{
  "schema_version": 1,
  "source_compilation_context": {
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "17141",
    "label": "Ogle County, Illinois"
  },
  "records": [
    {
      "id": "midwest-power-investors-rochelle-il",
      "state": "il",
      "kind": "facility",
      "name": "Steward Drive Data Center (Rochelle)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ogle"
      ],
      "city": "Rochelle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Earlier zoning permission existed. Contract denial is not reversal of every zoning entitlement. 48 MW and possible 150 MW expansion are planned scales, not additive/current IT load. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.rockfordnewsfirst.com/2026/04/28/rochelle-city-council-unanimously-rejects-data-center-proposal/",
          "host": "rockfordnewsfirst.com",
          "date": "2026-04-27",
          "published": "2026-04-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.cityofrochelle.net/data-center-qa/",
          "host": "www.cityofrochelle.net",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 42.04259,
        "lng": -89.32072,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "development-contract-rejected",
            "reported_finding": "WIFR reports Rochelle council rejected Midwest Power Investors / LFF proposal 0-7 on April 27; Mayor asked council to vote contract down.",
            "report_display_date": "2026-04-27",
            "independently_verified_current_status": null
          },
          "notes": [
            "Earlier zoning permission existed. Contract denial is not reversal of every zoning entitlement. 48 MW and possible 150 MW expansion are planned scales, not additive/current IT load.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.rockfordnewsfirst.com/2026/04/28/rochelle-city-council-unanimously-rejects-data-center-proposal/",
              "host": "rockfordnewsfirst.com",
              "date": "2026-04-27",
              "published": "2026-04-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 60",
          "scope": "The original City question and answer page describes an unnamed proposed data center and prospective development agreement conditions, with additions explicitly dated October 28, 2025. It does not independently complete the exact Midwest Power Investors and Steward Drive crosswalk or verify the later Council disposition. The public meeting root was captured as navigation before a later explicit robots denial; no further meeting records were requested around that denial. Private April 27 denial coverage is not adopted as an original legal outcome or computing closure. The separately named existing Allstate and Northern Trust facilities are not this proposal, and the City resource and cost assurances are not measured operating outcomes or independently verified executed contractual terms.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "older_unnamed_city_proposal_exact_current_outcome_held",
              "scope": "The original City question and answer page describes an unnamed proposed data center and prospective development agreement conditions, with additions explicitly dated October 28, 2025. It does not independently complete the exact Midwest Power Investors and Steward Drive crosswalk or verify the later Council disposition. The public meeting root was captured as navigation before a later explicit robots denial; no further meeting records were requested around that denial. Private April 27 denial coverage is not adopted as an original legal outcome or computing closure. The separately named existing Allstate and Northern Trust facilities are not this proposal, and the City resource and cost assurances are not measured operating outcomes or independently verified executed contractual terms."
            },
            "source_read_scope": {
              "complete_original_city_question_and_answer_body_read": true,
              "older_added_qa_date_not_exact_first_publication": true,
              "meeting_host_robots_denial_respected": true,
              "separate_allstate_northerntrust_not_this_record": true,
              "no_private_denial_as_original_outcome": true,
              "no_quantity_role_or_location_export": true
            }
          },
          "notes": [
            "The original City question and answer page describes an unnamed proposed data center and prospective development agreement conditions, with additions explicitly dated October 28, 2025. It does not independently complete the exact Midwest Power Investors and Steward Drive crosswalk or verify the later Council disposition. The public meeting root was captured as navigation before a later explicit robots denial; no further meeting records were requested around that denial. Private April 27 denial coverage is not adopted as an original legal outcome or computing closure. The separately named existing Allstate and Northern Trust facilities are not this proposal, and the City resource and cost assurances are not measured operating outcomes or independently verified executed contractual terms.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.cityofrochelle.net/data-center-qa/",
              "host": "www.cityofrochelle.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rochelle · Ogle · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17141"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
