{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "13103",
    "label": "Effingham County, Georgia"
  },
  "records": [
    {
      "id": "openai-project-camellia-effingham-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Camellia (OpenAI Effingham County Campus)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Effingham"
      ],
      "city": "Rincon",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Camellia county forecasts, benefit scopes and incomplete review. County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
          "host": "effinghamcounty.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.36712,
        "lng": -81.34137,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Camellia county forecasts, benefit scopes and incomplete review",
          "fields": {
            "agency": "Effingham County, Georgia",
            "project": "Project Camellia",
            "named_company": "OpenAI",
            "review_stage": "initial requirements met; county/state reviews, permits and inspections remain",
            "planned_phases": 5,
            "minimum_required_investment_basis_usd": 20000000000,
            "openai_community_commitment_lifetime_usd": 80000000,
            "included_school_meal_grant_2026_27_usd": 4300000,
            "ecida_tax_relief_commitment_annual_usd": 30000000,
            "ecida_tax_relief_years": 3,
            "forecast_pilot_2032_annual_usd": {
              "county": 27000000,
              "schools": 39000000
            },
            "forecast_buildout_year": 2032,
            "planned_nonindustrial_neighbor_buffer_feet_min": 300,
            "cooling_plan": "closed loop; treated surface water, not Floridan aquifer groundwater"
          },
          "notes": [
            "County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
              "host": "effinghamcounty.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_named_camellia_initial_consideration_not_completed_review",
              "scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service."
            }
          },
          "notes": [
            "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
              "host": "www.effinghamcounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rincon · Effingham · Source context reviewed",
      "status_scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13103"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
