{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18049",
    "label": "Fulton County, Indiana"
  },
  "records": [
    {
      "id": "decennial-akron-fulton-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Decennial Group Akron Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Akron",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval. $100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation. No complete record/current operating status, signed instruments, measured impacts or all-field certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns",
          "host": "abc57.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349",
          "host": "www.co.fulton.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368",
          "host": "www.co.fulton.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Agenda/_10262026-415",
          "host": "www.co.fulton.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.04695,
        "lng": -86.26349,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json",
          "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.",
          "fields": {},
          "notes": [
            "ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval.",
            "$100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation.",
            "No complete record/current operating status, signed instruments, measured impacts or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns",
              "host": "abc57.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_decennial_exploratory_proposal",
              "scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation."
            },
            "source_read_scope": {
              "all12_original_feb10_scan_pages_actually_viewed": true,
              "decennial_accounts_on_pages6and7_read": true,
              "no_selected_site_signed_agreement_or_verified_power": true,
              "feb10_recommendation_not_commissioners_adoption": true,
              "march2_physical_page1_text_read_and_viewed": true,
              "oct26_complete_original_agenda_text_read_and_viewed": true,
              "private_resident_names_and_addresses_excluded": true
            }
          },
          "notes": [
            "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349",
              "host": "www.co.fulton.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368",
              "host": "www.co.fulton.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Agenda/_10262026-415",
              "host": "www.co.fulton.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Akron · Fulton · Source context reviewed",
      "status_scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18049"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
