{
  "schema_version": 1,
  "source_compilation_context": {
    "id": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/id.json",
      "updated": "2026-10-23"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "16005",
    "label": "Bannock County, Idaho"
  },
  "records": [
    {
      "id": "fbi-greywolf-pocatello-id",
      "state": "id",
      "kind": "facility",
      "name": "FBI Grey Wolf Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bannock"
      ],
      "city": "Pocatello",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. John OConnell, Idaho State Journal, November19,2019 original ribbon-cutting report identifies Pocatello Gray Wolf expansion; Monday ceremony implies November18 from report, not directly dated official minutes. Groundbreaking October2017 and roughly100M historical expansion distinguish construction start, ceremony and current operation. About300 existing staff and space for250 additional over2-5years are2019 conditions/forecasts, not550 current jobs.110 nationwide2014 facilities,100 phased out and ultimate three retained are FBI historical consolidation counts, not US data-center census. No IT MW or current occupancy established. Public main body read; no account access. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.idahostatejournal.com/news/local/fbi-cuts-ribbon-on-pocatello-addition/article_0ba8e3c8-5d0e-50a6-b2da-8b75cbf79530.html",
          "host": "idahostatejournal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 42.66861,
        "lng": -112.22446,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-original-proposals-and-pollutant-correction-round75-2026-10-15.json",
          "scope": "Named original operator, government announcement or original reported project context.",
          "fields": {},
          "notes": [
            "John OConnell, Idaho State Journal, November19,2019 original ribbon-cutting report identifies Pocatello Gray Wolf expansion; Monday ceremony implies November18 from report, not directly dated official minutes. Groundbreaking October2017 and roughly100M historical expansion distinguish construction start, ceremony and current operation.",
            "About300 existing staff and space for250 additional over2-5years are2019 conditions/forecasts, not550 current jobs.110 nationwide2014 facilities,100 phased out and ultimate three retained are FBI historical consolidation counts, not US data-center census. No IT MW or current occupancy established. Public main body read; no account access.",
            "Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.idahostatejournal.com/news/local/fbi-cuts-ribbon-on-pocatello-addition/article_0ba8e3c8-5d0e-50a6-b2da-8b75cbf79530.html",
              "host": "idahostatejournal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The November 2019 ribbon-cutting account supplies historical Gray Wolf project context, not October 2026 operating confirmation. Office and data-center floor areas remain separate, and historical staffing projections are not actual current jobs. A bounded primary-source search did not establish a current matching record; absence from search is not closure."
            }
          },
          "notes": [
            "The November 2019 ribbon-cutting account supplies historical Gray Wolf project context, not October 2026 operating confirmation. Office and data-center floor areas remain separate, and historical staffing projections are not actual current jobs. A bounded primary-source search did not establish a current matching record; absence from search is not closure."
          ],
          "sources": [
            {
              "url": "https://www.idahostatejournal.com/news/local/fbi-cuts-ribbon-on-pocatello-addition/article_0ba8e3c8-5d0e-50a6-b2da-8b75cbf79530.html",
              "host": "www.idahostatejournal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pocatello · Bannock · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16005"
      }
    },
    {
      "id": "lex-developments-pocatello-id",
      "state": "id",
      "kind": "facility",
      "name": "Lex Developments AI Data Center (former Hoku polysilicon site)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bannock"
      ],
      "city": "Pocatello",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Utility study and final scale unresolved in report. Property purchase is not facility construction expenditure. Current appeal outcome unverified. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-05-18",
          "The City published October 1 consent packet reports that the Hearing Examiner denied the Lex conditional use application May 18, 2026 and issued an amended denial May 19. This is the dated denial account, not a computing shutdown, a final court judgment or the exact signature day of the later draft Council instrument."
        ],
        [
          "2026-09-17",
          "The City October 1 consent packet reports that Council voted September 17, 2026 to affirm the application denial and separately waive the waiting period for a new application. The draft signature and date lines remain blank. This reported vote does not approve a replacement application, certify a final executed instrument or establish physical shutdown."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.idahostatejournal.com/news/local/pocatello-hearing-examiner-denies-hoku-site-data-center-permit-but-lex-developments-vows-return/article_c80a0e12-3fe8-4ed0-b755-89321377a95d.html",
          "host": "idahostatejournal.com",
          "date": "2026-05-18",
          "published": "2026-05-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://pocatello.gov/AgendaCenter/ViewFile/Item/5674?fileID=15373",
          "host": "pocatello.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://pocatello.gov/AgendaCenter/ViewFile/Agenda/_10012026-1953?html=true",
          "host": "pocatello.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://pda.pocatello.gov/documents/agendas/2026/052026.pdf",
          "host": "pda.pocatello.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 42.69448,
        "lng": -112.25271,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "conditional-use-denial-with-possible-return",
            "reported_finding": "Idaho State Journal reports hearing examiner denied Lex Hoku-site permit; applicant considered appeal or revised application.",
            "report_display_date": "2026-05-18",
            "independently_verified_current_status": null
          },
          "notes": [
            "Utility study and final scale unresolved in report. Property purchase is not facility construction expenditure. Current appeal outcome unverified.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.idahostatejournal.com/news/local/pocatello-hearing-examiner-denies-hoku-site-data-center-permit-but-lex-developments-vows-return/article_c80a0e12-3fe8-4ed0-b755-89321377a95d.html",
              "host": "idahostatejournal.com",
              "date": "2026-05-18",
              "published": "2026-05-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 42",
          "scope": "The City October 1 consent packet expressly identifies the Lex data center conditional use case. Its draft written decision reports the May 18 denial, the September 17 vote affirming denial and a separate vote waiving the waiting period for a new application. The signature and legal date lines are blank, so an October 1 final executed decision is not assumed from its agenda date. The earlier Development Authority agenda lists a requested utility study item as pulled, not an award. These procedural records do not establish current construction or operation, a permanent property ban, final court review or approval of a new application.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_packet_reports_prior_denials_and_reapplication_waiver_with_unsigned_final_instrument",
              "scope": "The City October 1 consent packet expressly identifies the Lex data center conditional use case. Its draft written decision reports the May 18 denial, the September 17 vote affirming denial and a separate vote waiving the waiting period for a new application. The signature and legal date lines are blank, so an October 1 final executed decision is not assumed from its agenda date. The earlier Development Authority agenda lists a requested utility study item as pulled, not an award. These procedural records do not establish current construction or operation, a permanent property ban, final court review or approval of a new application."
            },
            "source_read_scope": {
              "consent_pdf_text_pages": [
                9,
                10,
                11
              ],
              "consent_pdf_visual_pages": [
                10,
                11
              ],
              "unsigned_final_date_not_invented": true,
              "other_consent_items_not_adopted": true,
              "development_authority_item7_pulled_not_approved": true
            }
          },
          "notes": [
            "The City October 1 consent packet expressly identifies the Lex data center conditional use case. Its draft written decision reports the May 18 denial, the September 17 vote affirming denial and a separate vote waiving the waiting period for a new application. The signature and legal date lines are blank, so an October 1 final executed decision is not assumed from its agenda date. The earlier Development Authority agenda lists a requested utility study item as pulled, not an award. These procedural records do not establish current construction or operation, a permanent property ban, final court review or approval of a new application.",
            "Identity, organization roles, locations, jurisdictions, quantities and physical opening fields stay unchanged. Source checks and prospective dates never establish an opening."
          ],
          "sources": [
            {
              "url": "https://pocatello.gov/AgendaCenter/ViewFile/Item/5674?fileID=15373",
              "host": "pocatello.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://pocatello.gov/AgendaCenter/ViewFile/Agenda/_10012026-1953?html=true",
              "host": "pocatello.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://pda.pocatello.gov/documents/agendas/2026/052026.pdf",
              "host": "pda.pocatello.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pocatello · Bannock · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-05-18",
          "text": "The City published October 1 consent packet reports that the Hearing Examiner denied the Lex conditional use application May 18, 2026 and issued an amended denial May 19. This is the dated denial account, not a computing shutdown, a final court judgment or the exact signature day of the later draft Council instrument.",
          "kind": "denied",
          "sources": [
            {
              "url": "https://pocatello.gov/AgendaCenter/ViewFile/Item/5674?fileID=15373",
              "host": "pocatello.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-09-17",
          "text": "The City October 1 consent packet reports that Council voted September 17, 2026 to affirm the application denial and separately waive the waiting period for a new application. The draft signature and date lines remain blank. This reported vote does not approve a replacement application, certify a final executed instrument or establish physical shutdown.",
          "kind": "denied",
          "sources": [
            {
              "url": "https://pocatello.gov/AgendaCenter/ViewFile/Item/5674?fileID=15373",
              "host": "pocatello.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16005"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
