{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18039",
    "label": "Elkhart County, Indiana"
  },
  "records": [
    {
      "id": "province-group-bristol-innovation-park-elkhart-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Bristol Innovation Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Elkhart"
      ],
      "city": "Bristol",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol",
          "host": "wvpe.org",
          "date": "2024-09-10",
          "published": "2024-09-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/bristolin-pubu/MEET-Minutes-28f69c956a6a48a6b51fe224e8835ce8.pdf",
          "host": "mccmeetings.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.bristolinnovationpark.com/",
          "host": "www.bristolinnovationpark.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.59742,
        "lng": -85.85875,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WVPE reports Province Group's Bristol proposal for an undisclosed tech company, with a favorable planning recommendation but a delayed town-council vote.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol",
              "host": "wvpe.org",
              "date": "2024-09-10",
              "published": "2024-09-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Both original May 19, 2026 work session minute pages describe the Bristol Innovation Park DPUD and proposed resident discussions. Selected original project portal sections display a withdrawal banner while retaining older filed and future hearing descriptions, two named landowner properties and no contingent owner or specific user. This mixed use rezoning account does not independently bind the exact older Province Group computing proposal or establish its present physical stage. Conflicting template dates are not silently repaired, and withdrawal of this rezoning is not computing closure. The original Town home robots request remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_bristol_dpud_context_older_computing_subject_and_current_stage_held",
              "scope": "Both original May 19, 2026 work session minute pages describe the Bristol Innovation Park DPUD and proposed resident discussions. Selected original project portal sections display a withdrawal banner while retaining older filed and future hearing descriptions, two named landowner properties and no contingent owner or specific user. This mixed use rezoning account does not independently bind the exact older Province Group computing proposal or establish its present physical stage. Conflicting template dates are not silently repaired, and withdrawal of this rezoning is not computing closure. The original Town home robots request remains held."
            },
            "source_read_scope": {
              "both_may19_original_minute_pages_text_read": true,
              "selected_original_project_portal_sections_read": true,
              "withdrawal_banner_and_stale_filed_fields_retained": true,
              "mixed_use_properties_not_forced_older_province_identity": true,
              "no_roles_locations_or_quantities_exported": true
            }
          },
          "notes": [
            "Both original May 19, 2026 work session minute pages describe the Bristol Innovation Park DPUD and proposed resident discussions. Selected original project portal sections display a withdrawal banner while retaining older filed and future hearing descriptions, two named landowner properties and no contingent owner or specific user. This mixed use rezoning account does not independently bind the exact older Province Group computing proposal or establish its present physical stage. Conflicting template dates are not silently repaired, and withdrawal of this rezoning is not computing closure. The original Town home robots request remains held.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/bristolin-pubu/MEET-Minutes-28f69c956a6a48a6b51fe224e8835ce8.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.bristolinnovationpark.com/",
              "host": "www.bristolinnovationpark.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bristol · Elkhart · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18039"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
