{
  "schema_version": 1,
  "source_compilation_context": {
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "17063",
    "label": "Grundy County, Illinois"
  },
  "records": [
    {
      "id": "aligned-coal-city-il",
      "state": "il",
      "kind": "facility",
      "name": "Aligned Coal City Campus",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grundy"
      ],
      "city": "Coal City",
      "address": "",
      "who": "Aligned Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CoalCity nonbinding inducement versus final TIF award. Original resolutions andredevelopmentagreementnotread; blog expressly saysinducementsnonbinding. Does notguaranteeTIFdistrict,extension,finalagreement orzoning.2Kconstructionand300permanentforecastsnotcurrentemployees.55to65dBnotexplicitAweighted,andatnearestresidencenotpropertyline; do notadoptcomplianceconclusion. No numericITMW or actualoperation.100Ktradefoundationdonationcorporateclaimnotadditionalcampsubsidy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city",
          "host": "hs.getobedio.com",
          "date": "2026-06-30",
          "published": "2026-06-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://aligneddc.com/coal-city-il-data-center/",
          "host": "aligneddc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.28528,
        "lng": -88.4185,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "CoalCity nonbinding inducement versus final TIF award",
          "fields": {
            "publisher_role": "Obedio land-use research/vendor blog",
            "project": "Aligned CoalCity, GrundyCounty, Illinois",
            "reported_site_acres_approx": 305,
            "reported_inducement_resolutions": [
              "26-09",
              "26-10"
            ],
            "reported_action_date": "2026-06-24",
            "reported_expected_construction_jobs_approx": 2000,
            "reported_expected_permanent_jobs_approx": 300,
            "reported_expected_water_gallons_per_day_approx": 41500
          },
          "notes": [
            "Original resolutions andredevelopmentagreementnotread; blog expressly saysinducementsnonbinding. Does notguaranteeTIFdistrict,extension,finalagreement orzoning.2Kconstructionand300permanentforecastsnotcurrentemployees.55to65dBnotexplicitAweighted,andatnearestresidencenotpropertyline; do notadoptcomplianceconclusion. No numericITMW or actualoperation.100Ktradefoundationdonationcorporateclaimnotadditionalcampsubsidy.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city",
              "host": "hs.getobedio.com",
              "date": "2026-06-30",
              "published": "2026-06-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 60",
          "scope": "The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_coal_city_proposal",
              "scope": "The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates."
            },
            "source_read_scope": {
              "original_complete_project_main_body_and_faq_read": true,
              "issuer_assurances_not_measured_performance": true,
              "separate_northlake_example_not_coalcity": true,
              "no_quantity_role_or_location_export": true
            }
          },
          "notes": [
            "The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/coal-city-il-data-center/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check46, October23,2026",
          "scope": "Aligned identifies its proposed Coal City campus in the main body of its own project page. Developer per source is the Aligned Data Centers provider brand for that stated proposal. Promised energy payments, design water use, noise control, jobs and tax benefits are attributed intentions, not measured or independently certified outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown.",
          "fields": {
            "company_association": {
              "name": "Aligned Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Aligned identifies its proposed Coal City campus in the main body of its own project page. Developer per source is the Aligned Data Centers provider brand for that stated proposal. Promised energy payments, design water use, noise control, jobs and tax benefits are attributed intentions, not measured or independently certified outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Aligned identifies its proposed Coal City campus in the main body of its own project page. Developer per source is the Aligned Data Centers provider brand for that stated proposal. Promised energy payments, design water use, noise control, jobs and tax benefits are attributed intentions, not measured or independently certified outcomes. The previously empty company field is populated only from this exact first party page. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Provider brand is distinct from a parent company, tenant and property owner. The source publication date is unknown."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/coal-city-il-data-center/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Coal City · Grundy · Source context reviewed",
      "status_scope": "The current original Aligned page expressly describes a proposed Coal City campus. This supports a listed proposal within the issuer account. Expected employment, tax benefits, prospective cooling and acoustic performance, industrywide energy cost assurances and a separate Northlake operating example are not measured Coal City outcomes, final permits or commissioned service. Founding dates and a staff biography are not exact project opening or announcement dates.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17063"
      }
    },
    {
      "id": "equinix-ch8-minooka-il",
      "state": "il",
      "kind": "facility",
      "name": "Equinix CH8 Minooka",
      "group": "building",
      "status": "Village reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grundy"
      ],
      "city": "Minooka",
      "address": "",
      "who": "Equinix",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Patch January23,2025, updatedMarch7, is a COMMUNITY CONTRIBUTION by village-trustee candidate Josh Stell, describing personal attendance at an Equinix proposal meeting. It is not Patch staff reporting, official minutes or a village endorsement. Limited original witness context supports an early Minooka proposal near Ridge Road between Holt and Wildy; it does not corroborate CH8 facility code. Approximately300acres, multi-billion-dollar investment, $20million annualtax and160-plus permanentjobs are contributor-reported proposal/forecast claims, not verified parcels, spending, receipts or jobs. No MW disclosed. No variance intention or promised communityfiber equals enacted conditions, executedservice or deliveredbenefit. Exact centroid pin remains unverified. Not full-field, exact parcel, currentoperations or independently audited numerical certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx",
          "host": "patch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.minooka.com/business-development/economic-development/transparency-portal/",
          "host": "www.minooka.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.minooka.com/news/posts/minooka-data-center-faq-and-fact-sheet/",
          "host": "www.minooka.com",
          "published": "2026-07-30",
          "date": "2026-07-30",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.29726,
        "lng": -88.43158,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json",
          "scope": "Named municipal/limited original-witness or operator context; dates and source origins explicit.",
          "fields": {},
          "notes": [
            "Patch January23,2025, updatedMarch7, is a COMMUNITY CONTRIBUTION by village-trustee candidate Josh Stell, describing personal attendance at an Equinix proposal meeting. It is not Patch staff reporting, official minutes or a village endorsement. Limited original witness context supports an early Minooka proposal near Ridge Road between Holt and Wildy; it does not corroborate CH8 facility code.",
            "Approximately300acres, multi-billion-dollar investment, $20million annualtax and160-plus permanentjobs are contributor-reported proposal/forecast claims, not verified parcels, spending, receipts or jobs. No MW disclosed. No variance intention or promised communityfiber equals enacted conditions, executedservice or deliveredbenefit. Exact centroid pin remains unverified.",
            "Not full-field, exact parcel, currentoperations or independently audited numerical certification."
          ],
          "sources": [
            {
              "url": "https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx",
              "host": "patch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 22",
          "scope": "Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_village_named_campus_construction_not_monitoring_result_or_operation",
              "scope": "Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane."
            }
          },
          "notes": [
            "Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.minooka.com/business-development/economic-development/transparency-portal/",
              "host": "www.minooka.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.minooka.com/news/posts/minooka-data-center-faq-and-fact-sheet/",
              "host": "www.minooka.com",
              "published": "2026-07-30",
              "date": "2026-07-30",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check23, October23,2026",
          "scope": "Government records identify the named project applicant or developer brand. Developer per source describes that filing relationship only. It does not establish the legal operator, legal property owner, independent environmental compliance, construction completion or current operation. No status, location, address, building code allocation, dates, quantities, tenant identity, permits or concerns are promoted. The Village of Minooka identifies the Equinix Data Center campus development at Ridge and Holt and separately describes the additional annexed area at Holt and Wabena. Its July 30,2026 fact sheet announcement names the approved Equinix development. This supports the Equinix development relationship for the campus only. The CH8 component code, exact footprint, commissioning and individual building allocation are not established here. Weekly air monitoring links and a sound study listing are not findings from those unread documents. No monitoring result, environmental assurance or physical stage is adopted.",
          "fields": {
            "company_association": {
              "name": "Equinix",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Government records identify the named project applicant or developer brand. Developer per source describes that filing relationship only. It does not establish the legal operator, legal property owner, independent environmental compliance, construction completion or current operation. No status, location, address, building code allocation, dates, quantities, tenant identity, permits or concerns are promoted. The Village of Minooka identifies the Equinix Data Center campus development at Ridge and Holt and separately describes the additional annexed area at Holt and Wabena. Its July 30,2026 fact sheet announcement names the approved Equinix development. This supports the Equinix development relationship for the campus only. The CH8 component code, exact footprint, commissioning and individual building allocation are not established here. Weekly air monitoring links and a sound study listing are not findings from those unread documents. No monitoring result, environmental assurance or physical stage is adopted."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Government records identify the named project applicant or developer brand. Developer per source describes that filing relationship only. It does not establish the legal operator, legal property owner, independent environmental compliance, construction completion or current operation. No status, location, address, building code allocation, dates, quantities, tenant identity, permits or concerns are promoted. The Village of Minooka identifies the Equinix Data Center campus development at Ridge and Holt and separately describes the additional annexed area at Holt and Wabena. Its July 30,2026 fact sheet announcement names the approved Equinix development. This supports the Equinix development relationship for the campus only. The CH8 component code, exact footprint, commissioning and individual building allocation are not established here. Weekly air monitoring links and a sound study listing are not findings from those unread documents. No monitoring result, environmental assurance or physical stage is adopted.",
            "Source retrieval dates remain separate from document publication and actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.minooka.com/business-development/economic-development/transparency-portal/",
              "host": "www.minooka.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Government project record, developer relationship reviewed"
            },
            {
              "url": "https://www.minooka.com/news/posts/minooka-data-center-faq-and-fact-sheet/",
              "host": "www.minooka.com",
              "published": "2026-07-30",
              "date": "2026-07-30",
              "checked": "2026-10-23",
              "label": "Government project record, developer relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Minooka · Grundy · Source context reviewed",
      "status_scope": "Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17063"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
