{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18127",
    "label": "Porter County, Indiana"
  },
  "records": [
    {
      "id": "agincourt-valparaiso-porter-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Agincourt Valparaiso Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Porter"
      ],
      "city": "Valparaiso",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valparaiso historical city-authored option statement. City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Valparaiso signed moratorium and trigger-based expiry. Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/",
          "host": "greatnews.life",
          "date": "2025-03-07",
          "published": "2025-03-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192",
          "host": "ci.valparaiso.in.us",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.ci.valparaiso.in.us/DocumentCenter/View/11025/04102025-RDC-Agenda-Packet",
          "host": "www.ci.valparaiso.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.ci.valparaiso.in.us/ArchiveCenter/ViewFile/Item/6192",
          "host": "www.ci.valparaiso.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.46084,
        "lng": -87.06747,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Valparaiso historical city-authored option statement",
          "fields": {
            "city_statement_date": "2025-03-07",
            "project_company": "Agincourt Investments LLC",
            "rdc_option_approval_date": "2025-01-09",
            "broader_city_owned_land_acres": 238,
            "optioned_acres_approx": 180,
            "initial_due_diligence_days": 180,
            "possible_additional_extension_days": 120,
            "initial_deposit_usd": 50000,
            "included_nonrefundable_usd": 10000,
            "deposit_increase_per30dayextension_usd": 25000,
            "offered_land_price_usd_min_exclusive": 9000000,
            "statement_stage": "no pending data-center design/application asof statement"
          },
          "notes": [
            "City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/",
              "host": "greatnews.life",
              "date": "2025-03-07",
              "published": "2025-03-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Valparaiso signed moratorium and trigger-based expiry",
          "fields": {
            "agency": "CityofValparaiso, Indiana",
            "ordinance": "16-2026",
            "adopted_date": "2026-08-10",
            "vote": "6-0",
            "mayor_signed_date": "2026-08-10",
            "mayor_signed_time_local": "19:55",
            "scope": "no approval of new data-center establishment or new land-use approvals/permits",
            "exceptions": [
              "existing lawful uses",
              "routine maintenance, repair or renovation",
              "development with established vested rights"
            ],
            "expiry_trigger": "effective date of UDO amendments governing data-center development, unless repealed or extended",
            "fixed_expiry_date": null
          },
          "notes": [
            "Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192",
              "host": "ci.valparaiso.in.us",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Valparaiso April 10, 2025 agenda packet contains March 13 draft Redevelopment Commission minutes marked subject to approval. The draft records a unanimous motion to terminate the Agincourt option and release escrow and says the City had not approved a data center project. This is a draft account, not an independently captured executed termination or final approved minutes. The separate signed August 10, 2026 City moratorium has its own exceptions and conditional expiry; it does not cause the earlier reported withdrawal or apply across all Porter County. Current physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "draft_option_termination_account_and_later_city_rule_not_physical_closure",
              "scope": "Valparaiso April 10, 2025 agenda packet contains March 13 draft Redevelopment Commission minutes marked subject to approval. The draft records a unanimous motion to terminate the Agincourt option and release escrow and says the City had not approved a data center project. This is a draft account, not an independently captured executed termination or final approved minutes. The separate signed August 10, 2026 City moratorium has its own exceptions and conditional expiry; it does not cause the earlier reported withdrawal or apply across all Porter County. Current physical stage remains unclear."
            },
            "source_scope": {
              "rdc_meeting_on": "2025-03-13",
              "packet_meeting_on": "2025-04-10",
              "draft_minutes_marked_subject_to_approval": true,
              "rdc_relevant_pdf_pages_read": [
                2,
                3,
                4
              ],
              "separate_city_moratorium_adopted_on": "2026-08-10",
              "both_signed_moratorium_pages_visually_read": true,
              "later_udo_changes_and_individual_vested_rights_not_audited": true,
              "mayor_statement_capture_self_redirect_held": true
            }
          },
          "notes": [
            "Valparaiso April 10, 2025 agenda packet contains March 13 draft Redevelopment Commission minutes marked subject to approval. The draft records a unanimous motion to terminate the Agincourt option and release escrow and says the City had not approved a data center project. This is a draft account, not an independently captured executed termination or final approved minutes. The separate signed August 10, 2026 City moratorium has its own exceptions and conditional expiry; it does not cause the earlier reported withdrawal or apply across all Porter County. Current physical stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.ci.valparaiso.in.us/DocumentCenter/View/11025/04102025-RDC-Agenda-Packet",
              "host": "www.ci.valparaiso.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.ci.valparaiso.in.us/ArchiveCenter/ViewFile/Item/6192",
              "host": "www.ci.valparaiso.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Valparaiso · Porter · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18127"
      }
    },
    {
      "id": "aws-portage-in",
      "state": "in",
      "kind": "facility",
      "name": "AWS Portage Data Center (AmeriPlex at the Port)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Porter"
      ],
      "city": "Portage",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage",
          "host": "insideindianabusiness.com",
          "date": "2023-12-20",
          "published": "2023-12-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.47073,
        "lng": -87.07827,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Inside INdiana Business, citing Times of Northwest Indiana, reports Portage AWS project and proposed tax treatment.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage",
              "host": "insideindianabusiness.com",
              "date": "2023-12-20",
              "published": "2023-12-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Portage · Porter · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18127"
      }
    },
    {
      "id": "provident-chesterton-porter-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Provident Chesterton Data Center Campus (former Brassie Golf Club)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Porter"
      ],
      "city": "Chesterton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses. This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread. Not full-field, exact parcel, currentoperations or independently audited numerical certification.",
      "date": "",
      "events": [
        [
          "2024-06-10",
          "Chesterton Council reported the named Provident and Brassie parties withdrawal of PUD and annexation petitions at its June 10, 2024 meeting. This dates the official Council account rather than an inferred letter day, permanent ban or physical computing closure."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
          "host": "chestertonin.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.44021,
        "lng": -87.06566,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json",
          "scope": "Named municipal/limited original-witness or operator context; dates and source origins explicit.",
          "fields": {},
          "notes": [
            "Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses.",
            "This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread.",
            "Not full-field, exact parcel, currentoperations or independently audited numerical certification."
          ],
          "sources": [
            {
              "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
              "host": "chestertonin.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete six page original June 10, 2024 Council minute text records counsel for the named Provident and Brassie parties reporting withdrawal of PUD and annexation petitions. This is a documented proposal withdrawal account rather than physical computing closure or present site use. The exact letter day is not inferred from a separate reference to a June 7 press release. The withdrawal is not a general Town ban, and present ownership, new applications and current physical stage remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_provident_brassie_petition_withdrawal_account_current_physical_stage_held",
              "scope": "The complete six page original June 10, 2024 Council minute text records counsel for the named Provident and Brassie parties reporting withdrawal of PUD and annexation petitions. This is a documented proposal withdrawal account rather than physical computing closure or present site use. The exact letter day is not inferred from a separate reference to a June 7 press release. The withdrawal is not a general Town ban, and present ownership, new applications and current physical stage remain unverified."
            },
            "source_read_scope": {
              "complete6page_original_minute_text_read": true,
              "original_selected_pages1and2_rendered": true,
              "withdrawal_account_not_computing_closure": true,
              "no_exact_letter_day_inferred": true
            }
          },
          "notes": [
            "The complete six page original June 10, 2024 Council minute text records counsel for the named Provident and Brassie parties reporting withdrawal of PUD and annexation petitions. This is a documented proposal withdrawal account rather than physical computing closure or present site use. The exact letter day is not inferred from a separate reference to a June 7 press release. The withdrawal is not a general Town ban, and present ownership, new applications and current physical stage remain unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
              "host": "www.chestertonin.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Chesterton · Porter · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-06-10",
          "text": "Chesterton Council reported the named Provident and Brassie parties withdrawal of PUD and annexation petitions at its June 10, 2024 meeting. This dates the official Council account rather than an inferred letter day, permanent ban or physical computing closure.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
              "host": "www.chestertonin.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18127"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
