{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "13139",
    "label": "Hall County, Georgia"
  },
  "records": [
    {
      "id": "project-turbo-okelly-road-gainesville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Turbo (Gainesville Data Center)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hall"
      ],
      "city": "Gainesville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-09-15",
          "Hall County staff account records five people speaking in opposition at the September 15, 2025 Planning Commission public hearing on Project Turbo. This dates the recorded hearing episode rather than the first concern, a final project disposition or measured impacts."
        ],
        [
          "2025-10-06",
          "Hall County staff account records an October 6, 2025 Planning Commission recommendation for Project Turbo with ten conditions by three affirmative votes, with one recusal and one absence. The recommendation does not establish a final Board approval or computing commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html",
          "host": "yahoo.com",
          "date": "2025-08-26",
          "published": "2025-08-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
          "host": "nyc3.digitaloceanspaces.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.31718,
        "lng": -83.81975,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "WSBTV story syndicated onYahoo describes ProjectTurbo proposed atOkellyRoad GainesvilleHallCounty,900000squarefeet/threebuildings/substation, USD1.2billionproposedvalue and developer-requested delay to aSeptember15planning meeting. Headline says plans abandoned while body still says proposed.",
            "independently_verified_current_operating_status": null,
            "canonical_current_status": null,
            "headline_body_stage_conflict": true
          },
          "notes": [
            "Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html",
              "host": "yahoo.com",
              "date": "2025-08-26",
              "published": "2025-08-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_special_use_proposal",
              "scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance."
            },
            "source_read_scope": {
              "original_memo_all_two_text_pages_read": true,
              "header_and_footer_dates_retained": true,
              "planning_recommendation_not_final_board_action": true,
              "proposed_conditions_not_final_ordinance": true,
              "public_opposition_not_measured_harm": true
            }
          },
          "notes": [
            "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
              "host": "nyc3.digitaloceanspaces.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gainesville · Hall · Source context reviewed",
      "status_scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.",
      "event_evidence": [
        {
          "date": "2025-09-15",
          "text": "Hall County staff account records five people speaking in opposition at the September 15, 2025 Planning Commission public hearing on Project Turbo. This dates the recorded hearing episode rather than the first concern, a final project disposition or measured impacts.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
              "host": "nyc3.digitaloceanspaces.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2025-10-06",
          "text": "Hall County staff account records an October 6, 2025 Planning Commission recommendation for Project Turbo with ten conditions by three affirmative votes, with one recusal and one absence. The recommendation does not establish a final Board approval or computing commissioning.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
              "host": "nyc3.digitaloceanspaces.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13139"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
