{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18063",
    "label": "Hendricks County, Indiana"
  },
  "records": [
    {
      "id": "radiusdc-plainfield-hendricks-county-in",
      "state": "in",
      "kind": "facility",
      "name": "RadiusDC Plainfield Campus (Indy I / Indy II)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hendricks"
      ],
      "city": "Plainfield",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT. Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [
        [
          "2026-01-12",
          "RadiusDC announced its Indianapolis colocation development on January 12, 2026. The original issuer account distinguishes planned Indy I from future Indy II. The announcement does not establish accomplished construction, actual utility load or a computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.radius-dc.com/location/indianapolis",
          "host": "radius-dc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in",
          "host": "www.radius-dc.com",
          "published": "2026-01-12",
          "date": "2026-01-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.76952,
        "lng": -86.51,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT.",
            "Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://www.radius-dc.com/location/indianapolis",
              "host": "radius-dc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_radius_indianapolis_development_proposal",
              "scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls."
            },
            "source_read_scope": {
              "complete_original_announcement_platform_and_current_facility_bodies_read": true,
              "indy1_and_future_indy2_not_both_operating": true,
              "nashville_building_statement_not_indianapolis": true,
              "utility_in_service_specification_not_computing_service": true
            }
          },
          "notes": [
            "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in",
              "host": "www.radius-dc.com",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.radius-dc.com/location/indianapolis",
              "host": "www.radius-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Plainfield · Hendricks · Source context reviewed",
      "status_scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.",
      "event_evidence": [
        {
          "date": "2026-01-12",
          "text": "RadiusDC announced its Indianapolis colocation development on January 12, 2026. The original issuer account distinguishes planned Indy I from future Indy II. The announcement does not establish accomplished construction, actual utility load or a computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in",
              "host": "www.radius-dc.com",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18063"
      }
    },
    {
      "id": "vantage-pittsboro-in",
      "state": "in",
      "kind": "facility",
      "name": "Vantage Pittsboro Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hendricks"
      ],
      "city": "Pittsboro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county",
          "host": "insideindianabusiness.com",
          "date": "2025-02-07",
          "published": "2025-02-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.townofpittsboro.org/DocumentCenter/View/1168/2026-10-27-PC-Agenda_V3?bidId=",
          "host": "www.townofpittsboro.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.townofpittsboro.org/agendacenter",
          "host": "www.townofpittsboro.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.78044,
        "lng": -86.52192,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside INdiana Business publicly readable article describes Vantage’s 618-acre Pittsboro rezoning request, with about 285 acres intended for the data center and three buildings described as 256/96/48 MW.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county",
              "host": "insideindianabusiness.com",
              "date": "2025-02-07",
              "published": "2025-02-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_pittsboro_current_agenda_exact_vantage_stage_held",
              "scope": "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service."
            },
            "source_read_scope": {
              "complete_original_oct27_agenda4page_text_read": true,
              "old_staff_pdf_url_returned_html_custom404": true,
              "observed1167_self_redirect_stopped": true,
              "independent1168_original_pdf_read": true,
              "no_generic_landscape_concern_assigned_exact_vantage": true
            }
          },
          "notes": [
            "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.townofpittsboro.org/DocumentCenter/View/1168/2026-10-27-PC-Agenda_V3?bidId=",
              "host": "www.townofpittsboro.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.townofpittsboro.org/agendacenter",
              "host": "www.townofpittsboro.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pittsboro · Hendricks · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18063"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
