host": "hpc.ua.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
              "host": "news.ua.edu",
              "published": "2023-09-05",
              "date": "2023-09-05",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tuscaloosa · Tuscaloosa · Source context reviewed",
      "event_evidence": [
        {
          "date": "2023-09-05",
          "text": "The September 5, 2023 publication date of the University account announces the planned computing center and reports earlier Stage 1 approval. It does not establish the exact approval day, a construction start or an August 2026 actual completion.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
              "host": "news.ua.edu",
              "published": "2023-09-05",
              "date": "2023-09-05",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01125"
      }
    },
    {
      "id": "youngwoo-project-brookwood-al",
      "state": "al",
      "kind": "facility",
      "name": "Project Brookwood Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tuscaloosa"
      ],
      "city": "Brookwood",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://tuscaloosathread.com/second-brookwood-data-center/",
          "host": "tuscaloosathread.com",
          "date": "2026-08-12",
          "published": "2026-08-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.24671,
        "lng": -87.52164,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "TuscaloosaThread reports planning commission unanimously recommended 374 acreannexation/rezoning for Youngwoo’sProjectBrookwoodLLC, with council final vote scheduledSeptember 15.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://tuscaloosathread.com/second-brookwood-data-center/",
              "host": "tuscaloosathread.com",
              "date": "2026-08-12",
              "published": "2026-08-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Brookwood · Tuscaloosa · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01125"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
