{
  "schema_version": 1,
  "source_compilation_context": {
    "id": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/id.json",
      "updated": "2026-10-23"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "16001",
    "label": "Ada County, Idaho"
  },
  "records": [
    {
      "id": "centeris-boise-bethel-court-id",
      "state": "id",
      "kind": "facility",
      "name": "Centeris Boise (former HP / DataSite data center)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Boise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Boise historical sale and occupancy readiness. 2011acquisition not2026opening/currenttenantproof. Building vacant since mid2008 does not establish current vacancy. Centeris operator crosswalk still needs currentcompany evidence. Undisclosed price not inferred from area. No numeric critical ITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://idahobusinessreview.com/?p=45117",
          "host": "idahobusinessreview.com",
          "date": "2011-06-03",
          "published": "2011-06-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.45098,
        "lng": -116.24127,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Boise historical sale and occupancy readiness",
          "fields": {
            "historical_facility": "former HewlettPackard BoiseDataCenter",
            "address": "9700 WestBethelCourt, Boise, Idaho",
            "reported_building_sqft": 60252,
            "purchaser": "BCC RPI Boise LLC, Benaroya and RealPropertyInvestors",
            "reported_historical_stage": "building ready for occupancy; no tenants announced June2,2011",
            "purchase_price": null
          },
          "notes": [
            "2011acquisition not2026opening/currenttenantproof. Building vacant since mid2008 does not establish current vacancy. Centeris operator crosswalk still needs currentcompany evidence. Undisclosed price not inferred from area. No numeric critical ITMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://idahobusinessreview.com/?p=45117",
              "host": "idahobusinessreview.com",
              "date": "2011-06-03",
              "published": "2011-06-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boise · Ada · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    },
    {
      "id": "diode-ventures-gemstone-kuna-id",
      "state": "id",
      "kind": "facility",
      "name": "Gemstone Technology Park",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Kuna",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. No operating status, MW or investment established by this page. Developer explicitly calls Gemstone a proposed620-acre site in early development. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.diodeventures.com/projects/kuna-idaho-usa",
          "host": "diodeventures.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.46917,
        "lng": -116.26112,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "project_status": "proposed, early development",
            "site_acres": 620,
            "city": "Kuna"
          },
          "notes": [
            "No operating status, MW or investment established by this page.",
            "Developer explicitly calls Gemstone a proposed620-acre site in early development.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.diodeventures.com/projects/kuna-idaho-usa",
              "host": "diodeventures.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 42",
          "scope": "Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_gemstone_early_development_proposal",
              "scope": "Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title."
            }
          },
          "notes": [
            "Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title.",
            "Identity, organization roles, locations, jurisdictions, quantities and physical opening fields stay unchanged. Source checks and prospective dates never establish an opening."
          ],
          "sources": [
            {
              "url": "https://www.diodeventures.com/projects/kuna-idaho-usa",
              "host": "www.diodeventures.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kuna · Ada · Source context reviewed",
      "status_scope": "Diode Ventures current project page explicitly names Gemstone Technology Park at Kuna and calls it a proposed data center site in early development. Company listed proposal records that current original project description. It does not establish a conditional use approval, construction start, delivered utility service, operating computers, final tenant or current property title.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    },
    {
      "id": "meta-kuna-id",
      "state": "id",
      "kind": "facility",
      "name": "Meta Kuna Data Center",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Kuna",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. Dakota Castets-Didier CBS2/IdahoNews original interviews publishedSeptember3,2026, updatedSeptember23 report Kuna facility OPEN/FULLYOPERATIONAL and serving Meta traffic. This is a newer reported operating milestone than earlier2025completion target, but not independent physical inspection or allfuturephasecompletion. Construction began2022; reported1.2Bcapital and750000+sf are company facility claims, not independently audited spend/gross survey. Closed-loop/virtually no water most of year and water-positive2030 are attributed technology claims/goals, not zero annual withdrawal or verified watershed restoration. Campus grid impact unclear in article: no exact IT MW. National poll percentages not independently checked/adopted. Broad1Bcommunityfund not Kuna-only capex. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified. Dated operator announcement that the Kuna data center is online and serving traffic. Operator-reported operation, not an independent October 15 inspection or certification that every planned expansion is complete. The timeline dates the announcement; it does not invent an exact physical energization date. Renewable-project MW, construction jobs and future water-reporting commitments are not current IT load or measured facility water use. Location precision stays approximate. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [
        [
          "2026-09-03",
          "Meta announced its Kuna data center online and serving traffic; this dates the announcement, not an independently observed energization."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive",
          "host": "idahonews.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
          "host": "datacenters.atmeta.com",
          "date": "2026-09-03",
          "published": "2026-09-03",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.41305,
        "lng": -116.23794,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "Dakota Castets-Didier CBS2/IdahoNews original interviews publishedSeptember3,2026, updatedSeptember23 report Kuna facility OPEN/FULLYOPERATIONAL and serving Meta traffic. This is a newer reported operating milestone than earlier2025completion target, but not independent physical inspection or allfuturephasecompletion. Construction began2022; reported1.2Bcapital and750000+sf are company facility claims, not independently audited spend/gross survey.",
            "Closed-loop/virtually no water most of year and water-positive2030 are attributed technology claims/goals, not zero annual withdrawal or verified watershed restoration. Campus grid impact unclear in article: no exact IT MW. National poll percentages not independently checked/adopted. Broad1Bcommunityfund not Kuna-only capex.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive",
              "host": "idahonews.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Dated operator announcement that the Kuna data center is online and serving traffic",
          "fields": {
            "current_status": "operating",
            "status_basis": "Meta explicitly announced this data center online and operational or serving traffic.",
            "status_as_of": "2026-09-03"
          },
          "notes": [
            "Operator-reported operation, not an independent October 15 inspection or certification that every planned expansion is complete. The timeline dates the announcement; it does not invent an exact physical energization date. Renewable-project MW, construction jobs and future water-reporting commitments are not current IT load or measured facility water use. Location precision stays approximate."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
              "host": "datacenters.atmeta.com",
              "date": "2026-09-03",
              "published": "2026-09-03",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "366aa0a27e1c057043472ecc59db9eeb911bd6db766c627662ed4b2a578ea10a",
          "events": [
            {
              "date": "2026-09-03",
              "kind": "announcement",
              "text": "Meta announced its Kuna data center online and serving traffic; this dates the announcement, not an independently observed energization.",
              "sources": [
                {
                  "url": "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
                  "host": "datacenters.atmeta.com",
                  "date": "2026-09-03",
                  "published": "2026-09-03",
                  "checked": "2026-10-15",
                  "date_kind": "publication",
                  "label": "Reviewed source"
                }
              ]
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 07, October 23, 2026",
          "scope": "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
              "host": "datacenters.atmeta.com",
              "published": "2026-09-03",
              "date": "2026-09-03",
              "checked": "2026-10-23",
              "label": "First party named facility source, PDF first page visually reviewed where supplied"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kuna · Ada · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-09-03",
          "kind": "announcement",
          "text": "Meta announced its Kuna data center online and serving traffic; this dates the announcement, not an independently observed energization.",
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
              "host": "datacenters.atmeta.com",
              "date": "2026-09-03",
              "published": "2026-09-03",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    },
    {
      "id": "rhea-data-blacks-creek-campus-ada-county-id",
      "state": "id",
      "kind": "facility",
      "name": "Rhea Data Blacks Creek Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Public-land proposal and future scoping are not a conveyance, environmental approval or operating campus. Potential solar supply, gas generation and existing Micron/Meta demand are separate from verified IT. No current permit, exact final footprint or tenant established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.boisestatepublicradio.org/politics-government/2026-09-21/idaho-data-center-blacks-creek-blm",
          "host": "boisestatepublicradio.org",
          "date": "2026-09-21",
          "published": "2026-09-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.48799,
        "lng": -116.2129,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Boise State Public Radio reports Rhea/Arevia interest in public parcels near Blacks Creek and possible gas generation, with BLM scoping hoped for by year-end.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Public-land proposal and future scoping are not a conveyance, environmental approval or operating campus. Potential solar supply, gas generation and existing Micron/Meta demand are separate from verified IT. No current permit, exact final footprint or tenant established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.boisestatepublicradio.org/politics-government/2026-09-21/idaho-data-center-blacks-creek-blm",
              "host": "boisestatepublicradio.org",
              "date": "2026-09-21",
              "published": "2026-09-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ada · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    },
    {
      "id": "valorc3-boise-2-id",
      "state": "id",
      "kind": "facility",
      "name": "ValorC3 Boise 2",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Boise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS. FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
          "host": "idahobusinessreview.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://valorc3.com/valorc3-boise-hyperscale-data-center-credit-facility/",
          "host": "valorc3.com",
          "published": "2026-04-29",
          "date": "2026-04-29",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://valorc3.com/valorc3-data-centers-announces-10mw-data-center-in-boise-idaho/",
          "host": "valorc3.com",
          "published": "2025-05-05",
          "date": "2025-05-05",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 43.4416,
        "lng": -116.2943,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS.",
            "FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
              "host": "idahobusinessreview.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator-reported_construction",
              "scope": "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction."
            }
          },
          "notes": [
            "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction."
          ],
          "sources": [
            {
              "url": "https://valorc3.com/valorc3-boise-hyperscale-data-center-credit-facility/",
              "host": "valorc3.com",
              "published": "2026-04-29",
              "date": "2026-04-29",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://valorc3.com/valorc3-data-centers-announces-10mw-data-center-in-boise-idaho/",
              "host": "valorc3.com",
              "published": "2025-05-05",
              "date": "2025-05-05",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boise · Ada · Source context reviewed",
      "status_scope": "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    },
    {
      "id": "valorc3-boise-emerald-id",
      "state": "id",
      "kind": "facility",
      "name": "ValorC3 Boise Data Center (former Fiberpipe)",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Boise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Critical, total facility, utility and PER UNIT backup ratings retain separate measures. They are not added together or inserted into legacy MW totals; technical as-of dates are unpublished.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS. FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
          "host": "idahobusinessreview.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://valorc3.com/boise-data-center/",
          "host": "valorc3.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf",
          "host": "valorc3.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 43.41867,
        "lng": -116.19047,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS.",
            "FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
              "host": "idahobusinessreview.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator-listed_service",
              "scope": "ValorC3 currently offers Boise Emerald services. Its specification distinguishes 1.15 MW critical capacity from 2 MW total facility power and separate substation ratings. Redundant generators are rated 2 MW PER UNIT with no count established. Web and PDF cooling tonnage differ, so neither is adopted; consistent hot/cold-aisle wording remains qualitative. No opening day, metered usage or exact point is inferred."
            }
          },
          "notes": [
            "ValorC3 currently offers Boise Emerald services. Its specification distinguishes 1.15 MW critical capacity from 2 MW total facility power and separate substation ratings. Redundant generators are rated 2 MW PER UNIT with no count established. Web and PDF cooling tonnage differ, so neither is adopted; consistent hot/cold-aisle wording remains qualitative. No opening day, metered usage or exact point is inferred."
          ],
          "sources": [
            {
              "url": "https://valorc3.com/boise-data-center/",
              "host": "valorc3.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf",
              "host": "valorc3.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boise · Ada · Source context reviewed",
      "status_scope": "ValorC3 currently offers Boise Emerald services. Its specification distinguishes 1.15 MW critical capacity from 2 MW total facility power and separate substation ratings. Redundant generators are rated 2 MW PER UNIT with no count established. Web and PDF cooling tonnage differ, so neither is adopted; consistent hot/cold-aisle wording remains qualitative. No opening day, metered usage or exact point is inferred.",
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 1.15,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "basis": "operator_reported_capacity",
          "scope": "Operator-listed critical capacity; not observed IT load, metered consumption, total facility power or substation capacity. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        },
        {
          "measure": "facility_gross_capacity",
          "value": 2,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "basis": "operator_reported_capacity",
          "scope": "Operator-listed total facility power; not critical IT capacity, metered demand or the separate substation ratings. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        },
        {
          "measure": "backup_generation",
          "value": 2,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "basis": "operator_reported_capacity",
          "scope": "Redundant generator rating PER UNIT. The source does not establish the number of units. Do not sum redundant units or interpret this as delivered generation, usable IT load, utility allocation or metered consumption. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        }
      ],
      "typed_water_facts": [
        {
          "measure": "cooling_type",
          "value": "Hot/cold-aisle airflow containment",
          "unit": null,
          "basis": "operator_reported_statement",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "scope": "Qualitative operator cooling description only; not measured consumption, withdrawal, zero water use or a full independently verified cooling plant. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
