{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "18181",
    "label": "White County, Indiana"
  },
  "records": [
    {
      "id": "blue-ladder-wolcott-white-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Wolcott Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "White"
      ],
      "city": "Wolcott",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wolcott developer concept and conflicting buildout timing. Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wolcottdatacenter.com/",
          "host": "wolcottdatacenter.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.74982,
        "lng": -86.86526,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Wolcott developer concept and conflicting buildout timing",
          "fields": {
            "project_name": "Wolcott Data Center",
            "county": "White County, Indiana",
            "proposed_campus_acres": 322,
            "planned_data_center_buildings": 4,
            "planned_each_data_building_footprint_sqft": 327612,
            "planned_office_sqft": 50000,
            "planned_warehouse_sqft": 100000,
            "expected_construction_jobs_approx": 1000,
            "developer_community_enhancement_commitment_usd": 35000000,
            "developer_claims_no_incentives_sought": true,
            "full_buildout_year_conflict": [
              2029,
              2030
            ]
          },
          "notes": [
            "Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wolcottdatacenter.com/",
              "host": "wolcottdatacenter.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_wolcott_project_portal_proposal",
              "scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes."
            },
            "source_read_scope": {
              "complete_original_project_portal_text_body_read": true,
              "illustrative_concept_and_final_engineering_limits_retained": true,
              "year2029_prose_and2030_chart_years_not_accomplished": true,
              "no_benefit_quantity_role_or_location_export": true
            }
          },
          "notes": [
            "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.wolcottdatacenter.com/",
              "host": "www.wolcottdatacenter.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wolcott · White · Source context reviewed",
      "status_scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18181"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
