{
  "schema_version": 1,
  "source_compilation_context": {
    "ar": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ar.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "05019",
    "label": "Clark County, Arkansas"
  },
  "records": [
    {
      "id": "dc-devco-project-pulse-gum-springs-ar",
      "state": "ar",
      "kind": "facility",
      "name": "Project Pulse Data Center Campus, Southwest Arkansas Mega Site (terminated)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Gum Springs",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. Arkadelphian April16,2026 report with April22 transcript update records EDCCC authorization of a991acre SouthwestArkansasMegaSite purchase agreement in GumSprings with DCDevco.11.4Mland deal,1Bminimum/150jobs/2032target were prospective, not closed purchase or completed spend/jobs. Counterparty/enduser unnamed. Representatives claimed50000gpdclosed-loop use and600000gpdavailability plus no residential-rate impact; these are projections/assertions, not a signed water/power contract or measured rate outcome. Main article and opening transcript portion read, not all82kcharacters/audio. Later April30termination report controls the agreement outcome; no hypothetical multiGW figure adopted from unread transcript passages. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification. Arkadelphian April30,2026 report quotes EDCCC/Alliance CEO saying buyer did not deposit required200000USD earnest money in time, so agreement terminated under its terms. Public metadata publishes April30; October header is current-site chrome, not event date. This supports reported purchase-agreement termination, not a verified recorded deed or a ruling forbidding every future data center on the land. May1acknowledgment meeting was scheduled in this story; outcome not read. Existing inherited cancelled status is corroborated context, not a newly discovered reversal.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://arkadelphian.com/2026/04/16/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/",
          "host": "arkadelphian.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://arkadelphian.com/2026/04/30/project-pulse-topic-of-special-edccc-meeting-friday-morning/",
          "host": "arkadelphian.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.05092,
        "lng": -93.17672,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "original-operator-transaction-and-local-outcomes-round61-2026-10-15.json",
          "scope": "Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.",
          "fields": {},
          "notes": [
            "Arkadelphian April16,2026 report with April22 transcript update records EDCCC authorization of a991acre SouthwestArkansasMegaSite purchase agreement in GumSprings with DCDevco.11.4Mland deal,1Bminimum/150jobs/2032target were prospective, not closed purchase or completed spend/jobs. Counterparty/enduser unnamed.",
            "Representatives claimed50000gpdclosed-loop use and600000gpdavailability plus no residential-rate impact; these are projections/assertions, not a signed water/power contract or measured rate outcome. Main article and opening transcript portion read, not all82kcharacters/audio. Later April30termination report controls the agreement outcome; no hypothetical multiGW figure adopted from unread transcript passages.",
            "Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."
          ],
          "sources": [
            {
              "url": "https://arkadelphian.com/2026/04/16/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/",
              "host": "arkadelphian.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "original-operator-transaction-and-local-outcomes-round61-2026-10-15.json",
          "scope": "Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.",
          "fields": {},
          "notes": [
            "Arkadelphian April30,2026 report quotes EDCCC/Alliance CEO saying buyer did not deposit required200000USD earnest money in time, so agreement terminated under its terms. Public metadata publishes April30; October header is current-site chrome, not event date. This supports reported purchase-agreement termination, not a verified recorded deed or a ruling forbidding every future data center on the land. May1acknowledgment meeting was scheduled in this story; outcome not read. Existing inherited cancelled status is corroborated context, not a newly discovered reversal.",
            "Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."
          ],
          "sources": [
            {
              "url": "https://arkadelphian.com/2026/04/30/project-pulse-topic-of-special-edccc-meeting-friday-morning/",
              "host": "arkadelphian.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The April 2026 Arkadelphian account describes a conditional 991-acre sale for Project Pulse. The article and opening portion of its edited transcript were reviewed; the full audio was not. Forecast 2032 operation and proposed water demand are not current delivery. The inherited termination wording is not established by this account; no new stage is inferred."
            }
          },
          "notes": [
            "The April 2026 Arkadelphian account describes a conditional 991-acre sale for Project Pulse. The article and opening portion of its edited transcript were reviewed; the full audio was not. Forecast 2032 operation and proposed water demand are not current delivery. The inherited termination wording is not established by this account; no new stage is inferred."
          ],
          "sources": [
            {
              "url": "https://arkadelphian.com/2026/04/16/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/",
              "host": "arkadelphian.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gum Springs · Clark · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "05019"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
