{
  "schema_version": 1,
  "source_compilation_context": {
    "ar": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ar.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "05035",
    "label": "Crittenden County, Arkansas"
  },
  "records": [
    {
      "id": "blockops-marion-ar",
      "state": "ar",
      "kind": "facility",
      "name": "BlockOps Marion Bitcoin Mine (planned)",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Crittenden"
      ],
      "city": "Marion",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. BlockOps site-specific historical investment versus portfolio stages. Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/",
          "host": "blockopsmining.com",
          "date": "2026-10-08",
          "published": "2026-10-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.20541,
        "lng": -90.30821,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "BlockOps site-specific historical investment versus portfolio stages",
          "fields": {
            "operator": "BlockOps",
            "page_updated_date": "2026-10-08",
            "helena_site_acres": 168,
            "helena_former_use": "Dragon Woodland Sawmill Corporation",
            "historical_land_purchase_usd_approx": 300000,
            "helena_renovation_commitment_usd": 2000000,
            "helena_total_planned_investment_usd": 13500000,
            "helena_projected_annual_sales_tax_usd": 105000,
            "helena_planned_miner_count": 2900,
            "other_operator_described_sites": {
              "Russellville": "operates",
              "Moreland": "operates",
              "Marion": "further development planned"
            }
          },
          "notes": [
            "Pageexplicitlynumbersasreportedatapprovalnotcurrentoperatinginventory.2Mrenovationand300000landnotaddtocomprehensive13.5Mwithoutscope. Minecountnotbuildings.8MWunderutilizedindustrialcapacitynotexplicitIT. Individualmunicipalapprovalorderunread;noexactapprovaldayinoperatorarticle. Advertisedenergypriceandcurtailmentcapnotindependentcurrentcustomtariff.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/",
              "host": "blockopsmining.com",
              "date": "2026-10-08",
              "published": "2026-10-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 44",
          "scope": "The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_marion_development_plan",
              "scope": "The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified."
            }
          },
          "notes": [
            "The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://www.blockopsmining.com/bitcoin-mining-rural-arkansas/",
              "host": "www.blockopsmining.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Marion · Crittenden · Source context reviewed",
      "status_scope": "The current original BlockOps page expressly describes further development planned in Marion. Company listed proposal is limited to that named forward development statement. Generic company operations, Helena approval figures and Russellville or Moreland operations do not establish Marion construction or operation. Exact premises, approvals, current build progress, quantities and an opening day remain unverified.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "05035"
      }
    },
    {
      "id": "google-west-memphis-ar",
      "state": "ar",
      "kind": "project",
      "name": "Google West Memphis Data Center Campus",
      "group": "building",
      "status": "Construction reported",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center development",
      "counties": [
        "Crittenden"
      ],
      "city": "West Memphis",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Subscriber article body was not read. The contract-review headline does not establish Entergy contract terms, executed contributions or all permit approvals. Public caption only. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-02",
          "Google and Entergy announced the West Memphis development within a wider Arkansas infrastructure investment. This is an announcement, not a construction start, opening or site-only investment allocation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/",
          "host": "arkansasonline.com",
          "date": "2026-09-03",
          "published": "2026-09-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
          "host": "blog.google",
          "published": "2025-10-02",
          "date": "2025-10-02",
          "checked": "2026-10-16",
          "label": "Original Arkansas infrastructure announcement"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Current Google location directory; flags are not status proof"
        },
        {
          "url": "https://arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F510%2F28051%2FEXHIBIT+B+-+Meeting+Minutes+09-15-2026.pdf",
          "host": "arkleg.state.ar.us",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "DRAFT recap of September 15 committee testimony"
        },
        {
          "url": "https://www.entergy.com/news/entergy-arkansas-powers-googles-4b-investment-in-the-state",
          "host": "www.entergy.com",
          "published": "2025-10-02",
          "date": "2025-10-02",
          "checked": "2026-10-16",
          "label": "Original Entergy announcement"
        },
        {
          "url": "https://www.entergy.com/news/entergy-customers-begin-seeing-benefits-from-data-center-agreements-fair-share-plus-pledge-keeps-money-in-customers-pockets",
          "host": "www.entergy.com",
          "published": "2026-08-27",
          "date": "2026-08-27",
          "checked": "2026-10-16",
          "label": "Regional operating/benefit forecast, not an opening record"
        },
        {
          "url": "https://www.entergy.com/blog/statement-from-entergy-arkansas",
          "host": "www.entergy.com",
          "published": "2026-09-02",
          "date": "2026-09-02",
          "checked": "2026-10-16",
          "label": "Utility contract-arithmetic statement, not an executed agreement"
        }
      ],
      "loc": {
        "lat": 35.22034,
        "lng": -90.32451,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Arkansas Democrat-Gazette's publicly visible caption documents June 1 construction of Google's planned four-billion-USD, 1,100-acre West Memphis campus.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Subscriber article body was not read. The contract-review headline does not establish Entergy contract terms, executed contributions or all permit approvals. Public caption only.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/",
              "host": "arkansasonline.com",
              "date": "2026-09-03",
              "published": "2026-09-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Google pending-location follow-up October 16",
          "scope": "Explicit existing-record identity, source confidence and phase review. No new physical site, parcel, whole-campus completion, whole-state refresh or automatic directory-flag status.",
          "fields": {
            "identity_scope": "Google and Entergy explicitly name the West Memphis development. It matches the existing Google West Memphis research record; no new site or duplicate ID is created.",
            "reported_construction_scope": "The DRAFT September 15, 2026 committee recap reports Google representative testimony that construction is occurring at West Memphis. Its visible DRAFT watermark is absent from text extraction. This is reported construction, not adopted minutes, an agency construction approval, a site inspection, delivered halls or operation.",
            "document_status": {
              "status": "DRAFT",
              "meeting_date": "2026-09-15",
              "pdf_creation_metadata_date": "2026-10-16",
              "published_date": null,
              "approval_date": null,
              "scope": "Creation metadata does not establish publication or adoption. The draft's approval of August 6 minutes does not approve its own September 15 text."
            },
            "provider_roles": [
              {
                "name": "Google",
                "role": "planned operator"
              }
            ],
            "investment_scope": "Google's $4 billion commitment through 2027 includes statewide cloud/AI infrastructure and programs. The whole amount is not independently assigned as West Memphis construction cost. The community fund is a separate purpose, not a tax award.",
            "grid_scope": "Entergy describes planned 600 MW solar and 350 MW battery power in Jefferson County serving the grid. These are different resources, not West Memphis IT load, site generation or an additive campus capacity.",
            "forecast_scope": "Entergy's August 2026 early-2027 operating/benefit forecast covers Arkansas/Louisiana projects collectively; it is not a West Memphis opening date, verified current operation or realized saving.",
            "contract_scope": "The September utility statement disputes newspaper arithmetic and describes long-term payments and projected benefits. No executed contract or commission order was read; no payment, benefit total or tariff term is normalized here.",
            "water_scope": "The draft's separate Central Arkansas Water comments about proposed Google/AVAIO projects are not assigned to West Memphis and do not prove current statewide permit/application absence.",
            "operator_point_lead": {
              "lat": 35.1465,
              "lng": -90.1848,
              "adopted": false,
              "scope": "Current operator-directory reference only; existing approximate geometry remains unchanged pending an explicit source/geometry review."
            }
          },
          "notes": [
            "Keep each source type, date and confidence visible. Reported activity is not a site inspection, legal permission, complete campus or current metered demand.",
            "All inherited geometry, addresses, jurisdictions, legacy MW, investment, jobs and opening fields remain unchanged.",
            "The construction label deliberately carries secondary-report confidence because its basis is an unadopted draft recap of testimony. No primary status confidence is claimed."
          ],
          "sources": [
            {
              "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
              "host": "blog.google",
              "published": "2025-10-02",
              "date": "2025-10-02",
              "checked": "2026-10-16",
              "label": "Original Arkansas infrastructure announcement"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current Google location directory; flags are not status proof"
            },
            {
              "url": "https://arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F510%2F28051%2FEXHIBIT+B+-+Meeting+Minutes+09-15-2026.pdf",
              "host": "arkleg.state.ar.us",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "DRAFT recap of September 15 committee testimony"
            },
            {
              "url": "https://www.entergy.com/news/entergy-arkansas-powers-googles-4b-investment-in-the-state",
              "host": "www.entergy.com",
              "published": "2025-10-02",
              "date": "2025-10-02",
              "checked": "2026-10-16",
              "label": "Original Entergy announcement"
            },
            {
              "url": "https://www.entergy.com/news/entergy-customers-begin-seeing-benefits-from-data-center-agreements-fair-share-plus-pledge-keeps-money-in-customers-pockets",
              "host": "www.entergy.com",
              "published": "2026-08-27",
              "date": "2026-08-27",
              "checked": "2026-10-16",
              "label": "Regional operating/benefit forecast, not an opening record"
            },
            {
              "url": "https://www.entergy.com/blog/statement-from-entergy-arkansas",
              "host": "www.entergy.com",
              "published": "2026-09-02",
              "date": "2026-09-02",
              "checked": "2026-10-16",
              "label": "Utility contract-arithmetic statement, not an executed agreement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Memphis · Crittenden · Source context reviewed",
      "status_scope": "The DRAFT September 15, 2026 committee recap reports Google representative testimony that construction is occurring at West Memphis. Its visible DRAFT watermark is absent from text extraction. This is reported construction, not adopted minutes, an agency construction approval, a site inspection, delivered halls or operation.",
      "event_evidence": [
        {
          "date": "2025-10-02",
          "text": "Google and Entergy announced the West Memphis development within a wider Arkansas infrastructure investment. This is an announcement, not a construction start, opening or site-only investment allocation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
              "host": "blog.google",
              "published": "2025-10-02",
              "date": "2025-10-02",
              "checked": "2026-10-16",
              "label": "Original Arkansas infrastructure announcement"
            },
            {
              "url": "https://www.entergy.com/news/entergy-arkansas-powers-googles-4b-investment-in-the-state",
              "host": "www.entergy.com",
              "published": "2025-10-02",
              "date": "2025-10-02",
              "checked": "2026-10-16",
              "label": "Original Entergy announcement"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "05035"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
