{
  "schema_version": 1,
  "source_compilation_context": {
    "fl": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/fl.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "12027",
    "label": "DeSoto County, Florida"
  },
  "records": [
    {
      "id": "dcip-arcadia-roan-street-fl",
      "state": "fl",
      "kind": "facility",
      "name": "DCIP DeSoto County Data Center (Roan Street)",
      "group": "approved",
      "status": "Agency reported approval",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "DeSoto"
      ],
      "city": "Arcadia",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeSoto original approval versus two larger pending applications. Three distinct cases and acreages. Approval reported only for the small original PUD and concept plan, not all hyperscale applications or every building permit. Pending hearings have no date on this index. No numeric IT MW or actual commissioning. Do not combine electrical generation with IT demand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-24",
          "The County original application account reports Board approval of the DCIP Roan Road PUD rezoning and concept development plan March 24, 2026. This is the specific land use decision, not construction or operation and not the separate later hyperscale application."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://desotobocc.com/431/Data-Center-Applications",
          "host": "desotobocc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 27.18631,
        "lng": -81.80947,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "DeSoto original approval versus two larger pending applications",
          "fields": {
            "agency": "DeSoto County, Florida",
            "county_reported_approved_project": {
              "applicant": "DCIP",
              "case": "RZNE-0077-2025",
              "address": "3800 NE Roan Road",
              "site_acres": 34.22,
              "facility_and_office_sqft": 35134,
              "generation_facility_included": true,
              "pud_and_concept_approval_date": "2026-03-24"
            },
            "separate_applications": [
              {
                "applicants": [
                  "DCIP",
                  "3-F Ranch"
                ],
                "case": "RZNE-0086-2026",
                "received": "2026-05-07",
                "acres": 274.26,
                "proposed_sqft": 3686125
              },
              {
                "applicants": [
                  "Swisher Mildred E TR",
                  "Swisher Properties"
                ],
                "case": "RZNE-0087-2026",
                "received": "2026-05-13",
                "acres": 553.79,
                "proposed_sqft": 4655000,
                "generation_facility_included": true
              }
            ]
          },
          "notes": [
            "Three distinct cases and acreages. Approval reported only for the small original PUD and concept plan, not all hyperscale applications or every building permit. Pending hearings have no date on this index. No numeric IT MW or actual commissioning. Do not combine electrical generation with IT demand.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://desotobocc.com/431/Data-Center-Applications",
              "host": "desotobocc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 38",
          "scope": "The current original County application account reports Board approval of the specific DCIP Roan Road PUD rezoning and concept plan on March 24, 2026. Agency reported approval is limited to that land use and concept decision. The separately listed later DCIP and 3 F Ranch hyperscale application is not merged into this smaller Roan Road component. The account does not establish a building permit, completed electrical generation, construction or computing operation. No proposed quantities or exact site reference are promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_reported_roan_road_pud_and_concept_approval",
              "scope": "The current original County application account reports Board approval of the specific DCIP Roan Road PUD rezoning and concept plan on March 24, 2026. Agency reported approval is limited to that land use and concept decision. The separately listed later DCIP and 3 F Ranch hyperscale application is not merged into this smaller Roan Road component. The account does not establish a building permit, completed electrical generation, construction or computing operation. No proposed quantities or exact site reference are promoted."
            }
          },
          "notes": [
            "The current original County application account reports Board approval of the specific DCIP Roan Road PUD rezoning and concept plan on March 24, 2026. Agency reported approval is limited to that land use and concept decision. The separately listed later DCIP and 3 F Ranch hyperscale application is not merged into this smaller Roan Road component. The account does not establish a building permit, completed electrical generation, construction or computing operation. No proposed quantities or exact site reference are promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://desotobocc.com/431/Data-Center-Applications",
              "host": "desotobocc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Arcadia · DeSoto · Source context reviewed",
      "status_scope": "The current original County application account reports Board approval of the specific DCIP Roan Road PUD rezoning and concept plan on March 24, 2026. Agency reported approval is limited to that land use and concept decision. The separately listed later DCIP and 3 F Ranch hyperscale application is not merged into this smaller Roan Road component. The account does not establish a building permit, completed electrical generation, construction or computing operation. No proposed quantities or exact site reference are promoted.",
      "event_evidence": [
        {
          "date": "2026-03-24",
          "text": "The County original application account reports Board approval of the DCIP Roan Road PUD rezoning and concept development plan March 24, 2026. This is the specific land use decision, not construction or operation and not the separate later hyperscale application.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://desotobocc.com/431/Data-Center-Applications",
              "host": "desotobocc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "12027"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
