  "schema_version": 1,
  "source_compilation_context": {
    "fl": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/fl.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "12115",
    "label": "Sarasota County, Florida"
  },
  "records": [
    {
      "id": "north-port-holdings-300-deep-park-north-port-fl",
      "state": "fl",
      "kind": "facility",
      "name": "Deep Park Data Center (North Port 300)",
      "group": "proposed",
      "status": "Application under review",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Sarasota"
      ],
      "city": "North Port",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. North Port pending application versus broader mixed-use concept. City map explicitly approximate, not exact coordinates. 282 acres and 112-acre pod include multiple uses, not exclusive DC footprint. Application receipt and voluntary master concept plan are not approval. Linked meetings do not establish enacted moratorium or exact expiry from this text. Legislative summaries are contextual agency explanations, not independent statute interpretation. No critical IT MW, final outcome or operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3",
          "host": "engage.zencity.io",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 27.18444,
        "lng": -82.33153,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "North Port pending application versus broader mixed-use concept",
          "fields": {
            "agency": "City of North Port, Florida",
            "applicant": "North Port300",
            "application_received_date": "2026-07-20",
            "stage_as_reported": "awaiting applicant response to staff sufficiency issues",
            "location": "Yorkshire area north of Interstate75 and south of Yorkshire Street",
            "proposed_building_area_sqft": 896000,
            "included_office_sqft_approx": 123200,
            "broader_mixed_use_site_acres": 282,
            "broader_plan_pods_acres_approx": {
              "commercial": 62,
              "residential": 107,
              "retail_office_storage_data_center": 112
            }
          },
          "notes": [
            "City map explicitly approximate, not exact coordinates. 282 acres and 112-acre pod include multiple uses, not exclusive DC footprint. Application receipt and voluntary master concept plan are not approval. Linked meetings do not establish enacted moratorium or exact expiry from this text. Legislative summaries are contextual agency explanations, not independent statute interpretation. No critical IT MW, final outcome or operations inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3",
              "host": "engage.zencity.io",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 38",
          "scope": "The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_north_port_300_application_sufficiency_review",
              "scope": "The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation."
            }
          },
          "notes": [
            "The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3",
              "host": "engage.zencity.io",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "North Port · Sarasota · Source context reviewed",
      "status_scope": "The current City project information account explicitly identifies North Port 300 and says its July 20, 2026 data center application underwent sufficiency review, with applicant responses to insufficiencies still awaited. Application under review is limited to that named workflow. The broader mixed use voluntary concept plan is distinct from an approved data center, and the source labels its map approximate. Discussion of a moratorium, general zoning and summaries of state law are not a signed current moratorium instrument, final project disposition, building work or computing operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "12115"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}