{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "13115",
    "label": "Floyd County, Georgia"
  },
  "records": [
    {
      "id": "atlas-coosa-project-gracie-floyd-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Coosa Data Center (Project Gracie)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Floyd"
      ],
      "city": "Rome",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.26318,
        "lng": -85.21399,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Atlas Gracie versus Sassy proposal identity",
          "fields": {
            "developer": "Atlas Development",
            "separate_proposals": [
              {
                "name": "Project Gracie",
                "locality": "Coosa, FloydCounty, Georgia",
                "proposed_acres": 200,
                "proposed_area_sqft": 2400000,
                "proposed_buildings": 7,
                "target_completion_month": "2032-12",
                "reported_planning_recommendation": "4-3 in favor; CountyBoard decision still required"
              },
              {
                "name": "Project Sassy",
                "locality": "Rome, Georgia",
                "proposed_initial_acres": 178,
                "sought_additional_acres": 15
              }
            ]
          },
          "notes": [
            "Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rome · Floyd · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13115"
      }
    },
    {
      "id": "atlas-project-sassy-rome-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Sassy (Atlas Development Rome Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Floyd"
      ],
      "city": "Rome",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.27861,
        "lng": -85.23083,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Atlas Gracie versus Sassy proposal identity",
          "fields": {
            "developer": "Atlas Development",
            "separate_proposals": [
              {
                "name": "Project Gracie",
                "locality": "Coosa, FloydCounty, Georgia",
                "proposed_acres": 200,
                "proposed_area_sqft": 2400000,
                "proposed_buildings": 7,
                "target_completion_month": "2032-12",
                "reported_planning_recommendation": "4-3 in favor; CountyBoard decision still required"
              },
              {
                "name": "Project Sassy",
                "locality": "Rome, Georgia",
                "proposed_initial_acres": 178,
                "sought_additional_acres": 15
              }
            ]
          },
          "notes": [
            "Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rome · Floyd · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13115"
      }
    },
    {
      "id": "microsoft-firecracker-rome-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Data Center Campus - Rome, GA",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Floyd"
      ],
      "city": "Rome",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending. Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
          "host": "allongeorgia.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://developromefloyd.com/targeted-sectors/technology/",
          "host": "developromefloyd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
          "host": "developromefloyd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 34.231,
        "lng": -85.21116,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending.",
            "Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
              "host": "allongeorgia.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."
            }
          },
          "notes": [
            "The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."
          ],
          "sources": [
            {
              "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
              "host": "allongeorgia.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://developromefloyd.com/targeted-sectors/technology/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "distinct_coosa_proposal_and_firecracker_current_stage_hold",
              "scope": "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage."
            },
            "identity_hold": {
              "coosa_school_proposal_distinct_from_microsoft_huffaker_purchase": true,
              "republication_not_independent_permit_verification": true,
              "current_firecracker_stage_verified": false,
              "minutes_request_state": "HTTP404"
            }
          },
          "notes": [
            "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rome · Floyd · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13115"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
