{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "13113",
    "label": "Fayette County, Georgia"
  },
  "records": [
    {
      "id": "microsoft-fairwater-fayetteville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Fairwater Atlanta (Azure AI Superfactory)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fayette"
      ],
      "city": "Fayetteville",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fayette generic incentives not Fairwater awarded benefits. Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-11-12",
          "Microsoft published its named Fairwater Atlanta operating account on November 12, 2025. The source reports operation beginning in October without an exact day. November 12 is the publication date, not a manufactured opening day or an operating certification for every Georgia campus."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://fayettega.org/doing-business/incentives-tax-rates/",
          "host": "fayettega.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
          "host": "news.microsoft.com",
          "published": "2025-11-12",
          "date": "2025-11-12",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.4136,
        "lng": -84.49495,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Fayette generic incentives not Fairwater awarded benefits",
          "fields": {
            "publisher": "Fayette County Development Authority",
            "scope": "generic incentive eligibility page",
            "tax_table_year": 2021
          },
          "notes": [
            "Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://fayettega.org/doing-business/incentives-tax-rates/",
              "host": "fayettega.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_named_fairwater_operation",
              "scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name."
            },
            "identity_and_date_scope": {
              "matched_named_facility": "Fairwater Atlanta",
              "inherited_fayetteville_jurisdiction_newly_certified": false,
              "exact_opening_day_established": false,
              "operating_start_month_reported": "October 2025",
              "network_total_not_site_capacity": true,
              "cooling_design_not_measured_total_water_use": true
            }
          },
          "notes": [
            "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fayetteville · Fayette · Source context reviewed",
      "status_scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
      "event_evidence": [
        {
          "date": "2025-11-12",
          "text": "Microsoft published its named Fairwater Atlanta operating account on November 12, 2025. The source reports operation beginning in October without an exact day. November 12 is the publication date, not a manufactured opening day or an operating certification for every Georgia campus.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13113"
      }
    },
    {
      "id": "microsoft-tyrone-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Tyrone Campus (Project Rita)",
      "group": "approved",
      "status": "Zoning approved",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fayette"
      ],
      "city": "Tyrone",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tyrone dated land-use and operator water forecast summary. Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-02-22",
          "The Town of Tyrone lists the Planning Commission public hearing for the Microsoft rezoning on February 22, 2024. A hearing is separate from the later Council zoning approval and from construction permits."
        ],
        [
          "2024-03-21",
          "The Town of Tyrone lists the Council public hearing for the Microsoft rezoning on March 21, 2024. This is the hearing date, not final approval or a physical milestone."
        ],
        [
          "2024-03-28",
          "The Town of Tyrone dates Council zoning approval for the Microsoft project to March 28, 2024. This is zoning approval only. Site plan review, land disturbance permits, building permits and operation remain separate."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tyronega.gov/datacenter",
          "host": "tyronega.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/wp-content/uploads/2026/07/Tyrone-May-26-Boards.pdf",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.42187,
        "lng": -84.50398,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Tyrone dated land-use and operator water forecast summary",
          "fields": {
            "town_council_zoning_approval_date": "2024-03-28",
            "town_reported_permit_status_as_of": "2026-06-02",
            "town_reported_permit_status": "no site plan,land-disturbance or building-permit applications submitted",
            "town_reported_local_incentive_status": "no abatement offered or requested",
            "operator_estimated_operational_water_gallons_per_day_approx": 4000
          },
          "notes": [
            "Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "tyronega.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "town_zoning_approval_with_later_permits_separate",
              "scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation."
            },
            "regulatory_scope": {
              "zoning_approval_on": "2024-03-28",
              "permit_application_absence_account_as_of": "2026-06-02",
              "later_permit_activity_checked_through_today": false,
              "town_explanation_not_countywide_rule_or_legal_advice": true,
              "operator_concept_board_is_draft_not_approved_site_plan": true
            },
            "community_session_date_conflict": {
              "operator_web_invitation": "May 19, 2026",
              "operator_board_footer": "May 26, 2026",
              "exact_session_day_resolved": false,
              "neither_day_added_as_accomplished_timeline_event": true
            }
          },
          "notes": [
            "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/wp-content/uploads/2026/07/Tyrone-May-26-Boards.pdf",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
              "host": "local.microsoft.com",
              "published": "2026-05-01",
              "date": "2026-05-01",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tyrone · Fayette · Source context reviewed",
      "status_scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
      "event_evidence": [
        {
          "date": "2024-02-22",
          "text": "The Town of Tyrone lists the Planning Commission public hearing for the Microsoft rezoning on February 22, 2024. A hearing is separate from the later Council zoning approval and from construction permits.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2024-03-21",
          "text": "The Town of Tyrone lists the Council public hearing for the Microsoft rezoning on March 21, 2024. This is the hearing date, not final approval or a physical milestone.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2024-03-28",
          "text": "The Town of Tyrone dates Council zoning approval for the Microsoft project to March 28, 2024. This is zoning approval only. Site plan review, land disturbance permits, building permits and operation remain separate.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13113"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
