{
  "schema_version": 1,
  "source_compilation_context": {
    "ak": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ak.json",
      "updated": "2026-10-23"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "02185",
    "label": "North Slope Borough, Alaska"
  },
  "records": [
    {
      "id": "stak-energy-north-slope-ak",
      "state": "ak",
      "kind": "facility",
      "name": "Stak Energy North Slope Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "North Slope"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. STAK signed preliminary land-lease finding, not final permit. Signed preliminary finding advances to public notice; it is not final lease issuance or construction/air/wetlands permits. Proposed5yearentry authorization is included in50yearlease, not55years. Document claim first data center inAlaska is not accepted statewide census claim; known other facilities make scope uncertain. Future final finding, rent and actual operations not established. State gas-generation infrastructure not automatically critical IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Alaska DNR public-comment extension for preliminary land-lease decision ADL422741. The June 17notice extended the earlier June 15deadline to July 17. The passage of that date does not prove a final lease, construction authorization or operation. Draft attachments are not executed instruments. No parcel precision or technical totals adopted.",
      "date": "",
      "events": [
        [
          "2026-07-17",
          "Scheduled deadline: Alaska DNR extended the STAK preliminary lease comment deadline to 4:30 p.m. Alaska Daylight Time; a final decision is not established."
        ],
        [
          "2026-06-17",
          "The June 17, 2026 publication date of the State notice reports an extension of comments on the STAK preliminary lease decision to July 17. The notice is not a final lease grant, construction start or physical operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957",
          "host": "aws.state.ak.us",
          "date": "2026-05-12",
          "published": "2026-05-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
          "host": "aws.state.ak.us",
          "date": "2026-06-17",
          "published": "2026-06-17",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 69.31356,
        "lng": -153.47942,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "STAK signed preliminary land-lease finding, not final permit",
          "fields": {
            "agency": "Alaska DNR Division of Oil and Gas",
            "applicant": "STAK Energy Corporation",
            "case": "ADL422741",
            "document_stage": "signed Preliminary Decision",
            "decision_date": "2026-05-12",
            "original_application_date": "2025-11-21",
            "revised_application_date": "2026-03-12",
            "proposed_lease_years": 50,
            "location": "approximately1mile west of DaltonHighway milepost390",
            "borough": "North Slope",
            "proposal": "modular data centers with on-site natural-gas power and supporting infrastructure",
            "comment_deadline": "2026-06-15T16:30:00-08:00"
          },
          "notes": [
            "Signed preliminary finding advances to public notice; it is not final lease issuance or construction/air/wetlands permits. Proposed5yearentry authorization is included in50yearlease, not55years. Document claim first data center inAlaska is not accepted statewide census claim; known other facilities make scope uncertain. Future final finding, rent and actual operations not established. State gas-generation infrastructure not automatically critical IT.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957",
              "host": "aws.state.ak.us",
              "date": "2026-05-12",
              "published": "2026-05-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Alaska DNR public-comment extension for preliminary land-lease decision ADL422741",
          "fields": {
            "case": "ADL422741",
            "extended_comment_deadline_local": "2026-07-17T16:30:00-08:00",
            "earlier_comment_deadline_superseded": "2026-06-15",
            "decision_scope": "Preliminary lease finding; final lease issuance and construction permits not established."
          },
          "notes": [
            "The June 17notice extended the earlier June 15deadline to July 17. The passage of that date does not prove a final lease, construction authorization or operation. Draft attachments are not executed instruments. No parcel precision or technical totals adopted."
          ],
          "sources": [
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
              "host": "aws.state.ak.us",
              "date": "2026-06-17",
              "published": "2026-06-17",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "d5663a6dc79521a07e51ce268ff9208e54c050c4c3fb22569782f061c523a82a",
          "events": [
            {
              "date": "2026-07-17",
              "kind": "scheduled_deadline",
              "text": "Scheduled deadline: Alaska DNR extended the STAK preliminary lease comment deadline to 4:30 p.m. Alaska Daylight Time; a final decision is not established.",
              "sources": [
                {
                  "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
                  "host": "aws.state.ak.us",
                  "date": "2026-06-17",
                  "published": "2026-06-17",
                  "checked": "2026-10-15",
                  "date_kind": "publication",
                  "label": "Reviewed source"
                }
              ]
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The original May 12 preliminary decision for STAK ADL 422741 proposes a State land lease and describes planned computing and energy infrastructure. The June 17 State public notice extends comments to July 17, replacing the earlier June 15 comment date in the preliminary decision. These are preliminary lease review records. A completed final finding, executed lease, entry authorization, physical construction or operation is not established by a passed comment date.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "preliminary_lease_and_extended_comment_period_not_final_lease_or_operation",
              "scope": "The original May 12 preliminary decision for STAK ADL 422741 proposes a State land lease and describes planned computing and energy infrastructure. The June 17 State public notice extends comments to July 17, replacing the earlier June 15 comment date in the preliminary decision. These are preliminary lease review records. A completed final finding, executed lease, entry authorization, physical construction or operation is not established by a passed comment date."
            },
            "source_read_scope": {
              "preliminary_decision_text_pages": [
                1,
                2
              ],
              "public_notice_body_read": true,
              "earlier_comment_due_on": "2026-06-15",
              "later_comment_due_on": "2026-07-17",
              "whole_preliminary_decision_audited": false
            }
          },
          "notes": [
            "The original May 12 preliminary decision for STAK ADL 422741 proposes a State land lease and describes planned computing and energy infrastructure. The June 17 State public notice extends comments to July 17, replacing the earlier June 15 comment date in the preliminary decision. These are preliminary lease review records. A completed final finding, executed lease, entry authorization, physical construction or operation is not established by a passed comment date.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957",
              "host": "aws.state.ak.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
              "host": "aws.state.ak.us",
              "published": "2026-06-17",
              "date": "2026-06-17",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "North Slope · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-07-17",
          "kind": "scheduled_deadline",
          "text": "Scheduled deadline: Alaska DNR extended the STAK preliminary lease comment deadline to 4:30 p.m. Alaska Daylight Time; a final decision is not established.",
          "sources": [
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
              "host": "aws.state.ak.us",
              "date": "2026-06-17",
              "published": "2026-06-17",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ]
        },
        {
          "date": "2026-06-17",
          "text": "The June 17, 2026 publication date of the State notice reports an extension of comments on the STAK preliminary lease decision to July 17. The notice is not a final lease grant, construction start or physical operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
              "host": "aws.state.ak.us",
              "published": "2026-06-17",
              "date": "2026-06-17",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "02185"
      }
    },
    {
      "id": "ta-infrastructure-endicott-ak",
      "state": "ak",
      "kind": "facility",
      "name": "Endicott Bitcoin Mining Pilot",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "North Slope"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alaska trial cryptocurrency module permit application. Permit application/public notice is not granted permit or proof trial began.1.4MWexplicitlybitcoincomputers, separate from AI/cloud power and existing generator capacity. Anchorage office is notice administration, not project address. Future final decision and actual current operations unknown. Proposed term is not actual energization period. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=217467",
          "host": "aws.state.ak.us",
          "date": "2024-11-15",
          "published": "2024-11-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 69.42679,
        "lng": -153.60302,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Alaska trial cryptocurrency module permit application",
          "fields": {
            "agency": "Alaska DNR",
            "applicant": "TA Infrastructure Management LLC",
            "case": "LAS35307",
            "application_received_date": "2024-11-05",
            "notice_publication_date": "2024-11-15",
            "location": "Duck Island Unit Satellite Drilling Island, North Slope",
            "proposed_trial_bitcoin_computer_load_mw": 1.4,
            "power_source": "existing Hilcorp Alaska generation using produced natural gas",
            "proposed_term_start_month": "2024-11",
            "proposed_term_end_month": "2028-11",
            "comment_deadline": "2024-11-29T16:30:00-09:00"
          },
          "notes": [
            "Permit application/public notice is not granted permit or proof trial began.1.4MWexplicitlybitcoincomputers, separate from AI/cloud power and existing generator capacity. Anchorage office is notice administration, not project address. Future final decision and actual current operations unknown. Proposed term is not actual energization period.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=217467",
              "host": "aws.state.ak.us",
              "date": "2024-11-15",
              "published": "2024-11-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The original November 15, 2024 State notice identifies TA Infrastructure application LAS 35307 for a trial computer module at the Satellite Drilling Island in the Duck Island Unit. The notice requests comments on an application and gives a proposed permit term. Neither the proposed term nor the existing generation equipment establishes permit issuance, actual installation or current mining. A final decision, later operating report and exact current physical stage remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "older_trial_module_application_not_current_installation",
              "scope": "The original November 15, 2024 State notice identifies TA Infrastructure application LAS 35307 for a trial computer module at the Satellite Drilling Island in the Duck Island Unit. The notice requests comments on an application and gives a proposed permit term. Neither the proposed term nor the existing generation equipment establishes permit issuance, actual installation or current mining. A final decision, later operating report and exact current physical stage remain unverified."
            }
          },
          "notes": [
            "The original November 15, 2024 State notice identifies TA Infrastructure application LAS 35307 for a trial computer module at the Satellite Drilling Island in the Duck Island Unit. The notice requests comments on an application and gives a proposed permit term. Neither the proposed term nor the existing generation equipment establishes permit issuance, actual installation or current mining. A final decision, later operating report and exact current physical stage remain unverified.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=217467",
              "host": "aws.state.ak.us",
              "published": "2024-11-15",
              "date": "2024-11-15",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "North Slope · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "02185"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
