{
  "schema_version": 1,
  "source_compilation_context": {
    "il": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/il.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "17179",
    "label": "Tazewell County, Illinois"
  },
  "records": [
    {
      "id": "western-hospitality-partners-pekin-il",
      "state": "il",
      "kind": "facility",
      "name": "Lutticken Farm Data Center (Pekin)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tazewell"
      ],
      "city": "Pekin",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Legal end to proposed agreement expected at March 23 council meeting, not observed in March 9 article. Announcement distinct from executed termination or permanent ban. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nprillinois.org/illinois/2026-03-09/data-center-wont-be-built-in-pekin",
          "host": "nprillinois.org",
          "date": "2026-03-09",
          "published": "2026-03-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.ci.pekin.il.us/DocumentCenter/View/1031/Developer-Mitigation-Letter",
          "host": "www.ci.pekin.il.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 40.50753,
        "lng": -89.5134,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "mayoral-termination-announcement",
            "reported_finding": "WCBU reporting via NPR Illinois says Pekin mayor announced city would no longer consider Western Hospitality Partners proposal.",
            "report_display_date": "2026-03-09",
            "independently_verified_current_status": null
          },
          "notes": [
            "Legal end to proposed agreement expected at March 23 council meeting, not observed in March 9 article. Announcement distinct from executed termination or permanent ban.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nprillinois.org/illinois/2026-03-09/data-center-wont-be-built-in-pekin",
              "host": "nprillinois.org",
              "date": "2026-03-09",
              "published": "2026-03-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 60",
          "scope": "The original City hosted four page mitigation letter requests a developer response on water, acoustics, utilities, construction and other planning subjects. The letter addresses Pekin I Developer LLC and the selected body does not independently complete its crosswalk to the inherited Western Hospitality and Lutticken Farm record. No exact letter or publication day is verified. Requested studies, blank review checklist and typed representative closing are not an executed City ordinance, project cancellation, completed studies or computing service. The public meeting portal returned a shell without substantive records; private later contract termination coverage is not adopted as an original outcome.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_mitigation_request_exact_project_crosswalk_and_current_stage_held",
              "scope": "The original City hosted four page mitigation letter requests a developer response on water, acoustics, utilities, construction and other planning subjects. The letter addresses Pekin I Developer LLC and the selected body does not independently complete its crosswalk to the inherited Western Hospitality and Lutticken Farm record. No exact letter or publication day is verified. Requested studies, blank review checklist and typed representative closing are not an executed City ordinance, project cancellation, completed studies or computing service. The public meeting portal returned a shell without substantive records; private later contract termination coverage is not adopted as an original outcome."
            },
            "source_read_scope": {
              "all_four_original_city_hosted_letter_text_pages_read": true,
              "undated_letter_not_exact_event": true,
              "representative_requests_not_executed_ordinance": true,
              "blank_checklist_not_completed_review": true,
              "no_site_concern_assigned_without_crosswalk": true,
              "no_quantity_role_or_location_export": true
            }
          },
          "notes": [
            "The original City hosted four page mitigation letter requests a developer response on water, acoustics, utilities, construction and other planning subjects. The letter addresses Pekin I Developer LLC and the selected body does not independently complete its crosswalk to the inherited Western Hospitality and Lutticken Farm record. No exact letter or publication day is verified. Requested studies, blank review checklist and typed representative closing are not an executed City ordinance, project cancellation, completed studies or computing service. The public meeting portal returned a shell without substantive records; private later contract termination coverage is not adopted as an original outcome.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.ci.pekin.il.us/DocumentCenter/View/1031/Developer-Mitigation-Letter",
              "host": "www.ci.pekin.il.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pekin · Tazewell · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "17179"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
