{
  "schema_version": 1,
  "source_compilation_context": {
    "ak": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ak.json",
      "updated": "2026-10-23"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "02122",
    "label": "Kenai Peninsula Borough, Alaska"
  },
  "records": [
    {
      "id": "deepgreen-cook-inlet-nikiski-ak",
      "state": "ak",
      "kind": "facility",
      "name": "Cook Inlet Subsea-Compute & Infrastructure Hub",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kenai Peninsula"
      ],
      "city": "Nikiski",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Acceptance not permit issuance, project license or construction authority.100MWgeneration not exact IT;66pods not66independentlycountable campuses. ORPC expressly denies partnership; AEA says no communication. November2commentdeadline future. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Official notice says estimated annual generation would be 100 megawatts. This mixes energy and power units; retain source wording as a unit conflict, with no inferred annual MWh or critical IT. Preliminary permit if issued grants study/license-filing priority, not land-disturbance rights, construction permission or rights on others property. Deadline remains future. FERC accepted preliminary-permit application notice; printed Federal Register page 56879 read in text and pixels. A preliminary permit, if issued, grants license-application priority, not permission to disturb land or enter others’ property. The source mixes annual energy with MW; no annual MWh or IT load is inferred. No final permit, current operation or precise parcel adopted.",
      "date": "",
      "events": [
        [
          "2026-11-02",
          "Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission."
        ],
        [
          "2026-09-04",
          "The September 4, 2026 Federal Register publication date announces acceptance for filing of the DeepGreen preliminary permit application. Acceptance is not an issued construction permission, actual project commencement or a physical opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.peninsulaclarion.com/2026/09/14/federal-review-advances-for-subsea-data-center-off-nikiski/",
          "host": "peninsulaclarion.com",
          "date": "2026-09-14",
          "published": "2026-09-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
          "host": "govinfo.gov",
          "date": "2026-09-04",
          "published": "2026-09-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 60.17744,
        "lng": -150.29169,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Peninsula Clarion reports FERC accepted DeepGreen preliminary-permit application for feasibility review.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Acceptance not permit issuance, project license or construction authority.100MWgeneration not exact IT;66pods not66independentlycountable campuses. ORPC expressly denies partnership; AEA says no communication. November2commentdeadline future.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.peninsulaclarion.com/2026/09/14/federal-review-advances-for-subsea-data-center-off-nikiski/",
              "host": "peninsulaclarion.com",
              "date": "2026-09-14",
              "published": "2026-09-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "application_accepted_for_filing": true,
            "construction_authorization": false,
            "permit_issued_verified": false,
            "docket": "P-15423-000",
            "notice_dated": "2026-09-01",
            "original_application_date": "2026-02-11",
            "supplement_date": "2026-06-26",
            "comment_deadline_local": "2026-11-02T17:00:00-05:00",
            "proposed_pods": 66,
            "proposed_turbines_range": [
              330,
              350
            ],
            "canonical_annual_generation_mwh": null,
            "critical_it_mw": null
          },
          "notes": [
            "Official notice says estimated annual generation would be 100 megawatts. This mixes energy and power units; retain source wording as a unit conflict, with no inferred annual MWh or critical IT.",
            "Preliminary permit if issued grants study/license-filing priority, not land-disturbance rights, construction permission or rights on others property. Deadline remains future.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
              "host": "govinfo.gov",
              "date": "2026-09-04",
              "published": "2026-09-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "FERC accepted preliminary-permit application notice; printed Federal Register page 56879 read in text and pixels",
          "fields": {
            "docket": "P-15423-000",
            "notice_dated": "2026-09-01",
            "comment_deadline_eastern": "2026-11-02T17:00:00-05:00",
            "permit_scope": "Application accepted for filing; no construction authorization established."
          },
          "notes": [
            "A preliminary permit, if issued, grants license-application priority, not permission to disturb land or enter others’ property. The source mixes annual energy with MW; no annual MWh or IT load is inferred. No final permit, current operation or precise parcel adopted."
          ],
          "sources": [
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
              "host": "govinfo.gov",
              "date": "2026-09-04",
              "published": "2026-09-04",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "f6fd2d84fd898077ba1b4eaa0f240994b607f93ad7615eb4793c1b9aa375cd08",
          "events": [
            {
              "date": "2026-11-02",
              "kind": "scheduled_deadline",
              "text": "Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission.",
              "sources": [
                {
                  "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
                  "host": "govinfo.gov",
                  "date": "2026-09-04",
                  "published": "2026-09-04",
                  "checked": "2026-10-15",
                  "date_kind": "publication",
                  "label": "Reviewed source"
                }
              ]
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "currently_noticed_preliminary_application_proposal",
              "scope": "The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate."
            },
            "source_read_scope": {
              "deepgreen_section_only": true,
              "adjacent_unrelated_federal_notices_excluded": true,
              "existing_scheduled_deadline_not_duplicated": true
            }
          },
          "notes": [
            "The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
              "host": "www.govinfo.gov",
              "published": "2026-09-04",
              "date": "2026-09-04",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Nikiski · Kenai Peninsula · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-11-02",
          "kind": "scheduled_deadline",
          "text": "Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission.",
          "sources": [
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
              "host": "govinfo.gov",
              "date": "2026-09-04",
              "published": "2026-09-04",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ]
        },
        {
          "date": "2026-09-04",
          "text": "The September 4, 2026 Federal Register publication date announces acceptance for filing of the DeepGreen preliminary permit application. Acceptance is not an issued construction permission, actual project commencement or a physical opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
              "host": "www.govinfo.gov",
              "published": "2026-09-04",
              "date": "2026-09-04",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "status_scope": "The original September 4 Federal Register notice identifies DeepGreen project P 15423 000 and an accepted preliminary permit application for a proposed Cook Inlet hydrokinetic and subsea computing project. Its comment and competing filing deadline is November 2, 2026. Agency listed proposal is limited to that pending study application context. Even a preliminary permit would provide study priority and would not authorize land disturbance, entry on others property, construction or computing operation. The separate existing November 2 scheduled deadline is preserved without a duplicate.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "02122"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
