{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18129",
    "label": "Posey County, Indiana"
  },
  "records": [
    {
      "id": "posey-county-boberg-road-data-center-in",
      "state": "in",
      "kind": "facility",
      "name": "Posey County Boberg Road Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Posey"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/",
          "host": "14news.com",
          "date": "2026-08-04",
          "published": "2026-08-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/08/Commissioners-August-4-2026.pdf",
          "host": "www.poseycountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-August-18-2026.pdf",
          "host": "www.poseycountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-Special-Meeting-August-27-2026.pdf",
          "host": "www.poseycountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.02192,
        "lng": -87.86865,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "commissioner-intention-not-recorded-vote",
            "reported_finding": "WFIE body says commissioners would vote no on Boberg/Hoenert proposal, yet also says no official proposal received and meeting adjourned after comment.",
            "report_display_date": "2026-08-04",
            "independently_verified_current_status": null
          },
          "notes": [
            "Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/",
              "host": "14news.com",
              "date": "2026-08-04",
              "published": "2026-08-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Posey signed August 4, 2026 Board minutes say no rezoning or project request had been brought before that Board. Commissioners stated opposition to a possible Boberg Road rezoning and preferred agricultural use. Those prospective statements are not an actual vote denying a submitted project. The August 18 minutes approve the August 4 minutes and record further requests for a moratorium, not its adoption. Neither requests nor an advertised ordinance discussion establish an enacted rule, current physical construction, operating service or a final countywide project outcome.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "prospective_boberg_opposition_not_formal_denial_or_adopted_moratorium",
              "scope": "Posey signed August 4, 2026 Board minutes say no rezoning or project request had been brought before that Board. Commissioners stated opposition to a possible Boberg Road rezoning and preferred agricultural use. Those prospective statements are not an actual vote denying a submitted project. The August 18 minutes approve the August 4 minutes and record further requests for a moratorium, not its adoption. Neither requests nor an advertised ordinance discussion establish an enacted rule, current physical construction, operating service or a final countywide project outcome."
            },
            "source_scope": {
              "board_meeting_on": "2026-08-04",
              "later_minutes_approval_on": "2026-08-18",
              "all_eight_august_minutes_pages_visually_read": true,
              "no_request_before_board_not_no_application_anywhere": true,
              "would_vote_no_not_denial_vote": true,
              "public_requests_for_moratorium_not_ordinance_adoption": true,
              "no_later_disposition_or_complete_policy_audit": true
            }
          },
          "notes": [
            "Posey signed August 4, 2026 Board minutes say no rezoning or project request had been brought before that Board. Commissioners stated opposition to a possible Boberg Road rezoning and preferred agricultural use. Those prospective statements are not an actual vote denying a submitted project. The August 18 minutes approve the August 4 minutes and record further requests for a moratorium, not its adoption. Neither requests nor an advertised ordinance discussion establish an enacted rule, current physical construction, operating service or a final countywide project outcome.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/08/Commissioners-August-4-2026.pdf",
              "host": "www.poseycountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-August-18-2026.pdf",
              "host": "www.poseycountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-Special-Meeting-August-27-2026.pdf",
              "host": "www.poseycountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Posey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18129"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
