{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18089",
    "label": "Lake County, Indiana"
  },
  "records": [
    {
      "id": "aws-hobart-in",
      "state": "in",
      "kind": "facility",
      "name": "AWS Hobart Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Hobart",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Northwest Indiana investment geography and Hobart announcement. 15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana",
          "host": "nwiforum.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.cityofhobart.org/AgendaCenter/ViewFile/Minutes/_03182026-2545",
          "host": "www.cityofhobart.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.41712,
        "lng": -87.38208,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Northwest Indiana investment geography and Hobart announcement",
          "fields": {
            "publisher_role": "Northwest Indiana regional economic-development organization",
            "regional_planned_aws_investment_usd": 15000000000,
            "regional_expected_new_jobs": 1100,
            "statewide_aws_planned_total_usd": 26000000000,
            "prior_st_joseph_county_commitment_usd": 11000000000,
            "hobart_agreement_announcement_date": "2025-11-25"
          },
          "notes": [
            "15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana",
              "host": "nwiforum.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "signed_city_discussion_and_current_notice_capture_holds_not_operating_phase",
              "scope": "Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear."
            },
            "source_scope": {
              "city_meeting_on": "2026-03-18",
              "all_four_signed_minutes_pages_visually_read": true,
              "public_comment_pages": [
                3,
                4
              ],
              "secondhand_medical_and_new_carlisle_claims_not_verified": true,
              "current_notice_route_failure_not_project_cancellation": true
            }
          },
          "notes": [
            "Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.cityofhobart.org/AgendaCenter/ViewFile/Minutes/_03182026-2545",
              "host": "www.cityofhobart.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hobart · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "coreweave-digital-crossroads-hammond-in",
      "state": "in",
      "kind": "facility",
      "name": "CoreWeave Digital Crossroads",
      "group": "stopped",
      "status": "Development agreement expired",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Hammond",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hammond official expiration of proposed development agreement. Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-01",
          "Hammond published its development agreement expiration notice on July 1, 2026, saying conditions for the proposed 301 Digital Crossroads project were not met by June 30 and no further extension of that agreement would be offered. This is the dated City notice, not an operating data center shutdown or the closure of an adjacent facility."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "host": "gohammond.com",
          "date": "2026-07-01",
          "published": "2026-07-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.42752,
        "lng": -87.39343,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Hammond official expiration of proposed development agreement",
          "fields": {
            "agency": "City of Hammond, Indiana",
            "announcement_date": "2026-07-01",
            "project_address": "301 Digital Crossroads",
            "agreement_parties": [
              "City of Hammond",
              "Hammond Redevelopment Commission",
              "Decennial Group",
              "CoreWeave"
            ],
            "development_agreement_expired_date": "2026-06-30",
            "previous_extensions": 2,
            "reason": "required milestones and obligations not satisfied",
            "city_position": "no additional extensions of the current agreement"
          },
          "notes": [
            "Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
              "host": "gohammond.com",
              "date": "2026-07-01",
              "published": "2026-07-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_proposed_development_agreement_expired_not_existing_facility_shutdown",
              "scope": "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed."
            }
          },
          "notes": [
            "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
              "host": "www.gohammond.com",
              "published": "2026-07-01",
              "date": "2026-07-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hammond · Lake · Source context reviewed",
      "status_scope": "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed.",
      "event_evidence": [
        {
          "date": "2026-07-01",
          "text": "Hammond published its development agreement expiration notice on July 1, 2026, saying conditions for the proposed 301 Digital Crossroads project were not met by June 30 and no further extension of that agreement would be offered. This is the dated City notice, not an operating data center shutdown or the closure of an adjacent facility.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
              "host": "www.gohammond.com",
              "published": "2026-07-01",
              "date": "2026-07-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "karis-critical-deep-river-merrillville-in",
      "state": "in",
      "kind": "facility",
      "name": "Karis Critical Deep River Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-09-10",
          "The original Merrillville Citizen Advisory Committee memorandum records that the Karis zoning ordinance was approved by the Town Council on September 10, 2024. This dates the reported zoning action without establishing final whole campus permission, a computing opening, current construction or utility authorization."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.39543,
        "lng": -87.38018,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_karis_advisory_and_later_general_pause_physical_stage_held",
              "scope": "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified."
            },
            "source_read_scope": {
              "complete3page_original_sept9_memorandum_text_read": true,
              "later_sept10_approval_parenthetical_not_meeting_day": true,
              "july14_physical_pages16and17_extension_actually_viewed": true,
              "noon_endpoint_not_midnight_or_prior_dec31suggestion": true,
              "old_town_term_and_later_minutes_distinct": true,
              "original_july2024_planminute_robots_disallow_retained": true
            }
          },
          "notes": [
            "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-09-10",
          "text": "The original Merrillville Citizen Advisory Committee memorandum records that the Karis zoning ordinance was approved by the Town Council on September 10, 2024. This dates the reported zoning action without establishing final whole campus permission, a computing opening, current construction or utility authorization.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "powerhouse-hobart-lake-county-in",
      "state": "in",
      "kind": "facility",
      "name": "PowerHouse Hobart",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Hobart",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW. DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
          "host": "powerhousedata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.43828,
        "lng": -87.36586,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW.",
            "DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "powerhousedata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."
            }
          },
          "notes": [
            "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hobart · Lake · Source context reviewed",
      "status_scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "project-shirley-eagle-creek-township-lake-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Project Shirley",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Eagle Creek Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/",
          "host": "latitudemedia.com",
          "date": "2026-05-01",
          "published": "2026-05-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://lakecountyin.gov/departments/council/meeting-minutes-c/2026/2026-04-14_meeting%20minutes.pdf",
          "host": "lakecountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.41176,
        "lng": -87.4124,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Latitude Media discusses Sentinel's proposed Eagle Creek Project Shirley and a postponed rezoning vote, saying no executed IURC service agreement had been filed at publication.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/",
              "host": "latitudemedia.com",
              "date": "2026-05-01",
              "published": "2026-05-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_project_shirley_proposal",
              "scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts."
            },
            "source_read_scope": {
              "original_april14_physical_page24_text_read": true,
              "no_open_house_occurrence_or_outcome_inferred": true,
              "unrelated_fiscal_audit_not_project_concern": true
            }
          },
          "notes": [
            "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://lakecountyin.gov/departments/council/meeting-minutes-c/2026/2026-04-14_meeting%20minutes.pdf",
              "host": "lakecountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Eagle Creek Township · Lake · Source context reviewed",
      "status_scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "province-group-merrillville-technology-park-in",
      "state": "in",
      "kind": "facility",
      "name": "Merrillville Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/huplrp0o/meeting-memo-11212024-data-center-committeee.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.39865,
        "lng": -87.35304,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_province_merrillville_proposal_history_and_general_pause_current_stage_held",
              "scope": "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition."
            },
            "source_read_scope": {
              "both_original_nov21_memorandum_text_pages_read": true,
              "blank_approval_and_execution_fields_retained": true,
              "weekday_header_conflict_not_repaired": true,
              "utility_study_and_special_exception_not_accomplished": true,
              "july14_extension_pages16and17_actually_viewed": true
            }
          },
          "notes": [
            "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/huplrp0o/meeting-memo-11212024-data-center-committeee.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "wylie-capital-broadway-merrillville-in",
      "state": "in",
      "kind": "facility",
      "name": "Wylie Capital Broadway Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/c1qpdrdq/11-20-24-meeting-memo-data-center-committeee.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.45354,
        "lng": -87.39187,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_wylie_proposal_history_and_general_pause_present_stage_held",
              "scope": "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results."
            },
            "source_read_scope": {
              "original_nov20_memorandum_selected_page1_read": true,
              "empty_original_provider_home_not_service_evidence": true,
              "july14_extension_pages16and17_actually_viewed": true,
              "no_current_site_specific_eligibility_or_stage_inferred": true
            }
          },
          "notes": [
            "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/c1qpdrdq/11-20-24-meeting-memo-data-center-committeee.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
