{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "13217",
    "label": "Newton County, Georgia"
  },
  "records": [
    {
      "id": "meta-stanton-springs-newton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Meta Newton Data Center (Stanton Springs)",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Social Circle",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
          "host": "datacenters.atmeta.com",
          "date": "2021-03-14",
          "published": "2021-03-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 33.55455,
        "lng": -83.85042,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "historical_planned_structure_area_sqft": 970000,
            "historical_completion_target_year": 2020
          },
          "notes": [
            "Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
              "host": "datacenters.atmeta.com",
              "date": "2021-03-14",
              "published": "2021-03-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes."
          },
          "notes": [
            "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 05, October 23, 2026",
          "scope": "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus fact sheet, visually reviewed PDF page 1"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Social Circle · Newton · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role. This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    },
    {
      "id": "serverfarm-covington-hazelbrand-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Serverfarm Covington Data Center (Hazelbrand Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Covington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law",
          "host": "gpb.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.selc.org/wp-content/uploads/2026/06/VoltaGrid-and-Serverfarm-Enforcement-Request.pdf",
          "host": "www.selc.org",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.serverfarmllc.com/data-centers/",
          "host": "www.serverfarmllc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.56728,
        "lng": -83.86432,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law",
              "host": "gpb.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The GPB report concerns generation enforcement at Serverfarm Covington, not automatically closure of the whole data center. SELC’s June 25 request is advocacy alleging violations, not an agency finding. Its separate emergency-generator and VoltaGrid prime-engine proposals are not summed as IT capacity. The public DocumentCloud page supplied metadata only; the actual July 2 agency letter was not read and supplies no adopted finding."
            }
          },
          "notes": [
            "The GPB report concerns generation enforcement at Serverfarm Covington, not automatically closure of the whole data center. SELC’s June 25 request is advocacy alleging violations, not an agency finding. Its separate emergency-generator and VoltaGrid prime-engine proposals are not summed as IT capacity. The public DocumentCloud page supplied metadata only; the actual July 2 agency letter was not read and supplies no adopted finding."
          ],
          "sources": [
            {
              "url": "https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law",
              "host": "www.gpb.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.selc.org/wp-content/uploads/2026/06/VoltaGrid-and-Serverfarm-Enforcement-Request.pdf",
              "host": "www.selc.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The current original Serverfarm locations page lists Covington Georgia as coming soon and separately describes its Atlanta ATL1 facility. The selected current city listing does not independently establish the exact Hazelbrand project identity, physical construction stage, commissioned computing, current tenant or the contents and disposition of a separate enforcement request. Atlanta ATL1 service is not transferred to Covington. City level coming soon wording and contracted or planned infrastructure remain separate from exact facility operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_listing_exact_hazelbrand_crosswalk_and_stage_held",
              "scope": "The current original Serverfarm locations page lists Covington Georgia as coming soon and separately describes its Atlanta ATL1 facility. The selected current city listing does not independently establish the exact Hazelbrand project identity, physical construction stage, commissioned computing, current tenant or the contents and disposition of a separate enforcement request. Atlanta ATL1 service is not transferred to Covington. City level coming soon wording and contracted or planned infrastructure remain separate from exact facility operation."
            },
            "source_read_scope": {
              "current_named_covington_coming_soon_listing_read": true,
              "atlanta_atl1_distinct_from_covington": true,
              "exact_hazelbrand_project_crosswalk_unverified": true,
              "private_enforcement_account_not_adopted_as_official_findings": true
            }
          },
          "notes": [
            "The current original Serverfarm locations page lists Covington Georgia as coming soon and separately describes its Atlanta ATL1 facility. The selected current city listing does not independently establish the exact Hazelbrand project identity, physical construction stage, commissioned computing, current tenant or the contents and disposition of a separate enforcement request. Atlanta ATL1 service is not transferred to Covington. City level coming soon wording and contracted or planned infrastructure remain separate from exact facility operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.serverfarmllc.com/data-centers/",
              "host": "www.serverfarmllc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Covington · Newton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    },
    {
      "id": "tpa-social-circle-technology-park-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Social Circle Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Social Circle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond. Not all fields, current operation, permits, exact parcel or critical IT independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4376",
          "host": "apps.dca.ga.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Access-check target"
        }
      ],
      "loc": {
        "lat": 33.52799,
        "lng": -83.84809,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The reviewed January 2025 news account links the TPA Newton County proposal to DRI 4376; other applications in the article are separate. The original DRI route was access-limited. A filed regional review is not final county approval or construction. This is a limited news-context review, without a new stage label."
            }
          },
          "notes": [
            "The reviewed January 2025 news account links the TPA Newton County proposal to DRI 4376; other applications in the article are separate. The original DRI route was access-limited. A filed regional review is not final county approval or construction. This is a limited news-context review, without a new stage label."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4376",
              "host": "apps.dca.ga.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            },
            {
              "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
              "host": "www.bisnow.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Social Circle · Newton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
