{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "13303",
    "label": "Washington County, Georgia"
  },
  "records": [
    {
      "id": "cleanspark-sandersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CleanSpark Sandersville Bitcoin Mining Facility",
      "group": "operating",
      "status": "Operator-reported mining operation",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Washington"
      ],
      "city": "Sandersville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 32.96963,
        "lng": -82.7959,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "lease_announcement": "2026-07-14",
            "initial_lease_years": 20,
            "optional_extensions_years": [
              5,
              5
            ],
            "expected_initial_term_revenue_usd": 6600000000,
            "expected_revenue_if_both_extensions_usd": 11600000000,
            "initial_operations_launch_year": 2022,
            "tenant": "Confidential global technology company, name unverified",
            "september_finance_update": "October9 issuer release reports Sandersville fully funded following notes financing.",
            "landlord_cost_scope": "Estimated10M to12M per criticalIT MW, not a disclosed total site cost."
          },
          "notes": [
            "Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "next-status-2026-10-19",
          "scope": "In its quarterly filing for June 30, 2026, CleanSpark reports continued bitcoin mining at its existing Sandersville site while describing a separate future AI campus on adjacent land.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_mining_operation",
              "scope": "In its quarterly filing for June 30, 2026, CleanSpark reports continued bitcoin mining at its existing Sandersville site while describing a separate future AI campus on adjacent land."
            }
          },
          "notes": [
            "The quarterly filing distinguishes the existing mining site from the new AI development. A future lease commencement and planned diversion of power are not current AI operation, closure or a completed conversion. The filing's time scope remains explicit; no physical event date or technical quantity is adopted."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sandersville · Washington · Source context reviewed",
      "status_scope": "In its quarterly filing for June 30, 2026, CleanSpark reports continued bitcoin mining at its existing Sandersville site while describing a separate future AI campus on adjacent land.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13303"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
