  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18141",
    "label": "St. Joseph County, Indiana"
  },
  "records": [
    {
      "id": "amazon-project-rainier-new-carlisle-in",
      "state": "in",
      "kind": "facility",
      "name": "Amazon Project Rainier",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Joseph"
      ],
      "city": "New Carlisle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "host": "iedc.in.gov",
          "date": "2024-04-25",
          "published": "2024-04-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster?trk=test",
          "host": "www.aboutamazon.com",
          "published": "2025-06-24",
          "date": "2025-06-24",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.61663,
        "lng": -86.28996,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "county": "St. Joseph",
            "announced_planned_investment_usd": 11000000000,
            "forecast_jobs_minimum": 1000,
            "announced_sales_tax_exemption_term_years": 50,
            "performance_based_incentive_caps_usd": {
              "headcount_tax_credits": 18300000,
              "training_grants": 5000000,
              "hoosier_business_investment_credits": 55000000,
              "redevelopment_credits": 20000000
            },
            "road_infrastructure_contribution_usd_up_to": 7000000
          },
          "notes": [
            "Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
              "host": "iedc.in.gov",
              "date": "2024-04-25",
              "published": "2024-04-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operational_multi_site_compute_cluster_not_complete_new_carlisle_campus",
              "scope": "Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held."
            },
            "source_version_scope": {
              "article_published_at": "2025-06-24T09:40:35.203Z",
              "article_modified_at": "2025-10-29T11:00:00Z",
              "current_wording_not_backdated_to_original_publication": true,
              "multi_site_cluster_capacity_not_local_capacity": true,
              "no_individual_building_phase_or_provider_role_change": true
            }
          },
          "notes": [
            "Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster?trk=test",
              "host": "www.aboutamazon.com",
              "published": "2025-06-24",
              "date": "2025-06-24",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
              "host": "iedc.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Carlisle · St. Joseph · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18141"
      }
    },
    {
      "id": "microsoft-granger-in",
      "state": "in",
      "kind": "facility",
      "name": "Microsoft Granger Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Joseph"
      ],
      "city": "Granger",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting",
          "host": "wvpe.org",
          "date": "2026-02-19",
          "published": "2026-02-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/st-joseph-county-public-meeting-recap/",
          "host": "local.microsoft.com",
          "published": "2026-05-20",
          "date": "2026-05-20",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://mishawaka.in.gov/news/city-of-mishawaka-and-regional-partners-sign-mou-to-support-water-sewer-service-and-wastewater-expansion/",
          "host": "mishawaka.in.gov",
          "published": "2025-08-26",
          "date": "2025-08-26",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.62769,
        "lng": -86.30205,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WVPE reports a Granger community panel on Microsoft's proposed campus and a county official still negotiating a development agreement under an NDA.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting",
              "host": "wvpe.org",
              "date": "2026-02-19",
              "published": "2026-02-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "primary_concept_and_regional_utility_planning_not_current_site_stage",
              "scope": "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode."
            },
            "scope_limits": {
              "operator_meeting_on": "2026-05-19",
              "city_regional_mou_release_on": "2025-08-26",
              "mou_not_built_utility_service": true,
              "laporte_not_granger": true,
              "existing_concern_item_not_duplicated": true
            }
          },
          "notes": [
            "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/st-joseph-county-public-meeting-recap/",
              "host": "local.microsoft.com",
              "published": "2026-05-20",
              "date": "2026-05-20",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://mishawaka.in.gov/news/city-of-mishawaka-and-regional-partners-sign-mou-to-support-water-sewer-service-and-wastewater-expansion/",
              "host": "mishawaka.in.gov",
              "published": "2025-08-26",
              "date": "2025-08-26",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Granger · St. Joseph · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18141"
      }
    },
    {
      "id": "new-carlisle-chicago-trail-data-center-st-joseph-county-in",
      "state": "in",
      "kind": "facility",
      "name": "New Carlisle Chicago Trail Data Center",
      "group": "stopped",
      "status": "Reported rezoning denial",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Joseph"
      ],
      "city": "New Carlisle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle",
          "host": "wvpe.org",
          "date": "2025-12-10",
          "published": "2025-12-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.59354,
        "lng": -86.28794,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "rezoning-denied",
            "reported_finding": "WVPE reports St Joseph County Council rejected rezoning needed for Chicago Trail proposal near New Carlisle after overnight meeting.",
            "report_display_date": "2025-12-10",
            "independently_verified_current_status": null
          },
          "notes": [
            "A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle",
              "host": "wvpe.org",
              "date": "2025-12-10",
              "published": "2025-12-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-F1-label-review-2026-10-20",
          "scope": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
          "fields": {
            "identity_label_context": {
              "previous_name": "New Carlisle Chicago Trail Data Center (rezoning denied)",
              "plain_name": "New Carlisle Chicago Trail Data Center",
              "interpretation": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
              "outcome_wording_is_not_identity": true
            },
            "current_stage_evidence": {
              "outcome": "reported_rezoning_denial",
              "scope": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure."
            }
          },
          "notes": [
            "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
            "Inherited inventory name: New Carlisle Chicago Trail Data Center (rezoning denied). The wording is retained as provenance, not as an independently verified outcome.",
            "An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle",
              "host": "www.wvpe.org",
              "published": "2025-12-10",
              "date": "2025-12-10",
              "checked": "2026-10-20",
              "label": "WVPE"
            }
          ],
          "checked": "2026-10-20",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Carlisle · St. Joseph · Source context reviewed",
      "status_scope": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18141"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}