  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18073",
    "label": "Jasper County, Indiana"
  },
  "records": [
    {
      "id": "aws-wheatfield-in",
      "state": "in",
      "kind": "facility",
      "name": "AWS Wheatfield Campus (Project Rise)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jasper"
      ],
      "city": "Wheatfield",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context. $7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted. 304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes. No complete record/current operating status, signed instruments, measured impacts or all-field certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/",
          "host": "nwindianabusiness.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.jaspercountyin.gov/government/documents/meeting-documents/county-commissioners/2026-county-commissioners-meetings/2026-county-commissioners-meetings-minutes/617-05-18-2026-jasper-county-commissioners-special-meeting-minutes/file",
          "host": "www.jaspercountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.02309,
        "lng": -87.116,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json",
          "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.",
          "fields": {},
          "notes": [
            "Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context.",
            "$7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted.",
            "304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes.",
            "No complete record/current operating status, signed instruments, measured impacts or all-field certification."
          ],
          "sources": [
            {
              "url": "https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/",
              "host": "nwindianabusiness.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Jasper County May 18, 2026 special meeting minutes record tabling Amazon Data Services and NIPSCO agreements to the June 1 meeting while details were addressed. They do not record June 1 approval or crosswalk the agreement to the inherited Project Rise component. Wheatfield is separately mentioned in County auction business, which is not a site identity match. A later reported approval, a regional Amazon investment or the expiry of that schedule is not a current individual construction or operating fact. The component and phase remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_agreement_tabling_not_exact_wheatfield_component_or_later_approval",
              "scope": "Jasper County May 18, 2026 special meeting minutes record tabling Amazon Data Services and NIPSCO agreements to the June 1 meeting while details were addressed. They do not record June 1 approval or crosswalk the agreement to the inherited Project Rise component. Wheatfield is separately mentioned in County auction business, which is not a site identity match. A later reported approval, a regional Amazon investment or the expiry of that schedule is not a current individual construction or operating fact. The component and phase remain held."
            }
          },
          "notes": [
            "Jasper County May 18, 2026 special meeting minutes record tabling Amazon Data Services and NIPSCO agreements to the June 1 meeting while details were addressed. They do not record June 1 approval or crosswalk the agreement to the inherited Project Rise component. Wheatfield is separately mentioned in County auction business, which is not a site identity match. A later reported approval, a regional Amazon investment or the expiry of that schedule is not a current individual construction or operating fact. The component and phase remain held.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.jaspercountyin.gov/government/documents/meeting-documents/county-commissioners/2026-county-commissioners-meetings/2026-county-commissioners-meetings-minutes/617-05-18-2026-jasper-county-commissioners-special-meeting-minutes/file",
              "host": "www.jaspercountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wheatfield · Jasper · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18073"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}